Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “DECOMMISSIONING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,423 records · Page 79

End of Life Management: Solar Photovoltaic Panels

Technical potential of materials recovered from end-of-life solar PV panels could exceed $15 billion by 2050. The global solar photovoltaic (PV) boom currently underway will represent a significant untapped business opportunity as decommissioned solar panels enter the waste stream in the years ahead, according to a report released today by the International Renewable Energy Agency (IRENA) and the International Energy Agency's Photovoltaic Power Systems Programme (IEA-PVPS). The report, End-of-Life Management: Solar Photovoltaic Panels, is the first-ever projection of PV panel waste volumes to 2050 and highlights that recycling or repurposing solar PV panels at the end of their roughly 30-year lifetime can unlock a large stock of raw materials and other valuable components. It estimates that PV panel waste, comprised mostly of glass, could total 78 million tonnes globally by 2050. If fully injected back into the economy, the value of the recovered material could exceed USD 15 billion by 2050. This potential material influx could produce 2 billion new panels or be sold into global commodity markets, thus increasing the security of future PV supply or other raw material-dependent products. The report suggests that addressing growing solar PV waste, and spurring the establishment of an industry to handle it, would require: the adoption of effective, PV-specific waste regulation; the expansion of existing waste management infrastructure to include end-of-life treatment of PV panels, and; the promotion of ongoing innovation in panel waste management. In most countries, PV panels fall under the classification of 'general waste' but the European Union (EU) was the first to adopt PV-specific waste regulations, which include PV-specific collection, recovery, and recycling targets. EU's directive requires all panel producers that supply PV panels to the EU market (wherever they may be based) to finance the costs of collecting and recycling end-of-life PV panels put on the market in Europe. End-of-Life Management: Solar Photovoltaic Panels, is the second of several solar-focused publications IRENA is releasing this summer. Last week, IRENA released The Power to Change, which predicts average costs for electricity generated by solar and wind technologies could decrease by between 26 and 59 per cent by 2025. Later this week, IRENA will release Letting in the Light: How Solar Photovoltaics Will Revolutionize the Electricity System - which provides a comprehensive overview of solar PV across the globe and its prospects for the future.

14 SOLAR ENERGY↗

Benchmarking Anticipated Wind Project Lifetimes: Results from a Survey of U.S. Wind Industry Professionals

This paper draws on a survey of wind industry professionals to clarify trends in the expected useful life of land-based wind power plants in the United States. The expected useful life of a project affects expectations about its profitability, the timing of possible decommissioning or repowering, and its levelized costs. We find that most wind project developers, sponsors and long-term owners have increased project-life assumptions over time, from a typical term of ~20 years in the early 2000s to ~25 years by the mid-2010s and ~30 years more recently. Current assumptions range from 25 to 40 years, with an average of 29.6 years. The estimated average levelized cost of energy (LCOE) for new wind projects built in 2018 is $\$ $40.4/MWh (real 2018$\$ $), assuming a 20-year project life. With a 25-year useful life and no change in assumed operations and maintenance (O&M) expenditures or wind plant performance over time, LCOE declines by 10%, to $\$ $36.2/MWh, because capital costs are recovered over five additional years of production. At the now-common 30-year assumed life, levelized costs decrease another 7%, to $\$ $33.5/MWh (under the same unaltered assumptions about O&M and performance). Even longer assumed lifetimes lead to further (but diminishing) LCOE reductions—e.g., to $\$ $31.7/MWh and $\$ $30.3/MWh for 35- and 40-year lives, respectively. The data and trends presented here may inform assumptions used by electric system planners, modelers and analysts. The results may also provide useful benchmarks to the wind industry, helping developers and assets owners to compare their expectations with those of their peers.

