Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “strategy”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,405 records · Page 78

A Framework Approach to Evaluate Cross-Cultural Adaptation of Public Engagement Strategies for Radioactive Waste Management - 13430

The complex interplay of politics, economics and culture undermines attempts to define universal best practices for public engagement in the management of nuclear materials. In the international context, communicators must rely on careful adaptation and creative execution to make standard communication techniques succeed in their local communities. Nuclear professionals need an approach to assess and adapt culturally specific public engagement strategies to meet the demands of their particular political, economic and social structures. Using participant interviews and public sources, the Potomac Communications Group reviewed country-specific examples of nuclear-related communication efforts to provide insight into a proposed approach. The review considered a spectrum of cultural dimensions related to diversity, authority, conformity, proximity and time. Comparisons help to identify cross-cultural influences of various public engagement tactics and to inform a framework for communicators. While not prescriptive in its application, the framework offers a way for communicators to assess the salience of outreach tactics in specific situations. The approach can guide communicators to evaluate and tailor engagement strategies to achieve localized public outreach goals. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Regulator Interface Strategies Implemented at the Y-12 National Security Complex Old Salvage Yard Soils Remediation Project, Oak Ridge, TN - 12162

The Oak Ridge Y-12 National Security Complex housed an area known as the Old Salvage Yard (OSY) that was approximately 7 acres. The OSY was used as an area for the accumulation, processing and storage of scrap metal and equipment from Y-12 operations extending from 1968 until 2009. Areas in the northern sections of OSY also have been used for the storage of used oils containing solvents and the accumulation and recycling or de-heading and crushing of 55-gal metal drums. Scrap metal operations historically involved the accumulation, sorting, storage, public sale or disposal of scrap metal and equipment. Non-containerised storage of scrap metal was routine until 1995 when scrap metal received at OSY was placed in B-24 and B-25 boxes. Under the American Recovery and Reinvestment Act (ARRA), approximately 26,759 cubic meters of scrap metal and debris were removed and disposed at both on and off-site disposal facilities including the on-site, Oak Ridge Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) landfill in 2010 and 2011. This removal action was performed in accordance with a CERCLA Record of Decision (ROD) and a close working relationship with both the U.S. Environmental Protection Agency (EPA) Region IV and Tennessee Department of Environment and Conservation (TDEC). Due to efficiencies and the excellent cooperative relationship forged with EPA Region IV and TDEC for Y-12 ARRA Cleanup Projects, a surplus of funding was available for additional remediation work that was completed in fiscal year (FY) 2011. The underlying OSY soils were targeted for characterization and potential remediation. To expedite these important activities, the U.S. Department of Energy Oak Ridge Environmental Management partnered with the regulators during detailed planning sessions through a variety of means to quickly and efficiently characterize and pinpoint areas requiring remediation according to previous ROD commitments. Data Quality Objectives (DQOs), data-sharing, real-time characterization reporting, surface and groundwater modeling and other interface planning activities were utilized to help facilitate and complete characterization and remediation activities. As a result of these strategies, the surgical extraction of one contiguous area of soil approximately 354 cubic meters is planned for FY12. The strategies discussed resulted in a major reduction of footprint remediation (i.e., 2.8% of the original estimate) which was originally estimated at over 26,759 cubic meters. The original estimate was developed using historical data collected at various times over the period of 20 years. By leveraging a hybrid sampling approach that involved both statistically-based and biased sampling locations, the area of contamination was significantly reduced resulting in both a compliant remedial design that is cost effective while mitigating a principle threat sources to surface and groundwater at the Y-12 plant. One remedial action boundary of 354 cubic meters was verified in the northern section of the Western OSY area known as the old drum de-header station for VOCs. The original estimate for disposal was in excess of 26,759 cubic meters. This area is scheduled for waste characterization and profile development in the first half of fiscal year 2012. The anticipated disposal facility is an on-site Oak Ridge CERCLA disposal landfill known as the Environmental Management Waste Management Facility (EMWMF). By utilizing the careful strategic planning, field-based screening and close cooperation of regulatory stakeholders as detailed in this paper, the total area of soil requiring remedial action within the Y-12 OSY footprint was 354 cubic meters or 2.8% of the original planned estimate. A potential waste reduction of 97.2% was realized over the original planned estimate for OSY Soils. Significant cost savings were achieved by - Minimizing the footprint of the remedial action; - Confirmatory analysis of soils instead of use of historical sampling results for waste profile development; - Targeting traditional laboratory analysis for soils that failed field screen protocols for radionuclides, heavy metals and VOCs; - Providing accurate and precise definition of RABs; and - Reduction of target contaminants for focused laboratory analysis instead of broad-range contaminants. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Successful Characterization Strategies for the Active High Risk Y-12 National Security Complex 9201-5 (Alpha-5) Facility, Oak Ridge, TN - 12164

