Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “risk”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,405 records · Page 78

Framework for Developing Management goals for Species at Risk and Application to Military Installations in the United States

A decision framework for setting management goals for species at risk is presented. Species at risk are those whose potential future rarity is of concern. Listing these species as threatened or endangered could potentially result in significant restrictions to activities in resource management areas in order to maintain those species. The decision framework, designed to foster proactive management, has nine steps: identify species at risk on and near the management area, describe available information and potential information gaps for each species, determine the potential distribution of species and their habitat, select metrics for describing species status, assess the status of local population or metapopulation, conduct threat assessment, set and prioritize management goals, develop species management plans, and develop criteria for ending special species management where possible. This framework will aid resource managers in setting management goals that minimally impact human activities while reducing the likelihood that species at risk will become rare in the near future. The management areas in many of the examples are United States (US) military installations, which are concerned about potential restrictions to military training capacity if species at risk become regulated under the US Endangered Species Act. The benefits of the proactive management set forth in this formal decision framework are that it is impartial, provides a clear procedure, calls for identification of causal relationships that may not be obvious, provides a way to target the most urgent needs, reduces costs, enhances public confidence, and, most importantly, decreases the chance of species becoming more rare.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Increasing risk of cascading hazards in the central Himalayas

Cascading hazards are becoming more prevalent in the central Himalayas. Primary hazards (e.g., earthquakes, avalanches, and landslides) often trigger secondary hazards (e.g., landslide dam, debris flow, and flooding), compounding the risks to human settlements, infrastructures, and ecosystems. Risk management strategies are commonly tailored to a single hazard, leaving human and natural systems vulnerable to cascading hazards. In this commentary, we characterize diverse natural hazards in the central Himalayas, including their cascading mechanisms and potential impacts. A scientifically sound understanding of the cascading hazards, underlying mechanisms, and appropriate tools to account for the compounding risks are crucial to informing the design of risk management strategies. Here, we also discuss the need for an integrated modeling framework, reliable prediction and early warning system, and sustainable disaster mitigation and adaptation strategies.

54 ENVIRONMENTAL SCIENCES↗

Challenges of future high power wireless power transfer for light-duty electric vehicles----technology and risk management

Wireless power transfer is a state-of-the-art technology with the advantage of convenience and flexibility, as well as the capability of enabling fully automated charging. With power transfer levels increasing beyond 100 kW, many technical and risk management challenges emerge. Here, instead of focusing on the progress review of wireless power transfer technology, this paper discusses the future challenges and risks for high power wireless charging for light-duty electric vehicles. Aiming at 200 kW or higher wireless power transfer, we discuss technology and risk management challenges in the area of electromagnetic safety, resonant frequency determination, and cybersecurity risks in detail. As potential solutions to overcome these challenges, the latest technologies with an emphasis on advanced shielding solutions and recent progress on SiC converters from both industrial and academic institutions are reviewed, and some perspectives and propositions are provided.

25 ENERGY STORAGE↗

A Cyber-Resilience Risk Management Architecture for Distributed Wind

Distributed wind is an electric energy resource segment with strong potential to be deployed in many applications, but special consideration of resilience and cybersecurity is needed to address the unique conditions associated with distributed wind. Distributed wind is a strong candidate to help meet renewable energy and carbon-free energy goals. However, care must be taken as more systems are installed to ensure that the systems are reliable, resilient, and secure. The physical and communications requirements for distributed wind mean that there are unique cybersecurity considerations, but there is little to no existing guidance on best practices for cybersecurity risk management for distributed wind systems specifically. This research develops an architecture for the consideration of cyber risks associated with distributed wind systems. The architecture takes into account the configurations, challenges, and standards for distributed wind to create a risk-focused perspective that considers of threats, vulnerabilities, and consequences, with special emphasis on what sets distributed wind systems apart from other distributed energy resources (DER). We discuss common distributed wind architectures and how they are interconnected to larger power systems. Because cybersecurity cannot exist independently, the cyber-resilience architecture must consider the system holistically. Finally, we discuss the implementation of a risk assessment process that uses the cyber-resilience framework to address challenges specific to distributed wind.

