Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “REMEDIATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,423 records · Page 79

Interim Measure Report Revision 0: Un-Numbered Operational Areas PRL 229

This report documents the Interim Measure (IM) completed at Un-Numbered Operational Areas (UNOA) potential release location (PRL) 229, at Kennedy Space Center (KSC), Florida. This document has been prepared for the National Aeronautics and Space Administration (NASA), in accordance with HydroGeoLogic, Inc.’s (HGL) Contract 80KSC019D0012, Task Order 80KSC019F0224. The purpose of this IM report is to document the field results of the 2022 IM conducted between December 13, 2021, and February 11, 2022, and to present the recommendations based on the IM findings. IM activities were completed at the UNOA PRL 229 to remove railroad ties and benzo(a)pyrene equivalent (BAPE)/total recoverable petroleum hydrocarbons (TRPH)-affected soil in accordance with the IM Work Plan (IMWP) (Jacobs/CORE, 2019a). The objectives of the IM were to mitigate human health risks by reducing site contaminants to the residential soil cleanup target level (SCTL) based on the 95 percent upper confidence limit on the mean. A second objective was to reduce low molecular weight and high molecular weight polynuclear aromatic hydrocarbon (PAH) concentrations below ecological screening values for terrestrial receptors. Prior to excavation operations, railroad ties from all areas were consolidated. In total, 50.67 tons of railroad ties were transported from the site to JED Landfill in St. Cloud, Florida. The cumulative excavation footprint spanned an area of 9,710 square ft. In total, 908.54 tons of soil was transported from the site to JED Landfill. To backfill the excavation area, 880 cubic yards of clean fill was trucked to the site from S&LMaterials, Inc. borrow pit in Christmas, Florida. Following completion of backfill, the site restoration activities included grading the disturbed areas to match the existing elevations and vegetation planting by the site restoration subcontractor. The IM implementation activities were presented to the KSC Remediation Team during its meeting on May 3, 2022. The Remediation Team reached consensus on the completion of the IM reducing the area affected by BAPE/TRPH above the State of Florida residential soil cleanup target levels.

PAHs↗

Launch Complex 34 SWMU CC054 Hot Spot Area 6 Expansion - Phase Three Implementation Work Plan

This Hot Spot (HS) Area 6 Air Sparge Expansion – Phase Three Implementation Work Plan (IWP) was prepared by Tetra Tech, Inc., for the National Aeronautics and Space Administration (NASA) under the Indefinite Delivery Indefinite Quantity Contract 80KSC019D0011-80KSC019F0067, for the implementation of an Air Sparging (AS) Interim Measure (IM) at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. LC34 has been designated as Solid Waste Management Unit (SWMU) CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act (RCRA) operating permit. Expansion of the HS 6 IM will include installation of an additional 192 AS wells to depths of approximately 40 feet below land surface (bls) to remediate contaminated groundwater within two areas located west and northeast of the existing HS 6 AS treatment area. These areas were delineated via direct push technology investigations in September and October 2023. The expansion will target “hot spot” concentrations of cis-1,2-dichloroethene (cDCE) and vinyl chloride (VC), which are the contaminants of concern in these areas with concentrations greater than 10-times Florida Department of Environmental Protection Natural Attenuation Default Concentrations. The highest cDCE and VC concentrations detected in the proposed phase three expansion area were 58,000 micrograms per liter (μg/L) (32 to 36 feet bls) and 12,000 μg/L (23 to 27 feet bls), respectively. The objective for this expansion is to remediate contaminated groundwater within the treatment zone to support transition to long-term monitoring. This phase three expansion will add an additional 9.4 acres of treatment area to the HS 6 IM, which currently covers approximately 26.9 acres.

