Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Data Characterization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,423 records · Page 79

Deep Direct-Use Feasibility Study Numerical Modeling and Uncertainty Analysis using iTOUGH2 for West Virginia University

To reduce the geothermal exploration risk, a feasibility study is performed for a deep direct-use system proposed at the West Virginia University (WVU) Morgantown campus. This study applies numerical simulations to investigate reservoir impedance and thermal production. Because of the great depth of the geothermal reservoir, few data are available to characterize reservoir features and properties. As a result, the study focuses on the following three aspects: 1. model choice for predicting reservoir impedance and thermal breakthrough: after investigating three potential models (one single permeability model and two dual permeability models) for flow through fractured rock, it is decided to use single permeability model for further analysis; 2. well placement (horizontal vs. vertical) options: horizontal well placement seems to be more robust to heterogeneity and the impedance is more acceptable; 3. Prediction uncertainty: the most influential parameters are identified using a First-Order-Second-Moment uncertainty propagation analysis, and the uncertain range of the model predictions is estimated by performing a Monte Carlo simulation. Heterogeneity has a large impact on the perdition, therefore, is considered in the predictive model and uncertainty analysis. The numerical model results and uncertainty analysis are used for economic analysis. The dataset submitted here support the described study. Manuscript is submitted to Geothermics, will be linked once paper is accepted.

15 GEOTHERMAL ENERGY↗

Marine Corps Base Camp Lejeune New River Estuary Shoreline Characterization

Critical military training and testing on lands along the nation’s coastal and estuarine shorelines are increasingly placed at risk because of development pressures in surrounding areas, impairments due to other anthropogenic disturbances, and increasing requirements for compliance with environmental regulations. The U.S. Department of Defense (DoD) intends to enhance and sustain its training and testing assets and to optimize its stewardship of natural resources through the development and application of an ecosystem-based management approach on DoD installations. To accomplish this goal, particularly for installations in estuarine/coastal environments, the Strategic Environmental Research and Development Program (SERDP) launched the Defense Coastal/Estuarine Research Program (DCERP) as a minimum 10-year effort at Marine Corps Base Camp Lejeune (MCBCL) in North Carolina. The results of the first six years of the program (DCERP1) are presented here.The overarching objectives of DCERP are to: (1) understand the effects of military training activities, infrastructure development, and other coastal military installations; (2) develop models, tools, and indicators to evaluate ecosystem health; and (3) recommend adaptive management strategies to sustain ecosystem natural resources within the context of an active military installation.This shapefile consists of the 2004 shoreline that was edited in the field in order to characterize the shoreline. The data was edited within ArcGIS, using GPS equipment to obtain the position of the boat relative to the shoreline. Fields were created for the shapefile including, Shoreline type, vegetation/species type, shoreline modification type, and relief. A unique identification code was created by concatenating the four field values of the four fields. A new field Veg_2 was added in January 2013 to code the vegetation and shoreline type.

54 ENVIRONMENTAL SCIENCES↗

VULCAN: A “hammer” for high-temperature materials research

Understanding changes in chemistry, microstructure, and physical properties during synthesis, processing, testing, and even service is vital for materials design and performance. Compared to traditional postmortem material characterization tools, in situ crystallographic characterization can provide considerable data and information on evolution of chemistry, dislocations, twinning, texture, and strains when a material is under external stimuli. Neutrons especially are able to probe material bulk properties and behaviors in extreme environments, thanks to their deep penetrating power and unique sensitivity to differentiate elements from lightweight to transition-metal atoms. In this article, we introduce and describe a diffractometer named VULCAN, which is located at Oak Ridge National Laboratory. Finally, this represents a powerful tool to understand materials properties and behaviors under complex environments, in particular, at high temperatures.

36 MATERIALS SCIENCE↗

RokBase - Beta

Web based tool and portal to explore and download data associated with Core Characterization Technical Report Series .