Building 9201-5 (Alpha 5) was completed in May 1944 and served as a production facility for National Nuclear Security Administration (NNSA) Y-12 Weapons Plant. During the Manhattan Project, it functioned as a uranium enrichment facility. The facility was renovated and altered over the years, converting the calutrons to support other missions. Alpha 5 consists of 4 floors and a basement measuring approximately 600,000 square feet. The facility contains various pieces of equipment remaining from legacy operations. A significant amount (approximately 200,000 kgs) of mercury (Hg) has been spilled in the facility over the operational history of the building. To further complicate matters, beryllium (Be) contamination in 9201-5 is found throughout approximately sixty percent of the facility. Concentrations varying from very low (< 0.2 micrograms (μg)/100 cm{sup 2}) to areas where concentrations are relatively high, approximately 600 μg/100 cm{sup 2}, in regulated beryllium areas. The primary site related contaminants (SRCs) for the waste in this facility are enriched uranium, depleted uranium, beryllium and mercury. This facility represents the highest environmental risk for DOE-ORO EM and NNSA at Y-12 and must be quickly addressed to minimize impacts to future Y-12 missions, as well as human health and the environment. As part of the American Recovery and Reinvestment Act (ARRA), approximately 700,000 cubic feet of legacy material was removed in 2010 and 2011. In addition, characterization of the 9201-5 facility was scheduled in the winter and spring of 2011. This activity was initiated in January 2011 and was completed in July 2011. Heavy schedule pressure was further complicated by the fact that this building has active utility, security and process systems. Given these complex variables, a unique, out of the box characterization strategy was forged in an effort to bound radiological and chemical contaminants, as well as providing the appropriate level of quality to ensure that this data could be used to develop waste profiles when deactivation, decontamination and demolition (D and D) activities are authorized at a future date. The characterization strategy involved a hybrid model of statistically-based and biased sampling events. To achieve the desired results, traditional intrusive sampling and laboratory analysis, as well as a number of field-based characterization methodologies (e.g., X-ray Fluorescence [XRF], Lumex and Non-Destructive Assay [NDA]) were utilized. Results were captured and synthesized into meaningful, usable conclusions in a facility characterization report that will more accurately aid D and D cost estimates for future remedial actions. This massive characterization campaign involved over 1,200 separate sample locations using 4 separate characterization methods and was successfully completed to meet a performance-based milestone within 8 months of initiation. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Radioactive Waste Characterization Strategies; Comparisons Between AK/PK, Dose to Curie Modeling, Gamma Spectroscopy, and Laboratory Analysis Methods- 12194

In the coming fiscal years of potentially declining budgets, Department of Energy facilities such as the Los Alamos National Laboratory (LANL) will be looking to reduce the cost of radioactive waste characterization, management, and disposal processes. At the core of this cost reduction process will be choosing the most cost effective, efficient, and accurate methods of radioactive waste characterization. Central to every radioactive waste management program is an effective and accurate waste characterization program. Choosing between methods can determine what is classified as low level radioactive waste (LLRW), transuranic waste (TRU), waste that can be disposed of under an Authorized Release Limit (ARL), industrial waste, and waste that can be disposed of in municipal landfills. The cost benefits of an accurate radioactive waste characterization program cannot be overstated. In addition, inaccurate radioactive waste characterization of radioactive waste can result in the incorrect classification of radioactive waste leading to higher disposal costs, Department of Transportation (DOT) violations, Notice of Violations (NOVs) from Federal and State regulatory agencies, waste rejection from disposal facilities, loss of operational capabilities, and loss of disposal options. Any one of these events could result in the program that mischaracterized the waste losing its ability to perform it primary operational mission. Generators that produce radioactive waste have four characterization strategies at their disposal: - Acceptable Knowledge/Process Knowledge (AK/PK); - Indirect characterization using a software application or other dose to curie methodologies; - Non-Destructive Analysis (NDA) tools such as gamma spectroscopy; - Direct sampling (e.g. grab samples or Surface Contaminated Object smears) and laboratory analytical; Each method has specific advantages and disadvantages. This paper will evaluate each method detailing those advantages and disadvantages including; - Cost benefit analysis (basic materials costs, overall program operations costs, man-hours per sample analyzed, etc.); - Radiation Exposure As Low As Reasonably Achievable (ALARA) program considerations; - Industrial Health and Safety risks; - Overall Analytical Confidence Level. The concepts in this paper apply to any organization with significant radioactive waste characterization and management activities working to within budget constraints and seeking to optimize their waste characterization strategies while reducing analytical costs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Regulations, Policies and Strategies for LLRW Management in Bangladesh - 12368

