Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Concept of Operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,423 records · Page 79

Damage Detection and Verification System (DDVS) for In-Situ Health Monitoring

Project presentation for Game Changing Program Smart Book Release. Detection and Verification System (DDVS) expands the Flat Surface Damage Detection System (FSDDS) sensory panels damage detection capabilities and includes an autonomous inspection capability utilizing cameras and dynamic computer vision algorithms to verify system health. Objectives of this formulation task are to establish the concept of operations, formulate the system requirements for a potential ISS flight experiment, and develop a preliminary design of an autonomous inspection capability system that will be demonstrated as a proof-of-concept ground based damage detection and inspection system.

Damage detection↗

Lunar Sample Return Entry Systems Analysis

The Lunar Prospector and Clementine missions have revealed deposits of water-ice located at the South Pole-Aitken Basin of the lunar surface. Due to the scarce amount of previous successful sample return missions and the recent discovery of water-ice, the National Research Council (NRC) Decadal Survey recommended prioritizing the development of a Lunar Sample Return Mission Architecture. The NRC Decadal survey ranked the return of cryogenic samples that could potentially aid in current scientific investigations and identify sites for in-situ resource utilization to support future exploration missions. This study aims to identify the key technical challenges and operational constraints involved in returning cryogenic samples in pristine condition. A detailed classification of defined ground rules and assumptions, justification of mission events and high level functional requirements reinforces the proposed concept of operations. In support of the drafted architecture, a comprehensive analysis on design and environmental constraints are documented for the Earth return vehicle, sample container and thermal protection entry system. The design and thermal analysis is comprised of quantitative dimensions for mass and volume, flight performance parameters and thermal system performance limitations. Further refinement of the high level functional requirements is imperative for determining the optimal approach for returning cryopreserved lunar samples.

Lunar Sample Return↗

NASA SEXTANT Mission Operations Architecture

The Station Explorer for X-Ray Timing and Navigation (SEXTANT) mission is a technology demonstration enhancement to the Neutron Star Interior Composition Explorer (NICER) mission, a NASA Astrophysics Explorer Mission of Opportunity to the International Space Station (ISS) that was launched in June of 2017. The NICER instrument is a precision pointing X-ray telescope that times pulsar sourced photon arrivals which the SEXTANT mission uses to perform autonomous onboard X-ray Pulsar Navigation (XNAV). By comparing the detected time of arrival of X-ray photons to a reference of expected pulsar timing models, one can infer a range and range rate measurement based on light time delay. Since both timing and orientation information comes from a celestial source, this technology could provide a GPS-like navigation capability available throughout our Solar System and beyond. Applications that XNAV can support include outer planet and interstellar missions, manned missions, libration orbit missions, and current infrastructure such as the Deep Space Network (DSN). The SEXTANT team successfully completed a first demonstration of in-space and autonomous XNAV in November 2017. NICER and SEXTANT have separate teams, with NICER being the primary team with its own science objectives. Operational modes for both missions must have concurrent and independent components as well as an integrated ground system. This paper describes on the operational infrastructure and successful operations for performing X-ray Pulsar Navigation with the Station Explorer for X-ray Timing and Navigation Technology (SEXTANT) demonstration. This paper first details the infrastructure implemented, then the concept of operations, and finally the operations for the SEXTANT demonstration and lessons learned.

Ground Systems↗

Lessons Learned from Medical System Foundation Development for Long-Duration Lunar Orbit and Lunar Surface Missions

