Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “technical management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,405 records · Page 78

Assessment of Delivery Accuracy in an Operational-Like Environment

In order to enable arrival management concepts and solutions in a Next Generation Air Transportation System (NextGen) environment, ground-based sequencing and scheduling functions were developed to support metering operations in the National Airspace System. These sequencing and scheduling tools are designed to assist air traffic controllers in developing an overall arrival strategy, from enroute down to the terminal area boundary. NASA developed a ground system concept and protoype capability called Terminal Sequencing and Spacing (TSAS) to extend metering operations into the terminal area to the runway. To demonstrate the use of these scheduling and spacing tools in an operational-like environment, the FAA, NASA, and MITRE conducted an Operational Integration Assessment (OIA) of a prototype TSAS system at the FAA's William J. Hughes Technical Center (WJHTC). This paper presents an analysis of the arrival management strategies utilized and delivery accuracy achieved during the OIA. The analysis demonstrates how en route preconditioning, in various forms, and schedule disruptions impact delivery accuracy. As the simulation spanned both enroute and terminal airspace, the use of Ground Interval Management - Spacing (GIM-S) enroute speed advisories was investigated. Delivery accuracy was measured as the difference between the Scheduled Time of Arrival (STA) and the Actual Time of Arrival (ATA). The delivery accuracy was computed across all runs conducted during the OIA, which included deviations from nominal operations which are known to commonly occur in real operations, such as schedule changes and missed approaches. Overall, 83% of all flights were delivered into the terminal airspace within +/- 30 seconds of their STA and 94% of flights were delivered within +/- 60 seconds. The meter fix delivery accuracy standard deviation was found to be between 36 and 55 seconds across all arrival procedures. The data also showed when schedule disruptions were excluded, the percentage of aircraft delivered within +/- 30 seconds was between 85 and 90% across the various arrival procedures at the meter fix. This paper illustrates the ability to meet new delivery accuracy requirements in an operational-like environment using operational systems and NATCA controller participants, while also including common events that might cause disruptions to the schedule and overall system.

Air Traffic Scheduling↗

Status Update on IAEA MODARIA II Working Group 1 (Assessment and Decision Making) - 19391

During WM2018, the work being done under the International Atomic Energy Agency (IAEA)'s Modelling and Data for Radiological Impact Assessments (MODARIA) II Programme (https://wwwns.iaea.org/projects/modaria/modaria2.asp?s=8 and l=129) was introduced. The Programme comprises seven working groups covering a wide range of topics. Amongst them, Working Group 1 (WG1) is focused on dose assessment and decision aiding tools to address existing exposure situations due to past practices involving naturally occurring radioactive material (NORM) and nuclear legacy sites. Specifically, this covers the development of methods and toolsets for risk-informed decision-making for such complex sites, and includes practical demonstration of decision-making processes and tools through case studies. During 2018 WG1 participants met twice to discuss the status and plans of work being conducted by the WG. The group held its Second Interim Meeting from 7 to 11 May 2018 at the Jozef Stefan Institute (JSI) in Ljubljana, Slovenia. The objectives of the meeting were to: (1) Discuss the status of WG1 work; (2) Start preparation of the interim draft version of the MODARIA II WG1 Report (herein referred to as the 'Interim Report'); (3) Review the progress of planned data analyses, model-model comparisons, and model-data comparisons being conducted through case studies for the Tessenderlo Chemie Site in Belgium, the Zapadnoe Uranium Mill Tailings Site in Ukraine, and a Former Tin Processing Facility Site in Brazil; (4) Discuss calculations conducted for a NORM Site in China for potential addition to the WG1 case studies; (5) Report on progress on topical studies and other assignments performed to support the preparation of several sections of the Interim Report; and (6) Discuss plans for incorporating some preliminary case studies considered by MODARIA I WG1 and MODARIA I WG3. During the meeting in Slovenia, WG1 participants also visited the Zirovski vrh (RZV) Uranium Mine and Mill Tailings Site near Ljubljana. From 22 to 25 October 2018, WG1 members also participated in the MODARIA II Third Technical Meeting in Vienna, Austria. The meeting facilitated analysis of the progress made so far by the seven working groups, as well as exploration of the dissemination of the results of the MODARIA II Programme through publication in scientific journals dealing with the various subject areas covered by the Programme. WG1 participants focused on the preparation of its Interim Report, and engaged in technical exchanges with the IAEA Le Trench Project on characterization, assessment, remediation and management of buried waste at legacy trench sites, as well as the To Enhance uncertainties Reduction and stakeholders Involvement Towards integrated and graded Risk management of humans and wildlife In long-lasting radiological Exposure Situations (TERRITORIES) project (https://territories.eu/). Currently, WG1 is in the process of preparing a draft report to document the results of its various case studies and special topics, and is preparing for the final Interim Meeting in May 2019 and the final Technical Meeting in October 2019, before the conclusion of the MODARIA II Program at the end of 2019. This paper will provide a status update of these activities, along with preliminary information on the WG1 report, including potential recommendations for future activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Enhanced Chemical Cleaning

