Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “PLANNING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,423 records · Page 79

Opportunities for Integrating Electric and Gas Planning

Growing demand for electricity in buildings is creating new opportunities and challenges for electric and natural gas planning. To date, electric and gas planning processes have largely been siloed, and only a few jurisdictions have started to examine how these two processes could be linked together. The report explores the current state of electric and gas system planning, and the benefits and challenges of integrating these planning processes. We frame the characteristics of an integrated electric and gas distribution planning process and identify indicators of progress toward the characteristics.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 116: Area 25 Test Cell C Facility, Nevada Test Site, Nevada, Revision 1

This Streamlined Approach for Environmental Restoration (SAFER) Plan identifies the activities required for the closure of Corrective Action Unit (CAU) 116, Area 25 Test Cell C Facility. The Test Cell C (TCC) Facility is located in Area 25 of the Nevada Test Site (NTS) approximately 25 miles northwest of Mercury, Nevada (Figure 1). CAU 116 is currently listed in Appendix III of the Federal Facility Agreement and Consent Order (FFACO) of 1996 (as amended February 2008) and consists of two Corrective Action Sites (CASs): (1) CAS 25-23-20, Nuclear Furnace Piping; and (2) CAS 25-41-05, Test Cell C Facility. CAS 25-41-05 is described in the FFACO as the TCC Facility but actually includes Building 3210 and attached concrete shield wall only. CAU 116 will be closed by demolishing Building 3210, the attached concrete shield wall, and the nuclear furnace piping. In addition, as a best management practice (BMP), Building 3211 (moveable shed) will be demolished due to its close proximity to Building 3210. This will aid in demolition and disposal operations. Radiological surveys will be performed on the demolition debris to determine the proper disposal pathway. As much of the demolition debris as space allows will be placed into the Building 3210 basement structure. After filling to capacity with demolition debris, the basement structure will be mounded or capped and closed with administrative controls. Prior to beginning demolition activities and according to an approved Sampling and Analysis Plan (SAP), representative sampling of surface areas that are known, suspected, or have the potential to contain hazardous constituents such as lead or polychlorinated biphenyls (PCBs) will be performed throughout all buildings and structures. Sections 2.3.2, 4.2.2.2, 4.2.2.3, 4.3, and 6.2.6.1 address the methodologies employed that assure the solid debris placed in the basement structure will not contain contaminants of concern (COCs) above hazardous waste levels. The anticipated post-closure-posting requirements for the mounded/capped basement structure, as well as for the entire CAU, are addressed in Section 4.2.10. The site contains radiologically impacted surfaces and hazardous materials. Based on review of the historical information for CAU 116 and recent site inspections, there is sufficient process knowledge to close CAU 116 using the SAFER process. CAUs that may be closed using the SAFER process have conceptual corrective actions that are clearly identified. Consequently, corrective action alternatives can be chosen prior to completing a corrective action investigation, given anticipated investigation results. The SAFER process combines elements of the data quality objective (DQO) process and the observational approach to plan and conduct closure activities. The DQOs are used to identify the problem and define the type and quality of data needed to complete the investigation phase of the SAFER process. The purpose of the investigation phase is to verify the adequacy of existing information used to determine the chosen corrective action. The observational approach provides a framework for managing uncertainty during the planning and decision-making phases of the project. The SAFER process allows for technical decisions to be made based on information gathered during site visits, interviews, meetings, research, and a consensus of opinion by the decontamination and decommissioning (D&D) team members. Any uncertainties are addressed by documented assumptions that are verified by sampling and analysis, data evaluation, onsite observations, and contingency plans, as necessary. Closure activities may proceed simultaneously with site characterization as sufficient data are gathered to confirm or disprove the assumptions made during selection of the corrective action. If, at any time during the closure process, new information is discovered that indicates that closure activities should be revised, closure activities will be reevaluated as appropriate. Based on a detailed review of historical documentation, there is sufficient process knowledge to close CAU 116 using the SAFER process. The COC have been determined and are discussed in Section 4.1.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