Core Characterization↗

Filtration and Leach Testing for PUREX Cladding Sludge and REDOX Cladding Sludge Actual Waste Sample Composites

A testing program evaluating actual tank waste was developed in response to Task 4 from the M-12 External Flowsheet Review Team (EFRT) issue response plan (Barnes and Voke 2006). The test program was subdivided into logical increments. The bulk water-insoluble solid wastes that are anticipated to be delivered to the Hanford Waste Treatment and Immobilization Plant (WTP) were identified according to type such that the actual waste testing could be targeted to the relevant categories. Under test plan TP RPP WTP 467 (Fiskum et al. 2007), eight broad waste groupings were defined. Samples available from the 222S archive were identified and obtained for testing. Under this test plan, a waste testing program was implemented that included: • Homogenizing the archive samples by group as defined in the test plan. • Characterizing the homogenized sample groups. • Performing parametric leaching testing on each group for compounds of interest. • Performing bench-top filtration/leaching tests in the hot cell for each group to simulate filtration and leaching activities if they occurred in the UFP2 vessel of the WTP Pretreatment Facility. This report focuses on a filtration/leaching test performed using two of the eight waste composite samples. The sample groups examined in this report were the plutonium-uranium extraction (PUREX) cladding waste sludge (Group 3, or CWP) and reduction-oxidation (REDOX) cladding waste sludge (Group 4, or CWR). Both the Group 3 and 4 waste composites were anticipated to be high in gibbsite, thus requiring caustic leaching. WTP RPT 167 (Snow et al. 2008) describes the homogenization, characterization, and parametric leaching activities before benchtop filtration/leaching testing of these two waste groups. Characterization and initial parametric data in that report were used to plan a single filtration/leaching test using a blend of both wastes. The test focused on filtration testing of the waste and caustic leaching for aluminum, in the form of gibbsite, and its impact on filtration. The initial sample was diluted with a liquid simulant to simulate the receiving concentration of retrieved tank waste into the UFP2 vessel (< 10 wt% undissolved solids). Filtration testing was performed on the dilute waste sample and dewatered to a higher solids concentration. Filtration testing was then performed on the concentrated slurry. Afterwards, the slurry was caustic leached to remove aluminum present in the undissolved solid present in the waste. The leach was planned to simulate leaching conditions in the UFP2 vessel. During the leach, slurry supernate samples were collected to measure the dissolution rate of aluminum in the waste. After the slurry cooled down from the elevated leach temperature, the leach liquor was dewatered from the solids. The remaining slurry was rinsed and dewatered with caustic solutions to remove a majority of the dissolved aluminum from the leached slurry. The concentration of sodium hydroxide in the rinse solutions was high enough to maintain the solubility of the aluminum in the dewatered rinse solutions after dilution of the slurry supernate. Filtration tests were performed on the final slurry to compare to filtration performance before and after caustic leaching.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Viscoelastic Model for Lung Parenchyma for Multi-Scale Modeling of Respiratory System Phase I: Hypo-Elastic Model for CFD Implementation

An isotropic constitutive model for the parenchyma of lung has been derived from the theory of hypo-elasticity. The intent is to use it to represent the mechanical response of this soft tissue in sophisticated, computational, fluid-dynamic models of the lung. This demands that the continuum model be accurate, yet simple and effcient. An objective algorithm for its numeric integration is provided. The response of the model is determined for several boundary-value problems whose experiments are used for material characterization. The effective elastic, bulk, and shear moduli, and Poisson’s ratio, as tangent functions, are also derived. The model is characterized against published experimental data for lung. A bridge between this continuum model and a dodecahedral model of alveolar geometry is investigated, with preliminary findings being reported.