Low level radioactive waste (LLW) is generated from various nuclear applications in Bangladesh. The major sources of radioactive waste in the country are at present: (a) the 3 MW TRIGA Mark-II research reactor; (b) the radioisotope production facility; (c) the medical, industrial and research facilities that use radionuclides; and (d) the industrial facility for processing monazite sands. Radioactive waste needs to be safely managed because it is potentially hazardous to human health and the environment. According to Nuclear Safety and Radiation Control Act-93, the Bangladesh Atomic Energy Commission (BAEC) is the governmental body responsible for the receipt and final disposal of radioactive wastes in the whole country. Waste management policy has become an important environmental, social, and economical issue for LLW in Bangladesh. Policy and strategies will serve as a basic guide for radioactive waste management in Bangladesh. The waste generator is responsible for on-site collection, conditioning and temporary storage of the waste arising from his practice. The Central Waste Processing and Storage Unit (CWPSU) of BAEC is the designated national facility with the requisite facility for the treatment, conditioning and storage of radioactive waste until a final disposal facility is established and becomes operational. The Regulatory Authority is responsible for the enforcement of compliance with provisions of the waste management regulation and other relevant requirements by the waste generator and the CWPSU. The objective of this paper is to present, in a concise form, basic information about the radioactive waste management infrastructure, regulations, policies and strategies including the total inventory of low level radioactive waste in the country. For improvement and strengthening in terms of operational capability, safety and security of RW including spent radioactive sources and overall security of the facility (CWPSF), the facility is expected to serve waste management need in the country and, in the course of time, the facility may be turned into a regional level training centre. It is essential for safe conduction and culture of research and application in nuclear science and technology maintaining the relevant safety of man and environment and future generations to come. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Further Development of an Execution Strategy Analysis (ESA) Capability and Tool for the Management of Spent Nuclear Fuel (SNF) - 17146

An Execution Strategy Analysis (ESA) capability and tool are being developed to evaluate alternative execution strategies for the potential future deployment of a consolidated Interim Storage Facility as part of an integrated waste management system. Application of the ESA approach not only leverages but also goes beyond traditional project analysis tools. The ESA tool allows for ongoing performance assessment of the evolving project execution plans that take into account significant assumptions, risks, and uncertainties throughout the project lifecycle. Development and application of the ESA capability and tool continued in 2016, primarily focusing on enhancing its flexibility to model a range of scenarios regarding how an integrated system for managing spent nuclear fuel and high-level radioactive waste could be deployed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

French Atomic and alternative energies commission decommissioning policy and strategies: What is at stake lessons learned and feedback experience - 15013

