Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “phase 1”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,405 records · Page 78

Improved Timing Scheme for Spaceborne Precipitation Radar

An improved timing scheme has been conceived for operation of a scanning satellite-borne rain-measuring radar system. The scheme allows a real-time-generated solution, which is required for auto targeting. The current timing scheme used in radar satellites involves pre-computing a solution that allows the instrument to catch all transmitted pulses without transmitting and receiving at the same time. Satellite altitude requires many pulses in flight at any time, and the timing solution to prevent transmit and receive operations from colliding is usually found iteratively. The proposed satellite has a large number of scanning beams each with a different range to target and few pulses per beam. Furthermore, the satellite will be self-targeting, so the selection of which beams are used will change from sweep to sweep. The proposed timing solution guarantees no echo collisions, can be generated using simple FPGA-based hardware in real time, and can be mathematically shown to deliver the maximum number of pulses per second, given the timing constraints. The timing solution is computed every sweep, and consists of three phases: (1) a build-up phase, (2) a feedback phase, and (3) a build-down phase. Before the build-up phase can begin, the beams to be transmitted are sorted in numerical order. The numerical order of the beams is also the order from shortest range to longest range. Sorting the list guarantees no pulse collisions. The build-up phase begins by transmitting the first pulse from the first beam on the list. Transmission of this pulse starts a delay counter, which stores the beam number and the time delay to the beginning of the receive window for that beam. The timing generator waits just long enough to complete the transmit pulse plus one receive window, then sends out the second pulse. The second pulse starts a second delay counter, which stores its beam number and time delay. This process continues until an output from the first timer indicates there is less than one transmit pulse width until the start of the next receive event. This blocks future transmit pulses in the build-up phase. The feedback phase begins with the first timer paying off and starting the first receive window. When the first receive window is complete, the timing generator transmits the next beam from the list. When the second timer pays off, the second receive event is started. Following the second receive event, the timing generator will transmit the next beam on the list and start an additional timer. The timers work in a circular buffer fashion so there only need to be enough to cover the maximum number of echoes in flight.

Berkun, Andrew↗

Termination unit

This invention relates to a termination unit comprising an end-section of a cable. The end section of the cable defines a central longitudinal axis and comprising end-parts of N electrical phases, an end-part of a neutral conductor and a surrounding thermally insulation envelope adapted to comprising a cooling fluid. The end-parts of the N electrical phases and the end-part of the neutral conductor each comprising at least one electrical conductor and being arranged in the cable concentrically around a core former with a phase 1 located relatively innermost, and phase N relatively outermost in the cable, phase N being surrounded by the neutral conductor, electrical insulation being arrange between neighboring electrical phases and between phase N and the neutral conductor, and wherein the end-parts of the neutral conductor and the electrical phases each comprise a contacting surface electrically connected to at least one branch current lead to provide an electrical connection: The contacting surfaces each having a longitudinal extension, and being located sequentially along the longitudinal extension of the end-section of the cable. The branch current leads being individually insulated from said thermally insulation envelope by individual electrical insulators.

42 ENGINEERING↗

Improvement of General Electric’s Chilled Ammonia Process with the use of Membrane Technology

General Electric Environmental Control Solutions (formerly Alstom Power Environmental Control Systems) set out to complete the Phase 1 award requirements for a Phase II renewal application for their project selected under DOE-FOA-0001190 “Small and Large Scale Pilots for Reducing the Cost of CO 2 Capture and Compression”. The project focus was to implement several improvement concepts utilizing membrane technology at the recipient’s Chilled Ammonia Process (CAP) CO 2 capture large-scale pilot plant. The goal was to lower the overall cost of technology. During the development of costs for the preliminary techno-economic assessment (TEA), it became clear that the capital and operating costs of this concept were not economically attractive. All work related to a Phase II renewal application at that point was halted as GE made the decision not to submit a Phase II renewal application. Discussions with DOE resulted in a path towards useful information produced from the design and cost work already completed on the project. With the reverse osmosis (RO) unit providing most of the cost issues, GE would provide a sensitivity analysis of the RO unit with respect to project cost. This information would be included with the Techno-Economic Analysis along with the Technology Gap Analysis.

