Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “test plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,405 records · Page 78

Broadcast control of air traffic

Concepts of increased pilot participation in air traffic control are presented. The design of an air traffic control system for pilot usage is considered. The operating and safety benefits of LF/VLF approaches in comparison to current nonprecision approach procedures and systems are discussed. With a good national system plan, flight testing and validation, and the use of local differential, or general diurnal, corrections, the LF/VLF system would provide service superior to that presently available.

Litchford, G. B.↗

Design and testing a high fuel volume fraction, externally finned, thermionic emitter.

A prototypical, high fuel volume fraction, thermionic emitter body was designed and tested. The emitter body is all tungsten, with a 1.40-cm ID, a 3.23-cm OD, and eight full-length axial fins. The emitter thickness is 0.15 cm while the fins and outer clad are 0.075 cm thick. Different methods of fabrication were used in making the test samples. Stress analysis was performed with a three-dimensional elastic code. Thermal testing of the samples, duplicating calculated radial temperature gradients, heatup and cooldown rates, and emitter body temperatures in operation, was performed with no structural failures noted (six heatup and cooldown cycles per sample). Further emitter analysis and testing is planned.

Peelgren, M. L.↗

Qualification plan for the ultraviolet spectrometer experiment (S-169), revision A

The qualification methods used to verify that the UVS hardware meets the technical requirements of the contract are defined. Included in this plan are test location, the qualification UVS to be tested, test objectives, and all tests required to verify that the UVS meets all performance and environmental requirements of the CEI specification. Additionally, environmental test conditions, testing time or cycles, allowable maintenance, logging requirements, manner of analysis, and utilization of test results, disposition of test specimens, failure criteria, retest requirements, facilities and support requirements, and the time phasing of the tests are presented.

Eckard, L. D., Jr.↗

ERTS-1 data applications to Minnesota forest land use classification

The author has identified the following significant results. Color-combined ERTS-1 MSS spectral slices were analyzed to determine the maximum (repeatable) level of meaningful forest resource classification data visually attainable by skilled forest photointerpreters for the following purposes: (1) periodic updating of the Minnesota Land Management Information System (MLMIS) statewide computerized land use data bank, and (2) to provide first-stage forest resources survey data for large area forest land management planning. Controlled tests were made of two forest classification schemes by experienced professional foresters with special photointerpretation training and experience. The test results indicate it is possible to discriminate the MLMIS forest class from the MLMIS nonforest classes, but that it is not possible, under average circumstances, to further stratify the forest classification into species components with any degree of reliability with ERTS-1 imagery. An ongoing test of the resulting classification scheme involves the interpretation, and mapping, of the south half of Itasca County, Minnesota, with ERTS-1 imagery. This map is undergoing field checking by on the ground field cooperators, whose evaluation will be completed in the fall of 1973.

Sizer, J. E.↗

Nuclear electric propulsion stage requirements and description

The application of a nuclear electric propulsion (NEP) stage in the exploration of near-earth, cometary, and planetary space was discussed. The NEP stage is powered by a liquid-metal-cooled, fast spectrum thermionic reactor capable of providing 120 kWe for 20,000 hours. This power is used to drive a number of mercury ion bombardment thrusters with specific impulse in the range of 4000-5000 seconds. The NEP description, characteristics, and functional requirements are discussed. These requirements are based on a set of five coordinate missions, which are described in detail. These five missions are a representative part of a larger set of missions used as a basic for an advanced propulsion comparison study. Additionally, the NEP stage development plan and test program is outlined and a schedule presented.

Mondt, J. F.↗

Tracking and data system support for the Pioneer project. Volume 3: Pioneer 10 from 1 April 1972 through the Jupiter encounter period, January 1974

The Tracking and Data Systems support of the Pioneer 10 mission from April 1, 1972 through the Jupiter encounter period which ended January 5, 1974 is described. The period covered involves operations in the interplanetary environment from the time of completion of the second trajectory correction to the start of Jupiter encounter; the implementation, planning, and testing that lead to the Jupiter encounter; and the operations during the 60 day encounter period.

Miller, R. B.↗

The interaction of spacecraft high voltage power systems with the space plasma environment

Research work has shown that the interaction of a spacecraft and its high voltage power systems with the space plasma environment can result in harmful power loss and damage to insulators and metal surfaces. Insulator and solar panel tests were performed and flight tests are planned. High voltage power processing equipment was shown to be affected by power loss, and by transients due to plasma interactions. Power loss was determined to be roughly proportional to the square of the voltage and increases approximately as the square root of the area. Kapton, Teflon, and glass were found to be satisfactory insulating materials and it is concluded that for large space power stations should consider the effect of large pinhole currents.