Launch Complex 34↗

Long-Term Biological Monitoring of an Impaired Stream: Implications for Environmental Management [Special Issue]

The long-term ecological recovery of an impaired stream in response to an industrial facility's pollution abatement actions and the implications of the biological monitoring effort to environmental management is the subject of this special issue of Environmental Management. This final article focuses on the synthesis of the biological monitoring program's components and methods, the efficacy of various biological monitoring techniques to environmental management, and the lessons learned from the program that might be applicable to the design and application of other programs. The focus of the 25-year program has been on East Fork Poplar Creek, an ecologically impaired stream in Oak Ridge, Tennessee with varied and complex stressors from a Department of Energy facility in its headwaters. Major components of the long-term program included testing and monitoring of invertebrate and fish toxicity, bioindicators of fish health, fish contaminant accumulation, and instream communities (including periphyton, benthic macroinvertebrate, and fish). Key parallel components of the program include water chemistry sampling and data management. Multiple lines of evidence suggested positive ecological responses during three major pollution abatement periods. Based on this case study and the related literature, effective environmental management of impaired streams starts with program design that is consistent across space and time, but also adaptable to changing conditions. The biological monitoring approaches used for the program provided a strong basis for assessments of recovery from remedial actions, and the likely causes of impairment. This case study provides a unique application of multidisciplinary and quantitative techniques to address multiple and complex regulatory and programmatic goals, environmental stressors, and remedial actions.

54 ENVIRONMENTAL SCIENCES↗

LONG-TERM STEWARDSHIP AT DOE HANFORD SITE - 12575

The U.S. Department of Energy's (DOE) Hanford Site is located in southeast Washington and consists of 1,518 square kilometers (586 square miles) of land. Established in 1943 as part of the Manhattan Project, Hanford workers produced plutonium for our nation's nuclear defense program until the mid 1980's. Since then, the site has been in cleanup mode that is being accomplished in phases. As we achieve remedial objectives and complete active cleanup, DOE will manage Hanford land under the Long-Term Stewardship (LTS) Program until completion of cleanup and the site becomes ready for transfer to the post cleanup landlord - currently planned for DOE's Office of Legacy Management (LM). We define Hanford's LTS Program in the ''Hanford Long-Term Stewardship Program Plan,'' (DOE/RL-201 0-35)[1], which describes the scope including the relationship between the cleanup projects and the LTS Program. DOE designed the LTS Program to manage and provide surveillance and maintenance (S&M) of institutional controls and associated monitoring of closed waste sites to ensure the protection of human health and the environment. DOE's Richland Operations Office (DOE-RL) and Hanford cleanup and operations contractors collaboratively developed this program over several years. The program's scope also includes 15 key activities that are identified in the DOE Program Plan (DOE/RL-2010-35). The LTS Program will transition 14 land segments through 2016. The combined land mass is approximately 570 square kilometers (220 square miles), with over 1,300 active and inactive waste sites and 3,363 wells. Land segments vary from buffer zone property with no known contamination to cocooned reactor buildings, demolished support facilities, and remediated cribs and trenches. DOE-RL will transition land management responsibilities from cleanup contractors to the Mission Support Contract (MSC), who will then administer the LTS Program for DOE-RL. This process requires an environment of cooperation between the contractors and DOE-RL. Information Management (IM) is a key part of the LTS program. The IM Program identifies, locates, stores, protects and makes accessible Hanford LTS records and data to support the transfer of property ultimately to LM. As such, DOE-RL manages the Hanford LTS Program in a manner consistent with LM's goals, policies, and procedures.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

In-Situ Generation of Iron-Chromium Precipitates for Long Term Immobilization of Chromium at the Hanford Site (Final Scientific/Technical Report)

Hexavalent chromium (Cr(VI)) is a toxic ground water contaminant widespread at the Hanford site and many other industrial facilities. A common remediation method for Cr(VI) is in situ reduction/immobilization, in which soluble Cr(VI) is reduced to the less soluble trivalent Cr (Cr(III)). If iron (Fe) minerals are present during the process, Cr(III) precipitates as a mixed Fe(III)-Cr(III) (Fe-Cr) solid. The objective of this exploratory research was to obtain preliminary evidence about the relationships among the method of Cr(VI) reduction (i.e., abiotic or microbial), the properties of the resulting Fe-Cr precipitates, and their tendencies to release soluble Cr(VI) in the presence of the common manganese oxide birnessite. The results of this exploratory research project show that the conditions of Cr(VI) reduction—specifically the ratio of Cr to Fe, and/or whether the Cr(VI) reductant is a mineral or a microorganism—can significantly affect the tendency of the resulting Fe-Cr precipitate to release Cr(VI) to the environment in the presence of birnessite. These results suggest the chosen remediation conditions have the potential to strongly influence not only the initial success of in situ Cr(VI) reduction/immobilization, but also the potential for successful long term sequestration of Cr in the form of stable soil precipitates.