Since its creation in 1945, the French Atomic Energy and Alternative Energies Commission has carried out research programmes on civil use of nuclear, and its application. CEA has set up and run various types of installations from research (accelerators, pond reactors, fast reactors, laboratories) to industry (power reactor, processing facilities). There are currently more than several tens of facilities which are presently closed down pending dismantling or in the process of being dismantled by CEA, the governmental body for research and development in nuclear and renewable energies. When operating, all these installations have generated radioactive waste. When they are shutdown, either as a result of the programmes for which they were set up, or due to equipment wearing out or being obsolete, these installations must be cleaned up, dismantled and decommissioned, taking into account their nuclear nature and requirements related to safety and environment. During the decommissioning process, the implementer has to deal with safety and site remediation issues. Dealing with these installations is a long-term programme which must be carefully planned and financed in order to optimise its management. The paper will describe the CEA's decommissioning policy, strategies adopted, and draw up lessons learned and feedback experience, showing that: - Safety is guaranteed, - Dismantling is a technically controllable operation, but R and D actions are to be developed for specific problems as characterization or operation in hostile environment. Moreover all the methods and techniques improve as a result of feedback experience, - The amount of material and waste produced by the dismantling are manageable. The very low, low and intermediate level waste can be stored on existing shallow land burial centres, some new repositories have to be created for specific waste (graphite, radium,...) and for high and intermediate level long live waste, which are stored in interim storage , - The dismantling must be optimized, especially by appliance of a good strategy based on rational industrial choices. - Communication and transparency with stakeholders is essential for global process acceptance, - The lessons learned and how feedback experience could benefit for future decommissioning projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Progress in Defining the UK Highly Active Storage Tanks POCO Strategy - 16134

In the UK Highly Active (HA) waste is stored in stainless steel tanks prior to encapsulation in glass in one of three operating vitrification plants. Significant progress has been made in recent years towards the reduction in the volume of HA Liquor (HAL) stored in these tanks and a number of the tanks are now operating at heel levels. As a result, a strategy is being developed to carry out Post Operational Clean Out (POCO) of some tanks while reprocessing operations continue, thus enabling accelerated and more cost effective clean-up of these HA facilities. This paper, and subsequent conference presentation, will highlight some of the key aspects of this strategy, including a description of the challenges and progress made so far to help facilitate the clean-up mission without having a detrimental effect on ongoing reprocessing operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Regulatory Compliance Strategy For Recovery-Driven Underground Ventilation System Changes - 16355

The Waste Isolation Pilot Plant (WIPP) facility is managed and operated by Nuclear Waste Partnership LLC (NWP) for the U.S Department of Energy (DOE). On February 14, 2014, a radiological event occurred in the WIPP facility underground repository, which resulted in the release of transuranic isotopes contaminating a portion of the underground primarily along the ventilation path from Panel 7, the location of the incident. The release was initially detected by an underground continuous air monitor (CAM) which caused an automatic switch of the ventilation system to filtration mode and ventilation was directed through high-efficiency particulate air (HEPA) filtration banks located in the surface exhaust building. When the HEPA filtration was engaged, the underground normal ventilation was reduced from 425,000 standard cubic feet per minute (scfm) to 60,000 scfm. Since the event, all exhaust air is filtered through HEPA filters at 60,000 scfm to minimize the possibility of exposure to workers, the public and the environment. Ventilation of fresh air to the WIPP underground is a primary limitation to performing underground recovery activities; therefore, recovery-driven ventilation changes are needed. The safe recovery of the WIPP facility and resumption of normal waste emplacement activities require an increase in ventilation capacity to be accomplished in three phases: 1) Interim Ventilation System, 2) Supplemental Ventilation System and 3) Permanent Ventilation System. Each phase adds increased air flow to the underground and allows for underground activities to be performed concurrently. The regulatory strategy for ventilation recovery focuses on ensuring that needed changes to the WIPP facility are protective of human health and the environment. Recovery-driven ventilation changes are implemented using the procedures, processes, and regulations that are required by the two primary regulatory agencies for the WIPP facility: the U.S. Environmental Protection Agency (EPA) and the New Mexico Environment Department (NMED) as well as DOE requirements. Regulatory compliance is being achieved for the three ventilation phases to restore underground ventilation by providing the regulators and stakeholders opportunities for involvement during the design and development processes. A strategy for a tiered NMED permitting process and a plan for developing required EPA documentation are under consideration. The Project's objective is to resume normal waste emplacement activities with safety, protection of the public, the worker and the environment as the highest priorities. Important elements of ensuring that WIPP facility recovery and future waste emplacement activities occur as planned are transparency and communication with the regulatory community. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

'Top 10' Facility Decommissioning Risks and Mitigation Strategies to Prevent Them - 16487

