Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “PrIMe”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,423 records · Page 79

Substituents Dependent Capability of bis(ruthenium-dioxolene-terpyridine)Complexes Toward Water Oxidation

The bridging ligand, 1,8-bis(2,2':6',2{double_prime}-terpyrid-4'-yl)anthracene (btpyan) was synthesized by the Miyaura-Suzuki cross coupling reaction of anthracenyl-1,8-diboronic acid and 4'-triflyl-2,2':6'-2{double_prime}-terpyridine in the presence of Pd(PPh{sub 3}){sub 4} (5 mol%) with 68% in yield. Three ruthenium-dioxolene dimers, [Ru{sub 2}(OH){sub 2}(dioxolene){sub 2}(btpyan)]{sup 0} (dioxolene = 3,6-di-tert-butyl-1,2-benzosemiquinone ([1]{sup 0}), 3,5-dichloro-1,2-benzosemiquinone ([2]{sup 0}) and 4-nitro-1,2-benzosemiquinone ([3]{sup 0})) were prepared by the reaction of [Ru{sub 2}Cl{sub 6}(btpyan)]{sup 0} with the corresponding catechol. The electronic structure of [1]{sup 0} is approximated by [Ru{sub 2}{sup II}(OH){sub 2}(sq){sub 2}(btpyan)]{sup 0} (sq = semiquinonato). On the other hand, the electronic states of [2]{sup 0} and [3]{sup 0} are close to [Ru{sub 2}{sup III}(OH){sub 2} (cat){sub 2}(btpyan)]{sup 0} (cat = catecholato), indicating that a dioxolene having electron-withdrawing groups stabilizes [Ru{sub 2}{sup III}(OH){sub 2}(cat){sub 2}(btpyan)]{sup 0} rather than [Ru{sub 2}{sup II}(OH){sub 2}(sq){sub 2}(btpyan)]{sup 0} as resonance isomers. No sign was found of deprotonation of the hydroxo groups of [1]{sup 0}, whereas [2]{sup 0} and [3]{sup 0} showed an acid-base equilibrium in treatments with t-BuOLi followed by HClO{sub 4}. Furthermore, controlled potential electrolysis of [1]{sup 0} deposited on an ITO (indium-tin oxide) electrode catalyzed the four-electron oxidation of H{sub 2}O to evolve O{sub 2} at potentials more positive than +1.6 V (vs. SCE) at pH 4.0. On the other hand, the electrolysis of [2]{sup 0} and [3]{sup 0} deposited on ITO electrodes did not show catalytic activity for water oxidation under similar conditions. Such a difference in the reactivity among [1]{sup 0}, [2]{sup 0} and [3]{sup 0} is ascribed to the shift of the resonance equilibrium between [Ru{sub 2}{sup II}(OH){sub 2}(sq){sub 2}(btpyan)]{sup 0} and [Ru{sub 2}{sup III}(OH){sub 2}(cat){sub 2}(btpyan)]{sup 0}.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Transverse Beam Polarizationas an Alternate View into New Physics at CLIC

In e{sup +}e{sup -} collisions, transverse beam polarization can be a useful tool in studying the properties of particles associated with new physics beyond the Standard Model(SM). However, unlike in the case of measurements associated with longitudinal polarization, the formation of azimuthal asymmetries used to probe this physics in the case of transverse polarization requires both e{sup {+-}} beams to be simultaneously polarized. In this paper we discuss the further use of transverse polarization as a probe of new physics models at a high energy, {radical}s = 3 TeV version of CLIC. In particular, we show (i) how measurements of the sign of these asymmetries is sufficient to discriminate the production of spin-0 supersymmetric states from the spin-1/2 Kaluza-Klein excitations of Universal Extra Dimensions. Simultaneously, the contribution to this asymmetry arising from the potentially large SM W{sup +}W{sup -} background can be made negligibly small. We then show (ii) how measurements of such asymmetries and their associated angular distributions on the peak of a new resonant Z{prime}-like state can be used to extract precision information on the Z{prime} couplings to the SM fermions.