17 WIND ENERGY↗

Magnetic Characterization and Tuning of a Mini-Gap In-Vacuum Undulator X25 for NSLS-II

Designed and built by ADC USA Inc. a Mini-Gap In-Vacuum Undulator (MGU X25) has been employed for almost 10 years at NSLS in the Macromolecular Crystallography X25 beamline [1]. The device is a useful and almost readily available X-ray source for NLSL-II beamline, therefore it was extracted in early 2014 from the NSLS X-ray ring after its decommissioning. The Micro-diffraction beamline (NYX) at NSLS-II will utilize the X25-MGU as a bright and tunable X-ray source over the photon range of 5- 20 KeV in the short cell 19-ID. However, the NSLS-II electron beam properties are significantly different from the NSLS ones and the field integral requirements to be met by NSLS-II IDs are more stringent. Consequently, the device was brought to the NSLS-II ID lab for magnetic tuning. It is also a unique opportunity to characterize the magnetic performance of an ID after 10 years of operation in a storage ring.

36 MATERIALS SCIENCE↗

MELCOR Modeling of Accident Scenarios at a Facility for Aqueous Reprocessing of Spent Nuclear Fuel

The work presented in this report applies the MELCOR code to evaluate potential accidents in non-reactor nuclear facilities, focusing on Design Basis Accidents. Ten accident scenarios were modeled using NRC's best-estimate severe accident analysis code, MELCOR 2.2. The accident scenarios simulated a range of explosions and/or fires related to a nuclear fuel reprocessing facility. The objective was to evaluate the radionuclide source term to the environment following initiating explosion and/or fire events. The simulations were performed using a MELCOR model of the Barnwell Nuclear Fuel Plant, which was decommissioned before beginning reprocessing operations. Five of the accident scenarios were based on the Class 5 Design Basis Accidents from the Final Safety Analysis Report. Three of the remaining accident scenarios include sensitivity studies on smaller solvent fires. The final two accidents included an induced fire from an initial explosion. The radionuclide inventory was developed from ORIGEN calculations of spent PWR fuel with an initial enrichment of 4.5% U-235 by weight. The fuel aged for five years after a final 500-day irradiation cycle. The burn-up was conservatively increased to 60 GWd/MTU to bound current US operations. The results are characterized in terms of activity release to the environment and the building decontamination factor, which is related the leak path factor used in Department of Energy safety analyses. The MELCOR 2.2 results consider adverse consequences to the filters, ventilation system, and structures as a result of the explosions and fires. The calculations also include best-estimate models for aerosol transport, agglomeration, and deposition. The new calculations illustrate best-estimate approaches for predicting the source term from a reprocessing facility accident.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

A Section 110 Evaluation of the Project 57 Rad-Safe Area Personnel Decontamination Building, Nye County, Nevada

Project 57 was an open-air, plutonium-dispersal safety test conducted by the United States in 1957 on a portion of the Nevada Test and Training Range (NTTR) (formerly the Las Vegas Bombing and Gunnery Range). The Project 57 test area, once known as Area 13, was a block of land abutting the northeastern boundary of the Nevada Test Site (NTS). The NTS was renamed the Nevada National Security Site (NNSS) in 2010. In keeping with the historical Cold War period designation, NTS will be used when discussing historic period events, while NNSS will be applied for contemporary activities. During Project 57, the high explosives of a nuclear weapon were triggered asymmetrically to simulate an accidental detonation. The test was conducted to study the extent of plutonium contamination from a nonnuclear yield accident, as well as assess the biological and environmental hazards such an event could create. Following the conclusion of the experiment, the contaminated area surrounding the ground zero (GZ) was fenced off and some of the contaminated equipment was buried in place. The Project 57 Rad-Safe area was abandoned. In 1981, the U.S. Department of Energy (DOE) decontaminated and decommissioned the Project 57 site. This Section 110 documentation was prompted by recognition that more than five decades have passed since the abandonment of the Project 57 Rad-Safe area, particularly the personnel decontamination building, which leaves the temporary structure vulnerable to natural forces of weathering and decay. However, these temporary facilities remain partially standing, allowing for a condition assessment and recommendations regarding the Rad-Safe area’s historical significance. The National Nuclear Security Administration, Nevada Field Office (NNSA/NFO) determined there was no area of potential effect (APE) (direct, indirect, or visual) because there is no planned undertaking and the Project 57 Rad-Safe area will continue to remain unused. Instead, a 4.5-acre study area was established to facilitate recording the Project 57 personnel decontamination building and the remaining accessory resources. The study area is bounded on the east by Valley Road and it extends to the east far enough to encompass the former Project 57 Rad-Safe area (Figure A-2). The Section 110 study area is located in the northwest quarter of Section 35, Township 07S Range 54E Mount Diablo Base and Meridian. It is on the 1962 Groom Mine SW USGS 7.5-minute series topographic quadrangle. Desert Research Institute (DRI) surveyed the Section 110 study area, resulting in the recording and evaluation of the Project 57 Rad-Safe area personnel decontamination building and four accessory resources (AR-1 through AR-4). Copies of the building form and report are on file at DRI and with the NNSA/NFO in Las Vegas, Nevada.

