Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “operational reliability”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,405 records · Page 78

Development of ITM Oxygen Technology for Low-cost and Low-emission Gasification and Other Industrial Applications

Air Products is carrying out a scope of work under DOE Award No. DE-FE0012065 “Development of ITM Oxygen Technology for Low-cost and Low-emission Gasification and Other Industrial Applications.” The Statement of Project Objectives (SOPO) includes a Task 4f in which a Decision Point shall be reached, necessitating a review of Tasks 2-5 with an emphasis on Task 4f. This Topical Report constitutes the Decision Point Application pertaining to Task 4f. The SOPO under DOE Award No. DE-FE0012065 is aimed at furthering the development of the Ion Transport Membrane (ITM) Oxygen production process toward a demonstration scale facility known as the Oxygen Development Facility (ODF). It is anticipated that the completion of the current SOPO will advance the technology significantly along a pathway towards enabling the design and construction of the ODF. Development progress on several fronts is critical before an ODF project can commence; this Topical Report serves as an early update on the progress in critical development areas. Progress was made under all tasks, including Materials Development, Ceramic Processing Development, Engineering Development, and Performance Testing. Under Task 4f, Air Products carried out a cost and performance study in which several process design and cost parameters were varied and assessed with a process model and budgetary costing exercise. The results show that the major variables include ceramic module reliability, ITM operating temperature, module production yield, and heat addition strategy. High-temperature compact heat exchangers are shown to contribute significant cost benefits, while directly firing into the feed stream to an ITM are even a mild improvement on the high-temperature recuperation approach. Based on the findings to-date, Air Products recommends no changes to the content or emphasis in the current SOPO and recommends its completion prior to another formal assessment of these factors.

Armstrong, Phillip↗

Plans for an ERL Test Facility at CERN

The baseline electron accelerator for LHeC and one option for FCC-he is an Energy Recovery Linac. To prepare and study the necessary key technologies, CERNhas started – in collaboration with JLAB and Mainz University – the conceptual design of an ERL Test Facility (ERL-TF). Staged construction will allow the study under different conditions with up to 3 passes, beam energies of up to about 1 GeV and currents of up to 50 mA. The design and development of superconducting cavity modules, including coupler and HOM damper designs, are also of central importance for other existing and future accelerators and their tests are at the heart of the current ERL-TF goals. However, the ERL-TF could also provide a unique infrastructure for several applications that go beyond developing and testing the ERL technology at CERN. In addition to experimental studies of beam dynamics, operational and reliability issues in an ERL, it could equally serve for quench tests of superconducting magnets, as physics experimental facility on its own right or as test stand for detector developments. This contribution will describe the goals and the concept of the facility and the status of the R&D.

Jensen, Erik↗

Energy Systems Integration: Data Call -- Become a Data Partner

This project aims to advance the understanding of costs associated with integrating PV onto the electric power distribution system while maintaining reliable grid operations. We have developed a bottom-up framework for calculating these costs as a function of PV penetration levels on specific feeders. This framework will used to inform and improve utility planning decisions, increase the transparency and speed associated with the interconnection process, and provide policymakers with more information on the total cost of energy from PV.

14 SOLAR ENERGY↗

Development of a Marx Modulator for FNAL Linac

A Marx-topology modulator has been designed and developed at the Fermi National Accelerator Laboratory under the Proton Improvement Plan (PIP). This modulator replaces the previous triode hard-tube design, increasing reliability, lowering operational costs, and maintaining waveform accuracy. The Marx modulator supplies the anode of the 7835 VHF power triode tube with a 35 kV, 375 Amp, 460 μs pulse at 15 Hz. It consists of 54 individual Marx cells, each containing a 639 μF capacitor charged to 900 Volts, combined in series with IGBT switches to create the desired output waveform. This requires variable rise and fall times, flattening of capacitive droop, and feedforward beam loading compensation. All five 201.25 MHz RF systems have been upgraded to Marx modulators to ensure continued operation of the linear accelerator.

43 PARTICLE ACCELERATORS↗

Development of a Marx Modulator for FNAL Linac

A Marx-topology modulator has been designed and developed at the Fermi National Accelerator Laboratory under the Proton Improvement Plan (PIP). This modulator replaces the previous triode hard-tube design, increasing reliability, lowering operational costs, and maintaining waveform accuracy. The Marx modulator supplies the anode of the 7835 VHF power triode tube with a 35 kV, 375 Amp, 460 µs pulse at 15 Hz. It consists of 54 indi-vidual Marx cells, each containing a 639 µF capacitor charged to 900 Volts, combined in series with IGBT switches to create the desired output waveform. This requires variable rise and fall times, flattening of capaci-tive droop, and feedforward beam loading compensation. All five 201.25 MHz RF systems have been upgraded to Marx modulators to ensure continued operation of the linear accelerator.