43 PARTICLE ACCELERATORS↗

Measurement of the B0 ->&#960&#8722&#8467&#957and B ->&#951(&#8242)&#8467&#957Branching Fractions, the B0 ->&#960&#8722&#8467&#957and B ->&#951&#8467&#957Form-Factor Shapes, and Determination of |Vub|

We report the results of a study of the exclusive charmless semileptonic decays, B{sup +} {yields} {eta}{sup {prime}}{ell}{sup +}{nu} and B{sup 0} {yields} {pi}{sup -}{ell}{sup +}{nu}, undertaken with approximately 464 million B{bar B} pairs collected at the {Upsilon}(4S) resonance with the BABAR detector. The analysis uses events in which the signal B decays are reconstructed with a loose neutrino reconstruction technique. We obtain partial branching fractions for B{sup +} {yields} {eta}{ell}{sup +}{nu} and B{sup 0} {yields} {pi}{sup -}{ell}{sup +}{nu} decays in three and 12 bins of q{sup 2}, respectively, from which we extract the f{sub +}(q{sup 2}) form-factor shapes and the total branching fractions {Beta}(B{sup +} {yields} {eta}{ell}{sup +}{nu}) = (0.36 {+-} 0.05{sub stat} {+-} 0.04{sub syst}) x 10{sup -4} and {Beta}(B{sup 0} {yields} {pi}{sup -}{ell}{sup +}{nu}) = (1.42 {+-} 0.05{sub stat} {+-} 0.07{sub syst}) x 10{sup -4}. We also measure {Beta}(B{sup +} {yields} {eta}{sup {prime}}{ell}{sup +}{nu}) = (0.24 {+-} 0.08{sub stat} {+-} 0.03{sub syst}) x 10{sup -4}. We obtain values for the magnitude of the CKM matrix element |V{sub ub}| using three different QCD calculations.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

RAYLEIGH-TAYLOR STRENGTH EXPERIMENTS OF THE PRESSURE-INDUCED alpha->epsilon->alpha' PHASE TRANSITION IN IRON

We present here the first dynamic Rayleigh-Taylor (RT) strength measurement of a material undergoing solid-solid phase transition. Iron is quasi-isentropically driven across the pressure-induced bcc ({alpha}-Fe) {yields} hcp ({var_epsilon}-Fe) phase transition and the dynamic strength of the {alpha}, {var_epsilon} and reverted {alpha}{prime} phases have been determined via proton radiography of the resulting Rayleigh-Taylor unstable interface between the iron target and high-explosive products. Simultaneous velocimetry measurements of the iron free surface yield the phase transition dynamics and, in conjunction with detailed hydrodynamic simulations, allow for determination of the strength of the distinct phases of iron. Forward analysis of the experiment via hydrodynamic simulations reveals significant strength enhancement of the dynamically-generated {var_epsilon}-Fe and reverted {alpha}{prime}-Fe, comparable in magnitude to the strength of austenitic stainless steels.

36 MATERIALS SCIENCE↗

New Improved Nuclear Data for Nuclear Criticality and Safety

The Geel Electron Linear Accelerator (GELINA) was used to measure neutron total and capture cross sections of 182,183,184,186 W and 63,65 Cu in the energy range from 100 eV to {approx}200 keV using the time-of-flight method. GELINA is the only high-power white neutron source with excellent timing resolution and ideally suited for these experiments. Concerns about the use of existing cross-section data in nuclear criticality calculations using Monte Carlo codes and benchmarks were a prime motivator for the new cross-section measurements. To support the Nuclear Criticality Safety Program, neutron cross-section measurements were initiated using GELINA at the EC-JRC-IRMM. Concerns about data deficiencies in some existing cross-section evaluations from libraries such as ENDF/B, JEFF, or JENDL for nuclear criticality calculations were the prime motivator for new cross-section measurements. Over the past years many troubles with existing nuclear data have emerged, such as problems related to proper normalization, neutron sensitivity backgrounds, poorly characterized samples, and use of improper pulse-height weighting functions. These deficiencies may occur in the resolved- and unresolved-resonance region and may lead to erroneous nuclear criticality calculations. An example is the use of the evaluated neutron cross-section data for tungsten in nuclear criticality safety calculations, which exhibit discrepancies in benchmark calculations and show the need for reliable covariance data. We measured the neutron total and capture cross sections of 182,183,184,186 W and 63,65 Cu in the neutron energy range from 100 eV to several hundred keV. This will help to improve the representation of the cross sections since most of the available evaluated data rely only on old measurements. Usually, these measurements were done with poor experimental resolution or only over a very limited energy range, which is insufficient for the current application.