The Human Research Program (HRP) Exploration Medical Capability (ExMC) Element has been tasked with the development of Medical System Foundations for Level of Care IV for both short-duration lunar orbital missions and, subsequently, long-duration lunar orbital and surface operations missions. These Medical System Foundations serve as a framework to aid in early medical system design and mission planning. The content of both Foundation models is similar, consisting of a concept of operations, functional decomposition, clinical content (medical conditions, capabilities, and resources), technical requirements (interface, non-functional, and functional), and traces between these components and to the NASA standards documents and parent-level (Program- and Vehicle habitat system-level) requirements. Additionally, the development of both Foundations employed systems engineering principles and a model-based systems engineering (MBSE) approach. Throughout the development of these Foundations, ExMC has strived to improve the efficiency and robustness of its processes and to be more responsive to change (i.e., in design reference mission parameters and assumptions) and to stakeholders’ feedback. The most significant improvements made between the short- and long-duration Foundation models during this transformation process are the following: • Replacement of the traditional document-based ConOps with a model-based ConOps according to MBSE principles, which facilitated more efficient understanding of the material and the consolidation of all relevant information into a centralized location. • Utilization of an agile approach with tasks organized into sprints. This approach enabled solicitation of more frequent usability feedback from stakeholders, incorporation of more human factors reviews into the sprints, and more efficient tasking of team members. This presentation will discuss the journey of developing both Foundation models, as well as the lessons learned and resulting improvements made between the Short- and Long-Duration models.

M Kaetzer↗

Flight Test Evaluation of an Unmanned Aircraft System Traffic Management (UTM) Concept for Multiple Beyond-Visual-Line-of-Sight Operations

This study evaluates a traffic management concept designed to enable simultaneous operations of multiple small unmanned aircraft systems (UAS) in the national airspace system (NAS). A five-day flight-test activity is described that examined the feasibility of operating multiple UAS beyond visual line of sight (BVLOS) of their respective operators in the same airspace. Over the five-day campaign, three groups of five flight crews operated a total of eleven different aircraft. Each group participated in four flight scenarios involving five simultaneous missions. Each vehicle was operated BVLOS up to 1.5 miles from the pilot in command. Findings and recommendations are presented to support the feasibility and safety of routine BVLOS operations for small UAS.

UTM↗

Correlation of the L-mode density limit with edge collisionality

The "density limit'' is one of the fundamental bounds on tokamak operating space, and is commonly estimated via the empirical Greenwald scaling. This limit has garnered renewed interest in recent years as it has become clear that ITER and many tokamak pilot plant concepts must operate near or above the widely-used Greenwald limit to achieve their objectives. Evidence has also grown that the Greenwald scaling - in its remarkable simplicity - may not capture the full complexity of the disruptive density limit. In this study, we assemble a multi-machine database to quantify the effectiveness of the Greenwald limit as a predictor of the L-mode density limit and identify alternative stability metrics. We find that a two-parameter dimensionless boundary in the plasma edge, $\nu_{*\rm, edge}^{\rm limit} = 3.0 \beta_{T,{\rm edge}}^{-0.4}$, achieves significantly higher accuracy (true negative rate of 97.7\% at a true positive rate of 95\%) than the Greenwald limit (true negative rate 86.1\% at a true positive rate of 95\%) across a multi-machine dataset including metal- and carbon-wall tokamaks (AUG, C-Mod, DIII-D, and TCV). The collisionality boundary presented here can be applied for density limit avoidance in current devices and in ITER, where it can be measured and responded to in real time.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Integration of New Technology Considering the Trade-Offs Between Operational Benefits and Risks: A Case Study of Dynamic Line Rating

Electric grid operators are adept at handling complexity and uncertainty. However, with increasing introduction of renewable generation, distributed energy resources, and more frequent severe weather events, operators will experience new workload and challenging decision scenarios. Here, this paper quantifies risks and benefits from an operator's perspective of introducing weather based forecast Dynamic Line Ratings (DLR) using variable wind conditions in addition to ambient temperature to relieve transmission congestion and facilitating more offshore wind (OSW). A concept of operations (CONOPS) applied to a forecast DLR implementation and its integration with OSW is defined. A method for evaluating tradeoffs of derating to make the rating more conservative but decreasing the benefit was developed and applied to a case study for two existing overhead transmission lines on Long Island, New York. The CONOPS uses historical day-ahead and hour-ahead High Resolution Rapid Refresh weather forecasts and weather station data to support planning and real-time operations. The analysis determines the risk of downgrades in real-time operational rating compared to the forecast and quantifies the frequency and severity of last-minute downgrades. The risk is compared against the benefits in increased capacity to provide insights on the additional amount of uncertainty DLR and OSW will add to the operator's workload.

