Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Environmental control”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,423 records · Page 79

Achieving groundwater monitoring optimization at SRS: a core team process based on rigorous technical assessment - 15273

The optimization of groundwater monitoring at Savannah River Site (SRS) was achieved through a core team process based on the application of a comprehensive, technical evaluation of individual regulated groundwater units. Groundwater monitoring at SRS is required at dozens of waste sites and includes about 4,000 samples annually. The expected longevity of groundwater contamination and associated groundwater monitoring and reporting constitutes a significant long-term cost to the environmental management budget. The core team, consisting of representatives from the Department of Energy (DOE); U.S. Environmental Protection Agency (USEPA); and the South Carolina Department of Health and Environmental Control (SCDHEC), recognized that monitoring needs for individual plumes evolve as remediation work progresses. The technical evaluation plan was generally based on the availability of many years of monitoring data. In addition, it was recognized that the well network, sampling frequency, and analytical suite had been the same for years and warranted evaluation to determine if the existing monitoring was meeting the current objectives. In order to systematically evaluate monitoring at eighteen different groundwater units, SRS developed a decision-logic analysis using flow sheets to address five areas of optimization identified with core team agreement, including: (1) current monitoring vs regulatory requirements, (2) spatial optimization, (3) temporal assessment, (4) analyte assessment, and (5) reporting assessment. The evaluation resulted in SRS proposing changes in the spatial, temporal, analyte, and reporting aspects of groundwater monitoring for fifteen of the eighteen individual groundwater units evaluated. Overall, these changes have resulted in annual savings of $370 K to date, with an additional $200 K in annual savings pending. Early and frequent core team deliberations helped ensure the success of this optimization effort. The technical evaluation was conducted after receiving core team buy-in for the goals and methods of the project. Technical evaluations for each unit were proposed to the regulators in unit-specific regulatory submittals. The technical justifications and core team decisions were all documented and implemented in accordance within the framework of the SRS Federal Facility Agreement or Resource Conservation and Recovery Act (RCRA) Permit process. This optimization approach can be expected to be highly successful for sites with rich historical data sets and where the requirements in regulatory monitoring plans can be negotiated. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Regulatory Compliance of H Retention Basin Using Rhombo Balls - 16151

Elevated pH conditions in the Savannah River Site 281-8H Retention Basin will have to be resolved prior to the issuance of a new National Pollutant Discharge Elimination System permit. The 281-8H retention basin collects rain water runoff, cooling tower blow downs and steam condensate from H Area Tank Farm operation processes. The basin discharges to a South Carolina Department of Health and Environmental Control National Pollutant Discharge Elimination System permitted out-fall, H-12. The permit requires the out-fall to meet certain discharge requirements. The National Pollutant Discharge Elimination System permit requires the pH to be within the range 4.8 to 8.5. The 281-8H Retention Basin has a steady history of elevated pH levels, above 8.5, especially during the warmer months of the year, normally March through October. The rise in pH has been attributed to the exponential growth of algae which occurs during the warm months of the year. The increased algae colonies undergo photosynthesis which depletes the CO{sub 2} in the basin water and subsequently raises the pH level. The current permit allows simultaneous discharge of low pH well water, pH between 4.6 and 5.0, and the 281-8H Retention Basin water which provides blending to achieve regulatory compliance. The regulatory agency indicated in 2010 that adding well water to achieve compliance of pH limits will not be allowed when the new permit is issued in the future. Therefore, a solution to the high pH had to be identified and implemented in order to ensure regulatory compliance. A system engineering evaluation was conducted to determine the best solution to the large algae colonies and high pH levels. The evaluation identified options in four primary categories as well as some combination of those categories to control algae growth and to ultimately increase the amount of CO{sub 2} in the basin. Eleven evaluation criteria were developed for the various options, and a percentage (out of 100%) was assigned to related groups of criteria. Twenty-six options were evaluated during this process. The highest ranking options determined from the evaluation were the 12-sided Rhombo ball floating cover, biological digester and a combination of the digester and the floating cover. Option 3, a combination of the top two choices, was chosen as the best approach. The Rhombo cover along with the initial shock application of a biological digester has worked to eliminate algae growth and lower the pH level. The Rhombos have significantly lowered the basin pH level from greater than 9 to less than 7, which is within the regulatory compliance pH requirements of 4.8 to 8.5. The system engineering evaluation and subsequent solution chosen are useful in many venues. The application of the 12 sided Rhombo ball's unique ability to nestle together no matter which way they turn is advantageous to applications/problems that need to block 99.99% sunlight from a body of water. The 281-8H Retention Basin required nine 18 wheeler truckloads with trailers that were 16.2 m (53 Ft) long and filled with Rhombo balls. The basin required a total of approximately 700,000 Rhombo balls to be fully covered. They are easy to install and handle. The Rhombo balls have wind resistance up to 120 Km/hr (75 MPH) and have a life expectancy of 25 years. This application can be used to control plant and algae growth and is effective in evaporation reduction at 99%. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Implementation of a Risk-Informed Monitoring Program for the Saltstone Disposal Facility - 19374