43 PARTICLE ACCELERATORS↗

Search for High-Mass States with One Lepton Plus Missing Transverse Momentum in Proton-Proton Collisions at $\sqrt{s} with the ATLAS Detector

The ATLAS detector is used to search for high-mass states, such as heavy charged gauge bosons (W{prime},W*), decaying to a charged lepton (electron or muon) and a neutrino. Results are presented based on the analysis of ppcollisions at a center-of-mass energy of 7 TeV corresponding to an integrated luminosity of 36 pb{sup -1}. No excess beyond standard model expectations is observed. A W{prime} with sequential standard model couplings is excluded at 95% confidence level for masses below 1.49 TeV, and a W* (charged chiral boson) for masses below 1.35 TeV.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Search for New Bottomlike Quark Pair Decays Q Q-Bar to (T W- ) (T-Bar W -) in Same-Charge Dilepton Events

We report the most restrictive direct limits on masses of fourth-generation down-type quarks b{prime}, and quark-like composite fermions (B or T{sub 5/3}), decaying promptly to tW{sup {-+}}. We search for a significant excess of events with two same-charge leptons (e, {mu}), several hadronic jets, and missing transverse energy. An analysis of data from p{bar p} collisions with an integrated luminosity of 2.7 fb{sup -1} collected with the CDF II detector at Fermilab yields no evidence for such a signal, setting mass limits m{sub b{prime}}, m{sub B} > 338 GeV/c{sup 2} and m{sub T{sub 5/3}} > 365 GeV/c{sup 2} at 95% confidence level.

43 PARTICLE ACCELERATORS↗

Search for heavy vector-like quarks coupling to light quarks in proton-proton collisions at root s=7 TeV with the ATLAS detector

This Letter presents a search for singly produced vector-like quarks, Q, coupling to light quarks, q. The search is sensitive to both charged current (CC) and neutral current (NC) processes, pp {yields} Qq {yields} Wqq{prime} and pp {yields} Qq {yields} Zqq{prime} with a leptonic decay of the vector gauge boson. In 1.04 fb{sup -1} of data taken in 2011 by the ATLAS experiment at a center-of-mass energy {radical}s = 7 TeV, no evidence of such heavy vector-like quarks is observed above the expected Standard Model background. Limits on the heavy vector-like quark production cross section times branching ratio as a function of mass m{sub Q} are obtained. For a coupling {kappa}{sub qQ} = v/m{sub Q}, where v is the Higgs vacuum expectation value, 95% C.L. lower limits on the mass of a vector-like quark are set at 900 GeV and 760 GeV from CC and NC processes, respectively.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Two Higgs doublets with fourth-generation fermions: Models for TeV-scale compositeness

We construct a class of two Higgs doublets models with a 4th sequential generation of fermions that may effectively accommodate the low-energy characteristics and phenomenology of a dynamical electroweak symmetry breaking scenario which is triggered by the condensates of the 4th family fermions. In particular, we single out the heavy quarks by coupling the heavier Higgs doublet ({Phi}{sub h}) which possesses a much larger VEV only to them while the lighter doublet ({Phi}{sub {ell}) couples only to the light fermions. We study the constraints on these models from precision electroweak data as well as from flavor data. We also discuss some distinct new features that have direct consequences on the production and decays of the 4th family quarks and leptons in high-energy colliders; in particular, the conventional search strategies for t{prime} and b{prime} may need to be significantly revised.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Dirac and Majorana Neutrino Signatures of Primordial Black Holes