17 WIND ENERGY↗

Expansion of Hazards and Probabilistic Risk Assessments of a Light-Water Reactor Coupled with Electrolysis Hydrogen Production Plants

This report builds upon the body of work sponsored by the Department of Energy (DOE) Light-Water Reactor Sustainability (LWRS) Flexible Power Operation and Generation (FPOG) program that presented generic probabilistic risk assessments (PRAs) for the addition of a heat extraction system (HES) to light-water reactors to support the co-location of a high temperature hydrogen electrolysis facility (HTEF). Probabilistic and deterministic hazards assessments and risk analyses are leveraged throughout this report. Several improvements and new analyses are included in this report. First, higher amounts of detail in the specifications of the generic HTEFs are used to produce scaled results for a 100, 500, and 1000 MW nominal hydrogen production facility. An additional hazard assessment of 1000 kg of hydrogen storage is performed. The facility hazards and footprint are assessed to determine the safe distance required for placement near the nuclear power plant (NPP). Second, specific designs for corresponding HESs for the different levels of support required by the HTEFs are analyzed in the PRA model. Third, a hazards analysis of the specified HTEFs leads not only to effects of the quantified risk assessment for the NPP, but also qualitative hazards assessment for the community. Finally, a seismic analysis and a high winds analysis have each been added to the PRA. The results investigate the applicability of the potential licensing approaches which do not require a full United States (U.S.) Nuclear Regulatory Commission (NRC) licensing review. The PRAs are generic and include listed assumptions. The HTEF design built for this project has further eliminated many conservative assumptions from the prior PRAs in this series. The PRA results indicate that the 10 CFR 50.59 licensing approach is justified due to the minimal increase in initiating event frequencies for all design basis accidents, with none exceeding 7.7%. The PRA results for core damage frequency and large early release frequency support the use of NRC Regulation Guide 1.174 as further risk information that supports a change without a full licensing amendment review. The hazard analyses and PRA confirm the need for engineered blast barriers of storage tanks and the common production header leaving the HTEF. The hazards analyses and PRA also confirm with high confidence that using the assumptions of design in this report that the safety case for licensing an HES addition and an HTEF sited with its unprotected high-pressure stage components 187 meters from the NPP’s transmission towers (the most fragile structure, system, and component) is strong.

08 HYDROGEN↗

Development and Demonstration of a Risk Assessment Approach for Approval of a Transportation Package of a Transportable Nuclear Power Plant for Domestic Highway Shipment

The U.S. Department of Defense (DoD) Strategic Capabilities Office (SCO) has tasked PNNL to address the regulatory challenges associated with confirming the safe transport of Transportable Nuclear Power Plants (TNPPs) containing irradiated nuclear fuel. A previous report—Proposed Risk-Informed Regulatory Framework for Approval of Microreactor Transportation Packages (PNNL-31867)—determined that the expected radioactive inventory in the irradiated fuel of a TNPP would likely require shipment in an NRC-approved Type B package (or spent nuclear fuel cask) but that a TNPP “package” is unlikely to meet the entire suite of NRC requirements set forth in Part 71 of Title 10 of the Code of Federal Regulations (CFR) for a Type B package. It was therefore concluded that shipment of this initial TNPP transportation package, as well as possibly others, under existing regulations would likely require NRC approval using the 10 CFR 71.12 (“Specific exemptions”) process that relies on risk-informed decision making supported by quantitative risk assessment (i.e., Probabilistic Risk Assessment).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Cybersecurity Resiliency of Marine Renewable Energy Systems-Part 1: Identifying Cybersecurity Vulnerabilities and Determining Risk