Decommissioning represents a set of risks that differ from facility design and construction, operations, or maintenance. An informal poll was taken querying experienced facility decommissioning project and program managers in government and private business sectors about top decommissioning risks. The poll considered experience in nuclear, fossil fuel, and oil and gas projects in Canada, the United States, the United Kingdom, and Australia. A classic risk assessment process was performed, where the likelihood and consequence(s) of impacts, typical or most commonly used controls, and the most effective mitigation strategies for various risks were identified. The risks that polled with the highest rankings were identified as the 'Top 10' decommissioning risks. Roger VanScoy stated 'Knowing our risks provides opportunities to manage and improve our chances of success.' The purpose of this effort was to identify and share the 'Top 10' decommissioning risks with those in the nuclear, fossil fuel, and oil and gas industry to help anticipate and manage those risks more effectively, avoid or reduce the potential consequences of the risks, and improve the chances of project success. Douglas Adams said: 'Human beings, who are almost unique in having the ability to learn from the experience of others, are also remarkable for their apparent disinclination to do so'. The information provided shares experiences, knowledge, and effective mitigation strategies from those with successful decommissioning experience so that others can learn and avoid the adverse consequences of risks inherent with decommissioning projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Methodology for Waste Forecasting and Informing an Integrated Waste Strategy at CNL - 18055

CNL is Canada's premier nuclear science and technology organization. CNL is a world leader in developing peaceful and innovative applications from nuclear technology through its expertise in physics, metallurgy, chemistry, biology and engineering. CNL is responsible for managing wastes from various locations across Canada. As a result of this work, legacy wastes have been generated and ongoing operations will continue to generate wastes. In order to identify gaps and ensure that paths are available to manage wastes, a waste forecast was developed. The waste forecast is intended to inform corporate strategy based on the volume of waste generated and into the future. One of the key pieces of output has been an estimate on the variability for forecasted volumes of wastes. Various sources of information were analyzed to provide a high-level summary. Many inputs were considered due to the various locations of waste generation, continuing operations, capital construction, decommissioning activities, and environmental remediation activities. In order to allow a holistic view, all waste streams were considered, including conventional industrial wastes to high-level wastes. The resulting output has mainly been used in identifying potential gaps in future storage requirements and disposition routes. It allows for the identification of the magnitude and the timing, if a gap is present. This information becomes a critical dataset to an Integrated Waste Strategy. Critical decisions regarding waste management can then be prioritized and scheduled. As the waste forecast is a living document, the existing information currently captured represents a baseline. To ensure quality management, future changes are to be documented through a change control process. Such changes can be from actual data or from updates to estimates through characterization, etc. As time progresses, comparisons between actual waste volumes versus forecasted volumes can then be used to further refine predictions on future waste generation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Exploiting Knowledge of Technetium in the Subsurface to Develop Remediation Strategies - 18223

Technetium-99 (Tc) contamination remains a major environmental problem at legacy nuclear reprocessing sites, such as the Hanford Site in south-central Washington State, where the total inventory of released Tc is estimated at 700 curies (Ci). The environmental risk associated with Tc is due to its long half-life (213,000 years) and the high mobility of the oxidized anionic pertechnetate species (Tc(VII)O{sub 4}{sup -}). Thus, there is a critical need to resolve scientific and technical issues underpinning the ability to safely, cost-effectively, and efficiently remediate Tc-contaminated vadose zone sediments and groundwater. Developing enhanced attenuation strategies for released Tc that reduce contaminant migration, while mitigating risk to human health and the environment, requires characterization of any retardation processes and Tc mass flux. The current conceptual model for Tc transport in the vadose zone assumes that Tc is predominantly present in its oxidized form as TcO{sub 4}{sup -}, which is highly soluble and mobile. However, under certain conditions, Tc can become entrained in solid phases. Tc-containing mineral phases from sediment cores extracted from various Hanford waste disposal sites were characterized to determine Tc present in vadose zone sediments as (i) TcO{sub 4} - that remains in water films associated with fine-grained sediments; (ii) Tc co-precipitated with other lanthanides in phosphate mineral phases; and (iii) Tc present as TcO{sub 2}.nH{sub 2}O in localized reducing zones. These results will be used to develop improved long-term Tc remediation strategies that are most likely to succeed during field application, through stimulation of conditions that enhance Tc attenuation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Media Relations Strategies in a Post-Information Age - 18452