54 ENVIRONMENTAL SCIENCES↗

Demand Driven Cycamore Archetypes

Future nuclear fuel cycle options may present advantages over today’s once-through fuel cycle. Nuclear fuel cycle simulation tools assess the performance of those fuel cycles as well as the dynamics of long-term technology transitions. In many nuclear fuel cycle simulation tools, it has historically been the responsibility of the user to manually define facility deployment schemes and all facility parameters. While this is straightforward in simple fuel cycles, transitions from one fuel cycle to another can be more complex. In particular, deployment schemes for supportive fuel cycle facilities beyond the reactor become complex if the analyst desires to avoid gaps in the nuclear fuel and power supply chain during those transition scenarios. As nuclear fuel cycle analysis approaches questions regarding the feasibility and performance of the deployment schemes and technology choices during technology transition, automation of this historically manual process is necessary. The main objective of this work was to develop and demonstrate Cyclus automation capabilities toward key nuclear fuel cycle transition scenarios. While deploying reactors to meet power demand is trivial, and existed in the earliest versions of CYCLUS, automated, predictive deployment and decommissioning of other facilities is more complex. These include mining, milling, enrichment, fuel fabrication, reprocessing, and others. For example, a balanced closed fuel cycle may require ensuring that there is enough fast reactor fuel for their operation and may drive deployment of a fleet of light water reactors. This concern comprises the main challenge that drove the project effort. The Demand-Driven Cycamore Archetype project (NEUP-FY16-10512) aimed to develop CYCAMORE demand-driven deployment capabilities and thereby automate transition scenario definition. The developed software package, d3ploy, in the form of a CYCLUS Institution agent, deploys Facilities to meet the front-end and back-end demands of the fuel cycle. The University of South Carolina and the University of Illinois applied multiple algorithmic approaches to this challenge. This project developed an in situ demand-driven development schedule calculation through non-optimizing, deterministic-optimizing, and stochastic-optimizing algorithms as CYCLUS archetypes and demonstrated these new archetypes in program-supporting fuel cycle transition scenarios. Both objectives were achieved. This report documents the results and deliverables obtained toward these achievements in detail.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

ARM West Antarctic Radiation Experiment

The National Science Foundation provided Antarctic logistical support to the Department of Energy's Atmospheric Radiation Measurement (ARM) Climate Research Facility from October 2015 through May 2017. Specific support included commercial and military cargo transportation, site preparation and facilities installation at McMurdo Station and at the WAIS Divide field camp in West Antarctica, power and data transmission, and personnel support. NSF provided continuous facility operation in McMurdo from November 2015 through decommissioning in January 2017, and at WAIS Divide during the 2015-2016 austral summer research season, from November 2015 through January 2016.