Section 3116(b) of the Ronald W. Reagan National Defense Authorization Act for Fiscal Year 2005 (NDAA) requires the US NRC, in coordination with the appropriate State agency, to monitor certain disposal actions of the US DOE to assess compliance with the performance objectives in Subpart C of Part 61 of Title 10 of the Code of Federal Regulations (CFR). Under Section 3116(b), the US NRC monitors the US DOE disposal of salt waste at the Saltstone Disposal Facility (SDF) at the Savannah River Site (SRS) in South Carolina. Since the first US NRC monitoring plan for the SDF was issued in 2007, the US NRC staff has made the risk-significant areas of interest more specific. Following the US DOE issuance of the 2009 performance assessment for the SDF and the US NRC review of that document, the US NRC issued its second monitoring plan for the SDF in 2013. The 2013 US NRC monitoring plan included 11 monitoring areas, which were broken down into 40 specific monitoring factors. The US NRC prioritized those monitoring factors (i.e., low, medium, high) based on the sensitivity of model results to the assumptions or processes covered by the monitoring factor and the uncertainty in those assumptions or processes. Those monitoring factors can be opened, closed, revised, and re-prioritized based on new information or changes in the US DOE activities and plans. For example, the list of US NRC high-priority monitoring factors has changed in response to changing information. The flexibility of this approach allows the US NRC to remain focused on risk-significant areas of interest. The US NRC staff has made changes to the NDAA monitoring program at the SDF since the issuance of the 2007 monitoring plan. First, the development of more specific monitoring factors and the prioritization of those monitoring factors has been successful in focusing the US NRC and the US DOE resources on risk-significant issues and providing transparency to stakeholders. Second, the US NRC reviews have become more focused on addressing specific monitoring factors, which has made the process for updating the monitoring plan more transparent. Finally, periodic management meetings and monthly telephone calls maintain open communications between the US NRC, US DOE, South Carolina Department of Health and Environmental Control (SCDHEC), and US EPA. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Update to the Performance Assessment for the Savannah River Site Saltstone Disposal Facility - 20124