20 FOSSIL-FUELED POWER PLANTS↗

Structural phase transition and 5f-electrons localization of PuSe explored by ab initio calculations

An investigation into the structural phase transformation, electronic and optical properties of PuSe under high pressure was conducted by using the full potential linearized augmented plane wave plus local orbitals (FP-LAPW+lo) method, in the presence and in the absence of spin-orbit coupling (SOC). Our results demonstrate that there exists a structural phase transition from rocksalt (B 1) structure to CsCl-type (B 2) structure at the transition pressure of 36.3 GPa (without SOC) and 51.3 GPa (with SOC). The electronic density of states (DOS) for PuSe show that the f-electrons of Pu are more localized and concentrated in a narrow peak near the Fermi level, which is consistent with the experimental studies. The band structure shows that B 1-PuSe is metallic. A pseudogap appears around the Fermi level of the total density of states of B 1 phase PuSe, which may contribute to its stability. The calculated reflectivity R(omega) shows agreement with the available experimental results. Furthermore, the absorption spectrum, refractive index, extinction coefficient, energy-loss spectrum and dielectric function were calculated. The origin of the spectral peaks was interpreted based on the electronic structures. - Abstract: Graphical Abstract Legend (TOC Figure): 5f-electrons are more localized by the analysis of the density of states (SOC). The origin spectra peaks was interpreted based on electronic structures.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Validation of MVP code with HTC critical experiments

In the 1980's, a series of high burnups critical experiments (HTC) was conducted at the Apparatus B experimental facility in Valduc with the support of the IRSN and AREVA NC. Four series of experiments were designed to assess profit associated with actinide-only burn-up credit in the criticality safety analysis for fuel handling (Phases 1 and 2), pool storage (Phase 3) and spent fuel cask (Phase 4) conditions. The HTC rods, specifically fabricated for the experiments, were designed to simulate a typical pressurized water reactor uranium oxide spent fuel. In order to validate the MVP-2.0 code and relatively new nuclear data libraries for the criticality safety analysis, the HTC critical experiments were analyzed using the MVP-2.0 code with JENDL-4.0, ENDF/B-VII.1 or JEFF-3.2. The effective neutron multiplication factor k{sub eff} values were obtained through analyses of all phases of the HTC experiments. It was shown that averaged values of k{sub eff} using JENDL-4.0 and ENDF/B-VII.1 were in good agreement with experimental results for all the phases, while those using JEFF-3.2 showed slight underestimation. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Army-NASA aircrew/aircraft integration program. Phase 5: A3I Man-Machine Integration Design and Analysis System (MIDAS) software concept document

This is the Software Concept Document for the Man-machine Integration Design and Analysis System (MIDAS) being developed as part of Phase V of the Army-NASA Aircrew/Aircraft Integration (A3I) Progam. The approach taken in this program since its inception in 1984 is that of incremental development with clearly defined phases. Phase 1 began in 1984 and subsequent phases have progressed at approximately 10-16 month intervals. Each phase of development consists of planning, setting requirements, preliminary design, detailed design, implementation, testing, demonstration and documentation. Phase 5 began with an off-site planning meeting in November, 1990. It is expected that Phase 5 development will be complete and ready for demonstration to invited visitors from industry, government and academia in May, 1992. This document, produced during the preliminary design period of Phase 5, is intended to record the top level design concept for MIDAS as it is currently conceived. This document has two main objectives: (1) to inform interested readers of the goals of the MIDAS Phase 5 development period, and (2) to serve as the initial version of the MIDAS design document which will be continuously updated as the design evolves. Since this document is written fairly early in the design period, many design issues still remain unresolved. Some of the unresolved issues are mentioned later in this document in the sections on specific components. Readers are cautioned that this is not a final design document and that, as the design of MIDAS matures, some of the design ideas recorded in this document will change. The final design will be documented in a detailed design document published after the demonstrations.