43 PARTICLE ACCELERATORS↗

Modeling Electrolysis-based H2 Production for Grid Service Assessment

Hydrogen is a promising clean and renewable source of energy. Its high energy density offers a unique and effective means to store energy. The integration of hydrogen production devices with the power grid could lead to a cleaner and more reliable grid operation at reasonable costs. In this work, the capability of Proton Exchange Membrane (PEM) electrolyzers to perform grid services is assessed using a battery equivalent model approach. The Battery Equivalent Model (BEM) has been developed to represent the physics and operation of a fleet of PEM electrolyzers. The BEM model has been designed to be modular and readily incorporated into grid planning studies. This application of PEM electrolyzers can be integrated with other power generation and consumption devices, aggregating capabilities of each device to enhance the ability of the integrated system to provide grid services and improves grid stability. The developed model is evaluated using ancillary support services including peak management, frequency regulation, voltage regulation, artificial inertia, spinning reserve, and wholesale market price response using a representative price and power system profiles. The BEM model has also been evaluated to provide frequency regulation service that conforms to the IEEE 1547-2018 standard. Metrics such as energy efficiency, charging efficiency, hydrogen production rate, and service efficacy have been incorporated into the model to quantify the performance of the fleet while responding to grid services. Results show the electrolyzer fleet's effectiveness in quickly adjusting its real power consumption based on grid service requests. The energy efficiency of the fleet is maintained relatively high – in the range of 78% and 90% during the service operation. These results demonstrate the ability of PEM electrolyzers to effectively provide fast dispatch capability through storing off-peak hour energy while regulating power consumption during peak hours. The BEM model can assist in quantifying the stability and variability impacts from integration of PEM electrolyzers with intermittent renewable resources in grid integration studies.

08 HYDROGEN↗

Novel Materials and Concepts for Next-Generation High Power Target Applications

Novel beam-intercepting materials and targetry concepts are essential to improve the performance, reliability and operation lifetimes of next generation multi-megawatt (multi-MW) accelerator target facilities. The beam-intercepting materials and components must sustain an order-of-magnitude increase in particle beam intensities and are beyond the current state-of-the-art. With conventional materials already limiting the scope of experiments, it is crucial to investigate novel target materials, technologies and concepts that will satisfy the requirements and maximize the physics benefits of future energy and intensity frontier experiments. This paper provides an overview of the related targetry R&D required over the next 10 years to support and enable future high-power accelerator target facilities.

43 PARTICLE ACCELERATORS↗

Hydrogen Fuel Cell Electric Bus (FCEB) Evaluations in US Public Transit Service

The National Renewable Energy Laboratory (NREL) is a Department of Energy (DOE) national laboratory focused on renewable energy and energy efficiency. NREL has evaluated alternative fuel and advanced propulsion transit buses for DOE and the U.S. Department of Transportation's Federal Transit Administration (FTA). These evaluations are focused on determining the status of fuel cell systems and the corresponding infrastructure in transit applications to help DOE and FTA assess the progress toward technology readiness. For the last 19 years NREL has evaluated FCEBs in service around the United States and in Canada. The results of these evaluations have been published in numerous reports that compare FCEB performance to conventional technology as well as document the implementation experience and lessons learned by the transit agencies and their demonstration teams. Currently, 70 fuel cell buses are in active service in the US and 66 FCEBs are in development. NREL is evaluating a subset of the active FCEBs that includes three transit agencies demonstrating 25 fuel cell electric buses in California. One bus has exceeded 35,000 hours in service and 12 have exceeded 25,000 hours. Fuel economy for the current generation of FCEBs has improved 35% over the previous generation and is double that of conventional buses. Maintenance cost for FCEBs is equivalent to diesel and BEBs. The most up-to-date performance results will be presented, including fuel economy, availability, reliability, and operational costs.

