Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Allocation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,423 records · Page 79

The Constellation-X Spectroscopy X-ray Telescope: Recent Technology Development

We describe recent progress in the technology development program for the mirror system for the Constellation-X Spectroscopy X-ray Telescope (SXT). Development of this mirror represents a significant technology challenge, as it must provide a combination of large effective area (3 sq. m) and modest angular resolution (15 arc second half power diameter requirement; 5 arc second goal) with a limited mass allocation. The baseline design incorporates over 200 nested Wolter 1 mirrors. Each of these in turn is segmented in order to simplify handling of the mirrors and facilitate mass production. The X-ray reflecting surfaces are fabricated from thin, thermally formed glass sheets. Production improvements have yielded mirror segments that approach the performance requirement without the need for epoxy replication. A mounting and alignment approach incorporating piezoelectric actuators has been shown to manipulate mirror segments with the required precision without introducing significant distortion. Substantial improvements in metrology methodology have provided insights into the mirror segment forming and alignment processes. An X-ray demonstration of a mirror segment pair is planned for early 2006.

Petre, Robert↗

Developing fault models for space mission software

Over the past several years, we have focused on developing fault models for space mission software. In general, these models use measurable attributes of a software system and its development process to estimate the number of faults inserted into the system during its development; their outputs can be used to better estimate the resources to be allocated to fault identification and removal for all system components.

fault models software development software archite↗

Optimizing technology investments: a broad mission model approach

A long-standing problem in NASA is how to allocate scarce technology development resources across advanced technologies in order to best support a large set of future potential missions. Within NASA, two orthogonal paradigms have received attention in recent years: the real-options approach and the broad mission model approach. This paper focuses on the latter.

NASA technology portfolio real-options risk-based ↗

Recent results in Mars Relay Network planning and scheduing

At different time periods in the future, Mars missions will overlap and previous studies indicate that during such periods existing deep space communication infrastructure will not be able to handle all Mars communication needs. A plausible solution is to perform optimal resource allocation for the Mars relay communication network; a network consisting of multiple surface units and orbiters on Mars and the Deep Space Stations. Unlike direct-to-earth, a relay communication, either in real-time or store-and-forward, can increase network science data return, reduce surface unit's direct-to-earth communication demands, and enable communication even when the surface unit is not facing Earth. It is the objective of this paper to take advantage of the relay operation to efficiently plan and schedule the network communications.

Relay Network planning and scheduling constrained ↗

In-flight testing of onboard UHF equipment

This paper proposes a plan to allow future flight projects to accomplish in-flight testing of on-board UHF equipment which the spacecraft carries for local relay link use at planet Mars only. This plan relies on onboard self-testing to verify receiver functional capabilities at various data rates, and on RF testing with narrow band CW signals transmitted at selected frequencies from an Earth station, non-interfering to existing UHF users, to verify the RF performance of antenna and microwave equipment. The Mars mission planners at JPL have accepted this concept as reasonable. The plan will be practical to implement with a frequency agile local link transceiver, like the next generation UHF transceiver being developed at JPL. The user can test it at one frequency and operate it at a different frequency within the operating range. Possible frequencies for uplink testing are identified. Further effort is needed to select specific test frequencies that will be agreeable to the users to which these bands are allocated.

UHF in-flight testing↗

My-Star: A Methodology and System for Tracing and Analyzing Requirements

This paper describes a methodology developed at the Jet Propulsion Laboratory (JPL), and designed for the process of requirements engineering and management. MY-STAR provides techniques for specifying, refining, allocating, baselining,sharing, changing, storing, and reporting on requirements and requirements metrics.

MY-STAR requirements engineering requirements mana↗

Natural Radio Source and Spacecraft Signal Measurements at Ka-Band (32.0 GHz) and X-Band (8.4 GHz) Using a 34-Meter Beam-Waveguide Antenna

From Intro.: NASA'a Deep Space Network (DSN) Technology Program at the Jet Propulsion Laboratory (JPL) is evaluating the use of the Ka-Band frequency allocation band (31.8 GHz to 32.3 GHz) for deep space to Earth telecommunications...This paper addresses the three current Ka-Band and X-Band activities, 1)KaAp, 2)SURSAT-1, and 3)KaBLE-II's upcoming Ka-Band experiments aboard Mars Global Surveyor.

Deep Space Network DSN Ka-Band Ka frequency↗

Technical Characteristics and Accuracy Capabilities of Delta Differential One-Way Ranging (DeltaDOR) as a Spacecraft Navigation Tool

The technique of determining spacecraft angular position by Delta Differential One-Way Ranging (DeltaDOR) is described. The dependence of measurement accuracy on parameters which define the spacecraft signal spectrum is shown. An illustration of DeltaDOR measurement accuracy, using the Mars Observer spacecraft, is presented. Guidelines for specifying spacecraft tone spectra are presented based on typical accuracy and ambiguity resolution needs, on frequency allocation for deep space tracking, on the efficient use of spacecraft signal power, and on the efficient use of ground tracking resources.