54 ENVIRONMENTAL SCIENCES↗

Savannah River Site Composite Analysis (FY2019 Annual Review)

The Savannah River Site (SRS) is a Department of Energy (DOE) site encompassing approximately 310 square miles in South Carolina. It is bounded on the southwest by the Savannah River (SR) and is situated approximately 12 miles south of Aiken, South Carolina, and 15 miles southeast of Augusta, Georgia. Construction of and subsequent operations at the SRS began in 1951 under the direction of the Atomic Energy Commission. The primary mission of the SRS was to produce tritium and plutonium for the national nuclear weapons complex. Between 1953 and 1955, SRS brought five reactors and various support facilities into operation in support of its primary mission. Support facilities included two chemical separations plants, a heavy water extraction plant, a nuclear fuel and target fabrication facility, a tritium extraction facility and waste management facilities. With the declining need for a large nuclear weapons stockpile since the end of the Cold War, many SRS facilities no longer produce or process nuclear materials. All reactors were shut down by 1993. However, the SRS Tritium Extraction Facility continues to supply DOE with tritium. Additionally, operations at the K-Area Complex currently provide interim safe storage for much of DOE’s excess plutonium (Pu) and high enriched uranium, in a building which formerly housed K Reactor. As the SRS mission has changed, many surplus facilities are being dispositioned safely and economically. SRS has completed extensive decommissioning activities in D-Area, M-Area, P-Area, R-Area, and T-Area, with groundwater (GW) remediation ongoing. High-level waste tanks continue to be emptied and closed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Antarctica Radiological Source Removals (Final Report)

On 18 May 2015, the research vessel Akademik Fedorov of the Russian Antarctic Expedition (RAE) delivered four radioisotope thermoelectric generators (RTGs) from Antarctica to the port of St. Petersburg, Russia. The RTGs had been previously used in the work program of the former Soviet Antarctic Expedition (SAE). From the mid-1970s, RTGs have been used to provide autonomous power at geophysical and meteorological stations located in remote regions of Antarctica. The research was completed in the early 1990s, but not all the generators had been removed when the stations were decommissioned. The remaining four unsecured RTGs, with their strontium-90 ( 90 Sr) radiological material and a combined total activity of 80,000 curies (Ci), still posed a potential risk as they could be used for nefarious purposes. Therefore, a plan of action for the removal of the RTGs from Antarctica was developed. This was done within the framework of the international program for the disposal of Russian RTGs. Financial support and technical oversight was provided by the U.S. Department of Energy (DOE), while logistical support was provided by the Russian Antarctic Expedition (RAE) of the Arctic and Antarctic Research Institute (AARI) and by subsidiaries of the Russian Federation’s Rosatom State Corporation. Recovering and repatriating the RTGs from the continent of Antarctica to the Russian Federation proved to be a very difficult task, including satisfying all the legal aspects within a very tight timeframe. This involved indemnification issues, adhering to new laws enacted after the Soviet Union era, and obtaining all the necessary permits and certifications for transport of the RTGs by air, sea, and land. It was an international, collaborative effort involving the cooperation of multiple organizations to complete the legal work and preparation of necessary documents. In addition, AARI needed to create a separate structure within its organization to manage the process, including the provision of special medical screenings, training, and certifications of its institute personnel. This was done so AARI could fulfill its obligation for the safe handling of radioactive materials while in the field. Recovery of the RTGs required overcoming several logistical hurdles. The Akademik Fedorov, which transported the RTGs back to the Russian Federation, required retrofits to accommodate the RTGs for safe and secure transport of radioactive material. The United States Project Team (USPT) inspected the vessel while it was in dry dock in Turku, Finland, being retrofitted with their design. Special sleds had to be designed to transport RTGs, as well as equipment for identifying crevasses in the glaciers, over the Antarctic packed snow and ice. Provision of adequate fuel supplies for the long trek to the interior of Antarctica to recover one of the RTGs also had to be addressed. With the successful recovery, repatriation, and disassembly of the RTGs, the Radioactive Heat Sources (RHSs) were extracted and dispositioned, thus eliminating any risk of these radioactive sources being used for terrorist purposes. Successful completion of the project also fulfilled the requirements of the Protocol on Environmental Protection to the Antarctic Treaty concerning the need to remove unused radioactive materials.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Dark Matter Search Using the Final SuperCDMS Soudan Dataset and the Development of a Large-Format, Highly-Multiplexed, Athermal-Phonon-Mediated Particle Detector