59 BASIC BIOLOGICAL SCIENCES↗

WaterTransport in PEM Fuel Cells: Advanced Modeling, Material Selection, Testing and Design Optimization

Water management in Proton Exchange Membrane, PEM, Fuel Cells is challenging because of the inherent conflicts between the requirements for efficient low and high power operation. Particularly at low powers, adequate water must be supplied to sufficiently humidify the membrane or protons will not move through it adequately and resistance losses will decrease the cell efficiency. At high power density operation, more water is produced at the cathode than is necessary for membrane hydration. This excess water must be removed effectively or it will accumulate in the Gas Diffusion Layers, GDLs, between the gas channels and catalysts, blocking diffusion paths for reactants to reach the catalysts and potentially flooding the electrode. As power density of the cells is increased, the challenges arising from water management are expected to become more difficult to overcome simply due to the increased rate of liquid water generation relative to fuel cell volume. Thus, effectively addressing water management based issues is a key challenge in successful application of PEMFC systems. In this project, CFDRC and our partners used a combination of experimental characterization, controlled experimental studies of important processes governing how water moves through the fuel cell materials, and detailed models and simulations to improve understanding of water management in operating hydrogen PEM fuel cells. The characterization studies provided key data that is used as inputs to all state-of-the-art models for commercially important GDL materials. Experimental studies and microscopic scale models of how water moves through the GDLs showed that the water follows preferential paths, not branching like a river, as it moves toward the surface of the material. Experimental studies and detailed models of water and airflow in fuel cells channels demonstrated that such models can be used as an effective design tool to reduce operating pressure drop in the channels and the associated costs and weight of blowers and pumps to force air and hydrogen gas through the fuel cell. Promising improvements to materials structure and surface treatments that can potentially aid in managing the distribution and removal of liquid water were developed; and improved steady-state and freeze-thaw performance was demonstrated for a fuel cell stack under the self-humidified operating conditions that are promising for stationary power generation with reduced operating costs.

30 DIRECT ENERGY CONVERSION↗

High Temperature Transducers for Online Monitoring of Microstructure Evolution

A critical technology gap exists relative to online condition monitoring (CM) of advanced nuclear plant components for damage accumulation; there are not capable sensors and infrastructure available for the high temperature environment. The sensory system, monitoring methodology, data acquisition, and damage characterization algorithm that comprise a CM system are investigated here. Thus this work supports the DOE mission to develop a fundamental understanding of advanced sensors to improve physical measurement accuracy and reduce uncertainty. The research involves a concept viability assessment, a detailed technology gap analysis, and a technology development roadmap.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Irradiation Assisted Stress Corrosion Cracking of Austenitic Stainless Steel in BWR Conditions

As a first step toward full scale utilization of the Advanced Test Reactor (ATR) and associated post irradiation examination (PIE) equipment at INL, the NRC and INL staffs have formulated a test program that is designed to help to establish INL and the Nuclear Science User Facilities (NSUF) as a viable destination for irradiation and PIE of reactor structural materials. This initial research program utilized two materials (304 Stainless Steel weld Heat Affected Zone (HAZ) and sensitized 304L stainless steel) that have previously been irradiated at the Halden reactor in Norway and tested at Argonne National Laboratory (ANL) so that test results may be compared, thereby establishing a measure of comparability between Halden and ATR irradiations. A secondary objective of this test program was to characterize the quality of data produced using INL’s newly constructed irradiation assisted stress corrosion cracking (IASCC) test cells. The specimens were be tested in typical boiling water reactor (BWR) conditions to measure stress corrosion cracking (SCC) and fracture toughness of un-irradiated specimens and then IASCC and fracture toughness of specimens irradiated to a fluence equal to approximately 1.0 X 10 21 n/cm 2 (E > 1 MeV).