VLBI Very Long Baseline Interferometry DOR tones D↗

Active microwave and millimeter wave SAR remote sensing

This paper presents the performance and interference criteria for spaceborne active sensors, interference mitigation techniques, and allocation considerations for certain frequency bands for the upcoming WRC 2003.

interference studies frequency compatibility studi↗

Experimental Results of LightSAR Mision Planning Using a Market-Based System

The allocation of scarce spacecraft resources to multiple users has always been a difficult process. This difficulty arises from the fact that there are never enough resources to meet the stated requirements of the scientific investigators who compete to acquire their desired data sets.

LightSAR Mission Planning Market-based systems↗

Mobile Satellite Bands Between 1-30 GHz

The recent surge in mobile and personal communications has placed new demands on radio spectrum usage in the Earth-to-space direction. In response to this demand, the 1992 World Administrative Radio Conference (WARC-92) revised the table of frequency allocations for mobile-satellite applications.

mobile-satellite spectrum aeronautical exclusive b↗

Cassini science planning process

The mission design for Cassini-Huygens calls for a four-year orbital survey of the Saturnian system and the descent into the Titan atmosphere and eventual soft-landing of the Huygens probe. The Cassini orbiter tour consists of 76 orbits around Saturn with 44 close Titan flybys and 8 targeted icy satellite flybys. The Cassini orbiter spacecraft carries twelve scientific instruments that will perform a wide range of observations on a multitude of designated targets. The science opportunities, frequency of encounters, the length of the Tour, and the use of distributed operations pose significant challenges for developing the science plan for the orbiter mission. The Cassini Science Planning Process is the process used to develop and integrate the science and engineering plan that incorporates an acceptable level of science required to meet the primary mission objectives far the orbiter. The bulk of the integrated science and engineering plan will be developed prior to Saturn Orbit Insertion (Sol). The Science Planning Process consists of three elements: 1) the creation of the Tour Atlas, which identifies the science opportunities in the tour, 2) the development of the Science Operations Plan (SOP), which is the conflict-free timeline of all science observations and engineering activities, a constraint-checked spacecraft pointing profile, and data volume allocations to the science instruments, and 3) an Aftermarket and SOP Update process, which is used to update the SOP while in tour with the latest information on spacecraft performance, science opportunities, and ephemerides. This paper will discuss the various elements of the Science Planning Process used on the Cassini Mission to integrate, implement, and adapt the science and engineering activity plans for Tour.

Cassini↗

Techniques to minimize adjacent band emissions from Earth Exploration Satellites to protect the Space Research (Category B) Earth Stations in the 8400-8450 MHz band

The Earth Exploration Satellites operating in the 8025-8400 MHz band can have strong adjacent band emissions on the8400-8450 MHz band which is allocated for Space Research (Category-B). The unwanted emission may exceed the protection criterion establish by the ITU-R for the protection of the Space Research (Category B) earth stations, i.e., deep-space earth stations. An SFCG Action Item (SF 23/14) was created during the 23rd SFCG meeting to explore technical and operational techniques to reduce the adjacent band emissions. In response to this action item, a study was conducted and results are presented in this document.

adjancent band emission↗

Regenerative pseudo-noise ranging for deep space applications

Currently, ranging for deep space missions is performed by turning around the uplink ranging modulation and remodulating it onto the downlink carrier. This method results in about 1.5 MHz of noise also being modulated onto the downlink, severely degrading the received ranging SNR on the ground. This degradation must be compensated for by either increasing the integration time of the received signal, which increases the length of time for the track, or increasing the downlink ranging signal's modulation index, which decreases the power available for the telemetry modulation. A method for the regeneration on the spacecraft of a pseudo noise (PN) ranging signal has been developed. This method allows for an increase of up to 30dB in the received downlink ranging power. The increased power can be used to decrease the measurement uncertainty, reduce the time of the measurement, or increase the power allocated to the downlink telemetry. This system was implemented in the Spacecraft Transponding Modem that was developed by JPL for NASA.

deep space ranging↗

GeoSTAR : developing a new payload for GOES satellites

The Geostationary Synthetic Thinned Aperture Radiometer (GeoSTAR) is a new concept for a microwave sounder, intended to be deployed on NOAA's next generation of geostationary weather satellites, the GOES-R series - due to first launch in 2012. This will fill a serious gap in OW remote sensing capabilities of long standing - a key capability that NOAA is book keeping at the top of its list of 'pre-planned product improvements' for GOES-R - i.e. the most urgently needed additional payload, which will be added as soon as funding has been allocated and programmatic issues resolved. Although real-aperture GEO microwave sounders have been proposed over the years, only GeoSTAR is capable of meeting the measurement requirements and is therefore now the leading candidate.

microwave↗