Over the past eighty years, numerous complementary observations of our universe have indicated that our current description of physics is far from complete. The “or- dinary matter”, such as electrons, protons, photons and neutrons, that constitutes the bulk of all human physical experiences is actually only a minority (about 16%) of the total mass of the universe. The remaining 84% is very poorly understood, but has profound effects on the dynamics and evolution of our universe. Because it does not interact with light, and is not observable in telescopes on earth, this extra mass is usually referred to as “dark matter”. Although the dark matter is poorly understood, Weakly Interacting Massive Particles (WIMPs) are a well-motivated candidate that can be directly detected via a non-gravitational interaction with nor- mal matter, potentially allowing for direct terrestrial detection and characterization of this dark matter. This dissertation is focused on this direct WIMP detect ion and will be broken into two main parts. The first part focuses on the blinded analysis of roughly three years of data collected from March 2012 to November 2015 by the SuperCDMS Soudan experiment. SuperCDMS Soudan consists of an array of 15, 0.6-kg, cryogenic, Ge iZIP particle detectors situated in a decommissioned iron mine in remote northern Minnesota. This analysis is optimized to be sensitive to theoretical WIMP masses above 10 GeV/$c^2$ . This result set the strongest limits for WIMP–germanium-nucleus interac- tions for WIMP masses greater than 12 Gev/$c^2$ and can be found here [1]. The second part focuses on the development new kind of particle detector in the style of a SuperCDMS iZIP, designed to simplify fabrication and readout, improve phonon-based position reconstruction, and help to scale to larger target arrays. These detectors replace the TES-based phonon sensors of the iZIP with Microwave Kinetic Inductance Detectors (MKIDs).

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Molten Salt Reactor Engineering Study for Off-Gas Management

In previous work published by the current team, the waste processing and waste form options were summarized for molten salt reactors (MSR) (Riley et al., 2018b; Riley et al., 2019). The primary types of waste from an MSR are summarized in Figure S1 and include (1) off-gas streams, (2) salt waste streams, (3) separated salt streams, (4) metal waste streams, (5) carbon waste streams, (6) decommissioning and decontaminating (D&D) waste streams, and (7) operating waste streams, or those that are generated from maintenance procedures. The primary focus of this report will be on management of the off-gas stream as it represents the pressure boundary for fuel-salt MSRs and, thus, is required for fission product confinement during reactor operation and reduction of the source term during a reactor accident.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Modeling the IFR-1 Experiment: A BISON Metallic Fuel Benchmark

As the 1970s nuclear reactor fleet slowly begins the decommission process, the US Department of Energy Office of Nuclear Energy (DOE-NE) aims to stimulate and support the construction and implementation of new nuclear reactors across the country in hopes of continuing the generation of clean, reliable, resilient energy. As a result, various efforts have been introduced to accelerate this process, including the Versatile Test Reactor project (VTR) and the Nuclear Energy Advanced Modeling and Simulation (NEAMS) program.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Best Practices for Shielding Analyses of Activated Metals and Spent Resins from Reactor Operation