In 2019, Savannah River Remediation developed a revision to the performance assessment (PA) on behalf of the U.S. Department of Energy (DOE) Savannah River Operations Office (SR) for the near-surface disposal of low-level waste at the Savannah River Site (SRS) Saltstone Disposal Facility (SDF). Soluble waste from SRS Tank Farms undergoes salt processing to remove cesium and other high activity constituents. The low-activity decontaminated salt solution (DSS) is then immobilized by mixing it into a cementitious waste form known as saltstone. After mixing, the saltstone is poured into leak-tight concrete vaults, known as saltstone disposal units (SDUs), where the waste form cures. By the time of facility closure, the SDF is expected to consist of 15 SDUs with a combined capacity of 1.06 E+09 L (280 Mgal) of cured saltstone. The facility operates under a Disposal Authorization Statement (DAS) from DOE and a permit from the South Carolina Department of Health and Environmental Control (SCDHEC). Since the start of operations in 1990, the SDF has received almost 6.7 E+07 L (18 Mgal) of DSS, resulting in the safe disposal of 2.7 E+16 Bq (7.3 E+05 Ci) of activity. Due to the radioactive decay of short-lived contaminants, the total remaining activity in the disposed waste is estimated to be approximately 1.4 E+16 Bq (3.9 E+05 Ci), as of September 2018. The Disposal Authorization Statement requires a demonstration that the system of engineered and natural features of the disposal facility will limit releases from the facility and be protective of human health and the environment for at least the next 1,000 years. The long-term performance of the facility was evaluated under the requirements of the DoE's Radioactive Waste Management Manual (US DOE Manual 435.1-1). Simulations were performed to demonstrate that the disposal facility would meet performance objectives specified in the manual. The evaluation was based on numerical models that simulate the releases of contaminants from the saltstone waste form. Contaminants were transported through groundwater and air pathways to points of assessment to evaluate compliance. In addition, the potential consequences of an inadvertent human intrusion (IHI) were also evaluated. In accordance with the guidance and recommendations in US DoE's technical standard for DAS, deterministic and probabilistic analyses were performed to demonstrate the SDF system, which includes the engineered cover system, the SDUs, the waste form, and the natural features of the site, provides a reasonable expectation that saltstone disposal will meet performance objectives. Post-closure doses to future members of the public (MOP) were evaluated; dose estimates from the air pathway were well below the 1.0 E-04 Sv/yr (10 mrem/yr) performance objective within 1,000 years, and the calculated doses to the MOP from all exposure pathways, including the groundwater and air pathways, were well below the 2.5 E-04 Sv/yr (25 mrem/yr) performance objective within 1,000 years. Doses following an assumed intrusion event within the facility boundaries were well below the IHI performance objectives, where the acute IHI dose was below the acute IHI dose performance objective of 5.0 E-03 Sv (500 mrem) and the chronic IHI dose was below the chronic IHI dose performance objective of 1.0 E-03 Sv/yr (100 mrem/yr) within 1,000 years. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Issue Resolution During the Development of the Performance Assessment for the Savannah River Site Saltstone Disposal Facility - 20125

In 2019, Savannah River Remediation developed a revision to the performance assessment (PA) on behalf of the U.S. Department of Energy (DOE) Savannah River Operations Office (SR) for the near-surface disposal of low-level waste at the Savannah River Site (SRS) Saltstone Disposal Facility (SDF). Soluble waste from SRS Tank Farms undergoes salt processing to remove cesium and other high-activity constituents. The low-activity decontaminated salt solution (DSS) is then immobilized by mixing it into a cementitious waste form known as saltstone. After mixing, the saltstone is poured into leak-tight concrete vaults, known as saltstone disposal units (SDUs), where the waste form cures. By the time of facility closure, the SDF is expected to consist of 15 SDUs with a combined capacity of 1.06 E+09 L (280 Mgal) of cured saltstone. The facility operates under a Disposal Authorization Statement from DOE and a permit from the South Carolina Department of Health and Environmental Control (SCDHEC). Since the start of operations in 1990, the SDF has received almost 6.7 E+07 L (18 Mgal) of DSS, resulting in the safe disposal of 2.7 E+16 Bq (7.3 E+05 Ci) of activity. Due to the radioactive decay of short-lived contaminants, the total remaining activity in the disposed waste is estimated to be approximately 1.4 E+16 Bq (3.9 E+05 Ci), as of September 2018. The Disposal Authorization Statement requires a demonstration that the system of engineered and natural features of the disposal facility will limit releases from the facility and be protective of human health and the environment for at least the next 1,000 years. The long-term performance of the facility was evaluated under the requirements of the DoE's Radioactive Waste Management Manual (US DOE Manual 435.1-1). Simulations were performed to demonstrate that the disposal facility would meet performance objectives specified in the manual. The evaluation was based on numerical models that simulate the releases of contaminants from the saltstone waste form. Contaminants were transported through groundwater and air pathways to points of assessment to evaluate compliance (i.e., 100 m from the SDUs). In addition, the potential consequences of an inadvertent human intrusion (IHI) were also evaluated. A number of issues were overcome during the development of these simulations. These issues were identified as part of internal technical reviews. Simulations are developed by people and people make mistakes, so the internal technical review process is a vital step in PA development. Specific examples of resolved issues include a unit-conversion error, an inappropriate definition for a model boundary condition, a model time-stepping issue, and an error in the calculation for the buildup of contaminants in soil. Actions taken to address these issues resulted in an improved product with a better supported technical basis and more defensible results. The identification and correction of these issues are discussed. By understanding these issues, model developers and technical reviewers working on PAs in the future may avoid repeating these types of mistakes. Transparency with respect to these mistakes builds trust between waste management sites, regulators, and stakeholders. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Zero-Valent Iron Permeable Reactive Barrier to Remediate Volatile Organic Compounds in Groundwater - 20209