Renee Spires, Project Manager at Savannah River Remediation, opens Session 3 (Accelerated Waste Retrieval and Closure: Key Technologies) at the 2010 EM Waste Processing Technical Exchange with a talk on enhanced chemical cleaning.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Switchgrass Best Management Practices for Biofuel Production

Switchgrass is a perennial C 4 grass native to North America and broadly adaptable across the U.S. Its high productivity, low input requirements, and ability to deliver significant ecosystem services benefits, including carbon sequestration, soil conservation, and wildlife habitat, make it well-suited for cultivation on marginal lands. Achieving the U.S. Department of Energy’s projected potential of 1 billion dry tons of biomass annually by 2050 – with switchgrass contributing up to 230 million tons – will require a transition to large-scale, commercial production. This technical guide was developed to provide decision-makers with current best management practices (BMPs) for establishing, managing, and harvesting bioenergy switchgrass at scale on marginal lands across the U.S. Midwest and Great Plains. Drawing extensively on previous field research and insights from the five-year 'Next-Generation Feedstocks for the Emerging Bioeconomy' project – funded by the U.S. Department of Energy’s Bioenergy Technologies Office – this guide provides practical strategies for scaling up switchgrass production to meet the demands of the growing bioeconomy.

Lee, D.K.↗

International Standards as Critical Enablers to Development and Diffusion of D and D Technologies - 19372

The U.S. Department of Energy's Office of Environmental Management (DOE EM) has taken a leading role in investing in the research and development (R and D) of critical technologies to support the safe and efficient decommissioning of legacy nuclear facilities. In order to facilitate the complex-wide deployment and adoption of those technologies from the laboratory to end users, and to maximize return on investment of government-sponsored R and D projects, DOE EM proactively solicits and evaluates initiatives intended to enhance achievement of these goals. One such case study emerged and involved the successful deployment of an intumescent fixative technology in support of the SRS 235-F PuFF Facility Risk Reduction Program. A detailed analysis confirmed that a critical enabler and key contributor to this effort was a deliberate, methodical approach to leverage an international, consensus-based standards organization from the onset. There is a substantial body of literature that supports the crucial role of standards in technology programs across all phases of development - from concept, to deployment, to large-scale diffusion - in other industries. Formal standards are the result of a consensual negotiation process carried out by producers, regulators, end users and other interested stakeholders in a voluntary process within standardization organizations (WTO, 2011). Therefore, standard setting is often viewed as a self-regulatory process (Gupta and Lad, 1983), and can often yield better acceptance of technologies in certain industries, particularly if those standards are further referenced in government directives and regulations. This analysis connects several theoretical concepts: information asymmetry, risk adverse markets, and technology diffusion. It is complimented by some initial, rudimentary survey results in a burgeoning academic study conducted by the author, and reinforced by the aforementioned case study on the deployment of a fixative technology at the SRS 235-F PuFF Facility. The importance of managing a holistic technology development program that focuses on not just the technical aspects of the technology itself, but the critical enablers as well, is emphasized. This effort has direct application to potentially enhancing DOE EM technology development programs across the complex. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Status of WSTF Pyrovalve Handbook Development in Year 2000