We study Primordial Black Holes (PBHs) as sources of massive neutrinos via Hawking radiation. Emphasizing that black holes emit neutrino mass eigenstates, we describe quantitatively how the PBH evolution and lifetime is affected by the mass and fermionic -- Dirac or Majorana -- nature of neutrinos. In the case of Dirac neutrinos, PBHs radiate right-handed and left-handed neutrinos in equal amounts, thus possibly increasing the effective number of neutrino species, $N_{\rm eff}$. Considering the full system of Friedmann equations, and the current constraint on $N_{\rm eff}$, we derive a novel bound on the initial PBH fraction $\beta^\prime$ for black hole masses $4\times 10^7\ {\rm g}\lesssim M_i \lesssim 10^9$ g. Future measurements of $N_{\rm eff}$ may be able to constraint the initial fraction for black hole masses as low as 1 g. If an excess in $N_{\rm eff}$ is found, PBHs with Dirac neutrinos could provide a minimal explanation of it. For example, for $10^7\ {\rm g} \lesssim M_i\lesssim 10^9$ g and $\beta^\prime \gtrsim 10^{-13}$, an excess radiation at the level of $0.2\lesssim \Delta N_{\rm eff}\lesssim 0.37$ is produced, which can alleviate the tension of the Hubble parameter measurements. Finally, we obtain the diffuse flux of right-helical neutrinos from PBHs at the Earth, and show that their detection in a PTOLEMY-like detector (using neutrino capture on Tritium) would be difficult.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Mentor Protégé Program Brochure

The U.S. Department of Energy (DOE) Mentor Protégé Program is designed to help small businesses obtain mentoring from DOE prime contractors. The program is meant to foster long-term business relationships between small businesses and DOE prime contractors while increasing the overall number of small business entities that receive DOE contract and subcontract awards.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

An Improved Measurement of the Secondary Cosmic Microwave Background Anisotropies from the SPT-SZ + SPTpol Surveys

We report new measurements of millimeter-wave power spectra in the angular multipole range $2000 \le \ell \le 11,000$ (angular scales $5^\prime \gtrsim \theta \gtrsim 1^\prime$). By adding 95 and 150\,GHz data from the low-noise 500 deg$^2$ SPTpol survey to the SPT-SZ three-frequency 2540 deg$^2$ survey, we substantially reduce the uncertainties in these bands. These power spectra include contributions from the primary cosmic microwave background, cosmic infrared background, radio galaxies, and thermal and kinematic Sunyaev-Zel'dovich (SZ) effects. The data favor a thermal SZ (tSZ) power at 143\,GHz of $D^{\rm tSZ}_{3000} = 3.42 \pm 0.54~ \mu {\rm K}^2$ and a kinematic SZ (kSZ) power of $D^{\rm kSZ}_{3000} = 3.0 \pm 1.0~ \mu {\rm K}^2$. This is the first measurement of kSZ power at $\ge 3\,\sigma$. We study the implications of the measured kSZ power for the epoch of reionization, finding the duration of reionization to be $\Delta z_{re} = 1.0^{+1.6}_{-0.7}$ ($\Delta z_{re}< 4.1$ at 95% confidence), when combined with our previously published tSZ bispectrum measurement.

79 ASTRONOMY AND ASTROPHYSICS↗

Prototype and Codesign of Nascent Flexible Wave Energy Converter Concepts

Prevailing mainstream ocean wave energy converter (WEC) archetypes are often relatively large monolithic rigid bodies with singular means of power take-off (e.g., relative motion between rigid bodies) and solo prime mover mechanisms (e.g. a rotary generator, a hydraulic piston). These mainstream WEC archetypes have existed for decades with some having histories spanning more than a century of significant investments and interests. As an alternative to the domain of mainstream WEC archetypes is the domain of distributed embedded energy converter technologies (also known as DEEC-Tec). Use of DEEC-Tec to create WECs - often called flexWECs - is a nascent domain of research and development that centers itself upon the interconnection of many relatively small energy converters - very small energy transducers - that interconnect and combine to create a much larger, overall, energy converting structure. The DEEC-Tec domain enables promising possibilities such as: direct in situ ocean wave energy harvesting and conversion throughout the volume of an entire flexWEC; inherent broad-banded ocean wave energy capture and conversion arising from near semi-continuous structural degrees of freedom; an innate absence of focusing and concentrating of ocean wave energy into a single prime mover and/or transmission system; and built-in implicit redundancy. As such, the DEEC-Tec domain could revolutionize how we conceptualize ocean wave energy conversion - both in terms of ocean wave energy converter design and what we view as viable environments and circumstances for ocean wave energy conversion. The research and development opportunities for the DEEC-Tec domain, therefore, are vast compared to the prevailing mainstream ocean wave energy converter domain. Correspondingly, there are ample opportunities to invest time and money into the DEEC-Tec domain with an aim to enable a paradigm shift in how ocean waves can be utilized as a more viable form of renewable energy. To that end, two seedling efforts have been enacted providing a very cursory investigation into the DEEC-Tec domain: (1) a preliminary simple fabrication/prototyping effort and (2) a preliminary co-design effort. The prototype seedling centers upon the design of a fabrication and evaluation rig for individual DEEC-Tec transducers; e.g., dielectric elastomer generators. The co-design seedling centers upon the analysis of those methods suitable for DEEC-Tec, ocean wave energy conversion, and fluid-structure interaction co-design efforts.