Domitz, S.↗

Applications of oblique-wing technology - An overview

A summary of oblique-wing technology programs, including system studies and experimental activities, is presented. Oblique-wing civil transports were studied and compared with conventional configurations at design cruise Mach numbers of 0.95 and 1.2. Studies of military configurations employing oblique-wing technology considered aircraft concepts, remotely piloted vehicles, and a cruise missile. Experimental activities included wind-tunnel tests of high and low aspect ratio oblique wings; flight tests are planned using unmanned and manned vehicles. The research program suggests that oblique-wing technology offers improved performance over conventional concepts for aircraft operating in the transonic speed range.

Nelms, W. P., Jr.↗

Lateral stability and control tests of the XP-77 airplane in the NACA full-scale tunnel, 16 June 1944

Tests were made in the NACA full-scale tunnel to determine the lateral stability and control characteristics of the XP-77 airplane. Measurements were made of the forces and moments on the airplane at various angles of attack and angles of yaw. The measurements were made with the propeller removed and with the propeller installed and operating at various thrust coefficients, and with the landing flaps retracted and deflected. The effects of aileron, elevator, and rudder deflection on control surface effectiveness and hinge moments were determined. The tests were planned to obtain the data required to evaluate as completely as possible the Army Air Force requirements on lateral stability and control for pursuit-type airplanes.

Czarnecki, K. R.↗

A mechanical, thermal and electrical packaging design for a prototype power management and control system for the 30 cm mercury ion thruster

A prototype electric power management and thruster control system for a 30 cm ion thruster is described. The system meets all of the requirements necessary to operate a thruster in a fully automatic mode. Power input to the system can vary over a full two to one dynamic range (200 to 400 V) for the solar array or other power source. The power management and control system is designed to protect the thruster, the flight system and itself from arcs and is fully compatible with standard spacecraft electronics. The system is easily integrated into flight systems which can operate over a thermal environment ranging from 0.3 to 5 AU. The complete power management and control system measures 45.7 cm (18 in.) x 15.2 cm (6 in.) x 114.8 cm (45.2 in.) and weighs 36.2 kg (79.7 lb). At full power the overall efficiency of the system is estimated to be 87.4 percent. Three systems are currently being built and a full schedule of environmental and electrical testing is planned.

Sharp, G. R.↗

A stirling engine computer model for performance calculations

To support the development of the Stirling engine as a possible alternative to the automobile spark-ignition engine, the thermodynamic characteristics of the Stirling engine were analyzed and modeled on a computer. The modeling techniques used are presented. The performance of an existing rhombic-drive Stirling engine was simulated by use of this computer program, and some typical results are presented. Engine tests are planned in order to evaluate this model.

Tew, R.↗

A mechanical, thermal and electrical packaging design for a prototype power management and control system for the 30 cm mercury ion thruster

A prototype Electric Power Management and Thruster Control System for a 30 cm ion thruster has been built and is ready to support a first mission application. The system meets all of the requirements necessary to operate a thruster in a fully automatic mode. Power input to the system can vary over a full two to one dynamic range (200 to 400 V) for the solar array or other power source. The Power Management and Control system is designed to protect the thruster, the flight system and itself from arcs and is fully compatible with standard spacecraft electronics. The system is designed to be easily integrated into flight systems which can operate over a thermal environment ranging from 0.3 to 5 AU. The complete Power Management and Control system measures 45.7 cm x 15.2 cm x 114.8 cm and weighs 36.2 kg. At full power the overall efficiency of the system is estimated to be 87.4 percent. Three systems are currently being built and a full schedule of environmental and electrical testing is planned.

Sharp, G. R.↗

Accelerated/abbreviated test methods for predicting life of solar cell encapsulants to Jet Propulsion Laboratory California Institute of Technology for the encapsulation task of the low-cost solar array project

An important principle is that encapsulants should be tested in a total array system allowing realistic interaction of components. Therefore, micromodule test specimens were fabricated with a variety of encapsulants, substrates, and types of circuitry. One common failure mode was corrosion of circuitry and solar cell metallization due to moisture penetration. Another was darkening and/or opacification of encapsulant. A test program plan was proposed. It includes multicondition accelerated exposure. Another method was hyperaccelerated photochemical exposure using a solar concentrator. It simulates 20 year of sunlight exposure in a short period of one to two weeks. The study was beneficial in identifying some cost effective encapsulants and array designs.

Kolyer, J. M.↗

Orbiter CIU/IUS communications hardware evaluation

The DOD and NASA inertial upper stage communication system design, hardware specifications and interfaces were analyzed to determine their compatibility with the Orbiter payload communications equipment (Payload Interrogator, Payload Signal Processors, Communications Interface Unit, and the Orbiter operational communications equipment (the S-Band and Ku-band systems). Topics covered include (1) IUS/shuttle Orbiter communications interface definition; (2) Orbiter avionics equipment serving the IUS; (3) IUS communication equipment; (4) IUS/shuttle Orbiter RF links; (5) STDN/TDRS S-band related activities; and (6) communication interface unit/Orbiter interface issues. A test requirement plan overview is included.

Huth, G. K.↗