54 ENVIRONMENTAL SCIENCES↗

Site transition framework for long-term surveillance and maintenance

This document provides a framework for all U.S. Department of Energy (DOE) facilities and sites where DOE may have anticipated long-term surveillance and maintenance (LTSM) responsibilities. It is a tool to help facilitate a smooth transition from remediation to LTSM, providing a systematic process for affected parties to utilize in analyzing the baseline to understand and manage the actions from EM mission completion through a site’s transition into LTSM. The framework is not meant to provide an exhaustive list of the specific requirement and information that are needed. Sites will have unique considerations that may not be adequately addressed by this tool, and it is anticipated that a team comprised of the transferring and receiving organization will use judgment in utilizing this augmenting with other DOE guidance. However the framework should be followed to the extent possible at each site; and adapted to accommodate unique site-specific requirements, needs, and documents. Since the objective of the tool is facilitate better understanding of the conditions of the site and the actions required for transfer, the transition team utilizing the checklist is expected to consult with management of both the receiving and transferring organization to verify that major concerns are addressed. Ideally, this framework should be used as early in the remediation process as possible. Subsequent applications of the Site Transition Framework (STF) to the site should be conducted periodically and used to verify that all appropriate steps have been or will be taken to close-out the site and that actions by both organization are identified to transfer the site to LTSM. The requirements are provided herein.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Estimating the Impact of Vadose Zone Sources on Groundwater to Support Performance Assessment of Soil Vapor Extraction

Soil vapor extraction (SVE) is a prevalent remediation approach for volatile contaminants in the vadose zone. To support selection of an appropriate endpoint for the SVE remedy, an evaluation is needed to determine whether vadose zone contamination has been diminished sufficiently to protect groundwater. When vapor-phase transport is an important component of the overall contaminant fate and transport from a vadose zone source, the contaminant concentration expected in groundwater is controlled by a limited set of parameters, including specific site dimensions, vadose zone properties, and source characteristics. An approach was developed for estimating the contaminant concentration in groundwater resulting from a contaminant source in the vadose zone based on pre-modeling contaminant transport for a matrix of parameter value combinations covering a range of potential site conditions. An interpolation and scaling process are then applied to estimate groundwater impact for site-specific conditions.

58 GEOSCIENCES↗

Assessment of Options for the Treatment of Nitrate Salt Wastes at Los Alamos National Laboratory

This paper summarizes the methodology used to evaluate options for treatment of the remediated nitrate salt waste containers at Los Alamos National Laboratory. The method selected must enable treatment of the waste drums, which consist of a mixture of complex nitrate salts (oxidizer) improperly mixed with sWheat Scoop®1, an organic kitty litter and absorbent (fuel), in a manner that renders the waste safe, meets the specifications of waste acceptance criteria, and is suitable for transport and final disposal in the Waste Isolation Pilot Plant located in Carlsbad, New Mexico. A Core Remediation Team was responsible for comprehensively reviewing the options, ensuring a robust, defensible treatment recommendation. The evaluation process consisted of two steps. First, a prescreening process was conducted to cull the list on the basis for a decision of feasibility of certain potential options with respect to the criteria. Then, the remaining potential options were evaluated and ranked against each of the criteria in a consistent methodology. Numerical scores were established by consensus of the review team. Finally, recommendations were developed based on current information and understanding of the scientific, technical, and regulatory situation. A discussion of the preferred options and documentation of the process used to reach the recommended treatment options are presented.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

What Lies Beneath Can Be Imaged

The Hanford Site was quickly established to help end World War II, making history for producing the plutonium used in the world’s first nuclear weapons. Throughout the Cold War years, Hanford employees produced plutonium for most of the more than 60,000 weapons in the U.S. nuclear arsenal stockpile. Today, the once highly active nuclear reactors are shut down. And the mission at Hanford turned full-circle as scientists, engineers and specialists work to clean up our nation’s most contaminated nuclear site. PNNL Computational Geophysicist Tim Johnson is helping decision-makers understand the complexity and breadth of the contamination in soils at Hanford. Tim and others are applying remote, high-resolution geophysical imaging to determine the extent of contamination in the soil below the surface and understand the processes controlling its movement. They also provide real-time imaging of remediation processes that are working to limit the movement of contaminants below the surface and toward water resources. Geophysical imaging simply means that PNNL scientists are combining the techniques of geology, physics, mathematics and chemistry with supercomputer modeling to create three-dimensional images of the waste and its movement. These real-time, remote images are essential in reducing the uncertainty associated with cleanup costs and remediation technologies.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Journey to Vulnerability Management?