Technology innovation, market demand, and the potential impacts of a changing climate are driving the marine renewable energy (MRE) industry to develop market-ready systems to provide low-carbon electricity for emerging, off-grid markets. The advanced operational and information technology devices used in MRE systems create a pathway for a cyber threat actor to gain unauthorized access to data or disrupt operation. To improve the resiliency of MRE systems as a predictable, affordable, and reliable source of energy from oceans and rivers, guidance was developed for an end users' organization that describes a framework for identifying and managing cybersecurity risk. The development of the cybersecurity guidance is based on standards described in the Risk Management Framework and Cybersecurity Framework developed by the National Institute of Standards and Technology (NIST). This paper is the first of a two-part series that describes an approach to determine the cybersecurity risk for MRE systems based on assessing potential cyber threats, identifying vulnerabilities (people, processes, and technology, including physical and operational environment), and evaluating the consequences a cyberattack would have on operation of the MRE system and impact on end users' mission and business objectives. MRE developers and stakeholders can use this approach to assess their current cybersecurity risk posture to incorporate appropriate cybersecurity controls to reduce the consequences and impacts from a cyberattack on MRE systems. This approach can be refined further as MRE systems are deployed and operational configurations are available.

97 MATHEMATICS AND COMPUTING↗

A Systems Modeling Approach for Risk Management of Command File Errors

The main cause of commanding errors is often (but not always) due to procedures. Either lack of maturity in the processes, incompleteness of requirements or lack of compliance to these procedures. Other causes of commanding errors include lack of understanding of system states, inadequate communication, and making hasty changes in standard procedures in response to an unexpected event. In general, it's important to look at the big picture prior to making corrective actions. In the case of errors traced back to procedures, considering the reliability of the process as a metric during its' design may help to reduce risk. This metric is obtained by using data from Nuclear Industry regarding human reliability. A structured method for the collection of anomaly data will help the operator think systematically about the anomaly and facilitate risk management. Formal models can be used for risk based design and risk management. A generic set of models can be customized for a broad range of missions.

probabilistic risk↗

Risk Assessment Metrics for NASA Fission Reactor Applications

Risk assessment is an important part of many NASA activities. In August 2019, the White House issued NSPM-20, which defines acceptable levels of risk for nuclear launches, but does not prescribe the particular methodologies or metrics that are to be used for comparison to the defined acceptance criteria. There are a variety of metrics that are possible and can be readily generated by a probabilistic risk assessment (PRA). This paper will explore alternative metrics that can be provided, along with some discussion of their characteristics and important factors to consider during a space fission reactor risk analysis.

Probabilistic Risk Assessment↗

Risk Classification Modernization

NASA’s risk classification system dates back to an era when every new NASA space mission was a one-of-a-kind build, and the only way to obtain reliability was as a by-product through a combination of reliability analyses, extensive and stringent quality requirements, and extensive testing. Originally, there were very limited commercial capabilities to develop systems to work reliably in space, so NASA considered its own homegrown approach the only recipe for success. This approach involved very detailed and prescriptive piece-part controls and no reliance on (and to some extent a rejection of) any type of commercial practices. Often risk was considered to be the lowest when NASA had the maximum amount of control and prescription, and the highest when commercial practices were largely employed, and these principles drove risk classification in the agency. Over time, however, commercial capabilities grew, and many products became standardized and commercialized, while the agency maintained its tried-and-true approach, paying little attention to the evolution of the commercial sector. This presentation introduces GSFC’s new approach at risk classification, which includes classification of components and full spacecraft, as well as of constellations of spacecraft.

risk↗

Risk Classification Modernization

NASA’s risk classification system dates back to an era when every new NASA space mission was a one-of-a-kind build, and the only way to obtain reliability was as a by-product through a combination of reliability analyses, extensive and stringent quality requirements, and extensive testing. Originally, there were very limited commercial capabilities to develop systems to work reliably in space, so NASA considered its own homegrown approach the only recipe for success. This approach involved very detailed and prescriptive piece-part controls and no reliance on (and to some extent a rejection of) any type of commercial practices. Often risk was considered to be the lowest when NASA had the maximum amount of control and prescription, and the highest when commercial practices were largely employed, and these principles drove risk classification in the agency. Over time, however, commercial capabilities grew, and many products became standardized and commercialized, while the agency maintained its tried-and-true approach, paying little attention to the evolution of the commercial sector. This presentation introduces GSFC’s new approach at risk classification, which includes classification of components and full spacecraft, as well as of constellations of spacecraft.

risk↗

PRA In Design: Increasing Confidence in Pre-operational Assessments of Risks (Results of a Joint NASA/ NRC Workshop)