This report investigated best practices for performing shielding evaluations of Type B waste packages, as defined in 10 CFR Part 71 regulations on packaging and transportation of radioactive material, or packages for which the contents are not defined before loading and may include a broad range of nuclides, geometries, and non-fuel materials. The following non-fuel waste streams were analyzed: Activated metals from decommissioned commercial power reactors, including Type 304 stainless steel, reactor vessel steel, and Inconel, Control blades from boiling water reactors, Neutron-activated corrosion products on surfaces of activated metals, and Spent resins from power plant operations. Measured elemental compositions, including major constituents and impurities, for steel and Inconel samples from commercial power reactors were used in activation calculations to determine radionuclide inventories in activated metals. For a simplified cask model, 60 Co contribution to the total external package dose rate at 30 days after shutdown varied from approximately 60% to 95%, depending on the activated metal, initial cobalt impurity concentration in the metal, and the thickness of the overpack gamma shield. Its maximum contribution to the total external package dose rate of approximately 100% was reached within the time interval of 2 to 5 years after shutdown and was maintained for up to 45 to 60 years after shutdown, depending on material, initial cobalt impurity concentration, and shield thickness. Thereafter, the 60 Co contribution to external package dose rate decreased with increasing decay time. Cobalt-60 is primarily produced by neutron reactions with the cobalt impurity in steel and Inconel. Other important radionuclides in activated metals contributing to package external dose rate are radionuclides with relatively short decay times, including 51 Cr, 59 Fe, 58 Co, and 54 Mn. These radionuclides may be represented as an equivalent 60 Co activity/source because 60 Co gamma ray emissions are bounding in terms of source strength and energy to other important radionuclides identified in the analyzed activated metals. Approaches for modeling the neutron-activated corrosion products that may be attached to activated reactor components were analyzed in this report. It was demonstrated that a surface source is more conservative than a uniform volumetric source for the treatment of neutron-activated corrosion products with respect to external package dose rates. An analysis of the maximum radionuclide loadings reported on spent resins identified the radionuclides 137 Cs, 60 Co, 134 Cs, 65 Zn, and 58 Co as the primary contributors to external package dose rate. For a resin cooled for 3.08 years, the external package dose rate was entirely produced by the reported 137 Cs and 60 Co inventory. The neutron sources from actinides found on spent resins or activated metals produced negligible dose rates and may be ignored in dose rate analyses. Effects of idealized waste material, source geometry, and spatial material/source distributions on external package dose rates were determined based on dose rate results for a simplified cask model under normal conditions of transport. Type 304 stainless steel, zirconium, and aluminum with adjusted mass densities based on a maximum content weight were analyzed for material modeling effects on external package dose rate. These materials produced identical external package dose rates within the statistical uncertainties of the dose rate estimates. Among four different source geometry configurations with homogeneous material of different mass densities, uniform volumetric source distribution, and the same source strength, the geometry configuration with lowest mass density (i.e., minimum self-shielding effect among the four cases) was most conservative. Spatial source distributions that better represent localized peak 60 Co activity values were more conservative than a uniform volumetric source distribution, assuming the same weight and total source strength per package. The increase in external dose rate caused by localized source peaks can be as much as the ratio between source peak activity density to average activity density, depending on the location of the activated metal with peak activity density. Therefore, the shielding analysis may be simplified if localized peak activities and the average activity per package can be measured/determined and documented at the time of cask loading. For simplicity, external package dose rates may be determined based on average source activity and a uniform volumetric source distribution. The dose rate results from that calculation model multiplied by the ratio of peak activity density to average activity density will produce maximum dose rate values for conservative estimates.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Inspection Status Report of Site A/Plot M (Report for 2020)

The Site A/Plot M, Decommissioned Reactor Site was inspected on September 24, 2020. Site A/Plot M is located in the Palos Area Preserves, operated by the Forest Preserve District of Cook County. The site was found to be in good condition with minimal erosional concerns across the grass covered mound at Plot M. Landscaping timbers installed along the footpath north of Plot M is effective in reducing erosion down the hill. Erosion concerns at Plot M are being addressed by Argonne National Laboratory (ANL). The bike trail installed by Cook County Forest Preserve to the east of Plot M has helped reduce traffic at the site. The Plot M monument appears solid with no visible cracks. The Site A monument has several cracks present that will possibly widen over time. No cause for a follow up inspection was identified.