Banda, Carolyn↗

Series of Phase Transitions in Cesium Azide Under High Pressure Studied by in situ X-ray Diffraction

In situ x-ray diffraction measurements of cesium azide (CsN{sub 3}) were performed at high pressures of up to 55.4 GPa at room temperature. Three phase transitions were revealed as follows: tetragonal (I4/mcm, Phase II) {yields} monoclinic (C2/m, Phase III) {yields} monoclinic (P2{sub 1}/m or P2{sub 1}, Phase IV) {yields} triclinic (P1 or P1{sup -}, Phase V), at 0.5, 4.4, and 15.4 GPa, respectively. During the II-III phase transition, CsN{sub 3} keeps its layered structure and the azide anions rotate obviously. The compressibility of Phase II is dominated by the repulsions between azide anions. The deformation of unit cell is isotropic in Phases II and IV and anisotropic in Phase III. With increasing pressures, the monoclinic angle increases in Phase III and then becomes stable in Phase IV. The bulk moduli of Phases II, III, IV, and V are determined to be 18 {+-} 4, 20 {+-} 1, 27 {+-} 1 and 34 {+-} 1 GPa, respectively. The ionic character of alkali azides is found to play a key role in their pressure-induced phase transitions.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

PROTEC TM TEAR-OFFS: RESULTS OF LONG TERM TESTING

The Savannah River National Laboratory (SRNL) has completed a series of tests (Phases 1 and 2) to assess the potential use of a Mylar{reg_sign} tear-off system as a primary or secondary protective barrier to minimize acid etching ('frosting'), accidental scratching, and/or radiation damage for shielded cells, glovebox, and/or chemical hood windows. Conceptually, thin, multi-layered sheets of Mylar (referred to throughout this report as the ProTec{trademark} tear-off system) can be directly applied to the shielded cell, glovebox, or hood sash window to serve as a secondary (or primary) barrier. Upon degradation of visual clarity due to accidental scratching, spills/splatters, and/or radiation damage, the outer layer (or sheet) of Mylar could be removed refreshing or restoring the view. Due to the multilayer aspect, the remaining Mylar layers would provide continued protection for the window from potential reoccurrences. Although the concept of using a tear-off system as a protective barrier is conceptually enticing, potential technical issues were identified and addressed as part of this phased study to support implementation of this type of system in the Defense Waste Processing Facility (DWPF). Specific test conditions of interest to the DWPF included the performance of the tear-off system exposed to or under the following conditions: (1) acid(s) (concentrated (28.9 M) HF, concentrated (15.9M) HNO{sub 3}, 6M HCl, and 0.6M H{sub 3}BO{sub 3}); (2) base (based on handling of radioactive sludges with pH of {approx}12-13); (3) gamma radiation (due to radioactive sources or materials being used in the analytical cells); (4) scratch resistance (simulating accidental scratching with the manipulators); and (5) in-situ testing (sample coupons exposed to actual field conditions in DWPF). The results of the Phase 1 study indicated that the ProTec tear-off concept (as a primary or secondary protective barrier) is a potential technical solution to prevent or retard excessive damage that would result from acid etching, base damage (as a result of a sludge spill or splatter), gamma radiation damage, and/or accidental scratching (due to manipulator/tool contact). Although identified as a potential solution, the Phase 1 testing was relatively short-term with exposure times up to 1-2 months for the acid and gamma radiation tests. Phase 2 testing included longer exposure times for the acid resistance (up to 456 days) and gamma radiation exposure (700 days with a cumulative gamma dose of {approx}3.1 x 10{sup 5} rad) assessments. The tear-off system continued to perform well in these longer-term acid resistance testing and gamma exposure conditions. Complete removal of the tear-offs after these long-term exposure times indicate that not only could visual clarity be restored but the mechanical integrity could be retained. The results also provided insight into the ability of the ProTec tear-off system to withstand the chemical and physical abuses expected in off-normal shielded cells operations. The conceptual erasing of scratches or marks by excessive manipulator abuse was demonstrated in the SRNL Shielded Cells mock-up facility through the removal of the outer layer tear-off with manipulators. In addition, the Phase 2 testing included an in-situ assessment of a prototype tear-off system in the DWPF Sampling Cells where the system was exposed to actual field conditions including radioactive sources, acidic and basic environments, dusting, and chemical cleaning solutions over a 5-6 month period. DWPF personnel were extremely satisfied with the performance (including the successful removal of 3 layers with manipulators) of the ProTec tear-off system under actual field conditions. The successful removal of the outer layer tear-offs with the manipulator, using tabs not specifically designed for remote operations, demonstrates that the system is 'manipulator-friendly' and could be implemented in a remote environment. The ability to remove the outer layer tear-off not only regains visual clarity but also reduces waste disposal volumes (i.e., disposal of a thin sheet of Mylar which is 'collapsible' versus the bulk disposal of a rigid Lexan{reg_sign} sheet (alpha shield) or glovebox/sash window) which is more cost effective. The tear-off system could also reduce the number of cell entries needed to replace the Lexan sheet and increase the time interval between glovebox/sash window replacements, which can be costly and time consuming. Although the primary focus of this study addresses the application of the ProTec tear-off system to shielded cells windows, the concept is also potentially applicable to glovebox and hood sash windows. In fact, the tear-off concept is potentially applicable to any system where visual clarity is compromised given the environmental conditions of the test. In addition, the tear-offs could be applied to walls or shelves where a protective barrier would reduce deterioration or discoloration.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SNM Movement Detection/Radiation Sensors and Advanced Materials Portfolio Review, CdMnTe (CMT) Gamma Ray Detectors