RIVER PROTECTION PROJECT SYSTEM PLAN

The U.S. Department of Energy (DOE), Office of River Protection (ORP) manages the River Protection Project (RPP). The RPP mission is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. As a result, ORP is responsible for the retrieval, treatment, and disposal of approximately 57 million gallons 1 of radioactive waste contained in the Hanford Site waste tanks and closure2 of all the tanks and associated facilities. The previous revision of the System Plan was issued in May 2008. ORP has made a number of changes to the tank waste treatment strategy and plans since the last revision of this document, and additional changes are under consideration. ORP has contracts in place to implement the strategy for completion of the mission and establish the capability to complete the overall mission. The current strategl involves a number of interrelated activities. ORP will reduce risk to the environment posed by tank wastes by the following: (1) Retrieving the waste from the single-shell tanks (SST) to double-shell tanks (DST) and delivering the waste to the Waste Treatment and Immobilization Plant (WTP). (2) Constructing and operating the WTP, which will safely treat all of the high-level waste (HLW) fraction contained in the tank farms. About one-third of the low-activity waste (LAW) fraction separated from the HLW fraction in the WTP will be immobilized in the WTP LAW Vitrification Facility. (3) Developing and deploying supplemental treatment capability assumed to be a second LAW vitrification facility that can safely treat about two-thirds of the LAW contained in the tank farms. (4) Developing and deploying supplemental pretreatment capability currently assumed to be an Aluminum Removal Facility (ARF) using a lithium hydrotalcite process to mitigate sodium management issues. (5) Developing and deploying treatment and packaging capability for contact-handled transuranic (CH-TRU) tank waste for possible shipment to and disposal at the Waste Isolation Pilot Plant (WIPP) in New Mexico. (6) Deploying interim storage capacity for the immobilized high-level waste (IHLW) pending determination of the final disposal pathway. (7) Closing the SST and DST tank farms, ancillary facilities, and all associated waste management and treatment facilities. (8) Optimizing the overall mission by resolution of technical and programmatic uncertainties, configuring the tank farms to provide a steady, well-balanced feed to the WTP, and performing trade-offs of the required amount and type of supplemental treatment and of the amount of HLW glass versus LAW glass. ORP has made and continues to make modifications to the WTP contract as needed to improve projected plant performance and address known or emerging risks. Key elements needed to implement the strategy described above are included within the scope of the Tank Operations Contract (TOC). Interim stabilization of the SSTs was completed in March 2004. As of April 2009, retrieval of seven SSTs has been completed and retrieval of four additional SSTs has been completed to the limits of technology. Demonstration of supplemental LAW treatment technologies has stopped temporarily pending revision of mission need requirements. Award of a new contract for tank operations (TOC), the ongoing tank waste retrieval experience, HLW disposal issues, and uncertainties in waste feed delivery and waste treatment led to the revision of the Performance Measurement Baseline (PM B), which is currently under review prior to approval. 6 This System Plan is aligned with the current WTP schedule, with hot commissioning beginning in 2018, and full operations beginning in late 2019. Major decisions regarding the use of supplemental treatment and the associated technology, the ultimate needed capacity, and its relationship to the WTP have not yet been finalized. This System Plan assumes that the outcome of these decisions will be to provide a second LAW vitrification facility. No final implementation decisions regarding supplemental technology can be made until the Tank Closure and Waste Management Environmental Impact Statement is completed and a Record of Decision is issued by DOE. Technical solutions are being developed to mitigate the impact from substantially increased estimates of sodium to be added during pretreatment of the tank waste solids. This may involve one or more of the following options: (1) refining or modifying the flowsheet to reduce the required amount of additional sodium, (2) increasing the overall LAW vitrification capacity, (3) increasing the incorporation of sodium into the LAW glass, (4) increasing the incorporation of aluminum in the HLW glass to reduce caustic leaching requirements, or (5) implementing other technical solutions. For planning purposes, the PMB assumes that option (5) above, in the form of an ARF, will be successful in reducing the sodium required to be added during pretreatment of the tank waste.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integration of Design Data Into Automated Fiber Placement Process Planning Metrics

With the ever-expanding aviation industry, a need is arising for more rapid production of composite aircraft to meet increasing demand. State-of-the-art aircraft such as the Boeing 787showcase 50% composite material usage by weight, highlighting this emerging industry-wide adoption of the material system. Currently, many of the large structures associated with these aircraft are manufactured additively via Automated Fiber Placement (AFP). The AFP process shows great potential for efficient manufacturing, however unavoidable defects still occur because of tool surface geometry, placement errors, or poor process planning, resulting in decreased quality and throughput. Due to such effects, it is critical to incorporate design for manufacturing (DFM) principles to achieve the optimal manufacturing plan and resulting structure. This work will develop a methodology for incorporating design information into process planning metrics in an automated fashion to achieve an optimal set of process inputs.The analysis incorporates HyperX, Computer Aided Process Planning (CAPP) and Vericut Composite Programming (VCP). Safety margins from HyperX are imported into CAPP where AFP defects are mapped to the values. The resulting margins are then incorporated into the CAPP manufacturability algorithms, creating a design informed process planning analysis