In late 2009, the National Aeronautics and Space Administration (NASA) and the U.S. Nuclear Regulatory Commission (NRC) jointly organized a workshop to discuss technical issues associated with application of risk assessments to early phases of system design. The workshop, which was coordinated by the Idaho National Laboratory, involved invited presentations from a number of PRA experts in the aerospace and nuclear fields and subsequent discussion to address the following questions: (a) What technical issues limit decision-makers’ confidence in PRA results, especially at a preoperational phase of the system life cycle? (b) What is being done to address these issues? (c) What more can be done? The workshop resulted in participant observations and suggestions on several technical issues, including the pursuit of non-traditional approaches to risk assessment and the verification and validation of risk models. The workshop participants also identified several important non-technical issues, including risk communication with decision makers, and the integration of PRA into the overall design process.

42 ENGINEERING↗

Concentrations, Sources, and Risk Assessment of Organohalogen Compounds in Soils from Kiambu to Mombasa, Kenya

Concentrations, sources, and risk assessment of 16 organochlorinated pesticides (OCPs), seven polychlorinated biphenyls (PCBs) and seven polybrominated diphenyl ethers (PBDEs) were determined in soils from Kiambu to Mombasa in Kenya. The total concentrations of OCPs ranged between 7.62 and 76.09 ng/g, dominated by HCHs. Source identification displayed recent inputs and historical use of DDTs and lindane. The total concentrations of PCBs ranged from 9.90 to 20.8 ng/g with an average of 14.40 ng/g dominated by penta-PCBs from old transformers leakages. The total PBDEs concentrations were in the range of 1.89–38.36 ng/g and with a mean of 11.38 ng/g. Electric and electronic equipment waste and PBDE containing materials as sources of PBDE. The risk assessment of OCPs and PCBs showed low potential human health risk from OCPs, while PCBs indicated to pose a high risk.

54 ENVIRONMENTAL SCIENCES↗

A new view of radiation-induced cancer: integrating short- and long-term processes. Part II: second cancer risk estimation

As the number of cancer survivors grows, prediction of radiotherapy-induced second cancer risks becomes increasingly important. Because the latency period for solid tumors is long, the risks of recently introduced radiotherapy protocols are not yet directly measurable. In the accompanying article, we presented a new biologically based mathematical model, which, in principle, can estimate second cancer risks for any protocol. The novelty of the model is that it integrates, into a single formalism, mechanistic analyses of pre-malignant cell dynamics on two different time scales: short-term during radiotherapy and recovery; long-term during the entire life span. Here, we apply the model to nine solid cancer types (stomach, lung, colon, rectal, pancreatic, bladder, breast, central nervous system, and thyroid) using data on radiotherapyinduced second malignancies, on Japanese atomic bomb survivors, and on background US cancer incidence. Potentially, the model can be incorporated into radiotherapy treatment planning algorithms, adding second cancer risk as an optimization criterion.

59 BASIC BIOLOGICAL SCIENCES↗

Method for assessing coal-floor water-inrush risk based on the variable-weight model and unascertained measure theory

Water inrush from coal-seam floors greatly threatens mining safety in North China and is a complex process controlled by multiple factors. This study presents a mathematical assessment system for coal-floor water-inrush risk based on the variable-weight model (VWM) and unascertained measure theory (UMT). In contrast to the traditional constant-weight model (CWM), which assigns a fixed weight to each factor, the VWM varies with the factor-state value. The UMT employs the confidence principle, which is more effective in ordered partition problems than the maximum membership principle adopted in the former mathematical theory. The method is applied to the Datang Tashan Coal Mine in North China. First, eight main controlling factors are selected to construct the comprehensive evaluation index system. Subsequently, an incentive-penalty variable-weight model is built to calculate the variable weights of each factor. Then, the VWM-UMT model is established using the quantitative risk-grade divide of each factor according to the UMT. On this basis, the risk of coal-floor water inrush in Tashan Mine No. 8 is divided into five grades. For comparison, the CWM is also adopted for the risk assessment, and a differences distribution map is obtained between the two methods. Finally, the verification of water-inrush points indicates that the VWM-UMT model is powerful and more feasible and reasonable. The model has great potential and practical significance in future engineering applications.