Significant data have been generated through various spacecraft propulsion system projects involving the use of pyrotechnically operated valves (pyrovalves). These data need to be analyzed, interpreted, summarized, associated, and formatted so they can be made available for spacecraft propulsion system design involving pyrovalves and used to specify test procedures in the performance evaluation and qualification of these systems. To meet this need, a Pyrovalve Handbook is being developed at the NASA White Sands Test Facility. Standards of performance for pyrovalve applications are being formulated under the sponsorship of the NASA Technical Standards Program, as are pyrovalve testing standards under the sponsorship of the NASA Safety and Risk Management Program. The ultimate goal is to have the Handbook adopted as a voluntary standard under the guidance of the AIAA Energetic Components and Systems Technical Committee and, in a more restrictive format, become an integral part of ISO standards for Explosive Systems and Devices Used on Space Vehicles. Feedback from both Government and industry is encouraged and will be the focus of the presentation. It is especially critical that feedback be received on content and formatting of the Handbook to maximize benefit to the technical community. Submission of validated data from organizations outside of NASA is also encouraged.

Howard, Julien L.↗

The Cementitious Barriers Partnership Experimental Programs and Software Advancing DOE’s Waste Disposal/Tank Closure Efforts – 15436

The U.S. Department of Energy Environmental Management (DOE-EM) Office of Tank Waste Management-sponsored Cementitious Barriers Partnership (CBP) is chartered with providing the technical basis for implementing cement-based waste forms and radioactive waste containment structures for long-term disposal. DOE needs in this area include the following to support progress in final treatment and disposal of legacy waste and closure of High-Level Waste (HLW) tanks in the DOE complex: long-term performance predictions, flow sheet development and flow sheet enhancements, and conceptual designs for new disposal facilities. The DOE-EM Cementitious Barriers Partnership is producing software and experimental programs resulting in new methods and data needed for end-users involved with environmental cleanup and waste disposal. Both the modeling tools and the experimental data have already benefited the DOE sites in the areas of performance assessments by increasing confidence backed up with modeling support, leaching methods, and transport properties developed for actual DOE materials. In 2014, the CBP Partnership released the CBP Software Toolbox –“Version 2.0” which provides concrete degradation models for 1) sulfate attack, 2) carbonation, and 3) chloride initiated rebar corrosion, and includes constituent leaching. These models are applicable and can be used by both DOE and the Nuclear Regulatory Commission (NRC) for service life and long-term performance evaluations and predictions of nuclear and radioactive waste containment structures across the DOE complex, including future SRS Saltstone and HLW tank performance assessments and special analyses, Hanford site HLW tank closure projects and other projects in which cementitious barriers are required, the Advanced Simulation Capability for Environmental Management (ASCEM) project which requires source terms from cementitious containment structures as input to their flow simulations, regulatory reviews of DOE performance assessments, and Nuclear Regulatory Commission reviews of commercial nuclear power plant (NPP) structures which are part of the overall US Energy Security program to extend the service life of NPPs. In addition, the CBP experimental programs have had a significant impact on the DOE complex by providing specific data unique to DOE sodium salt wastes at Hanford and SRS which are not readily available in the literature. Two recent experimental programs on cementitious phase characterization and on technetium (Tc) mobility have provided significant conclusions as follows: recent mineralogy characterization discussed in this paper illustrates that sodium salt waste form matrices are somewhat similar to but not the same as those found in blended cement matrices which to date have been used in long-term thermodynamic modeling and contaminant sequestration as a first approximation. Utilizing the CBP generated data in long-term performance predictions provides for a more defensible technical basis in performance evaluations. In addition, recent experimental studies related to technetium mobility indicate that conventional leaching protocols may not be conservative for direct disposal of Tc-containing waste forms in vadose zone environments. These results have the potential to influence the current Hanford supplemental waste treatment flow sheet and disposal conceptual design.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The cementitious barriers partnership experimental programs and software advancing DOE's waste disposal/tank closure efforts - 15436