17 WIND ENERGY↗

Tools to Support Human Factors and Systems Engineering Interactions During Early Analysis

We describe an approach and existing software tool support for effective interactions between human factors engineers and systems engineers in early analysis activities during system acquisition. We examine the tasks performed during this stage, emphasizing those tasks where system engineers and human engineers interact. The Concept of Operations (ConOps) document is an important product during this phase, and particular attention is paid to its influences on subsequent acquisition activities. Understanding this influence helps ConOps authors describe a complete system concept that guides subsequent acquisition activities. We identify commonly used system engineering and human engineering tools and examine how they can support the specific tasks associated with system definition. We identify possible gaps in the support of these tasks, the largest of which appears to be creating the ConOps document itself. Finally, we outline the goals of our future empirical investigations of tools to support system concept definition.

Thronesbery, Carroll↗

Tools to Support Human Factors and Systems Engineering Interactions During Early Analysis

We describe an approach and existing software tool support for effective interactions between human factors engineers and systems engineers in early analysis activities during system acquisition. We examine the tasks performed during this stage, emphasizing those tasks where system engineers and human engineers interact. The Concept of Operations (ConOps) document is an important product during this phase, and particular attention is paid to its influences on subsequent acquisition activities. Understanding this influence helps ConOps authors describe a complete system concept that guides subsequent acquisition activities. We identify commonly used system engineering and human engineering tools and examine how they can support the specific tasks associated with system definition. We identify possible gaps in the support of these tasks, the largest of which appears to be creating the ConOps document itself. Finally, we outline the goals of our future empirical investigations of tools to support system concept definition.

Thronesbery, Carroll↗

Scheduling and Delivering Aircraft to Departure Fixes in the NY Metroplex with Controller-Managed Spacing Tools

In this paper, successful Time-Based Flow Management (TBFM) scheduling systems for arrivals are considered and adapted to apply to departures. We present a concept of operations that integrates Controller-Managed Spacing tools for departures (CMS-D) with existing tactical departure scheduling tools to coordinate demand at departure fixes in a metroplex environment. We tested our concept in a Human-in-the-Loop simulation and compared the effect of two scheduling conditions: 1) "Departure Scheduling" consisting of an emulation of the Integrated Departure and Arrival Capability (IDAC) where Towers and a Planner (Traffic Management Coordinator at the appropriate facility) coordinate aircraft scheduled takeoff times to departure fixes; and 2) "Arrival Sensitive Departure Scheduling" where, in addition, the Tower and Planner also consider arrival Scheduled Time of Arrivals (STAs) at the airport's dependent runway. Results indicate little difference between the two scheduling conditions, but a large difference between the No Tools and the two scheduling conditions with CMS-D tools. The scheduling/CMS-D tools conditions markedly reduced heading, speed clearances, and workload for controllers who were merging flows at the departure fixes. In the tool conditions, departure controllers conditioned departures earlier rather than later when aircraft were tied near the departure fixes. In the scheduling/CMS-D tools conditions, departures crossed the departure fixes 50 seconds earlier and with an 8% error rate (consisting of time ahead or behind desired time of arrival) compared to a 19% error rate in the No Tool condition. Two exploratory runs showed that similar beneficial effects can be obtained only with the CMS-D tools without scheduling takeoff times, but at the cost of a somewhat higher workload for controllers, indicating the benefits of pre-departure scheduling of aircraft with minimal delays. Hence, we found that CMS-D tools were very beneficial in the metroplex environment we tested but that further research is needed to clarify the benefits of the various scheduling approaches.

terminal airspace↗

Conjunction Assessment and Deconfliction Paradigm for Co-located Satellite Constellations with On-Spacecraft “Autonomous” Flight Dynamics Control