Automated Fiber Placement↗

Development and Clustering of Rate-Oriented Load Metrics for Customer Price-Plan Analysis: Preprint

One of the few methods electric utilities can use to motivate and change customer energy consumption is through their retail rate structures. Utilities are increasingly moving towards more dynamic rate-plans to achieve the objectives of motivating energy conservation, increasing self-consumption from onsite renewable generation, reducing peak demand and to flattening the demand profiles. This paper presents a set of rate-oriented customer load metrics that are the determinants of customers bill under four unique rate-plans. These metrics are not only indicative of which rate structure a customer should choose based on their load profiles, but also convey useful information about load consumption behavior. With these metrics, the utility can analyze their customers and identify customer classes that are rewarded under each rate-plan. This can help inform utilities whether the customer profiles being rewarded under each rate-plans are meeting their original objectives. To develop these customer classes, we calculate these rate-oriented load metrics for each customer and perform k-means clustering. The analysis is conducted on from a set of 300 customer profiles, examining the impact of four different rate-plans, different numbers of clusters and looking at customer bills and cluster load profile characteristics.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Key Takeaways: First Cohort of Action Plans for Rapid Power Sector Decarbonization

The purpose of this synthesis report is to extract key takeaways from the first cohort of CEM Action Plans for rapid power sector decarbonization, developed by Australia, Chile, the European Union, India, and the United Kingdom. These Action Plans differ in their approach to power sector decarbonization based on the domestic resources available, governance structure, and regional context, among other factors. However, they also share common themes that were emphasized in the collaborative report released at CEM13. This report is not intended to be inclusive of all components in each Action Plan. Rather, this report highlights how select best practices for planning, building, and operating power systems are being implemented differently in these Action Plans, with equal focus given to each jurisdiction. Ministers and stakeholders from other governments with similar decarbonization goals can consider these examples within their own unique context.

Australia↗

Development of the Office of Civilian Radioactive Waste Management National Transportation Plan

The Director of the Department of Energy's (DOE) Office of Civilian Radioactive Waste Management (OCRWM) designated development of the National Transportation Plan (NTP) as one of his four strategic objectives for the program. The Office of Logistics Management (OLM) within OCRWM was tasked to develop the plan, which will accommodate state, local, and tribal concerns and input to the greatest extent practicable. The plan will describe each element of the national transportation system that OCRWM is developing for shipping spent nuclear fuel and high-level radioactive waste to the proposed geologic repository at Yucca Mountain, Nevada. The plan will bring together OCRWM's approach for acquiring capital assets (casks, rail cars, and a rail line in Nevada) and its operational planning efforts in a single, comprehensive document. It will also provide a timetable for major transportation decisions and milestones needed to support a 2017 start date for shipments to the Yucca Mountain repository. The NTP will be revised to incorporate new developments and decisions as they are finalized. This paper will describe the elements of the NTP, its importance in providing a comprehensive overview of the national transportation system, and the role of stakeholders in providing input on the NTP and the national transportation system. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Alternative D and D Planning Tool - 12466