The U.S. Department of Energy Environmental Management (DOE-EM) Office of Tank Waste Management sponsored Cementitious Barriers Partnership (CBP) is chartered with providing the technical basis for implementing cement-based waste forms and radioactive waste containment structures for long-term disposal. DOE needs in this area include the following to support progress in final treatment and disposal of legacy waste and closure of High-Level Waste (HLW) tanks in the DOE complex: - Long-term performance predictions and - Flow sheet development and flow sheet enhancements - Conceptual designs for new disposal facilities The DOE-EM Cementitious Barriers Partnership is producing software and experimental programs resulting in new methods and data needed for end-users involved with environmental cleanup and waste disposal. Both the modeling tools and the experimental data have already benefited the DOE sites in the areas of performance assessments by increasing confidence backed up with modeling support, leaching methods, and transport properties developed for actual DOE materials. In 2014, the CBP Partnership released the CBP Software Toolbox - 'Version 2.0' which provides concrete degradation models for: 1) sulfate attack, 2) carbonation, 3) chloride initiated rebar corrosion, and includes constituent leaching. These models are applicable and can be used by both DOE and the Nuclear Regulatory Commission (NRC) for service life and long-term performance evaluations and predictions of nuclear and radioactive waste containment structures across the DOE complex (Figure 1) including Future SRS salt-stone and HLW tank performance assessments and special analyses - Hanford site HLW tank closure projects and other projects in which cementitious barriers are required - The Advanced Simulation Capability for Environmental Management (ASCEM) project which requires source terms from cementitious containment structures as input to their flow simulations - Regulatory reviews of DOE performance assessments - Nuclear Regulatory Commission reviews of commercial nuclear power plant (NPP) structures which are part of the overall US Energy Security program to extend the service life of NPPs In addition, the CBP experimental programs have had a significant impact on the DOE complex by providing specific data unique to DOE sodium salt wastes at Hanford and SRS which are not readily available in the literature. Two recent experimental programs on cementitious phase characterization and on technetium (Tc) mobility have provided significant conclusions as summarized below: Recent mineralogy characterization discussed in this paper illustrates that sodium salt waste form matrices are somewhat similar to but not the same as those found in blended cement matrices which to date have been used in long-term thermodynamic modeling and contaminant sequestration as a first approximation. Utilizing the CBP generated data in long-term performance predictions provides for a more defensible technical basis in performance evaluations. - In addition, recent experimental studies related to technetium mobility indicate that conventional leaching protocols may not be conservative for direct disposal of Tc- containing waste forms in vadose zone environments. These results have the potential to influence the current Hanford supplemental waste treatment flow sheet and disposal conceptual design. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

NASA’s Revised Planetary Protection Policy and Implementation

NASA has updated its planetary protection policy and implementation approach in response to advances in scientific understanding of solar system targets, upcoming mission opportuni-ties for exploration and sample return, and the private sector’s emerging capability to plan missions to Earth’s Moon and Mars. In September 2021, the NASA Procedural Requirements NPR 8715.24, entitled “Planetary Protection Provisions for Robotic Extraterrestrial Missions” was released which repositions planetary protection in existing NASA mission and program management structures, introduces risk-informed decision making, expands on key roles and responsibilities for both programmatic and the Oÿce of Safety and Mission Assurance, updates the categorization process and streamlines the planetary protection documentation approval and schedule. NASA is working on a more detailed technical standard to accompany NPR 8715.24 which will include the detailed technical requirements to address organic contamina-tion, inadvertent impact avoidance, biological control and management, end of mission disposal and restricted Earth-Return sample safety and assurance. This report to the COSPAR com-munity will describe the current NASA planetary protection policy and its alignment with the revised COSPAR planetary protection policy. NASA’s plans for updating the supporting “Handbook for Implementing Planetary Protection Technical Requirements” and future policies for addressing planetary protection of crewed missions will also be presented.

Elaine Seasly↗

Development of Management Metrics for Research and Technology

Professor Ted Sheskin from CSU will be tasked to research and investigate metrics that can be used to determine the technical progress for advanced development and research tasks. These metrics will be implemented in a software environment that hosts engineering design, analysis and management tools to be used to support power system and component research work at GRC. Professor Sheskin is an Industrial Engineer and has been involved in issues related to management of engineering tasks and will use his knowledge from this area to allow extrapolation into the research and technology management area. Over the course of the summer, Professor Sheskin will develop a bibliography of management papers covering current management methods that may be applicable to research management. At the completion of the summer work we expect to have him recommend a metric system to be reviewed prior to implementation in the software environment. This task has been discussed with Professor Sheskin and some review material has already been given to him.