Many organizations that deal with radioactive materials reluctantly engage in media relations and social media. This paper explores the drivers behind the dramatic coverage of clean-up activities nearest to large media markets. Interviews and media analysis reveal how companies and government actors responded to aggressive media investigations. Insights from professional journalists demonstrate the significance of Freedom of Information Act (FOIA) requests and computer assisted reporting on past and future coverage. Coverage of Hanford and Santa Susana Field Laboratory set the stage for creative engagement strategies developed to support public interest in clean-up efforts. Industrial and engineering firms, particularly small to mid-sized subcontractors, often place less priority on media and public relations. However, recent examples demonstrate that organizations that deal with scientific risk must evolve. Firms that acknowledge changing media trends update their communication strategies in ways that improve public trust and understanding. It's easy to understand why many organizations resist communicating when public concerns arise. Legal issues and contract restrictions may limit communications. The return on investment may seem low. Understanding exposure and hazard requires perspective, context and accuracy. Reporters and citizens also have better access to primary sources. Computer assisted reporting (CAR) and the dramatic rise of requests under the Freedom of Information Act (FOIA) lay bare details of the inner workings of complex situations, often without context. Examples from FOIA requests and challenges filed in the U.S. district courts, are described to help project administrators understand the points of view that can take shape on government projects from filings and disclosures. The range of benefits and risks of ongoing interaction with reporters provides a framework for assessing the right level of effort. For remediation efforts near large media markets, the influence of effective communication is magnified. (authors)

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Chromium Plume at LANL - From Conceptual Site Model to Development of Complex Remediation Strategies - 18682

A hexavalent chromium plume is present in deep groundwater beneath Los Alamos National Laboratory (LANL or the Laboratory). The plume originated from releases of potassium dichromate from cooling towers from 1956 - 1972. Estimates are that up to 72,000 kg of chromium was released during that period. Data from surface water-balance studies, core-hole and groundwater characterization, geomorphic investigations and geology and geophysics provide the basis for an evolved conceptual model that chromium initially traveled rapidly via an effluent-supported stream for several kilometers, then infiltrated through a stratigraphically complex 275-300 meters thick vadose zone and eventually into a deep (regional) aquifer that is the water supply for the Laboratory and surrounding municipality. The travel time from the release point to the regional aquifer is estimated at 5-10 years based on modeling and contaminant tracers. Monitoring data from two-screen wells and piezometers within the regional aquifer, and data derived from stratified sampling conducted during sonic coring and from analysis of sonic core indicate that the chromium contamination occurs within the upper 23 meters of the highly stratified regional aquifer. Different geologic units at the water table and structural dip of depositional bedding appear to have little effect on chromium migration and plume shape and thickness which instead appear to be a manifestation of multiple breakthrough locations, interconnectedness of preferential hydraulic strata, and a negligible vertical gradient. Recent monitoring data indicate that the down-gradient plume edge (as defined by the New Mexico groundwater standard of 50 μg/L) may be advancing near the Laboratory's boundary with a neighboring Indian reservation. The Laboratory is addressing the increasing concentrations with a regulatory-driven interim measure that uses hydraulic control to manage plume migration. The interim measure involves limited-duration (2-3 years) pumping, treatment, and injection to rapidly establish and maintain the 50 μg/L plume edge within the Laboratory boundary while a final remediation strategy is developed and approved by the State regulator. A final remediation strategy will depend heavily on the ability to cost-effectively access the deep aquifer. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Execution Strategy Analysis (ESA) Origin Sites Readiness Model - 19073