01 COAL, LIGNITE, AND PEAT↗

Multi-scale Quantitative Risk Analysis of Seabed Minerals: Principles and Application to Seafloor Massive Sulfide Prospects

The potential for mining hydrothermal mineral deposits on the seafloor, such as seafloor massive sulfides, has become technically possible, and some companies (currently not many) are considering their exploration and development. Yet, no present methodology has been designed to quantify the ore potential and assess the risks relative to prospectivity at prospect and regional scales. Multi-scale exploration techniques, similar to those of the play analysis that are used in the oil and gas industry, can help to fulfill this task by identifying the characteristics of geologic environments indicative of ore-forming processes. Such characteristics can represent a combination of, e.g., heat source, pathway, trap and reservoir that all dictate how and where ore components are mobilized from source to deposition. In this study, the understanding of these key elements is developed as a mineral system, which serves as a guide for mapping the risk of the presence or absence of ore-forming processes within the region of interest (the permissive tract). The risk analysis is carried out using geoscience data, and it is paired with quantitative resource estimation analysis to estimate the in-place mineral potential. Resource estimates are simulated stochastically with the help of available data (bathymetric features in this study), conventional grade–tonnage models and Monte Carlo simulation techniques. In this paper, the workflow for a multi-scale quantitative risk analysis, from the definition to the evaluation of a permissive tract and related prospect(s), is described with the help of multi-beam data of a known hydrothermal vent site.

58 GEOSCIENCES↗

Linkages between riverine flooding risk and economic damage over the continental United States

Economic damages from riverine flooding are expected to grow because of climate change. Yet, there are few 7 studies analyzing flooding damages in the U.S. that clearly measure the roles of hazard, exposure, and vulnerability 8 separately and locally. A lack of this knowledge prohibits spatially detailed predictions of future damages. By being 9 able to separate into these three risk factors, we provide all necessary inputs for uncertainty analysis of the flooding-10 damages forecasts that can incorporate new predictive scenarios for each component. To analyze the flooding risk 11 factors of non-coastal counties within the contiguous U.S. between 1999-2018, we gathered information on (1) 12 property and human damages from flooding, (2) maximum annual river discharge, (3) the number of housing units 13 and the years in which they were built, and (4) the incidence of flooding events. We used the method of trimmed 14 least absolute deviated and trimmed least square estimators to obtain the individual impact of hazard, exposure, and 15 vulnerability in the context of censored flooding damages for panel data. The resulting estimates indicate that 16 exposure has been the main driver of flooding risk for most counties in the U.S. Here, we use these estimates to describe 17 the main source of flooding risk for non-coastal counties for the 1999-2018 period.

54 ENVIRONMENTAL SCIENCES↗

Automatic determination of cardiovascular risk by CT attenuation correction maps in Rb-82 PET/CT

Background: We investigated fully automatic coronary artery calcium (CAC) scoring and cardiovascular disease (CVD) risk categorization from CT attenuation correction (CTAC) acquired at rest and stress during cardiac PET/CT and compared it with manual annotations in CTAC and with dedicated calcium scoring CT (CSCT). Methods and Results: We included 133 consecutive patients undergoing myocardial perfusion {sup 82}Rb PET/CT with the acquisition of low-dose CTAC at rest and stress. Additionally, a dedicated CSCT was performed for all patients. Manual CAC annotations in CTAC and CSCT provided the reference standard. In CTAC, CAC was scored automatically using a previously developed machine learning algorithm. Patients were assigned to a CVD risk category based on their Agatston score (0, 1-10, 11-100, 101-400, >400). Agreement in CVD risk categorization between manual and automatic scoring in CTAC at rest and stress resulted in Cohen’s linearly weighted κ of 0.85 and 0.89, respectively. The agreement between CSCT and CTAC at rest resulted in κ of 0.82 and 0.74, using manual and automatic scoring, respectively. For CTAC at stress, these were 0.79 and 0.70, respectively. Conclusion: Automatic CAC scoring from CTAC PET/CT may allow routine CVD risk assessment from the CTAC component of PET/CT without any additional radiation dose or scan time.

62 RADIOLOGY AND NUCLEAR MEDICINE↗