50 EE - Wind and Water Power Program - Water (EE-4↗

System and method for collecting and isolating radiosotopes

A method for obtaining 225 AC from 225 Ra having the steps of assembling a column having an inorganic stationary phase; priming the column to immobilize 226 Ra 225 Ra and natural decay products therefrom; immobilizing the 226 Ra, 225 Ra, 224 Ra, and natural decay products therefrom onto a stationary phase within the column; and eluting the column containing the 225 Ra with an aqueous sulfate solution to obtain a milking effluent that contains 225 AC. Also provided is a method for obtaining pure 225 AC from its isotope parents, the method comprising assembling a column having a stationary phase comprising an inorganic material; priming the column with the isotope parents to immobilize 225 Ac, and natural decay products of 225 AC; immobilizing the 225 Ac, and natural decay products therefrom onto the stationary phase within the column 226 Ra, 225 Ra, 224 Ra; and eluting the column containing the 225 AC to obtain an effluent that contains the isotope parents.

Brown, Michael A.↗

Ion Exchange Column Thermal Modeling: Prevention of Process Effluent Boiling - 18577

The Savannah River Site treats and disposes of legacy high-level waste, which resulted from 60 years of nuclear material production, medical research, and other nuclear related work. Complex mixtures of soluble and insoluble solids occupy tanks of which the South Carolina Department of Health and Environmental Control recognizes as the single largest environmental risk state-wide. The risk is reduced through removal, treatment, and solidification of decontaminated salt waste. Presently, SRS decontaminates the soluble salt component of the waste, a solution containing actinides and cesium, via implementation of the Actinide Removal Process and the Modular Caustic Side Solvent- Extraction Unit. Caustic solvent extraction is set to increase in scale by late 2018, with startup of the newly constructed Salt Waste Processing Facility. In conjunction with Salt Waste Processing Facility startup, Savannah River Remediation has been tasked by the Department of Energy to demonstrate modular ion exchange technology. The Tank Closure Cesium Removal project aims to demonstrate the feasibility of modular ion exchange processes for future Department of Energy applications. The Tank Closure Cesium Removal system is scheduled to begin operation in mid-2018. Dissolved salt solution, or influent, will be fed through a filter and ion exchange columns in lead-lag configuration, producing effluent. The effluent is fed to a separate high-level waste tank, for future disposition at Salt-stone Production Facility. Once the demonstration project is complete, the loaded ion exchange columns will be purged, dried, and placed in interim safe storage, awaiting final disposition. The ion exchange media selected for the Tank Closure Cesium Removal system is Honeywell UOP IONSIV{sup C} R-9120. The media is a prime candidate for separation of cesium from radioactive high-level waste. UOP R-9120{sup C} is inorganic and has high capacity, selectivity, and affinity for cesium. During operation, influent is fed to the ion exchange columns, contacting UOP R-9210{sup C} packed within the media vessel. Contact initiates loading of isotopes, and given ample time the solid phase (ion exchange media) and solution achieve thermodynamic equilibrium. UOP R-9120{sup C} is a prime candidate for separation of cesium and dissolved fission products. Although the properties of UOP R-9120{sup C} are favorable for separation, the same properties lead to accumulation of a heat source in the ion exchange bed. Cesium-137 and its daughter product, barium-137 m, generate a clear majority of heat (i.e. ∼ 94%). During operation salt solution flows through each column and transports heat from the ion exchange bed. Once operation is terminated, the effluent contained within the porous bed volume becomes essentially static. In the absence of engineering controls, the heat generated may boil the effluent. Rapid vaporization of aqueous salt solution would lead to bed over pressurization. Over pressurization and an associated release of high-level waste would result in adverse impacts to human health and the environment. This paper focuses on modeling the heat transfer associated with the Tank Closure Cesium Removal system ion exchange column. The model evaluates the maximum heat generation and the associated radionuclide loadings that prevent boiling within of the media vessel, under no flow conditions. A safety significant control, maintaining loadings less than the established loading limit ensures associated impacts to human health and the environment are prevented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Expedited Walkdowns and Preparation of Cost Estimates for Decontamination and Demolition of Excess Facilities - 20335

