Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “launch”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,405 records · Page 78

INSAT-1A launch on Delta

The INSAT-1A, the first in a series of 12 transponder communications satellites developed for India, is described as well as the launch plans. The launch vehicle will be the Delta 3910 configuration which incorporates an extended long tank Thor booster, nine Castor IV strap-on motors, a TR-201 second stage, and an 8 foot fairing. The satellite will be placed in a suborbital trajectory. A DAM-D stage will then thrust it into a synchronous transfer orbit. An apogee kick motor will be fired to circularize its orbit at a geosynchronous altitude of 19,300 nautical miles.

Source record↗

INTELSAT satellite scheduled for launch

The launch schedule for INTELSAT V-D, the fourth of a series of nine international telecommunications satellites, is presented. Satellite and launch vehicle specifications are presented.

Source record↗

Offshore Space Center (offshore launch site)

Any activity requiring the development of the HLLV can benefit by operations from an offshore space center (OSC) since operating near the equator provides a twenty percent increase in payload in an ecliptic plan orbit. Some OSC concepts considered include a moored floating (semisubmersible) design, a stationary design supported by fixed piles, and a combination of these two. The facility supports: a 15,000 foot long, 300 foot wide runway, designed to accommodate a two staged winged launch vehicle, with a one million pound payload capacity to low earth orbit; an industrial area for HLLV maintenance; an airport terminal, control and operation center, and observation tower; liquid hydrogen and liquid oxygen production and storage, and fuel storage platforms; a power generation station, docks with an unloading area; two separate launch sites; and living accommodations for 10,000 people. Potential sites include the Paramount Seamount in the Pacific Ocean off the north coast of South America. Cost estimates are considered.

Harvey, D. G.↗

Launch mission summary INTELSAT V (F5) Atlas/Centaur-60

The Atlas/Centaur 60 launch vehicle, INTELSAT V (F5) spacecraft, and mission are summarized. Also included is information relative to launch windows, flight plan, radar and telemetry coverage, selected trajectory information, and a brief sequence of flight events.

Source record↗

The Scout Launch Vehicle program

The Scout Launch Vehicle Program to utilize solid propellant rockets by the DOD and to provide a reliable, low cost vehicle for scientific and applications aircraft is discussed. The program's history is reviewed and a vehicle description is given. The Vandenberg Air Force Base and the San Marco launch sites are described, and capabilities such as payload weight, orbital inclinations, payload volume and mission integration time spans are discussed. Current and future plans for improvement, including larger heat shields and individual rocket motors are also reviewed.

Foster, L. R., Jr.↗

The utilization of Shuttle launched vehicles for technical validation of advanced earth and planetary entry systems

Studies of future space missions have shown that transport vehicles which utilize passage (aeroassisted) through the atmosphere of the earth or an appropriate planet have a substantial payload advantage over earlier concepts which used retro propulsion to effect the transition to local orbit. A description is presented of aeroassisted concepts currently under consideration for application to NASA's advanced space entry missions. Proposed aeroassisted planetary orbit entry vehicles are considered, taking into account the aerobrake concept, the aerocapture concept, proposed aeroassisted earth orbit entry vehicles, the application of Shuttle launched research vehicles to aerobrake and aerocapture technology validation, Shuttle launched vehicle options, flight trajectory options, and trajectory termination options.

Jamison, C. C.↗

Launch-Window Program

Parameterized Investigation of Launch Opportunities and Trajectories (PILOT) program developed to perform mission simulation computations that yield data for use in delimiting optimum launch windows. CoPILOT utility program used to read and format PILOT-generated data file.

Erickson, J. A.↗

Launch summary for 1981

Launchings identified from reports received for the period January 1, 1981 through December 31, 1981 including sounding rocket, satellite and space probe launchings are summarized.

Vostreys, R. W.↗

RCA-E/Delta post launch report

The RCA-E spacecraft launch is summarized. Performance of the three stage Delta launch vehicle was nominal and placed the payload in a transfer orbit as planned. The ABM firing is also summarized.

Abrahamson, J. A.↗

Telesat-G/Delta post launch report

The Canadiari Telesat-G (ANIK-D1) commercial communications satellite was launched successfully from the Eastern space and Missile Center (ESMC) at 7:10 p.m., EDT, on August 25, 1982, by a Delta 3920 Vehicle, Mission Number 164. Performance of the two stage Delta launch vehicle was nominal and placed the payload in a low circular orbit as planned. The Payload Assist Module (PAM-D), which is part of the payload, also performed nominally. The synchronous transfer orbital elements achieved by Delta/PAM, compared with the nominal expected, are provided. The satellite performed satisfactorily during the transfer orbit, and the ABM was fired successfully at 5:29 p.m., EDT, on August 29, 1982. The satellite was maneuvered to a position 104 degrees West Longitude above the equator. Satellite status is satisfactory and it has entered service.