On August 1, 2011, URS - CH2M Oak Ridge LLC (UCOR) began cleanup of the East Tennessee Technology Park (ETTP). UCOR's $2.2 billion contract has an initial five-year term and a four-year option period for completing the cleanup of ETTP and performing surveillance and maintenance and waste management operations at both the Oak Ridge National Laboratory and the Y-12 National Security Complex. ETTP D and D work includes disposition of large, complex, contaminated, Manhattan Project-era facilities such as the K-25 and K-27 uranium enrichment facilities. At ETTP, UCOR views the D and D process as a 'Waste Factory' with waste production lines from the point-of-generation to the point-of-disposal. Safely transforming vertically-standing buildings into horizontally-lying waste in a disposal facility is the primary cleanup objective. Whereas a factory produces widgets, D and D produces waste-lots of waste. In support of the Waste Factory view, UCOR is developing a systems planning tool to help better plan how to effect cleanup by improving waste planning, uniting waste generator with waste dis-positioner, and represent the 'waste factory' in a computer model that allows the D and D and waste management teams to better understand available disposal paths, waste uncertainties and potential consequences, driving variables, and sensitivity to changes. Any model of reality represents a compromise. Part of the Waste Factory Model's value may be in providing standardization and relative direction for assisting decision making as opposed to absolute cost or schedule answers. From that relative direction, management can commission detailed planning and estimating. Also, the model's output credibility is tied directly to its input quality. That is why, as discussed above, the Waste Factory Model's key informational component will be the standardized waste streams (e.g., Structure/Debris disposed at EMWMF) and associated standardized unit costs. The model development process generally, and the development team's collaboration, specifically, is most important. Building-in this integrity up-front, transparently, will help ensure that the model outputs are known, understood, and credible (no mysterious 'black-box' components). The Waste Factory Model is envisioned to help improve understanding of a given project's waste implications; help reveal and suggest the important few variables out of the trivial many; reveal likely process bottlenecks, and help focus risk mitigation and assumption management efforts to better manage the projected total cost. In the long term, the UCOR team's goal is to incorporate an information feedback loop to help improve the accuracy of key model attributes, such as the standardized cost information. This way, by design, the model output should improve over time and thus help the model mature into both a credible scenario tool and a standardized project planning resource. The initial model capabilities may be narrow, but with time and effort it may prove to be a timely and cost-effective tool. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Overview of the DOE nuclear fuels storage and transportation planning project - 15444

The US Department of Energy (DOE) Office of Nuclear Energy is conducting planning activities within the Nuclear Fuels Storage and Transportation Planning Project (NFST) to lay the groundwork for implementing interim storage, including associated transportation, per the Administration's Strategy for the Management and Disposal of Used Nuclear Fuel and High-Level Radioactive Waste, and to develop a foundation for a new nuclear waste management organization. The purpose of the NFST is to make progress on this important national issue within existing legislative and budgetary authorizations. The objective of the NFST is to develop and begin implementation of an integrated plan to (1) implement interim storage; (2) improve the overall integration of storage as a planned part of the waste management system; (3) prepare for the large-scale transportation of spent nuclear fuel and high-level radioactive waste, with an initial focus on removing SNF from the shutdown reactor sites; and (4) develop foundational information, resources, and capabilities needed to support the aforementioned objectives and future implementation decisions and actions. An over-arching goal is to develop options for decision-makers on the design of an integrated waste management system. The planning activities are divided into four major topical areas: (1) Consent-Based Siting, (2) Storage, (3) Transportation, and (4) Strategic Crosscuts. This paper provides an overview of the NFST and its activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Tool for Planning Near-Term Waste Transfers at the Hanford Site - 18491

Washington River Protection Solutions, LLC is developing a software tool designed to simulate near-term waste affecting activities at the Hanford Site. The tool will allow for timely planning and evaluation of near-term operational activities, as well as facilitate feedback incorporation from the field to enable rapid iteration of various planning scenarios for a Multi-Year Operating Plan. Implementation of this tool in the Multi-Year Operating Plan planning process will support building a better connection between execution of daily activities and long-term mission objectives. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cost saving opportunities in emergency planning at nuclear power plants - 18819

This paper identifies generalized offsite emergency planning costs for 2014 covering twenty different commercial nuclear plant locations in the U.S. This information was analyzed to quantify the potential cost savings associated with reduction in offsite emergency planning zone size as a function of sixteen offsite emergency planning standards contained in 10 CFR 50.47(b). Mean annual operating and maintenance costs and startup costs for a typical offsite nuclear power plant emergency planning program were $2.25 M and $10 M, respectively. However, if a reactor design technical basis were developed that allowed for a reduction in offsite plume emergency planning zone (EPZ) size from the nominal 10 mile standard currently used, collocation of that EPZ with the site plant boundary could produce programmatic savings in excess of 90% over a typical 40 year plant life. Lesser, but still potentially significant savings, are possible if the plume EPZ were resized to five and two miles. Negligible potential cost savings were identified with reductions in the ingestion pathway EPZ size which has been typically set at 50 miles. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Advanced Fuels Campaign Execution Plan