Lawrence Livermore National Security, LLC (LLNS) is the prime contractor responsible for managing and operating Lawrence Livermore National Laboratory (LLNL). The mission of the LLNL is to strengthen security of the United States through development and application of world-class science and technology to enhance the nation's defense, reduce the global threat from terrorism and weapons of mass destruction, and respond with vision, quality, integrity, and technical excellence to scientific issues of national importance. To accomplish its mission, LLNL must plan and manage its campus space and facilities to optimize use of its relatively small one-square-mile footprint. LLNL currently has numerous excess facilities that require decontamination and demolition (D and D). The LLNL Legacy Facility Program is responsible for stewardship and risk reduction programs to effectively manage these excess assets at LLNL. The Legacy Facility Program identified 10 excess facilities at LLNL that were candidates for demolition based on risks from further degradation of the facilities, potential exposure to hazardous materials, or need for removal to make way for new program facilities. The buildings range from a structure built in 1943 to serve as a US Navy drill hall during World War II, to a facility that provided neutrons to study material properties for the fusion energy program. The National Nuclear Security Administration (NNSA) appropriated FY19 funding for the development of Class 3 estimates for these 10 excess facilities that would be used to develop a Program Management Plan for funding consideration. Class 3 estimates are not conceptual, nor overly detailed, but adequate to be used for budget and appropriation purposes. Using existing strategic sourcing agreements, LLNL was able to organize a team of senior subject matter experts (SMEs) with diverse technical backgrounds across the Department of Energy (DOE) Complex to complete extensive process knowledge (PK) reviews and walk-downs of each excess facility and to deliver accurate and complete estimates under an expedited schedule (i.e., within eight weeks). To facilitate the expedited schedule, LLNL was fully prepared for the arrival of the JGMS team, which consisted of the following companies: J.G. Management Systems, Inc. (JGMS); Strata-G, LLC; and Michael Baker International. LLNL provided background and PK information on the excess facilities, pictures, supporting historical documentation, and radiological survey history as well as escorted access to the facilities. The JGMS team has previous experience supporting Program Management Plans for excess facilities at the Y-12 National Security Complex. The team mobilized to LLNL and performed the facility walk-downs from January 22-25, 2019. Using a methodical evaluation process, expertise, and experience, the team was able to deliver walk-down draft reports and estimates to LLNL before their February 8, 2019 deadline. LLNL then in turn reviewed, completed the estimates by adding waste management costs and other LLNL costs, and delivered the estimates to NNSA by February 15, 2019. The completed final reports, including draft D and D estimates, were delivered to LLNL before their March 6, 2019 deadline. The work was successfully completed ahead of the expedited schedule required by LLNL, resulting in a commendation from the client. This paper describes how the partnership and collaboration as a fully integrated team comprised of the prime contractor, LLNS, and the JGMS team successfully met the needs of the US government, resulting in the performance of expedited site walk-downs, the development of summary evaluation reports, and the preparation of draft Class 3 estimates and preliminary schedules for the D and D of 10 excess facilities at LLNL. The efforts of the team will enable the D and D of the first excess facility in the 2020-2021 time frame. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Session 059 - Panel: Small Business Procurement and Contracting Opportunities within the US DOE Complex and USACE FUSRAP Sites (R1.7)

This panel session focused on small business procurement and contracting opportunities within the DOE Complex and USACE FUSRAP Sites. The federal government encourages prime contractors to obtain goods and services from small and disadvantaged businesses (Tier 2) and often tie these goals to contract award fee. Goods and services being considered for these procurements include decontamination and decommissioning, remediation, transportation and disposal of radioactive waste, health physics, emergency response planning and training, lab services, R and D products, waste treatment, maintenance, A/E and professional consulting. Panelists with presentations: Small Business Procurement and Contracting Opportunities within the US DOE Complex and USACE FUSRAP Program (Aaron Deckard; Subcontracting Opportunities with the DOE Primes (William Badger); Bechtel National, Inc. Small Business Opportunities (Lisa Tribuce-Leoung Tat); Small Business Procurement and Contracting Opportunities (Gina Joiner); Small Business Procurement and Contracting Opportunities - Flour (Katy Burnau); Environmental WORK, Formerly Utilized Sites Remedial Action Program (FUSRAP) (John Busse)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