Constellations that employ highly-automated satellite flight dynamics can operate safely from a collision avoidance (CA) perspective using current CA screening technology and communication paradigms—except when in proximity to other highly-automated constellations: there is no existing arrangement and concept of operations to allow the low-latency CA screenings, exchange of information, and assignment/acceptance of mitigation responsibility that co-location of highly-automated constellations requires. However, the serendipitous co-location of the NASA Starling mission—an autonomously-controlled technology demonstration constellation—and the SpaceX Starlink constellation has presented an opportunity (indeed, a requirement) to develop and build out a solution for safe operations of two (or more) co-located, highly-automated satellite constellations. Such a solution has been designed and constructed, including the required ground node; and it will be exercised as a dedicated, in-flight safety experiment between the two constellations from January to September 2024. Lessons learned from this experiment are expected to feed the design of the US Department of Commerce’s Tracking Control System for Space (TraCSS) space traffic coordination solution.

conjunction assessment↗

Post-Shuttle EVA Operations on ISS

The EVA hardware used to assemble and maintain the ISS was designed with the assumption that it would be returned to Earth on the Space Shuttle for ground processing, refurbishment, or failure investigation (if necessary). With the retirement of the Space Shuttle, a new concept of operations was developed to enable EVA hardware (EMU, Airlock Systems, EVA tools, and associated support equipment and consumables) to perform ISS EVAs until 2016 and possibly beyond to 2020. Shortly after the decision to retire the Space Shuttle was announced, NASA and the One EVA contractor team jointly initiated the EVA 2010 Project. Challenges were addressed to extend the operating life and certification of EVA hardware, secure the capability to launch EVA hardware safely on alternate launch vehicles, and protect EMU hardware operability on orbit for long durations.

West, Bill↗

Analysis of Wake VAS Benefits Using ACES Build 3.2.1: VAMS Type 1 Assessment

The FAA and NASA are currently engaged in a Wake Turbulence Research Program to revise wake turbulence separation standards, procedures, and criteria to increase airport capacity while maintaining or increasing safety. The research program is divided into three phases: Phase I near term procedural enhancements; Phase II wind dependent Wake Vortex Advisory System (WakeVAS) Concepts of Operations (ConOps); and Phase III farther term ConOps based on wake prediction and sensing. The Phase III Wake VAS ConOps is one element of the Virtual Airspace Modelling and Simulation (VAMS) program blended concepts for enhancing the total system wide capacity of the National Airspace System (NAS). This report contains a VAMS Program Type 1 (stand-alone) assessment of the expected capacity benefits of Wake VAS at the 35 FAA Benchmark Airports and determines the consequent reduction in delay using the Airspace Concepts Evaluation System (ACES) Build 3.2.1 simulator.

Smith, Jeremy C.↗

Prototype Flight Management Capabilities to Explore Temporal RNP Concepts

Next Generation Air Transportation System (NextGen) concepts of operation may require aircraft to fly planned trajectories in four dimensions three spatial dimensions and time. A prototype 4D flight management capability is being developed by NASA to facilitate the development of these concepts. New trajectory generation functions extend today's flight management system (FMS) capabilities that meet a single Required Time of Arrival (RTA) to trajectory solutions that comply with multiple RTA constraints. When a solution is not possible, a constraint management capability relaxes constraints to achieve a trajectory solution that meets the most important constraints as specified by candidate NextGen concepts. New flight guidance functions provide continuous guidance to the aircraft s flight control system to enable it to fly specified 4D trajectories. Guidance options developed for research investigations include a moving time window with varying tolerances that are a function of proximity to imposed constraints, and guidance that recalculates the aircraft s planned trajectory as a function of the estimation of current compliance. Compliance tolerances are related to required navigation performance (RNP) through the extension of existing RNP concepts for lateral containment. A conceptual temporal RNP implementation and prototype display symbology are proposed.

Ballin, Mark G.↗

Modeling Operations Costs for Human Exploration Architectures

Operations and support (O&S) costs for human spaceflight have not received the same attention in the cost estimating community as have development costs. This is unfortunate as O&S costs typically comprise a majority of life-cycle costs (LCC) in such programs as the International Space Station (ISS) and the now-cancelled Constellation Program. Recognizing this, the Constellation Program and NASA HQs supported the development of an O&S cost model specifically for human spaceflight. This model, known as the Exploration Architectures Operations Cost Model (ExAOCM), provided the operations cost estimates for a variety of alternative human missions to the moon, Mars, and Near-Earth Objects (NEOs) in architectural studies. ExAOCM is philosophically based on the DoD Architecture Framework (DoDAF) concepts of operational nodes, systems, operational functions, and milestones. This paper presents some of the historical background surrounding the development of the model, and discusses the underlying structure, its unusual user interface, and lastly, previous examples of its use in the aforementioned architectural studies.