Abstract Text Idaho National Laboratory’s Information Management (IM) is transforming how they manage IT vulnerabilities. The IM team realized the increasing risks to the Lab and the difficulty of ‘keeping tabs’ on multiple organizations and multiple process for Vulnerability Management (VM). They chose to stand up an IT Operations and Vulnerability Management group to help centralize VM across IM organizations. Come listen and participate as we describe the on-going journey to facilitating a centralized vulnerability management operation. A mature VM program should provide a manageable life cycle for vulnerabilities and variances. In addition, the program must provide visibility to management and stakeholders for continuous monitoring and reporting of vulnerability discovery and remediation across Applications, Databases, Workstations, Servers, Infrastructure Equipment, and remediation of Variances.

97 MATHEMATICS AND COMPUTING↗

Application of Data Quality Objectives in Decommissioning Plans

The Data Quality Objectives (DQOs) are applicable and relevant in the design of measurements that provide data for good, effective decision-making. The DQOs provide criteria for the design of measurements and provide a target for assessing the level of data quality that is considered acceptable for effective decision-making. Such targets in the design of measurements help eliminate the acquisition of unnecessary, duplicative or overly precise data. They help provide more efficient use of limited measurement resources. With the application of DQOs, D and D program decisions are identified, DQOs are established, and measurements are designed to provide data that meet the DQOs for each decision point. Since the Historical Site Assessment (HSA), Scoping, Characterization, and Remedial Action Surveys provide data and information to all D and D program decision-making, an integrated approach should be taken where all input requirements are considered, in the design of each survey. The decision points and their linkages form a network of decisions referred to as a decision framework. Since distinct D and D program functions are linked by their decisions, programs proceed through the decision framework, in a uniform fashion, to one endpoint, the decision to release the site. The decision to release the site is based on the ability to pass the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM). Therefore, D and D planning has a primary aim, to integrate D and D program efforts in a manner that will allow D and D decision-making to reach one end point, effective MARSSIM decision-making. The Decision Framework is best represented, schematically, by a decision tree. The decision tree is based on 3- decision points and represents a decision in each of the Remediation, Dose Assessment and MARSSIM program functions. The decisions address the extent of excavation, dose modeling approach, and sampling for the MARSSIM Final Status Survey (FSS). The simplified decision rule established for each decision point relies on the questions: deep excavation or not; site-specific modeling or not; and high number of samples or not. For these decision rules, the basic outcomes are yes or no to the questions. As decision-makers proceed through the decision tree, there are 8 different paths available based on the theoretical relationship 2N, where N=3. All the paths lead to the one-end point, MARSSIM decision-making. Data and information from pre-release surveys provide input to each decision (although not illustrated in the decision tree schematic). Here MARSSIM represents a legitimate D and D program with decision-making functions. Since D and D decisions are connected to MARSSIM decisions, as illustrated in the decision tree, D and D decision-making can be captured in the MARSSIM context and the decision tree included in the MARSSIM report. These weighted options were selected because they represent 3-alternate plans (strategies) that could be implemented with equivalent total resources (costs). Hypothetical costing for each D and D program function is indicated at each section of the paths in terms of normalized values 10 and 1, in arbitrary units. Option 1 describes a path where Deep Excavation, Site specific Modeling, and a Low Number of Samples for the FSS are the bases. Option 2 describes a path where Deep Excavation, Screening Values, and a High Number of Samples are the bases. Option 3 utilizes Shallow Excavation, Site-specific Modeling, and a High Number of Samples in the FSS design. Since the 3-options are equivalent in costs, the selection of the best D and D option or MARSSIM Plan for the site could be determined by other factors such as Waste Management, Health and Safety, or Regulatory Compliance. For example, a site with Health and Safety issues may want to utilize Option 3, so that cleanup worker exposure is minimized during excavation. A small site, that has limited technical support, may want to use tables of screening values for dose assessments, and therefore Option 2 may be an appropriate MARSSIM Plan. Another example would be a case for the use of Option 1 where the D and D manager may want to minimize difficulties with getting pass MARSSIM tests. By conducting extensive cleanup and calculating more realistic (less conservative) dose values, more flexibility in MARSSIM is obtained. for any decision framework, there are a number of reasonable paths to be considered in D and D decision-making and that these paths can be viewed as a family of MARSSIM Plans. Optimization of MARSSIM decision-making can occur by selecting, from this family of MARSSIM Plans, the most appropriate plan for the conditions at a specific site. This approach represents a more comprehensive evaluation of D and D options and strategies that regulators and stakeholders would most likely appreciate in the MARSSIM Final Report. In an era of information management, it would be prudent to take advantage of opportunities offered by the application of DQOs and the utilization of its decision-framework. The example utilized of a decision framework, is an overly simplified (N=3) model and is presented for illustrative purposes. A typical D and D project would have many more decision points to consider in formulating the decision framework and its decision tree, and the use of high level computing would be needed.