Sheskin, Theodore J.↗

Using social network and stakeholder analysis to help evaluate infectious waste management: A step towards a holistic assessment

Highlights: • Assessment of infectious waste management in Bangkok, in particular incineration. • Integration of social network and stakeholder analysis assessment methods. • Assessment of stakeholder characteristics, role, interaction and communication. • Interviewees self-evaluate their own characteristics and the system. • Non-technical aspects are important for system acceptability, and sustainability. - Abstract: Assessing the strengths and weaknesses of a solid waste management scheme requires an accurate analysis and integration of several determining features. In addition to the technical aspects, any such system shows a complex interaction of actors with varying stakes, decision-making power and influence, as well as a favourable or disabling environment. When capitalizing on the knowledge and experience from a specific case, it is also crucial that experts do not “forget” or underestimate the importance of such social determinants and that they are familiar with the methods and tools to assess them. Social network analysis (SNA) and stakeholder analysis (SA) methods can be successfully applied to better understand actors’ role and actions, analyse driving forces and existing coordination among stakeholders, as well as identify bottlenecks in communication which affect daily operations or strategic planning for the future way forward. SNA and SA, appropriately adjusted for a certain system, can provide a useful integration to methods by assessing other aspects to ensure a comprehensive picture of the situation. This paper describes how to integrate SNA and SA in order to survey a solid waste management system. This paper presents the results of an analysis of On-Nuch infectious waste incinerator in Bangkok, Thailand. Stakeholders were interviewed and asked to prioritize characteristics and relationships which they consider particularly important for system development and success of the scheme. In such a way, a large quantity of information about organization, communication between stakeholders and their perception about operation, environmental and health impact, and potential alternatives for the system was collected in a systematic way. The survey results suggest that stakeholders are generally satisfied with the system operation, though communication should be improved. Moreover, stakeholders should be strategically more involved in system development planning, according to their characteristics, to prevent negative reactions.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Advisory Committee on the Redesign of the Space Station

The Space Station Program was initiated in 1984 to provide for permanent human presence in an orbiting laboratory. This program evolved into Space Station Freedom, later identified as a component to facilitate a return of astronauts to the Moon, followed by the exploration of Mars. In March 1993 the Clinton Administration directed NASA to undertake an intense effort to redesign the space station at a substantial cost savings relative to Space Station Freedom. The Advisory Committee on the Redesign of the Space Station was established in March 1993 to provide independent assessment of the advantages and disadvantages of the redesign options. The results of the Committee's work is described. Discussion describes the mission that the Administration has articulated for the Space Station Program and the scientific and technical characteristics that a redesigned station must possess to fulfill those objectives. A description of recommended management, operations, and acquisition strategies for the redesigned program is provided. The Committee's assessment of the redesign options against five criteria are presented. The five criteria are technical capabilities, research capabilities, schedule, cost, and risk. A discussion of general mission risk is included.

Source record↗

Preliminary Evaluation of the SNF Transportation Infrastructure at Operating Commercial Nuclear Power Plant Sites - 18466

The U.S. Department of Energy (DOE) has a goal to develop solutions for the long-term, sustainable management of the nation's spent nuclear fuel (SNF) and high-level radioactive waste (HLW). The DOE Office of Nuclear Energy's (DOE-NE) Office of Integrated Waste Management (IWM) is applying integrated waste management system analysis, system engineering, and decision analysis principles to inform future decisions regarding potential future nuclear waste management system architectures. One aspect of an integrated nuclear waste management system architecture is transportation of spent nuclear fuel from the fleet of commercial nuclear reactors to interim storage and/or disposal facilities. This paper presents a preliminary evaluation of the SNF transportation infrastructure at existing commercial nuclear power plant sites. Reactor site surveys performed by DOE in the 1990's and early 2000's that described the transportation infrastructure at commercial reactor sites at that time served as the starting point for the evaluation. Geographical information systems (GIS) and available open-source information about the reactor sites were used to identify changes in the transportation infrastructure at operating commercial nuclear power plant sites. The data and schematics contained within the previous surveys were comparatively analyzed alongside the GIS tools Google Earth, Google Maps, and DOE's Stakeholder Tool for Assessing Radioactive Transportation (START) to determine potential transportation modes and to identify improvements to the transportation infrastructure that may be needed at each of the sites. The preliminary results obtained and the insight gained from this effort support both integrated waste management system architecture analyses and future planning efforts. This is a technical paper that does not take into account the contractual limitations under the Standard Contract for Disposal of Spent Nuclear Fuel and/or High-Level Radioactive Waste (Standard Contract) (10 CFR Part 961). Under the provisions of the Standard Contract, DOE does not consider spent nuclear fuel in multi-assembly canisters to be an acceptable waste form, absent a mutually agreed to contract amendment. To the extent discussions or recommendations in this paper conflict with the provisions of the Standard Contract, the Standard Contract provisions prevail. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Proceedings of the NSSDC Conference on Mass Storage Systems and Technologies for Space and Earth Science Applications