54 ENVIRONMENTAL SCIENCES↗

A White Paper: Disposition Options for a High-Temperature Gas-Cooled Reactor

The high-temperature gas-cooled reactor (HTGR) is a uranium-fueled, graphite-moderated, gas-cooled nuclear reactor design concept capable of producing very high core outlet temperatures. Both types of HTGR have the tristructural isotropic (TRISO) fuel kernel at the heart of the fuel design. For the prismatic block-type HTGR, the TRISO particles are overcoated with a resinated graphitic matrix and pressed into fuel compacts, which are then heat treated and placed in the fuel channels of the prismatic-block-shaped fuel assemblies. For the pebble-bed-type HTGR, the TRISO particles are dispersed in a graphitic-matrix sphere, which is the basic unit for the reactor core. Despite having very different fuel designs, both types of HTGR are graphite-moderated, gas-cooled, thermal reactors using many of the same materials. As a result, both prismatic-block-type and pebble-bed-type HTGRs have similar radioactive waste streams, all of which require safe and secure storage and eventual disposition. Modern HTGR designs are based on a long and rich operating history of several different graphite-moderated, gas-cooled, thermal reactors. Several of these reactors have been shut down, the fuel has been placed in safe storage, and they have undergone some degree of decommissioning. As such, there is significant experience in the management of the spent nuclear fuel (SNF) and radioactive wastes associated with operating these reactors. This white paper will, (1) identify the definitions and regulations that apply to the safe and secure management, storage, and disposal of radioactive waste; and (2) identify the key radioactive waste streams from HTGRs and their characteristics. Idaho National Laboratory (INL) has significant experience in the management of SNF from HTGR predecessors. This experience should form the basis for the management and disposition efforts of the radioactive waste from any new HTGR-type small modular reactor, or microreactor intended for deployment at the INL site.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

TA-16-306: A Plastics Components Development Facility (Volumes 1 & 2)

The U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA), Los Alamos Field Office (Field Office), has prepared final documentation for the resolution of adverse effects to Building 306 in Technical Area (TA) 16 at Los Alamos National Laboratory (LANL or the Laboratory). This documentation is being submitted to the New Mexico State Historic Preservation Officer (SHPO). TA-16-306 was determined eligible for listing in the National Register of Historic Places (Register) in 1995 in the report, TA-16 Heating System Replacement (LA-CP-95-0180). TA-16- 306 was identified as an excess property to be decontaminated, decommissioned, and demolished by the LANL Footprint Reduction Program in fiscal year 2021, an adverse effect to Register eligible building 16-306 requiring mitigation. To bring a resolution to the adverse effects to Building TA-16-306, the Field Office initiated consultation with the SHPO on December 4, 2017. The New Mexico Historic Preservation Division concurred with the mitigation actions outlined in the Programmatic Agreement among the U.S. Department of Energy, National Nuclear Security Administration, Los Alamos Field Office, the New Mexico State Historic Preservation Office, and the Advisory Council on Historic Preservation Concerning Management of Historic Properties of Los Alamos National Laboratory, Los Alamos, New Mexico (PA) in correspondence dated January 30, 2018. The PA states in Appendix D.2.A that adverse effects to Register-eligible buildings and structures will be resolved according to the procedures defined in A Plan for the Management of the Cultural Heritage at Los Alamos National Laboratory, New Mexico (CRMP) (LA-UR-19-21590, formerly LA-UR-15-27624) and within the PA itself. Volume 2 contains a collection of photos of building TA-16-306 with index.