99 GENERAL AND MISCELLANEOUS↗

Reaching Site Closure for Groundwater under Multiple Regulatory Agencies

Groundwater at the Connecticut Yankee Atomic Power Company (CYAPCO) Haddam Neck Plant (HNP) requires investigation of both radionuclides and chemical constituents in order to achieve closure. Cleanup criteria for groundwater are regulated both by federal and state agencies. These requirements vary in both numerical values as well as the duration of post remediation monitoring. The only consistent requirement is the development of a site conceptual model and an understanding of the hydrogeologic conditions that will govern contaminant transport and identify potential receptors. To successfully reach closure under each agency, it is paramount to understand the different requirements during the planning stages of the investigation. Therefore, the conceptual site model, groundwater transport mechanisms, and potential receptors must be defined. Once the hydrogeology is understood, a long term groundwater program can then be coordinated to meet each regulatory agency requirement to both terminate the NRC license and reach site closure under RCRA. Based on the different criteria, the CTDEP-LR (or RSR criteria) are not only bounding, but also requires the longest duration. As with most decommissioning efforts, regulatory attention is focused on the NRC, however, with the recent industry initiatives based on concern of tritium releases to groundwater at other plants, it is likely that the USEPA and state agencies may continue to drive site investigations. By recognizing these differences, data quality objectives can include all agency requirements, thus minimizing rework or duplicative efforts. CYAPCO intends to complete groundwater monitoring for the NRC and CTDEP-RD by July 2007. However, because shallow remediations are still being conducted, site closure under USEPA and CTDEP-LR is projected to be late 2011.

54 ENVIRONMENTAL SCIENCES↗

Integration of 'omics technologies for characterization of complex microbial ecosystems

Environmental remediation sites possess complexity at both biotic and abiotic levels, with temporal shifts that are associated with the interaction of both systems. Single scientific disciplines no longer serve to address and understand the complex nature of these sites. An integration of physical, chemical, and biological characterizations or a more inclusive environmental systems approach is needed. As a proof of concept, an integrated approach was developed to identify bio-signatures from a complex environmental community to provide sensitive, early indicators and predictors of response to radionuclide and chemical exposures of interest for environmental management. Specifically, the integrated approach used a combination of genetics, transcriptomics, proteomics, and computational statistics to characterize a complex periphyton community following uranium exposure. This additional, specific information has promise to further reduce uncertainties in environmental remediation and monitoring in realizing the potential impacts of exposure in advance to reduce potential mitigation efforts. Results from this study establish a basis for bio-signature characterization of any ecosystem for comparison or monitoring of biotic exposure and effects in response to a specific contaminant. (authors)

54 ENVIRONMENTAL SCIENCES↗

In-Situ Uranium Stabilization Through Polyphosphate Injection: Pilot-Scale Treatability Test at the 300 Area, Hanford Site