The proceedings of the National Space Science Data Center Conference on Mass Storage Systems and Technologies for Space and Earth Science Applications held July 23 through 25, 1991 at the NASA/Goddard Space Flight Center are presented. The program includes a keynote address, invited technical papers, and selected technical presentations to provide a broad forum for the discussion of a number of important issues in the field of mass storage systems. Topics include magnetic disk and tape technologies, optical disk and tape, software storage and file management systems, and experiences with the use of a large, distributed storage system. The technical presentations describe integrated mass storage systems that are expected to be available commercially. Also included is a series of presentations from Federal Government organizations and research institutions covering their mass storage requirements for the 1990's.

Blackwell, Kim↗

A Practical Application of Integrated Systems Engineering and Project Management on a Complex EPC Project - 17207

This paper introduces how an integrated set of Systems Engineering (SE) and Project Management (PM) processes were applied in a practical way, to address the challenges on a complex, highly technical, Engineering Procurement Construction project within the nuclear field. This approach was inspired by: - the principles contained in a Community of Practice on Lean in Program Management jointly established in May 2012 by MIT, PMI and INCOSE; - an opportunity to apply international standard ISO/IEC 15288:2008(E) Systems and software engineering - System life cycle processes on a real-life situation; - and the belief that there is great value in applying Systems Engineering and Project Management in an integrated manner on a project. The project offering this opportunity was the Detail Engineering, Procurement, Construction and Cold Commissioning (EPC) of the Silo Direct-encapsulation Plant (SDP). This project was undertaken by the Joint Venture (JV) formed by Areva, Mace and Atkins (a.m.a. Nuclear Ltd). Unfortunately, early termination of the project, at a stage when only a part of the processes and tools were being implemented, did not allow this integrated approach to be demonstrated in full. However, the benefits achieved in the early stages in aligning and forming an integrated project execution team, showed potential for great benefits. This paper covers an introductory analysis of the situation, the successes and benefits achieved from implementing an integrated SE - PM approach up to the stage when the project was terminated, and possible path forward had the project continued. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Tracking Restoration And Closure (TRAC): Status Update on Story Maps for Communicating Site Cleanup and Closure Status - 19033

The U.S. Department of Energy (DOE) Office of Environmental Management (EM) initiated the development of a customized, web-based mapping tool for communicating technical information on groundwater plumes at sites within the EM complex. Although the online tool was initially conceived to be a simple conversion of a paper report on contaminant plume sizes, remedial approaches, and regulatory status, it has advanced to providing specific information on cleanup status and site closure. The story maps provide robust geospatial visualization of plumes at DOE sites, as well as explanatory text, photographs, and video for an entire site, or for a management unit within the site. This collection of story maps is called TRAC (Tracking Restoration And Closure), and not only communicates information for each individual site, but also summarizes pertinent metrics on cleanup and remaining contaminants across all EM sites. TRAC is focused on communicating cleanup status, technical challenges, and needs for site closure, with a key challenge of transforming data into relevant, easily understood information. Although DOE managers are the target audience, the story maps can also be used to contribute to public understanding of groundwater cleanup progress at EM sites. Unlike the data access tools maintained at some EM sites (e.g., Hanford, Portsmouth, and Paducah), TRAC is neither a portal for data downloads, nor a tool for performing data analytics. Rather, the goal of TRAC is to provide relevant information on cleanup progress and closure that is consistent across all sites, allowing the user to view summary information across all sites, or examine information relevant to a particular site. This information sharing is needed to maintain open communications with interested parties and communicate efforts that ensure long-term protection of human health and the environment. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Experiences with Testing the Largest Ground System NASA Has Ever Built