The US DOE-SRS, the US EPA, and the South Carolina Department of Health and Environmental Control determined it was appropriate to perform a non-time critical removal action at the P-Area Groundwater Operable Unit at the SRS to reduce the mass and downgradient transport of trichloroethylene in the P-Area groundwater plume. Contaminated groundwater discharges to a nearby stream, Steel Creek, within the SRS boundaries, resulting in trichloroethylene concentrations above the maximum contaminant level. Impact to surface water is limited in areal extent and supported by recently collected characterization data. The P-Area Groundwater Operable Unit encompasses the groundwater beneath an industrial area within SRS, P Area, where the P-Reactor once operated. The boundaries of the P-Area Groundwater Operable Unit extend northwest to Steel Creek, northeast toward PAR Pond, and southeast to Meyers Branch. Groundwater in the Upper Three Runs Aquifer of the P-Area Groundwater Operable Unit has been impacted by reactor and facility operations between 1954 and 1991, including tritium and volatile organic compounds. The P-Area surface units contributing to groundwater contamination were remediated as part of the P-Area Operable Unit in 2011. The P-Reactor closure is one of the first of its kind in the DOE Complex and is one of only a few full-sized production reactors in the US to undergo completion of final closure activities. The nature and extent of groundwater contamination was determined using a variety of investigative approaches such as groundwater monitoring wells, direct-push technology, and surface water samples. Groundwater contamination associated with trichloroethylene is primarily exhibited in a narrow plume that extends from the source area at P-Reactor and west to Steel Creek. Maximum contaminant level exceedances in groundwater occur over an area of ∼6.9 hectares for trichloroethylene with concentrations as high as 7.7 milligrams per liter. To the west of the P-Area facility area, the trichloroethylene groundwater plume is controlled by a buried geologic feature, assumed to be an old stream bed, that further narrows the groundwater plume in what has been designated as the 'neck area.' This narrowing of the groundwater plume provides an ideal location for a treatment barrier. The non-time critical removal action alternative chosen is to install a zero-valent iron permeable reactive barrier within the neck area of the trichloroethylene groundwater plume, perpendicular to groundwater flow direction. This technology will provide a treatment barrier that will reduce trichloroethylene groundwater concentrations by 90% and has an anticipated useful life of at least 25 years. A pre-design investigation was performed in the neck area to confirm site lithology, hydrogeology, geochemistry, and extent of trichloroethylene contamination prior to a final design. A treatability study, conducted as part of the pre-design investigation, indicated that the subsurface and groundwater in the PArea Groundwater Operable Unit is compatible with the zero-valent iron and will not lead to excessive buildup from mineralization/precipitation or biofouling. Probabilistic modeling was conducted using field and laboratory data to determine the expected performance of the zero-valent iron permeable reactive barrier. The model simulations indicated that a 3.81-centimeter thick barrier would provide greater than 90% reduction of trichloroethylene groundwater concentration. The final design of the zero-valent iron permeable reactive barrier is a barrier that will extend 80.5 linear meters in a 'zigzag' orientation to best transect the trichloroethylene plume and account for varying groundwater flow. The barrier will be installed from 13.7 meters below ground surface to 41.1 meters below ground surface for 65.8 linear meters and from 13.7 meters below ground surface to 36.6 meters below ground surface for 14.6 linear meters, the base of which is 'keyed' into a low permeability zone. The barrier is designed to a thickness of 10.2 centimeters, which was determined to reduce the trichloroethylene groundwater concentrations by greater than 90% with a safety factor of 2.67. A total of approximately 689 metric tons of zero-valent iron will be injected through 22 injection wells spaced 3.66 meters apart, using guar to suspend the zero-valent iron. Zero-valent iron permeable reactive barrier construction will be monitored through 23 installed resistivity receivers offset 7.32 meters from the zerovalent iron permeable reactive barrier. The zero-valent iron will be energized with a low-voltage 100 Hertz signal during injection and will be monitored using the resistivity receivers to ensure complete coalescence of the zero-valent iron permeable reactive barrier. The zero-valent iron was sized to have a hydraulic conductivity greater than the natural subsurface, thus promoting groundwater flow through the barrier. As contaminated groundwater contacts the zero-valent iron, volatile organic compounds, including trichloroethylene, are immediately degraded to harmless compounds such as ethylene. The performance of the zero-valent iron permeable reactive barrier will be monitored using three upgradient monitoring well clusters, six downgradient monitoring well clusters, and four in-wall monitoring wells. The in-wall monitoring wells will indicate immediate reduction of trichloroethylene mass in the groundwater and allow analyses of the zero-valent iron permeable reactive barrier health. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ESTABLISHING FINAL END STATE FOR A RETIRED NUCLEAR WEAPONS PRODUCTION REACTOR; COLLABORATION BETWEEN STAKEHOLDERS, REGULATORS AND THE FEDERAL GOVERNMENT