This paper describes the pilot-scale treatability test that was conducted to evaluate the efficacy of using a polyphosphate injection approach to treat uranium-contaminated groundwater in situ within the 300 Area aquifer at the Hanford Site in Richland, Washington. Primary test objectives were to assess 1) direct treatment of available uranium contributing to the groundwater plume through precipitation of the uranyl-phosphate mineral autunite, and 2) emplacement of secondary-treatment capacity via precipitation of the calcium-phosphate mineral apatite, which acts as a long-term sorbent for uranium. Based on an injection design analysis that incorporated results from both bench-scale testing and site-specific characterization activities, a three-phase injection approach was selected for field-scale testing. This approach consisted of 1) an initial polyphosphate injection to facilitate direct treatment of aqueous uranium in the pore space, 2) a second phase consisting of a calcium chloride injection to provide an available calcium source for the creation of apatite, and 3) a subsequent polyphosphate injection to supply a phosphate source for the formation of apatite. The total-solution volume injected during this field test was approximately 3.8 million L (1 million gal). Results from this investigation will be used to identify implementation challenges and investigate the technology's ability to meet remedial objectives. In addition, data from this test will provide valuable information for designing a full-scale remedial action for uranium in groundwater beneath the 300 Area of the Hanford Site, and a detailed understanding of the fundamental underpinnings necessary to evaluate the efficacy and potential for utilization of the polyphosphate technology at other sites with varying geochemical and hydrodynamic conditions. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Engineering and Technology Road-map

Throughout its existence, the Environmental Management (EM) program has required a strong technology component to accomplish its mission, one that is focused on developing technologies to enhance safety, effectiveness, and efficiency. Although the Department of Energy (DOE) has made great progress toward safely disposing of the legacies of the Cold War, much remains to be done. These past accomplishments provide a guide for future success; however, the unique nature of many of the remaining challenges will require a strong and responsive applied research and engineering program. The Engineering and Technology Road-map was developed to address this need and guide the EM Engineering and Technology Program. The Road-map identifies the technical risks and uncertainties that the EM program faces over the next ten years; the strategies EM will use to reduce those risks; and the planned outcomes of implementing those strategies. Input for this Road-map was provided by EM Federal Project Directors, Stakeholders, Site Contractors, National Laboratories and the National Academy of Science. To accomplish this work, EM has designated federal Strategic Initiative Managers who will work with Federal Project Directors to develop, refine and implement a detailed scope and schedule for each initiative, as well as identify the point at which the technologies developed will be inserted into EM cleanup projects. The starting point for the Road-map was technical project risk and uncertainty. Risks are defined as known technical issues that could prevent project success. Uncertainties are indefinite or unpredictable technical aspects of a project. Risks included in the Road-map were identified in three ways: 1) By the Projects - EM's operations are performed within a culture of disciplined project management, based on DOE Order 413.3A, Program and Project Management for the Acquisition of Capital Assets. As such, technical risks and uncertainties affecting each cleanup project are identified early in the project life cycle, are captured in project risk assessments, and often lead to applied technology development activities. 2) By reviews and assessments - EM utilizes experts to review the progress of its major cleanup projects and to assess the maturity of evolving technologies. These reviews include External Technical Reviews and Technology Readiness Assessments. They transcend the project's baseline and often identify opportunities for reducing technical risk through development and deployment of innovative or enhanced technologies. 3) By the sites - EM periodically asks EM sites to identify technical risks and uncertainties in the form of technical needs. The Road-map divides EM risks into six program areas: Waste Processing, Groundwater and Soil Remediation, Deactivation and Decommissioning (D and D) and Facility Engineering, Spent Nuclear Fuel, Challenging Materials, and Integration. Tables 1-6 show those risks and uncertainties, as well as the 13 strategic initiatives established to address those risks. In conclusion, the Engineering and Technology Road-map presents an integrated approach to reducing the technical risks and uncertainties facing the EM program in a manner consistent with its disciplined approach to project management. The risks include challenges in waste processing, groundwater and soil remediation, deactivation and decommissioning, spent nuclear fuel, challenging materials, and integration. The EM Engineering and Technology Program will address these risks, and will use applied research and engineering to improve technologies and processes at sites across the country. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

In Situ Stabilization of Inactive Low Level Waste Pipelines in the Melton Valley Watershed at Oak Ridge National Laboratory