The Advanced Fuels Campaign (AFC) Execution Plan details the strategy, mission, scope, and goals—both near-term and long-term—along with the structure and organization of nuclear fuels and materials research, development, and demonstration (RD&D) activities within the Fuel Cycle Technologies (FCT) program. The FCT program, tasked by the U.S. Department of Energy (DOE), employs a science-based approach to advance fuel technologies. This approach integrates theory, experiments, and multi-scale modeling and simulation (M&S) to develop a predictive understanding of fuel fabrication processes and fuel/cladding performance under irradiation, moving beyond traditional empirical methods. The long-term goals of the AFC are guided by the AFC Strategic Plan and align with the DOE Office of Nuclear Energy (NE) Roadmap [1], which outlines a multi-decade vision for demonstrating and qualifying advanced fuel forms to support diverse fuel cycle options. Near-term goals focus on enhancing accident tolerant fuels (ATF) for Light Water Reactors (LWR), a significant challenge that demands balancing immediate objectives with ongoing progress toward advanced reactor missions. Accelerating the traditional fuel qualification process to meet ATF objectives is another critical challenge. A detailed set of 5-year goals, summarized below, has been developed in line with the overarching science-based fuel development approach: • Advanced LWR Fuel Technologies: By 2027, support the development of advanced LWR fuel technologies with improved performance and enhanced accident tolerance. This includes high burnup (HBu), low enriched uranium (LEU)+, coated cladding, and doped fuel, aimed at complementing industry-led significant LWR uprates and plant refurbishments. • Tristructural Isotropic (TRISO) Fuel: Achieve qualification by 2028 and develop improved designs for emerging markets. • Metal Fuel: Achieve qualification by 2028 and develop improved designs for emerging markets. • Molten Salt Fuel: By 2027, deploy a robust program that enables fuel salt qualification technologies needed to support fuel salt research and development (R&D), focusing on emergent needs to derisk fuel salt production and utilization in advanced reactors. • Long-Term ATF: Develop fuel technologies that enable significant power uprates (~50%) in refurbished or new LWRs while optimizing fissile material utilization and waste disposal. The 5-year milestones in the AFC Execution Plan are contingent on an assumed budget. This Execution Plan will be updated annually to reflect actual funding profiles as budget guidance becomes available, ensuring milestones are adjusted accordingly. In summary, the AFC Execution Plan presents a comprehensive strategy to advance nuclear fuel technologies through a science-based approach, addressing both near-term and long-term goals while adapting to funding realities.

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

National Security Technology Incubation Strategic Plan

This strategic plan contains information on the vision, mission, business and technology environment, goals, objectives, and incubation process of the National Security Technology Incubation Program (NSTI) at Arrowhead Center. The development of the NSTI is a key goal of the National Security Preparedness Project (NSPP). Objectives to achieve this goal include developing incubator plans (strategic, business, action, and operations), creating an incubator environment, creating a support and mentor network for companies in the incubator program, attracting security technology businesses to the region, encouraging existing business to expand, initiating business start-ups, evaluating products and processes of the incubator program, and achieving sustainability of the incubator program. With the events of 9/11, the global community faces ever increasing and emerging threats from hostile groups determined to rule by terror. According to the National Nuclear Security Administration (NNSA) Strategic Plan, the United States must be able to quickly respond and adapt to unanticipated situations as they relate to protection of our homeland and national security. Technology plays a key role in a strong national security position, and the private business community, along with the national laboratories, academia, defense and homeland security organizations, provide this technology. Fostering innovative ideas, translated into relevant technologies answering the needs of NNSA, is the purpose of the NSTI. Arrowhead Center of New Mexico State University is the operator and manager of the NSTI. To develop the NSTI, Arrowhead Center must meet the planning, development, execution, evaluation, and sustainability activities for the program and identify and incubate new technologies to assist the NNSA in meeting its mission and goals. Technology alone does not give a competitive advantage to the country, but the creativity and speed with which it is employed does. For a company to succeed, it must have sustainable competitive advantages in seven key areas: geography, products and businesses, distribution, sales and service culture, efficiency, brand, and most important, people. The four strategic goals of the plan are to: 1. Identify and recruit small businesses with technology applications for national security. 2. Design and implement a national security incubator program that provides incubator services and physical space for the targeted businesses. 3. Provide business assistance and technical leadership to NSTI clients to assist in bringing their products to market. 4. Construct a new multi-tenant facility with dedicated physical space for businesses with technology applications for national security.