bus↗

Emulation and Adversarial Analysis of EV Charging Networks

In the effort of decarbonization and evolution of the modern electrical grid, electric vehicles (EVs) play a key part to transform the grid. However, due to the rapid adoption of EVs and the demand of the charging infrastructure required to power said EVs, risk of a cyber-attack may impose serious consequences. There is a need to analyze and protect the charging ecosystem infrastructure from cyber threats before it reaches wide-scale deployment. In an effort to secure vehicle to grid (V2G) communications, standardization is necessary for continued reliable system operation. The protocol ISO 15118 outlines controls and practices that should be implemented for secure vehicle to grid (V2G) communications. The standard is gaining momentum for American markets as the demand for EV infrastructure grows. The adoption of ISO 15118 in American markets poses several challenges: the deployment of a public key infrastructure (PKI) as outlined within the standard, interoperability of charging different EVs with chargers from different manufactures using the PKI, and scaling the ecosystem to meet the demand while managing risks. This project was created to understand potential cyber and scaling challenges of PKI for EV infrastructure through utilizing a series of emulated components mapping to what exists in the EV ecosystem today, and the components of the PKI that are under development. The key nodes within the emulation that are under development are: electric vehicle (EV), electric vehicle supply equipment (EVSE), charge network operator (CNO), certificate authority (CA), and online certificate status protocol (OCSP) that must all interact using secure and trusted communications. With these emulated components and utilizing orchestration methods to rapidly deploy and scale the components, the ability to analyze risks of the ecosystem and address gaps before the PKI ecosystem is fully deployed to production should yield a more robust and mature production charging infrastructure. Our approach will use a modular architecture of virtual machines within an orchestration platform and will target scales of 100s, 1000s, and 10,000s of entities interacting. The core research questions trying to be answered with this scope of work are: what are the impacts of a rogue CA, what are the risks of certificate revocation list (CRL) management, what is the value of OCSP stapling, what components are vulnerable to DOS attacks, and what test effective payloads may impact the components.

charging ecosystem↗

IEA PVPS Task 13 Techno-Economic Study of Bifacial Photovoltaic Systems on Single Axis Trackers

The International Energy Agency PVPS Task 13 has assembled an international team of photovoltaic (PV) researchers from government labs, academia, and industry to study the specific application of bifacial PV modules deployed on tracking systems. This configuration is of particular interest as it has been identified as the PV system design with the lowest Levelized Cost of Electricity (LCOE) for over 90% of the world [1]. As such, much research, development, and commercial activity are focused on further optimizing this system design for different regions and markets, including field deployment and advanced modeling activities. Despite these efforts, many challenges remain to overcome with this system design. This conference paper will report on several areas the team is working on as part of this project. The first part of this study focuses on extensive interviews with PV tracker companies (we have identified 35) and customers worldwide to identify emerging technology trends, design diversity, market environments, and the reliability and performance of these systems. We will provide a market summary of technologies such as advanced tracking algorithms, methods for dealing with topography within the PV plant, different system configurations and layouts, backside irradiance optimization from albedo enhancement, and ground sculpting. We will also review dual-use applications of tracked bifacial systems, such as Agrivoltaics and Building-Integrated PV. These interviews are underway now, and we will be able to report our initial findings at the conference. The second part of the study focuses on summarizing performance monitoring and evaluation methods, with particular attention to capacity and acceptance testing for such systems. The third part of the study reviews performance modeling and yield assessment methods for these tracked bifacial PV systems. The final part of the study covers reliability and operations, and maintenance data from these systems.

albedo↗

A trust fund approach to accelerating deployment of CCS: options and considerations

The paper discusses one possible avenue to accelerate deployment of carbon dioxide capture and sequestration (CCS) technologies: use of a special-purpose CCS Trust Fund. A CCS Trust Fund financed, for example, through fees on coal-based or fossil fuel-based electricity generation may have a role in reducing CO{sub 2} emissions from power plants because it could: raise funds at the scale needed to support a significant number (e.g., 10 to 30) of commercial-scale CCS projects; ensure that the funds raised would be used to demonstrate CCS at commercial scale for a full range of systems applicable to U.S. power plants; establish the true costs, reliability, and operability of power plants with CCS; utilize private-sector business standards for project selection and management to ensure program cost effectiveness; and significantly reduce CCS costs within 10 to 15 years by supporting approximately 30 demonstrations, yielding substantial national economic benefits as CCS becomes widely deployed. The United States has considerable experience with trust funds. While no single existing fund illustrates all the features that might be desirable for a CCS Trust Fund, lessons from prior U.S. experience can be used to design an effective, efficient mechanism for advancing commercial-scale deployment of CCS. In particular, experience has indicated the importance of financial self-sufficiency, private-sector management standards, insulation from the annual Congressional appropriations process, and termination upon completion of objectives. Carefully crafted enabling legislation and, most likely, use of a quasi-public or private entity to manage a CCS Trust Fund will be needed to incorporate these and other desirable features. 25 refs., 1 tab., 1 app.