The project goals are: (1) Develop CMT radiation detectors - Demonstrate feasibility (Phase 1 is complete) and Improve material properties and device performance; (2) This project will lead to novel radiation detectors - high detection efficiency, high energy-resolution, ambient-temperature operation, and low production cost; and (3) Such detectors are needed in areas of nonproliferation and national security for detection of SNM. Research highlights are: (1) We achieved our Phase-I goal - Demonstration of CMT detector performance approaching that of CZT detectors; (2) Demonstrated that In-doped CMT is much closer to its anticipated performance as radiation detectors than other alternative materials, TlBr and HgI{sub 2} - Large crystal volumes, 10{sup 10}{Omega}{center_dot}cm, 3 x 10{sup -3}cm{sup 2}/V, and stable response; and (3) Conducted material and device characterization experiments - Detectors: I-V, {mu}{sub e}, ({mu}{tau}){sub e}, internal E fields, energy spectra, and high-resolution x-ray response mapping data and Materials - DLTS, TCT, PL, EPDs, XRD, PCD and IR transmission.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Volume 1: Survey of Available Information in Support of the Energy-Water Bandwidth Study of Desalination Systems

The U.S. Department of Energy (DOE) has set a goal to reduce the cost of seawater desalination systems to $0.50/ cubic meter (m 3 ) through the development of technology pathways to reduce energy, capital, operating, soft, and system integration costs.1 In support of this goal and to evaluate the technology pathways to lower the energy and carbon intensity of desalination while also reducing the total water cost, DOE is undertaking a comprehensive study of the energy consumption and carbon dioxide (CO 2 ) emissions for desalination technologies and systems. This study is being undertaken in two phases. Phase 1, Survey of Available Information in Support of the Energy-Water Bandwidth Study of Desalination Systems, collected the background information that will underpin Phase 2, the Energy Water Bandwidth Study for Desalination Systems. This report (Volume 1) summarizes the results from Phase 1. The results from Phase 2 will be summarized in Volume 2: Energy Water Bandwidth Study for Desalination Systems (Volume 2). The analysis effort for Phase 2 will utilize similar methods as other industry-specific Energy Bandwidth Studies developed by DOE,2 which has provided a framework to evaluate and compare energy savings potentials within and across manufacturing sectors at the macroscale. Volume 2 will assess the current state of desalination energy intensity and reduction potential through the use of advanced and emerging technologies. For the purpose of both phases of study, energy intensity is defined as the amount of energy required per unit of product water output (for example, kilowatt-hours per cubic meter of water produced). These studies will expand the scope of previous sectorial bandwidth studies by also evaluating CO 2 intensity and reduction opportunities and informing a techno-economic analysis of desalination systems. Volume 2 is expected to be completed in 2017.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Large space telescope, phase A. Volume 1: Executive summary