Mahon, J. B.↗

LANDSAT-4 post launch report 1

LANDSAT-4 (formerly LANDSAT-D) was launched successfully at 1:59 p.m. EDT on July 16, 1982, from Vandenberg Air Force Base. The Delta 3920 launch vehicle performed flawlessly and placed the satellite into the planned three sigma low orbit of 694 km. The lower orbit was selected to eliminate a retrograde maneuver for the orbit adjust burns necessary to place the satellite into its planned operational 16-day repeat track at 705 km. Spacecraft separation and the initiation of solar array depolyment occurred, over the Indian Ocean tracking station. Spacecraft attitude rates at separation were low, allowing the Earth sensor to immediately acquire the Earth with the momentum wheels and without use of the propulsion system. All systems activated as of noon on July 18, 1982, are performing well with no significant discrepancies reported.

Source record↗

Shuttle derived vehicle analysis solid booster unmanned launch vehicle concept definition study, volume 2

The technical effort associated with the selection and definition of the recommended SRB-X concept is documented. Included are discussions concerning the trades leading to the selected concept, the analysis that established the concept's basic subsystem characteristics, selected configuration description and performance capabilities, launch site operations and facility needs, development schedule, cost characteristics, risk assessment, and a cursory comparison with other launch systems.

Source record↗

The RCA-F/Delta launch

The Delta 3924 launch vehicle configuration which incorporates the extended long tank Thor booster, nine Castor 4 strap-on motors, the AJ-118 second stage and the TE 364-4 third stage is to place into a synchronous transfer orbit, the second in a series of high-traffic capacity, 24 transponder communications satellites. Three days after launch, the satellite's apogee kick motor circularizes the orbit at geosynchronous altitude of 19,300 NM above the equator at approximately 128 degrees W longitude. The satellite can service commercial and government voice, digital and video communications requirements between Alaska and CONUS. The communications payload, mission requirements and spacecraft systems and subsystems are described.

Source record↗

Prediction of corridor effect from the launching of the satellite power system

A diagnostic model is developed to define the parameters which control the corridor effect of contaminants deposited in a narrow latitudinal band of the earth's atmosphere by numerous launches of the STS and heavy lift launch vehicles for construction of satellite solar power systems. Identified factors included the pollution injection rate, the ambient background levels of the pollutant species, and the transport properties related to the dilution rate of the chemicals. If the chemical life of the pollutant was shorter or the same length of time as the transport time, alterations in the chemical production and loss rates were found to be parameters necessarily added to the model. A comparison with NASA Ames Research Center two-dimensional model results indicate that the corridor effect was possile with operations above 60 km in the case of H2O, H2, and NO production.

Borucki, W. J.↗

Separation and Staging Mechanisms for the Indian SLV-3 Launch Vehicle

A unique separation and jettison system for the ascent fairing and a staging system for the apogee motor of the first Indian satellite launch vehicle are described. Design features, development problems, and mission constraints are discussed in addition to the solutions adopted. A qualification summary is included for each system, and flight results obtained from SLV-3 launches are described.

Abdulmajeed, M. K.↗

Concepts, technology, and operations for a quick response, highly maneuverable launch vehicle

Preliminary results from the NASA orbit-on-demand study are used to identify major technology issues for development of a quick response vehicle. Reasonable vehicles are found to require significant advances in propulsion, structures, materials, and flight mechanics technology. Vehicle concepts using normal growth technology predicted for the 1990s are compromised by expendable hardware or by unmanageable size and complexity. Operational analyses of the vertical-launch and horizontal-launch takeoff vehicles show that the latter have more inherent operational utility. The supply of liquid hydrogen propellant at alternate sites is a major issue; however, propane may be a viable option for at least one concept. Propellant for orbital maneuvering significantly increases gross weight for many of the concepts. This increase is greater for horizontal-takeoff systems becasue of their larger orbiters.

Gabris, E. A.↗

Structures and materials technology issues for reusable launch vehicles

Projected space missions for both civil and defense needs require significant improvements in structures and materials technology for reusable launch vehicles: reductions in structural weight compared to the Space Shuttle Orbiter of up to 25% or more, a possible factor of 5 or more increase in mission life, increases in maximum use temperature of the external surface, reusable containment of cryogenic hydrogen and oxygen, significant reductions in operational costs, and possibly less lead time between technology readiness and initial operational capability. In addition, there is increasing interest in hypersonic airbreathing propulsion for launch and transmospheric vehicles, and such systems require regeneratively cooled structure. The technology issues are addressed, giving brief assessments of the state-of-the-art and proposed activities to meet the technology requirements in a timely manner.

Dixon, S. C.↗