cost estimating↗

Innovative Approaches to Using the International Space Station as a Mars Transit Analog

Human research on the International Space Station (ISS) crew has made significant advances in understanding of the effects of physiology on human health in space missions. However, ISS has not been as suitable for research on other hazards of human spaceflight such as isolation and communications delay. NASA recently completed a special assessment of whether modifications could be made to operations or facilities so that ISS could be used more effectively as an analog to simulate long-duration crew missions beyond low earth orbit. A cross-disciplinary team met to identify concept of operations, trade spaces, challenges, and opportunities to making ISS more operationally relevant as a Mars transit mission analog, and the results and implementation plans are summarized in this manuscript. In addition to the use case of 12-month missions (already in planning by the NASA ISS Program to bound expected Mars transit durations), three new use cases where ISS could provide valuable high-fidelity experience were identified. (1) Testing of operations procedures and medical care could be enhanced by demonstrating crew handling a simulated medical event in microgravity, autonomously, and with significant communications delay. (2) Isolation and confinement effects of deep space transit could be studied on ISS to validate current habitable volume requirements for Mars transit as well as provide context for evaluating the results of the extensive ground-based simulations in HERA and NEK. A trade study of possible operational and hardware changes that would make ISS applicable to these use cases was completed. (3) Surface operations after the physiological deconditioning of a long transit could be conducted to validate crew ability to perform critical ground tasks after 6-month Mars transit and aid in conceptual design of Mars surface element architectures. Each of the case studies includes a trade space between operational impacts on nominal ISS activities and degree of fidelity. A phased approach to implementation means that several "quick start" activities can be done in 2019-2020 at the same time as planning continues for more complex exploration analog options beginning as early as 2022. The team determined that many of these quick-start tasks could be done with available assets, entirely independent of other exploration system development timelines (such as Orion, Space Launch System). The consideration of the full suite of human spaceflight capabilities in the lunar vicinity can also be included as each step in human exploration serves as a simulation opportunity for some aspect of subsequent missions. Further discussions of options with the international community are critical for considering the benefits as well as impacts of simulation activities on ISS, as well as to better formulate future mission architectures.

Robinson, Julie A.↗

Design of Superconducting Parallel Bar Deflecting and Crabbing rf Structures

A new concept for a deflecting and crabbing rf structure based on half-wave resonant lines was introduced recently*. It offers significant advantages to existing designs and, because of it compactness, allows low frequency operation. This concept has been further refined and optimized for superconducting implementation. Results of this optimization and application to a 400 MHz crabbing cavity and a 499 MHz deflecting cavity are presented.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

STIDP: A US Department of Homeland Security program for countering explosives attacks at large public events and mass transit facilities

The Department of Homeland Security’s Standoff Technology Integration and Demonstration Program is designed to accelerate the development and integration of technologies, concepts of operations, and training to prevent explosives attacks at large public events and mass transit facilities. The program will address threats posed by suicide bombers, vehicle-borne improvised explosive devices, and leave-behind bombs. The program is focused on developing and testing explosives countermeasure architectures using commercial off-the-shelf and near-commercial standoff and remotely operated detection technologies in prototypic operational environments. An important part of the program is the integration of multiple technologies and systems to protect against a wider range of threats, improve countermeasure performance, increase the distance from the venue at which screening is conducted, and reduce staffing requirements. The program will routinely conduct tests in public venues involving successively more advanced technology, higher levels of system integration, and more complex scenarios. This paper describes the initial field test of an integrated countermeasure system that included infrared, millimeter-wave, and video analytics technologies for detecting person-borne improvised explosive devices at a public arena. The test results are being used to develop a concept for the next generation of integrated countermeasures, to refine technical and operational requirements for architectures and technologies, and engage industry and academia in solution development.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