01 COAL, LIGNITE, AND PEAT↗

ITER design review: Tritium issues

One of the key activities on ITER during 2007 is a Design Review covering selected high priority areas of the project in which a significant number of features of the design with the potential to compromise the achievement of some objectives of ITER have been identified. These issues are being addressed by a number of focussed working groups to develop solutions for these issues which will enhance operating margins, reliability and availability, and ensure compliance with the French licensing framework. One of the working groups has been set up to investigate tritium-related issues. The principal design features which are being addressed by this group and the proposed resolutions of these issues are described in the paper. (authors)

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Establishing no credible risk of inadvertent criticality for the K-25 demolition project - 14310

Demolition of the K-25 Gaseous Diffusion Plant required establishing a non-credible risk of inadvertent criticality because a Criticality Accident Alarm System (CAAS) could not be reliably maintained operable as the building was being torn down. Preparation for, and demolition of, the facility was a multi-year long effort with significant changes in approach. The most significant change was to demolish the facility with as much of the process gas equipment and piping left in the facility as possible, rather than removing all process gas equipment and piping from the facility prior to demolishing the building structure only. The contractor had to adapt their approach to accommodate these changes. The normal approach to demolition was to remove all process gas equipment and piping prior to demolition, using Nuclear Criticality Safety (NCS) controls based on the double contingency principle, while CAAS coverage was intact. Then, the building structure was demolished with no requirement for a CAAS. This was the method used to demolish the K-33 Building, for example. In the case of K-25 demolition, all equipment and piping that met the Environmental Management Waste Management Facility (EMWMF) disposal cell Waste Acceptance Criteria (WAC) was left in the building and removed as part of the building demolition process. This resulted in significant quantities of fissionable material remaining in the building and being handled during demolition. The NCS Organization worked closely with several groups during preparation activities. A Data Management organization was established to specifically identify every piece of process gas equipment and piping in the facility so that it could be accounted for and characterized. Deactivation and Decommissioning (D and D) personnel conducted internal visual inspections, by remote camera, of all process gas equipment and piping larger than 3' diameter, to reveal any large deposits that would require removal. Non-Destructive Assay (NDA) of the vast majority of equipment and piping was required to quantify the amount of fissionable material remaining. Finally, all process gas equipment and piping larger than 3'' diameter was internally filled with foam, which was credited by NCS with immobilizing the remaining fissionable material such that large migration and accumulation could not occur during demolition activities. NCS personnel worked closely with all of these groups in order to acquire the data and information needed to establish a non-credible risk of inadvertent criticality during building demolition. Good communication and a close working relationship between NCS, the various D and D/characterization personnel, and the Department of Energy (DOE) ensured the success of the modified approach to building demolition. The same successful approach is currently underway in the K-27 Building as well. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Dynamically Learning Incentives for Load Control

As electrical generation becomes more distributed and volatile, and loads become more uncertain, controllability of distributed energy resources (DERs), regardless of their ownership status, will be necessary for grid reliability. Grid operators lack direct control over end-users' grid interactions, such as energy usage, but incentives can influence behavior -- for example, an end-user that receives a grid-driven incentive may adjust their consumption or expose relevant control variables in response. A key challenge in studying such incentives is the lack of data about human behavior, which usually motivates strong assumptions, such as distributional assumptions on compliance or rational utility-maximization. In this paper, we propose a general incentive mechanism in the form of a constrained optimization problem -- our approach is distinguished from prior work by modeling human behavior (e.g., reactions to an incentive) as an arbitrary unknown function. We propose feedback-based optimization algorithms to solve this problem that each leverage different amounts of information and/or measurements. We show that each converges to an asymptotically stable incentive with (near)-optimality guarantees given mild assumptions on the problem. Finally, we evaluate our proposed techniques in voltage regulation simulations on standard test beds. We test a variety of settings, including those that break assumptions required for theoretical convergence (e.g., convexity, smoothness) to capture realistic settings. In this evaluation, our proposed algorithms are able to find near-optimal incentives even when the reaction to an incentive is modeled by a theoretically difficult (yet realistic) function.

demand response↗

Robotics for Energy Infrastructure Construction on Earth and Beyond: Pilot Study Exploring Level 3-4 Semi-Autonomous Installation of a Reduced-Scale Photovoltaic Power Plant Prototype: Preprint