42 ENGINEERING↗

Evaluation of Hybrid FPOG Applications in Regulated and Deregulated Markets Using HERON

Recent changes in the U.S. energy market, such as low natural gas prices and increased electricity production for variable renewable energy (VRE) sources, have led to an economic crisis for existing light-water reactor (LWR) nuclear power plants (NPP). Many owners and operators of LWRs have elected to decommission these plants rather than continue using them as consistent sources of clean baseload power. This has led to exploration of various possibilities to increase the economic viability of these units, including market restructuring to monetize benefits LWRs already provide to the grid through ancillary markets, load following and economic dispatch, and possible integration of secondary systems directly to the NPP for production of additional products through technologies such as hydrogen electrolysis or water desalination. Previous studies have considered the technologies associated with these Integrated Energy Systems (IES) activities, and the analysis of markets for these secondary products. To analyze the economic viability of various system configurations including IES, especially given the uncertainty surrounding load demand, electricity prices, and the availability of VRE resources, the stochastic technoeconomic analysis package HERON (Heuristic Energy Resource Optimization Network) was released earlier this year as an extension of the risk analysis framework RAVEN (Risk Analysis Virtual Environment). HERON focuses foremost on making the complex uncertainty quantification analysis tools approachable for energy systems analysts, also providing general dispatch optimization algorithms for those workflows. HERON continues to be improved and tested as a significant part of the IES viability analyses performed in this work. HERON is not a capacity expansion model. To consider market and grid energy system development in a variety of scenarios, HERON is best used in coupling with modelling tools such as US-REGEN, which sacrifice some of the uncertainty analysis and resolution of HERON's modelling for the ability to efficiently predict the change in the grid energy system's profile due to economic drivers over decades. HERON can then use this information to explore the economic viability of introducing changes to the predicted outcomes, such as the introduction of an IES. In this work, experts at EPRI using US-REGEN provide six projection scenarios for use in HERON stochastic technoeconomic analysis (STEA) in considering the options available for increasing LWR economic viability through introduction of a hydrogen-centric IES using a high-temperature steam electrolysis plant (HTSE), hydrogen storage, and a constant-rate contracted hydrogen consumer. The results obtained are differential in nature; they do not report expected profits for any configuration, but rather report on the possible increase in the NPV of a configuration with respect to a baseline no-IES configuration. Due to the uncertainty captured in the variable net load of the systems, there is likewise uncertainty in the mean values reported. We consider this viability both in terms of a regulated market, where the energy producers and IES are owned and operated by single entity, as well as a deregulated market, where the IES chooses its bid for electricity generation and is then dispatched by the grid system operator. Results indicate that for deregulated markets, the inclusion of the IES is often statistically beneficial. This is especially true in policies that are not favorable towards nuclear, as nuclear is less often dispatched and is forced to deal with frequent idle capacity. In the nominal case as well as the case of carbon tax policies, inclusion of the IES clearly benefited the economic performance of the NPP. In the regulated case, however, there was a trend towards minimizing the IES, likely due to the optimal sizing performed by US-REGEN of the NPP within the system as well as the lack of penalty for idle capacity at the NPP in the regulated market analyses.

99 GENERAL AND MISCELLANEOUS↗

Rediscovering the Economics of Nuclear Power. White paper

Energy policy can often be narrow and take a short-term view as well as beholden to public opinion as demonstrated by the early decommissioning of nuclear power plants (NPPs) in Germany and Belgium after the Fukushima Daiichi event. The subsequent pursuit of renewable electric power generating capacity should not lose sight of the value of technological diversity in an energy portfolio. Domestic market incentives have failed to maintain the U.S.'s technological diversity as demonstrated by the dwindling state of the nuclear power industry. The nuclear power industry faces many challenges, such as aging infrastructure, policy driven production disincentives, and licensing delays, which leave the nuclear power industry at a cross roads. However, there is an opportunity to identify both a socially beneficial technology mix which includes NPPs and corresponding strategies for retaining NPPs in the U.S. energy portfolio. This paper proposes three technical approach options to identify strategies to assist NPPs that will hopefully prove publicly unobtrusive, economically affordable, and potentially profitable.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