The Melton Valley watershed at Oak Ridge National Laboratory (ORNL) contained an inactive waste pipeline system consisting of approximately 12 kilometers of buried waste pipelines and over 142 m{sup 3} in surface/subsurface appurtenances (e.g., vents, valve pits, pump vaults, etc.). Historically, the system was used to transport liquid low level and process waste between generator facilities in Melton Valley, storage and disposal sites in Melton Valley, and storage/treatment facilities in Bethel Valley. The selected remedy in the Melton Valley Record of Decision (ROD) for inactive pipelines was isolation, removal, or stabilization. Pipeline remediation activities began in the summer of 2005 and were completed in the spring of 2006. The task entailed an iterative process of selecting pipeline access points, excavating and exposing pipelines, performing tapping, draining and cutting activities, either installing fittings for grouting or plugging and capping the lines. Grouting was accomplished using paired access points, with one location serving as the grout injection point and the other as vent/drain and grout confirmation point. Grouting was conducted by pumping a cement-bentonite grout into the specially installed fittings and typically proceeded from a low point to a high point to ensure complete filling of the pipeline (i.e., no void space). The project successfully grouted a total of 8,454 meters (linear distance) of pipeline; another 3,573 meters of pipeline was stabilized through isolation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lessons Learned for Construction and Waste Water Management at Radioactive Waste Closure Site

Environmental remediation of three different radioactive waste closure sites each required exhaustive characterization and evaluation of sampling and analytical information in resolving regulatory and technical issues that impact cleanup activities. One of the many regulatory and technical issues shared by all three and impacting the cleanup activities is the compliant management and discharge of waste waters generated and resulting from the remediation activities. Multiple options were available for each closure site in resolving waste water management challenges depending upon the base regulatory framework defined for the cleanup or closure of the site. These options are typically regulated by the federal Clean Water Act (CWA), with exemptions available under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and the Superfund Amendments and Reauthorization Act of 1986 (SARA) or Memorandum of Understanding (MOU) between regulatory agencies. In general, all parties must demonstrate equivalent compliance when concerns related to the protection of the general public and the environment. As such, all options for management of waste water resulting from closure activities must demonstrate compliance to or equivalent actions under the CWA. The CWA provides for the National Pollution Discharge Elimination System (NPDES) that is typically maintained by individual states through permitting process to generators, public utilities, and more recently, construction sites. Of the three sites, different compliance strategies were employed for each. The approach for the Columbus Closure Project (CCP) was to initiate full scale compliance to the Ohio EPA General Construction Permit No. OHC000002. The CCP provided Notice of Intent (NOI) to the Ohio EPA to discharge under the general permit according to the regulator approved Storm Water Pollution Prevention Plan. For the second site, the Li Tungsten Superfund Site in Glen Cove, New York, the option was to manage and discharge waste water under a due diligence process to New York State General Permit No. GP-02-01. For the third site, the Middlesex Sampling Plant in Middlesex, New Jersey, the options was to manage and discharge waste water to the Publicly Owned Treatment Works (POTW). Each option has resulted in a safe, cost-effective, and compliant approach to managing discharging waste waters from the site closure activities. (authors)

54 ENVIRONMENTAL SCIENCES↗

Post-Closure Land Jurisdiction Transfer to the US Fish and Wildlife Service at Rocky Flats: Surviving the Safari Through Old Records and Other Lessons Learned

The U.S. Department of Energy's (DOE's) Rocky Flats Site (Rocky Flats), located near Denver, Colorado, was listed on the Comprehensive Environmental Response, Compensation, and Liability Act National Priorities List (NPL) in 1989. Subsequent cleanup and closure activities were completed in October 2005 and the final remedy was selected in September 2006. The remedy is 'no further action' for the generally un-impacted Peripheral Operable Unit (OU), formerly known as the Buffer Zone, and institutional and physical controls with continued monitoring for the Central OU, formerly the industrialized area. The Peripheral OU has been deleted from the NPL and jurisdiction over the majority of land in that OU (3,953 acres) was transferred to the U.S. Fish and Wildlife Service (USFWS) on July 12, 2007, to establish the Rocky Flats National Wildlife Refuge. The remaining approximately 929 acres in the Peripheral OU were retained by DOE's Office of Legacy Management where outstanding mineral leases and mining operations exist. As mineral rights are purchased or mining operations and mineral leases are completed and fully reclaimed, jurisdiction of portions of the 929 acres will also be transferred to USFWS for inclusion into the refuge. During the almost 2 years since cleanup and closure work was completed at Rocky Flats, DOE and USFWS have worked the specific legal parameters, timing, and constraints of the 3,953-acre transfer. Many lessons have been learned, based on these early experiences. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