The Savannah River Site (SRS) is a 310-square-mile United States Department of Energy nuclear facility located along the Savannah River (SRS) near Aiken, South Carolina. Nuclear weapons material production began in the early 1950s, utilizing five production reactors. In the early 1990s all SRS production reactor operations were terminated. The first reactor closure end state declaration was recently institutionalized in a Comprehensive Environmental Response and Compensation and Liability Act (CERCLA) Early Action Record of Decision. The decision for the final closure of the 318,000 square foot 105-P Reactor was determined to be in situ decommissioning (ISD). ISD is an acceptable and cost effective alternative to off-site disposal for the reactor building, which will allow for consolidation of remedial action wastes generated from other cleanup activities within the P Area. ISD is considered protective by the regulators, U. S. Environmental Protection Agency (US EPA) and the South Carolina Department of Health and Environmental Control (SCDHEC), public and stakeholders as waste materials are stabilized/immobilized, and radioactivity is allowed to naturally decay, thus preventing future exposure to the environment. Stakeholder buy-in was critical in the upfront planning in order to achieve this monumental final decision. Numerous public meetings and workshops were held in two different states (covering a 200 mile radius) with stakeholder and SRS Citizens Advisory Board participation. These meetings were conducted over an eight month period as the end state decision making progressed. Information provided to the public evolved from workshop to workshop as data became available and public input from the public meetings were gathered. ISD is being considered for the balance of the four SRS reactors and other hardened facilities such as the chemical processing canyons.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Tape-cast sensors and method of making

A method of making electrochemical sensors in which an electrolyte material is cast into a tape. Prefabricated electrodes are then partially embedded between two wet layers of the electrolyte tape to form a green sensor, and the green sensor is then heated to sinter the electrolyte tape around the electrodes. The resulting sensors can be used in applications such as, but not limited to, combustion control, environmental monitoring, and explosive detection. A electrochemical sensor formed by the tape-casting method is also disclosed.

47 OTHER INSTRUMENTATION↗

Space shuttle environmental and thermal control life support system computer program

A computer program for the design and operation of the space shuttle environmental and thermal control life support system is presented. The subjects discussed are: (1) basic optimization program, (2) off design performance, (3) radiator/evaporator expendable usage, (4) component weights, and (5) computer program operating procedures.