There is a growing need to build energy infrastructure at massive scale on both Earth and in space. On Earth, increasing electricity demand from applications such as AI data centers is driving rapid expansion of power systems, while in space, long-duration missions such as lunar operations require reliable and resilient energy infrastructure that can be deployed quickly. These needs outpace the capabilities of conventional construction methods. Robotic construction offers a path to faster, lower-cost, and more consistent deployment, yet most existing approaches focus on automating individual tasks rather than end-to-end assembly. The Industrialized Construction Innovation (ICI) team at the National Laboratory of the Rockies (NLR), in collaboration with the Colorado School of Mines, has been investigating robotics and automation strategies for rapid end-to-end energy infrastructure construction. This paper presents a pilot study demonstrating level 3-4 semi-autonomous, end-to-end robotic assembly of a reduced-scale photovoltaic power plant prototype under terrestrial conditions. The approach combines hardware redesign of photovoltaic components for robotic compatibility, discrete-event and physics-based robotic simulations in synthetic environments, and sim-to-real deployment to execute end-to-end robotic assembly of[NM1.1][NM1.2] tracking components, structural members, photovoltaic modules, and embedded electrical connections. The pilot identifies key limitations like tolerance management, perception and localization, end effector capability, fastening methods, and multi-physics simulation fidelity, that must be addressed to enable end-to-end robotic assembly of full-scale energy infrastructure. The study highlights how these insights inform scaling strategies for terrestrial energy infrastructure and adaptation to unstructured and extreme environments, including off-world scenarios such as robotic assembly of vertical tall lunar towers.

14 SOLAR ENERGY↗

Development of Digital Twin-Informed Predictive Maintenance for Critical Components in Advanced Reactors

Small modular reactors (SMRs) and microreactors, along with other advanced reactor (AR) technologies, are key to the future of nuclear energy. For these systems to achieve low operating costs, high reliability, and flexibility across applications, their operation and maintenance must be optimized. Digital twin (DT) technology is one of the technologies that enables real-time (or faster than real-time) monitoring and prognosis of critical components which are vital for operational efficiency, low costs, and enhanced safety of ARs, accelerating their deployment. DT technology provides dynamic virtual representation of physical assets by integrating real-time data, physics-based models, and advanced analytics, which is critical to optimizing the performance of the entire energy system throughout the life cycle. DTs empower engineers and operators to virtually explore different scenarios, configurations, and control strategies, allowing for the identification of optimal solutions that maximize reactor efficiency, safety, and economics.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Stability and support issues in the construction of large span caverns for physics

New physics experiments, proposed to study neutrinos and protons, call for the use of large underground particle detectors. In the United States, such detectors would be housed in the US Deep Underground Science and Engineering Laboratory (DUSEL), sited within the footprint of the defunct Homestake Mine, South Dakota. Although the experimental proposals differ in detail, all rely heavily upon the ability of the mined and reinforced rock mass to serve as a stable host for the detector facilities. Experimental proposals, based on the use of Water Cherenkov detector technology, specify rock caverns with excavated volumes in excess of half a million cubic meters, spans of at least 50 m, sited at depths of approximately one to 1.5 kilometers. Although perhaps sited at shallower depth, proposals based on the use of Liquid Argon (LAr) detector technology are no less challenging. LAr proposals not only call for the excavation of large span caverns, but have an additional need for the safe management of large quantities (kilo-tonnes) of cryogenic liquid, including critical provisions for the fail-safe egress of underground personnel and the reliable exhaust of Argon gas in the event of a catastrophic release. These multi-year, high value physics experiments will provide the key experimental data needed to support the research of a new generation of physicists as they probe the behavior of basic particles and the fundamental laws of nature. The rock engineer must deliver caverns that will reliably meet operational requirements and remain stable for periods conservatively estimated to be in excess of twenty years. This paper provides an overview of the DUSEL site conditions and discusses key end-user requirements and design criteria likely to dominate in determining the viability of experimental options. The paper stresses the paramount importance of collecting adequate site-specific data to inform early siting, dimensioning and layout decisions. Given the large-scale of the excavation and likely timeline to construction, the paper also strongly suggests that there are exciting opportunities for the rock mechanics and engineering community to identify and efficiently integrate research components into the design and construction process.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Combined Heating and Power Using Microturbines in a Major Urban Hotel

This paper describes the results of a cooperative effort to install and operate a Cooling, Heating and Power (CHP) System at a major hotel in San Francisco, CA. The packaged CHP System integrated four microturbines, a double-effect absorption chiller, two fuel gas boosters, and the control hardware and software to ensure that the system operated predictably, reliably, and safely. The chiller was directly energized by the recycled hot exhaust from the microturbines, and could be configured to provide either chilled or hot water. As installed, the system was capable of providing up to 227 kW of net electrical power and 142 Refrigeration Tons (RT) of chilled water at a 59oF (15oC) ambient temperature. For the year, the CHP efficiency was 54 percent. Significant lessons learned from this test and verification project are discussed as well as measured performance and economic considerations.

42 ENGINEERING↗