This is a technical paper that does not take into account the contractual limitations under the Standard Contract for Disposal of Spent Nuclear Fuel and/or High-Level Radioactive Waste (Standard Contract) (10 CFR Part 961). Under the provisions of the Standard Contract, DOE does not consider spent nuclear fuel in multi-assembly canisters to be an acceptable waste form, absent a mutually agreed to contract amendment. To the extent discussions or recommendations in this paper conflict with the provisions of the Standard Contract, the Standard Contract provisions prevail. The DOE Office of Nuclear Energy (DOE-NE) Office of Spent Fuel and Waste Disposition (SFWD) Integrated Waste Management System (IWMS) program is developing an Execution Strategy Analysis (ESA) Origin Sites Readiness Model using the Goldsim{sup TM} software application to provide information on potential future approaches for removing SNF and HLW from origin sites such as commercial nuclear power plant sites. The purpose of this ESA model is to apply integrated waste management system analysis, system engineering, and decision analysis principles to inform future decisions regarding potential future nuclear waste management system architectures. The ESA Origin Sites Readiness Model is a dynamic simulation modeling capability. It is developed for use in the analysis and comparison of potential future implementation strategies associated with an integrated nuclear waste management program. The model is designed to be independent of the destination of the SNF or HLW so the results from the Origin Sites Readiness Model are equally applicable to a wide range of scenarios involving shipments to generic destinations in an integrated waste management system. The model explicitly takes significant assumptions, uncertainties, and risks into account. Currently, the ESA Origin Sites Readiness Model includes 14 shutdown sites (Maine Yankee, Yankee Rowe, Connecticut Yankee, Vermont Yankee, La Crosse, Big Rock Point, Zion, Kewaunee, Fort Calhoun, Trojan, Rancho Seco, Humboldt Bay, San Onofre, and Crystal River) and is designed to be modular so that other sites can be added in the future. The model also includes multiple transportation modes (heavy haul truck, rail, and barge), activities related to the acquisition of transportation assets such as railcars and transportation casks, and site-specific considerations of on-site and near-site transportation infrastructure. The model was developed using the ESA process with Subject Matter Experts (SME); it incorporates uncertainty and risks and provides a structured, systematic methodology for evaluating potential SNF campaign scenarios. The model also complements other system-level logistics tools being developed by SFWD. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A GIS-Based Suitability Analysis of a Phytomanagment Strategy for TCE in Groundwater and Soil Niagara Falls Storage Site, New York - 19385

The large number of complexly contaminated sites throughout the nation has propagated the application of phytoremedial techniques in a wide array of environmental remediation strategies. The use and breeding of vegetation for the in-situ treatment of environmental media (soil, groundwater, sediment) contaminated with organic or inorganic contaminants has shown to provide a low-cost alternative to conventional means of remediating contaminated sites (e.g., groundwater extraction, chemical oxidation or reduction, bioremediation, excavation, etc.). One impediment to effective phytoremediation is the selection of proper plant-species, which is complicated due to the many variables that are required for plant-species viability (i.e. range of soil pH, annual precipitation values, depth to groundwater table, etc.). This study employed the use of a Geographic Information Systems (GIS) to first define the spatial extent of contaminated media (soil and groundwater) at a project site and then support an effective means to optimize phytoremediative techniques to manage these impacts prior to final remediation. Spatial analyses and analytical calculations were coupled to determine an optimal plant species and spacing to maximize the effectiveness of a phytomanagement plan. The incorporation of fuzzy membership functions and fuzzy overlay provide an innovative method to help select the optimal plant-species for phytomanagement planning. Fuzzy membership functions were used to represent the plant growth requirements and provided an intuitive method to represent the uncertainty associated with plant-growth requirements. The fuzzy overlay function then employed a raster-based suitability analysis that together provided decision makers with a scientific solution to optimally design a phytomanagement strategy for site-related volatile organic compound (VOC) impacts. The Niagara Falls Storage Site (NFSS) VOC-impacted groundwater is contained in clayey glacial sediments, which commonly are technically impractical to remediate. Prior on-site studies show that native poplar (cottonwood variants) preferentially translocate or phytoextract the VOCs from the site soils and thus provide a proven mechanism to manage the multi-media impacts. Consequently, the Army Corps of Engineers Buffalo District evaluated phytoremediative approaches as a passive tool to manage the VOCs during the project life cycle prior to final remediation. The fuzzy membership functions and fuzzy overlay modeling of candidate species narrowed the selection to an optimal species and subsequent transpiration modeling estimated the plant spacing for the overall phytomanagement plan. The method employed for this study is easy applied to other phytoremediative and phytomanagement actions derived from hazardous waste decision making. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Unforeseen Events Alter Stewardship Strategies at the Decommissioned BONUS Reactor in Puerto Rico - 19572