99 GENERAL AND MISCELLANEOUS↗

National Security Technology Incubation Project Continuation Plan

This document contains a project continuation plan for the National Security Technology Incubator (NSTI). The plan was developed as part of the National Security Preparedness Project (NSPP) funded by a Department of Energy (DOE)/National Nuclear Security Administration (NNSA) grant. This continuation plan describes the current status of NSTI (staffing and clients), long-term goals, strategies, and long-term financial solvency goals.The Arrowhead Center of New Mexico State University (NMSU) is the operator and manager of the NSTI. To realize the NSTI, Arrowhead Center must meet several performance objectives related to planning, development, execution, evaluation, and sustainability. This continuation plan is critical to the success of NSTI in its mission of incubating businesses with security technology products and services.

99 GENERAL AND MISCELLANEOUS↗

Chapter 8: Planning Tools to Simulate and Optimize Neighborhood Energy Systems

This section introduces different energy modeling tools available in Europe and the USA for community energy master planning process varying from strategic Urban Energy Planning to more detailed Local Energy Planning. Two modeling tools used for Energy Master Planning of primarily residential communities, the 3D city model with CityGML, and the Net Zero Planner tool developed for the US Department of Defense installations are described in more details.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Transmission Planning Studies for the Renewable Energy Zone (REZ) Process

Transmission planning studies help practitioners identify the most attractive transmission options to cost-effectively connect Renewable Energy Zones (REZs) to load while sustaining the balance between generation and demand in a variety of potential operating conditions and yielding the most benefits at minimum cost. This document focuses on the transmission planning studies of the REZ Transmission Planning process to help practitioners understand the analyses involved in studying potential transmission upgrade and expansion options, the general data requirements, and the associated modeling considerations. The REZ process is an approach to plan, approve, and build transmission infrastructure that connects REZs - geographic areas that have high-quality RE resources, suitable topography and land-use designations, and demonstrated developer interest - to the power system. The REZ process helps to increase the share of solar photovoltaic (PV), wind, and other resources while also maintaining reliability and economics.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A Scalable Solution Framework for Stochastic Transmission and Generation Planning Problems. Draft

Current commercial software tools for transmission and generation investment planning have limited stochastic modeling capabilities. Because of this limitation, electric power utilities generally rely on scenario planning heuristics to identify potentially robust and cost effective investment plans for a broad range of system, economic, and policy conditions. Several research studies have shown that stochastic models perform significantly better than deterministic or heuristic approaches, in terms of overall costs. However, there is a lack of practical solution approaches to solve such models. In this paper we propose a scalable decomposition algorithm to solve stochastic transmission and generation planning problems, respectively considering discrete and continuous decision variables for transmission and generation investments. Given stochasticity restricted to loads and wind, solar, and hydro power output, we develop a simple scenario reduction framework based on a clustering algorithm, to yield a more tractable model. The resulting stochastic optimization model is decomposed on a scenario basis and solved using a variant of the Progressive Hedging (PH) algorithm. We perform numerical experiments using a 240-bus network representation of the Western Electricity Coordinating Council in the US. Although convergence of PH to an optimal solution is not guaranteed for mixed-integer linear optimization models, we find that it is possible to obtain solutions with acceptable optimality gaps for practical applications. Our numerical simulations are performed both on a commodity workstation and on a high-performance cluster. The results indicate that large-scale problems can be solved to a high degree of accuracy in at most two hours of wall clock time.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Considerations for Resilience Guidelines for Clean Energy Plans: For the Oregon Public Utility Commission and Oregon Electricity Stakeholders

This document summarizes relevant approaches, research, models, and national examples for state utility regulators tasked with developing utility guidelines for risk-based resiliency planning. In 2021, the Oregon Legislature enacted a 100 percent clean electricity by 2040 standard that requires the Oregon Public Utility Commission (PUC) to oversee utility planning for aggressive clean energy deployment through Clean Energy Plans (House Bill 2021, Sec. 4). In addition to meeting emissions reductions targets, Clean Energy Plans must also: "Include a risk-based examination of resiliency opportunities that includes costs, consequences, outcomes, and benefits based on reasonable and prudent industry resiliency standards and guidelines established by the Public Utility Commission." This report will support the Oregon Public Utility Commission in developing resilience guidelines. Other state public utility commissions may also benefit from this research.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