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Deep Borehole Laboratory and Borehole Testing Strategy: Generic Drilling and Testing Plan

This report presents a generic (i.e., site-independent) preliminary plan for drilling, testing, sampling, and analyzing data for a deep characterization borehole drilled into crystalline basement for the purposes of assessing the suitability of a site for deep borehole disposal (DBD). This research was performed as part of the deep borehole field test (DBFT). Based on revised U.S. Department of Energy (DOE) priorities in mid-2017, the DBFT and other research related to a DBD option was discontinued; ongoing work and documentation were closed out by the end of fiscal year (FY) 2017. This report was initiated as part of the DBFT and documented as an incomplete draft at the end of FY 2017. The report was finalized by Sandia National Laboratories in FY2018 without DOE funding, subsequent to the termination of the DBFT, and published in FY2019. This report presents a possible sampling, testing, and analysis campaign that could be carried out as part of a future project to quantify geochemical, geomechanical, geothermal, and geohydrologic conditions encountered at depths up to 5 km in crystalline basement.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Making Coal Relevant for Small Scale Applications: Modular Gasification for Syngas/Engine CHP Applications in Challenging Environments

This Front-End Engineering Design (FEED) study is funded by the US Department of Energy (DOE), and managed by the National Energy Technology Laboratory (NETL) through a Cooperative Agreement awarded to the University of Alaska Fairbanks (UAF) to perform a technical and cost study for the design and installation of a Hamilton-Maurer International (HMI) gasifier for generating a clean syngas for firing in reciprocating engines. An existing diesel engine generator (DEG) and a commercially available spark ignition engine are used to generate electricity with the low-Btu syngas. Other than the HMI gasifier, only commercially available technologies were assumed for this study. An important objective of this design study was to estimate capital and operating costs of small modular coal and coal/biomass fired generating units to provide wind regulation services. Although this study is based on retrofitting an existing coal fired power plant with the HMI gasifier, sufficient data was developed to characterize greenfield units. The original concept was to provide clean syngas and tars/oils from the gasification process to the existing Colt-Pielstick PC2.6B diesel engine generator (9.6 MWe) installed at the UAF Atkinson Power Plant. The intent was to convert the diesel engine to operate in a dual fuel mode, firing both syngas and tars/oils. As the project progressed, Fairbanks Morse Engine (FME), current licensee for the Colt-Pielstick engine line, was not able to develop a modification package for the engine to allow for syngas firing. Although this type of modification is available for firing natural gas, the capability does not extend to syngas. Western Energy Systems, distributor for Innio Jenbacher, was able to offer the Jenbacher Model JMS620 engine. After review of available options, the project team selected a design configuration using two Jenbacher engines rated at 1965 kWe each to fire the syngas, with the oils/tars directed to the Colt Pielstick diesel to be blended with ultra-low sulfur diesel oil (ULSD). The Jenbacher engines are expected to operate at continuous base load, with some load-following ability, while the existing diesel engine will operate in grid support service, with loads varying from a nominal 25% to 100%. An annual capacity factor for the diesel engine is projected to be between 50% and 60%. The overall gasifier and gas clean-up system is sized to produce enough syngas to adequately fuel three Jenbacher Engines for a nominal power output of 5.9 MWe, but this study assumes that only two Jenbacher engines will be installed due to space constraints in the Atkinson Power Plant, and because of expected air emission permit limitations. There is still potential that the excess syngas capacity equivalent to about 2 MWe could be used as supplemental fuel for the DEG. The exhaust from the Jenbacher engines is passed through heat recovery units to generate low pressure steam, thereby providing a significant portion of the steam required for operating the gasifier. The overall performance of the HMI gasifier/engine configuration is summarized as follows: 1) Overall electric efficiency, Jenbacher and diesel engines, based on gasifier fuel production (syngas and pyrolysis liquids) is 35.2% LHV, 2) Overall cogenerating efficiency (electricity plus steam), based on gasifier fuel production (syngas and pyrolysis liquids) is 54.8% LHV, 3) Overall electric efficiency, Jenbacher and diesel engines, based on coal input, is 29.6% LHV, and 4) Overall cogenerating efficiency, electricity plus steam, based on coal input is 46.0%. This project is estimated to have a Bare Erected Cost (BEC) of $\$$ 33.4 million and a Total Plant Cost (TPC) of $\$$ 45.7 million. Based on the original scope, sending both the clean syngas and the oils and tars to the existing diesel engine, the BEC and TPC values would have been $\$$ 23.3 million and $\$$ 32.1 million, respectively. A variable Cost of Electricity (COE) is calculated to reflect only those costs that will be incurred by incremental operation of the system for the HMI gasifier/Jenbacher engine combination. Operation of the diesel engine is determined separately. The variable COE values are: Case 1: 100% Usibelli Coal: (a) HMI gasifier/Jenbacher Engines -- 8.3 cents/kWh; (b) Diesel Engine -- 20.2 cents/kWh, and Case 2: 80% Usibelli Coal + 20% wood chips (proportion based on Btu input, LHV basis): (a) HMI Gasifier/Jenbacher -- 13.7 cents/kWh; (b) Diesel Engine -- 20.2 cents/kWh. The incremental cost of operating the gasifier/Jenbacher system increases with co-firing of wood chips due to the high cost of this material, over five times as costly as Usibelli coal delivered to the Atkinson Power building. The diesel cost is constant as the oils and tars are priced at the same value as the ULSD for the purposes of fueling the diesel engine. Section 8 of this report provides details of the O&M costs. The overall power system is configured to be modular and scalable to provide a wide range of generating capacity using the same components. This allows for reduction in cost, risk, schedule time to engineer and construct, and provides some degree of repeatability for air permitting.