MH-1A Sturgis Decommissioning and Dismantlement - 20281

The U.S. Army Corps of Engineers (USACE) with its prime contractor, Aptim Federal Services, LLC (APTIM), recycled 5,260 metric tons (11.6 million pounds) of material from Sturgis Barge (Sturgis) during the Decommissioning and Dismantlement of the MH-1A nuclear power reactor. The overall objective of the project was to reduce residual radioactivity associated with MH-1A to levels that permitted release of Sturgis for dismantlement and termination of the Army Reactor Office permit. By effectively applying waste hierarchy's three Rs - reduce, reuse and recycle - the Sturgis project not only minimized the amount of waste that required disposal at landfills, but also reduced the potential for long-term environmental liability emanating from these landfills. The project team completed the physical decommissioning efforts in June 2018 in Galveston, TX. In September 2018, radiological surveys were completed to demonstrate the vessel could be released for shipbreaking. Sturgis was towed from Galveston, TX to Brownsville, TX in late September 2018. Shipbreaking, dismantlement and recycling efforts began in early October 2018 and were completed on 15 March 2019. As part of the decommissioning effort in Galveston, the team shipped 69 shipments (860 metric tons) of low-level radioactive waste and radioactive components to the Waste Control Specialist (WCS) facility in Andrews TX for disposal. Certain radioactive components had to be transferred to the Department of Energy prior to placing the materials into the Federal Waste Facility located within WCS. However, most of the radioactive waste was characterized, profiled, approved and managed under the WCS permitted radioactive waste exemption process authorized and implemented by the Texas Commission on Environmental Quality (TCEQ) and the Radioactive Materials Division. This allows LLRW and LLMW to be shipped as regulated waste and then upon receipt at WCS through satisfying the relevant waste acceptance criteria the waste is exempted and placed into the WCS RCRA permitted cell. An additional 35 shipments (544 metric ton) of contaminated hazardous waste water were transported to U.S. Ecology in Robstown, TX for treatment/disposal. An additional 36 shipments (500 metric tons) of non-hazardous wastewater was sent to Republic Waste Services' facility in Fresno, TX. The disposal of these materials required close coordination with State of Texas regulators. During decommissioning, the project team recycled approximately 270 metric tons (600,000 pounds) of lead and steel. As part of the dismantlement in Brownsville, TX the team recycled approximately 5,000 metric tons (11 million pounds) of ferrous and non-ferrous material, limiting our disposal requirements to about 180 metric tons (400,000 pounds) of material (<4% from entire shipbreaking activity). Although the primary hazard being mitigated by this project was radiological, recycling was always a priority for the project. The team strived to achieve sustainability goals as we implemented this one of a kind project. Scrap metal recycling has a large positive impact on the environment and can also favorably impact project disposal costs. Steel is among the most recycled material in the world. Nearly 40% of the world's steel production is made from scrap. Recycling steel also requires 75% less energy than producing it from raw materials. By using recycled steel rather than virgin materials, 2.33 kg of carbon emissions are eliminated per kg of steel [1]. The project recycled more than 4,500 metric tons (10 million pounds) of steel, which eliminated about 10,400 metric tons (23 million pounds) of CO{sub 2}. By implementing a recycling initiative for the Sturgis project, the team was able to realize cost avoidance for disposal of scrap, cost savings from the metals recycled, plus the project provided benefits to the environment through our recycling efforts. Once the dismantlement was complete, the team prepared a detailed decommissioning closure report, which allowed for the termination of the Army Reactor Decommissioning Permit. While it not only reduced any potential long-term environmental liability, this project to decommission and dismantle a floating nuclear power plant is truly unprecedented - it is a prime example of the USACE mission which is: 'Engineering solutions for the Nation's toughest challenges'. This unique, one of a kind, historical power plant was never designed to be taken apart, and the available information about its construction was lacking in many details. The hazards that required mitigation dictated a painstaking and deliberate process in order to avoid any release to the environment and the community, and to protect the health and safety of the workers involved while keeping the waste hierarchy's three R's - reduce, reuse and recycle at the forefront. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