In the 1980s, the National Aeronautics and Space Administration (NASA) embarked upon a major Earth-focused program called Mission to Planet Earth. The Goddard Space Flight Center (GSFC) was selected to manage and develop a key component - the Earth Observing System (EOS). The EOS consisted of four major missions designed to monitor the Earth. The missions included 4 spacecraft. Terra (launched December 1999), Aqua (launched May 2002), ICESat (Ice, Cloud, and Land Elevation Satellite, launched January 2003), and Aura (scheduled for launch January 2004). The purpose of these missions was to provide support for NASA s long-term research effort for determining how human-induced and natural changes affect our global environment. The EOS Data and Information System (EOSDIS), a globally distributed, large-scale scientific system, was built to support EOS. Its primary function is to capture, collect, process, and distribute the most voluminous set of remotely sensed scientific data to date estimated to be 350 Gbytes per day. The EOSDIS is composed of a diverse set of elements with functional capabilities that require the implementation of a complex set of computers, high-speed networks, mission-unique equipment, and associated Information Technology (IT) software along with mission-specific software. All missions are constrained by schedule, budget, and staffing resources, and rigorous testing has been shown to be critical to the success of each mission. This paper addresses the challenges associated with the planning, test definition. resource scheduling, execution, and discrepancy reporting involved in the mission readiness testing of a ground system on the scale of EOSDIS. The size and complexity of the mission systems supporting the Aqua flight operations, for example, combined with the limited resources available, prompted the project to challenge the prevailing testing culture. The resulting success of the Aqua Mission Readiness Testing (MRT) program was due in no small measure to re-structuring the traditional programmatic and technical approach to a more efficient and robust program. Programmatically, it meant gaining the endorsement, commitment, and cooperation of the numerous subsystem element managers and other stakeholder organizations. Technically, it required an MRT program that was agile, could rapidly adapt to requirements changes, and was flexible in its overall approach. Furthermore, this paper addresses the following questions: 1. What are the key ingredients (e.g., test tools, organization) needed to conduct a successful MRT program? 2. What distinguishes EOS MRT from the traditional system testing approach? 3. Where should the focus of testing be since it is infeasible to test every element or subsystem? 4. How can MRT be applied effectively to other systems or missions? To provide answers to these questions, this paper relies heavily on real-life, hands-on experiences ("lessons learned") gained during mission readiness testing of the Terra ground system and, most recently, the Aqua and ICESat missions. Moreover, this paper explores how lessons learned were turned into lessons applied for the upcoming Aura mission. Although derived from the EOS missions, MRT techniques and strategies can be applied to enhance the testing of other missions.

Lehtonen, Ken↗

Inventory Management Improvement Project

The Lawrence Livermore National Laboratory (LLNL) conducts research and development for the National Nuclear Security Agency (NNSA) and its affiliates. The Polymer AM team at LLNL conducts research and development in 3D printing, specifically direct-ink-write, in accordance with LLNL and NNSA missions. The team is composed of machine operators, chemists, testing engineers, and project engineers across multiple lab spaces with one shared storage area at LLNL. The operations use a variety of different consumables and hardware to conduct research applications for LLNL and NNSA. These items are critical to performing operation tasks; if an item is out of stock, operations associated with the respective item could be suspended for weeks. As such, the Polymer AM team manages an inventory of spare consumables and hardware to ensure these items are always available. However, the current management system, an excel sheet managed by the project engineer group, is not intuitive in providing inventory information despite the high labor utilization needed to maintain the system. As such, the team is looking to improve their inventory management that can send notifications regarding inventory needs, accessible to other team members, provide all relevant information to a specific item, and store historical information for budget and operation planning. The proposed solution is a Computer Maintenance Management System (CMMS): a web-based management software that stores inventory information and provides automated notifications. The system will store information on each item including quantity in stock, technical information, supplier information, costs, lead times, and expiration date. The system has a notifications function that can send notifications to the respective team member’s when an item needs to be counted, item inventory is low, or an item is approaching their expiration date. Information for each item can be tracked over time creating data to be used for budget planning and process improvement purposes. Due to its web-based source, the system can be accessed by the respective team member viewing technical information, quantity, and purchasing information.

42 ENGINEERING↗