01 COAL, LIGNITE, AND PEAT↗

SECARB Permits for Seismic and Other Site Preparation Plan

The Southeast Regional Carbon Sequestration Partnership’s (SECARB’s) Anthropogenic Test is a demonstration of the deployment of CO 2 capture, transport, geologic storage and monitoring technologies. This project is one of the first and the largest fully integrated commercial prototype coal-fired carbon capture and storage projects in the USA. Drilled in January 2011, a deep characterization well provided geologic data confirming that the test site represented an attractive location for safe, long-term storage of CO 2 . Two Class V Experimental Injection Well underground injection control (UIC) permits were issued in November 2011 and subsequently the project’s injection wells were installed. A robust monitoring, verification and accounting (MVA) plan has been developed to monitor and track the CO 2 plume and the associated pressure field. The CO 2 MVA effort for the Anthropogenic Test CO 2 (Test) injection demonstration includes two wellbore seismic methods, specifically time-lapse Croswell seismic and vertical seismic profiles (VSP). Due to the unique challenges presented by this Test (injection depth of 9,500+ ft. into thin, stacked reservoir sands and limited injection volumes) surface seismic was eliminated as a Monitoring, Verification, and Accounting (MVA) tool. However, the newly drilled project wells provided ample casing diameters (prior to running tubing) to accommodate wellbore seismic receivers (wireline and tubing deployed) and a Croswell source.

54 ENVIRONMENTAL SCIENCES↗

Valuing Residential Energy Efficiency: Analysis for a Prototypical Southeastern Utility [Slides]

The increasing amount of variable renewable energy resources and shifts towards more end-use and vehicle electrification suggests profound changes to power system planning and operation. Specifically, renewable energy is expected to shift net peak demand from late afternoon to early evening and end-use electrification may significantly increase winter peak demand. Residential energy efficiency is likely to align well with these shifts as it tends to produce savings in the early evening (e.g., from lighting measures) and coincident with heating loads (e.g., from envelope and space conditioning measures). Despite the opportunity to decrease system costs and emissions, residential energy efficiency is often limited by static valuation methods and its economic potential is considerably less than its technical potential. Using hourly residential energy efficiency characterizations, utility program cost data, and a capacity expansion model, we estimate the benefits of residential energy efficiency for a prototypical, summer-peaking utility in the Southeastern region. We first establish the cost-effective residential energy efficiency portfolio through “competition” with supply-side resources in a forward-looking capacity expansion model. Importantly, we then evaluate several scenarios intended to drive an increasing amount of cost-effective residential energy efficiency through measure cost reductions, increased customer adoption, policy goals (e.g., carbon price), and delivery of an integrated package of measures. The results quantify total system cost and emissions reductions, fossil-fuel plant retirements, and peak demand reductions. Results suggest the design and prioritization of policies and programs to access the untapped amount of cost-effective residential energy efficiency.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Implementation of Distributed Memory Computing in MOSAIC to Enable Large 3D Simulations of Irradiated Concrete