Source record↗

Advanced Environmental Monitoring and Control Program: Technology Development Requirements

Human missions in space, from the International Space Station on towards potential human exploration of the moon, Mars and beyond into the solar system, will require advanced systems to maintain an environment that supports human life. These systems will have to recycle air and water for many months or years at a time, and avoid harmful chemical or microbial contamination. NASA's Advanced Environmental Monitoring and Control program has the mission of providing future spacecraft with advanced, integrated networks of microminiaturized sensors to accurately determine and control the physical, chemical and biological environment of the crew living areas. This document sets out the current state of knowledge for requirements for monitoring the crew environment, based on (1) crew health, and (2) life support monitoring systems. Both areas are updated continuously through research and space mission experience. The technologies developed must meet the needs of future life support systems and of crew health monitoring. These technologies must be inexpensive and lightweight, and use few resources. Using these requirements to continue to push the state of the art in miniaturized sensor and control systems will produce revolutionary technologies to enable detailed knowledge of the crew environment.

Jan, Darrell↗

NASA's Plans for Developing Life Support and Environmental Monitoring and Control Systems

Life Support and Monitoring have recently been reworked in response to the Vision for Space Exploration. The Exploration Life Support (ELS) Project has replaced the former Advanced Life Support Element of the Human Systems Research and Technology Office. Major differences between the two efforts include: the separation of thermal systems into a new stand alone thermal project, deferral of all work in the plant biological systems, relocation of food systems to another organization, an addition of a new project called habitation systems, and overall reduction in the number of technology options due to lower funding. The Advanced Environmental Monitoring and Control (AEMC) Element is retaining its name but changing its focus. The work planned in the ELS and AEMC projects is organized around the three major phases of the Exploration Program. The first phase is the Crew Exploration Vehicle (CEV). The ELS and AEMC projects will develop hardware for this short duration orbital and trans-lunar vehicle. The second phase is sortie landings on the moon. Life support hardware for lunar surface access vehicles including upgrades of the CEV equipment and technologies which could not be pursued in the first phase due to limited time and budget will be developed. Monitoring needs will address lunar dust issues, not applicable to orbital needs. The ELS and AEMC equipment is of short duration, but has different environmental considerations. The third phase will be a longer duration lunar outpost. This will consist of a new set of hardware developments better suited for long duration life support and associated monitoring needs on the lunar surface. The presentation will show the planned activities and technologies that are expected to be developed by the ELS and AEMC projects for these program phases.

Lawson, B. Michael↗

Environmental charging tests of spacecraft thermal control louvers

The environmental charging of spacecraft surfaces program consists, in part, of experimental evaluation of material response to the environmental charged particle flux. A flight type spacecraft thermal control louver assembly has been tested in an electron flux. The louver blade surface potential, the louver assembly currents, and the relatively high number of discharges observed in the electron environment are self-consistent results. The unexpected result of this testing was the flutter observed when the louvers were closed. The flutter is about 1 to 2 Hz in frequency and is probably electrostatically induced.

Berkopec, F. D.↗

Ubiquitous Wireless Smart Sensing and Control

Need new technologies to reliably and safely have humans interact within sensored environments (integrated user interfaces, physical and cognitive augmentation, training, and human-systems integration tools). Areas of focus include: radio frequency identification (RFID), motion tracking, wireless communication, wearable computing, adaptive training and decision support systems, and tele-operations. The challenge is developing effective, low cost/mass/volume/power integrated monitoring systems to assess and control system, environmental, and operator health; and accurately determining and controlling the physical, chemical, and biological environments of the areas and associated environmental control systems.

Wagner, Raymond↗

Ubiquitous Wireless Smart Sensing and Control. Pumps and Pipes JSC: Uniquely Houston

Need new technologies to reliably and safely have humans interact within sensored environments (integrated user interfaces, physical and cognitive augmentation, training, and human-systems integration tools).Areas of focus include: radio frequency identification (RFID), motion tracking, wireless communication, wearable computing, adaptive training and decision support systems, and tele-operations. The challenge is developing effective, low cost/mass/volume/power integrated monitoring systems to assess and control system, environmental, and operator health; and accurately determining and controlling the physical, chemical, and biological environments of the areas and associated environmental control systems.

Wagner, Raymond↗

Programable Multicrate Controller

High-speed, environmentally hardened controller developed for use with commercially available system crates for both experiment control and data handling. Programable crate controller consists of three functional areas: control section utilizes high-speed bit-slice circuitry, memory, and data way interface.

Mook, G. L.↗