The Phase A study of the Large Space Telescope (LST) is reported. The study defines an LST concept based on the broad mission guidelines provided by the Office of Space Science (OSS), the scientific requirements developed by OSS with the scientific community, and an understanding of long range NASA planning current at the time the study was performed. The LST is an unmanned astronomical observatory facility, consisting of an optical telescope assembly (OTA), scientific instrument package (SIP), and a support systems module (SSM). The report consists of five volumes. The report describes the constraints and trade off analyses that were performed to arrive at a reference design for each system and for the overall LST configuration. A low cost design approach was followed in the Phase A study. This resulted in the use of standard spacecraft hardware, the provision for maintenance at the black box level, growth potential in systems designs, and the sharing of shuttle maintenance flights with other payloads.

Source record↗

Solar Power Satellite antenna phase control system hardware simulation, phase 4: Volume 1: Executive summary

The phase control system is described. Potential sources of phase error are identified and the performance leading to selection of the allowable phase error for each source is summarized. The pilot transmitter, the effects of ionospheric, the master slave returnable timing system (MSRTS), the SPS receiver, and the high power amplifier for dc to microwave conversion are considered separately. Design parameters of the pilot transmitter and spacetenna transponder are presented.

Lindsey, W. C.↗

VERA Benchmarking Results for Watts Bar Nuclear Plant Unit 1 Cycles 1-12

Among the most important accomplishments during Phase 1 of the Consortium for Advanced Simulation of Light Water Reactors (CASL) is the development and deployment of what is known as VERA-CS, the steady-state nuclear reactor core simulation capability of the Virtual Environment for Reactor Applications, VERA. With this product CASL now has the ability to perform and support analyses relating to common evolutions of operating commercial pressurized water reactors (PWRs), including startup testing, power escalation, fuel cycle depletion, and fuel assembly discharge, reinsert, and shuffling. VERA-CS is a high-fidelity, multi-physics engineering tool that utilizes modest high-performance computing (HPC) systems and engineering-scale clusters to simultaneously simulate the local fuel rod neutronics and coolant channel thermal-hydraulics over the life of the reactor. Though it is still under development, the results demonstrated in this report provide encouraging evidence that VERA-CS will become highly acclaimed for industrial, scientific, and educational applications alike.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Effects of composition and crystallographic ordering on the ferromagnetic transition in Ni–Co–Mn–In magnetic shape memory alloys

In the present study, the effects of composition and the level of crystallographic ordering were studied in Ni 45 Co 5 Mn 50-X In X magnetic shape memory alloys with X = 13.55, 13.71 and 13.92, in order to reveal the relationship between the Curie temperature (T C ) of the austenite phase and the degree of L2 1 ordering. Various samples were prepared using secondary heat treatments at different temperatures below the order-disorder transition temperature and for different durations, after solution heat treatment, in order to control the degree of ordering. T C s were determined using calorimetric and magnetometry measurements. The relationship between the T C and the degree of order was used to predict the evolution of the order during selected heat treatments. It was shown that the T C of austenite exhibits a monotonous non-linear dependence on the fraction of the L2 1 phase. This relationship was corroborated via ab initio numerical calculations within a mean field approximation. Dependence of the crystallographic order parameter on temperature and duration of secondary heat treatments showed that ordering kinetics is fast, the total degree of order depends only on the annealing temperature and cooling rate for long enough treatments, and maximum achievable degree of order is limited by the low thermal energy available for atomic diffusion at low temperatures. Lastly, small changes in composition were observed to have a significant impact on martensitic transformation temperatures, and a significant but smaller effect on the ferromagnetic transition in these systems.