The decommissioned Boiling Nuclear Superheater (BONUS) reactor northwest of Rincon, Puerto Rico, was developed as a prototype nuclear power plant to investigate the feasibility of the integral boiling superheating concept. Through a combined effort of the US Atomic Energy Commission (AEC) and the Puerto Rico Water Resources Authority (PRWRA), the reactor first achieved a controlled nuclear chain reaction in 1964 and remained operational until June 1968. It was the eighth nuclear reactor constructed in the world and one of only two boiling-water superheater reactors ever developed in the United States. Following its decommissioning in 1970, AEC, the predecessor to the US Department of Energy (DOE), and PRWRA, the predecessor to the Puerto Rico Electric Power Authority (PREPA), worked together post-closure to address the remaining residual contamination and safely open the facility to the public for science educational outreach. Presently, the DOE Office of Legacy Management (LM) has long-term stewardship responsibilities for the reactor entombment, which includes periodic site inspections of the entombment system and oversight of the Radiological Protection Program (RPP) implemented by PREPA. PREPA has responsibility for conducting radiological measurements in accordance with the approved RPP for the facility, recordkeeping and reporting, and facility control and maintenance. The entombment system has a design life of 140 years; DOE has an obligation to ensure long-term protectiveness at the site for the next 90 years until the contact dose of the entombment system reaches background conditions. As part of the long-term protectiveness strategy, in September 2000, the BONUS reactor facility was renamed the Dr. Modesto Iriarte Technology Museum, and then in 2007, the facility was listed under the National Register of Historical Places. The museum contains numerous displays that recount the history of the BONUS site, as well as the development of electric power and nuclear energy, and receives approximately 100 visitor requests each year. The best long-term strategies need to be flexible and are subject to change. As such, the long-term maintenance responsibilities at the BONUS reactor facility were formerly documented in the 2010 Letter of Agreement between LM and PREPA to reaffirm the joint commitment of long-term protectiveness. This commitment did not waiver despite two devastating hurricanes in 2017, Irma and Maria, and the recent bankruptcy filing by the territory of Puerto Rico. To address the financial uncertainties facing PREPA, secure LM's commitment to long-term stewardship liabilities in the future, and offer a level of care similar to that at other LM sites, LM has offered several strategic opportunities to ensure the long-term sustainability of the site. Both LM and PREPA share a common and long-term stewardship commitment at the BONUS reactor facility, which includes ensuring protectiveness of the entombed radiological waste material. Protection of human health and the environment is at the forefront of the DOE mission, and the beneficial reuse of legacy sites continues to be a goal of the agency. The collaborative ability of both organizations to transform a Cold War-era facility such as a former nuclear reactor to an educational center embodies a unique ability to present local history while educating future generations on LM's mission to protect human health and the environment across the 92 sites it manages. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analysis of ELAP and mitigation strategies in Maanshan PWR with PCTRAN

On March 11, 2011, the Fukushima Daiichi Nuclear Power Plant, owned by Tokyo Electric Power Company, encountered a beyond design basis earthquake/tsunami and the flood crippled the on-site emergency power and electric transmission systems. The ELAP (Extended Loss of Alternating Current Power) and LUHS (Loss of Ultimate Heat Sink) events severely damaged the core cooling systems and the safety functions of the containment. As a result, three reactor cores were damaged. Also, the cooling capability of nuclear spent fuel pools was lost due to loss of AC and DC power. Existing Station Blackout (SBO) analyses have demonstrated that even with leakage from Reactor Coolant Pump (RCP) seals, the core could maintain coolable only when heat transfer exists between primary loop and secondary loop. Depend on the availability of DC power in different plant designs, the SBO coping times were shown to be 4 to 16 hours. According to INPO event report, it is necessary to analyze the consequences if current coping times are extended with increased core water inventory loss from pump seals. In an ELAP scenario, all active system including Emergency Core Cooling System (ECCS) and motor driven AFW were out of power supply, results in degradation of core cooling capability. Moreover, the fuel exposed risk would increase due to continuously Reactor Coolant System (RCS) inventory loss through pump seals. Therefore, mitigation strategy must be applied prior to core uncovering to prevent its damage and assure plant safety. This research utilized a fast running NPP safety simulation code, PCTRAN, to assess reactor performances in the situations of ELAP of Maanshan PWR. Also, the sensitivity study of injection flow rates and effectiveness of mitigation strategy were demonstrated. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