The concrete biological shield (CBS) of light-water reactors protects workers and the surrounding environment by absorbing neutron and gamma irradiation emitted from the reactor core. The radiation dose increases with the CBS’s operational time and, in the long term, becomes significant enough to raise the question of irradiation effects on concrete—and particularly on the structural integrity of the CBS. Irradiation-induced damage has been identified as one of the main degradation mechanisms in the CBS. Neutron radiation causes the swelling of aggregate-forming minerals at different rates and amplitudes depending on the mineral’s nature. Silicate-bearing minerals such as quartz are particularly sensitive to neutron radiation and experience up to 17.8% volumetric expansion. Aggregates comprise several minerals with different orientations and are, therefore, subject to cracking as a result of mismatch strains. Additionally, the swelling of aggregates creates significant stresses in the surrounding cement paste matrix, which also results in crack formation. In parallel with the collection of characterization and irradiation test data, development of modeling and simulation tools for irradiated concrete is ongoing with the support of the US Department of Energy Office of Nuclear Energy’s Light Water Reactor Sustainability (LWRS) program. This effort resulted in the development and application of the fast-Fourier transform (FFT)–based code Microstructure-Oriented Scientific Analysis of Irradiated Concrete (MOSAIC) at Oak Ridge National Laboratory.

61 RADIATION PROTECTION AND DOSIMETRY↗

Visualization of the High-Burnup Spent Fuel Rod Phase 1 Test Plan: Technical Memo - Spent Fuel and Waste Disposition (Technical Memo)

Twenty-five high-burnup fuel rods were extracted from seven different fuel assemblies used for power production at the North Anna nuclear power plant and shipped to Oak Ridge National Laboratory (ORNL) in 2016 for detailed non-destructive examination (NDE) and destructive examination (DE). The spent fuel rods were from 17×17 lattices and consist of four cladding types—Zirlo ® , M5 ® , Zircaloy-4, and low tin Zircaloy-4 (Zirc-4). These spent fuel rods are being tested to provide: (a) baseline characterization and mechanical property data that can be used as a comparison to fuel that was loaded into a modified TN-32B cask in November 2017, as part of the high-burnup confirmatory data project and (b) data applicable to high-burnup fuel rods (>45 GWd/MTU) currently stored and to be stored in the dry-cask fleet. The TN-32B cask is referred to as the “Demo” cask and is currently expected to be transported to a separate location and the internal contents inspected in approximately ten years. ORNL has completed the NDE of the twenty-five fuel rods. The purpose of this technical memorandum is to present a simplified summary of the first phase of destructive examinations and test conditions that will be used for communicating with various stakeholders. The destructive examinations will leverage the expertise and capabilities from multiple national laboratories for performing independent measurements of relevant data. Close coordination is required to ensure that all examinations follow well documented procedures and are performed so that measured data and characteristics can be readily compared. Pacific Northwest National Laboratory (PNNL) has published a detailed overview of the test program. ORNL and PNNL developed detailed draft test plans for testing to be performed at their facilities. ORNL and PNNL are in the process of refining these test plans to apply specifically to the testing described in this memorandum. Argonne National Laboratory (ANL) contributed to the ORNL test plan by describing tests to be conducted at ANL. Testing will be based on continuous learning. If a test produces results that are inconsistent with expectations or current trends, further testing will be paused until a path forward is established to understand the results and to identify follow-on testing.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