36 MATERIALS SCIENCE↗

SU-E-T-648: Quality Assurance Using the RADPOS System for 4D Radiotherapy with CyberKnife

Purpose: The CyberKnife robotic radiosurgery system uses Synchrony respiratory motion compensation, which requires independent performance verification. In this work, the RADPOS 4D dosimetry system’s motion measurements are compared with internal fiducial position measurements. In addition, RADPOS measurements are compared with Synchrony’s predictive correlation model, which is based on internal fiducial and external LED marker position measurements. Methods: A treatment plan was created for a lung insert containing fiducials, RADPOS detector, and Solid Water tumor phantom. Two Quasar Respiratory Motion Phantoms (Q1 and Q2) and two RADPOS detectors (R1 and R2) were used: Q1 simulated lung motion with a lung insert moving in the superior/inferior direction, while Q2 simulated chest motion with a chest platform moving in the anterior/posterior direction. Before treatment, R1 was secured inside of the tumor phantom within Q1, while LED markers and R2 were positioned on the chest platform of Q2. Two treatment delivery cases were studied: isocentric plan (I) and non-isocentric patient plan (P). Four motion cases were studied: no motion (0), sinusoidal and in-phase (1), sinusoidal and out-of-phase (2), patient waveform and out-of-phase (3). A coordinate alignment algorithm was implemented, allowing RADPOS and model position data to be compared within the fiducial coordinate system. Results: The standard deviation of the differences between RADPOS and fiducial position measurements was below 0.6 mm for all experimental cases. The standard deviation of the differences between RADPOS and model position data was 1.0, 1.5, and 1.6 mm along the primary direction of motion for case I1, I2, and P3, respectively. Conclusion: Our work demonstrates that RADPOS is a useful tool for independent quality assurance of CyberKnife treatment with Synchrony respiratory compensation. RADPOS and fiducial position measurement closely match, and RADPOS confirms the effectiveness of CyberKnife’s Synchrony motion tracking. This work was supported by OCAIRO (Ontario Consortium for Adaptive Interventions in Radiation Oncology) grant.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Rotary Table Design for the Modular In-Chamber Electron Beam Welding System

The Modular In-Chamber Electron Beam Welding (MIC-EBW) system which is being designed and assembled under DOE Projects DE-NE0008846 (Phase 1--completed) and DE-NE0009039 (Phase 2—in progress) includes several major components: four modules (the lower vacuum module, electron beam module, a spacer module, and a lid), a robust rotary table, large vacuum pumps/system, electron beam welding system controls/power supply, and an electron beam generator/gun. Many of these components and their functions were described in the earlier EPRI-DOE report 3002018146. This report provides an overview of one of the primary components, the rotary table, that has been designed and will be manufactured by Rusach International in Phase 2 of the project.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Analysis of NuCycle® Process Waste Streams and Identification of Candidate Waste Forms (CRADA 719) Abstract

The objective of this project is to support collaboration between PNNL and Curio to address technical gaps in the immobilization of waste streams generated by the NuCycle® process, thereby improving the overall viability of the technology. This work will be carried out in two phases, described below. Phase 1 – Waste Management Study The first phase consists of a comprehensive waste management study focused on the waste streams produced during the NuCycle® process, including those containing long lived fission products (LLFPs, e.g., I 129) and transuranic elements (TRUs). This phase involves compiling waste compositions and characteristics based on recently completed NuCycle® testing and modeling efforts. Established waste forms and processing methods will be identified for streams where they are applicable.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Particle acceleration in solar flares

A review of observational data supports the proposal that there are two distinct phases of particle acceleration in solar flares. 'Phase 1' is associated with the flash phase and is here interpreted as acceleration during field-line reconnection. 'Phase 2' is associated with type II and type IV radio bursts, and is ascribed to stochastic acceleration in the turbulent plasma behind a magnetohydrodynamic shock formed ahead of an ejected plasmoid.

Sturrock, P. A.↗