Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “energy saving process”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,405 records · Page 78

Utilizing waste heat in wastewater treatment plants for water desalination: Modeling and Multi-Objective optimization of a Multi-Effect desalination system using Decision Tree Regression and Pelican optimization algorithm

This paper examines the feasibility of using waste heat from wastewater treatment plants (WWTPs) for water desalination. A model was developed to utilize waste heat from the gensets at As Samra WWTP in Jordan, using real data and TRNSYS® software to calculate available waste heat. The desalination process was then modeled with ASPEN PLUS® software, focusing on multi-effect desalination (MED). Both series and parallel configurations for the MED system were compared. The study investigated the effects of system feeding flow rate, feeding pressure, and heat input on productivity, performance ratio, and recovery ratio. The study also introduces a novel optimization technique combining machine learning and modern optimization algorithms to maximize system productivity and performance. Initially, a decision tree regression (DTR) model is developed to establish relationships between key independent variables (flow rate, feed pressure, and heat input) and dependent variables (productivity, performance ratio, and recovery ratio). The Pelican Optimization Algorithm (POA) is then used to identify the optimal values of the independent variables for maximum productivity and performance. The results show that using a series configuration yields a system productivity of 3984.2 kg/hr, a performance ratio of 3.78, and a recovery ratio of 0.991 at a feed flow rate of 4000 kg/hr, feed pressure of 3 bars, and heat input of 719 kW. Optimal productivity (4421 kg/hr), performance ratio (3.81), and recovery ratio (0.851) are achieved at a feed flow rate of 5166 kg/hr, feed pressure of 3.2 bars, and heat input of 794 kW. In conclusion, the techno-economic assessment indicates a levelized cost of water of 1.63 USD/m 3 for parallel configurations and 1.65 USD/m 3 for series configurations, with a payback period of less than two years.

42 ENGINEERING↗

Evaluation of Hydrogen Production Feasibility for a Light Water Reactor in the Midwest

Increased electricity production from renewable energy resources coupled with low natural gas prices has caused existing light-water reactor (LWRs) to experience ever diminishing returns from the electricity market. Via partnership among Idaho National Laboratory (INL), The National Renewable Energy Laboratory (NREL), Argonne National Laboratory (ANL), Exelon, and Fuel Cell Energy a techno-economic analysis on the viability of retrofitting existing pressurized water reactors (PWRs) to produce hydrogen (H2) via high temperature steam electrolysis (HTSE) has been conducted. Such integration would allow nuclear facilities to expand into additional markets that may be more profitable in the long-term. To accommodate such an integration, a detailed analysis of HTSE process operation, requirements, and flexibility was conducted. Technical analysis includes proposed nuclear system control scheme modifications to allow dynamic operation of the HTSE via both thermal and electrical connection to the nuclear plant. High fidelity Modelica simulations showcase the viability of such control schemes. However, due to limited knowledge of solid oxide fuel cell (SOFC) stack degradation due to thermal gradients; thermal cycling of the HTSE was not included. Therefore, the control schemes proposed are only utilized to re-distribute steam at startup and only the portion of electricity utilized in the electrolyzers is cycled. From the detailed analysis of the nuclear integration and the HTSE process design, a comprehensive cost estimation was conducted in the APEA and H2A models to elucidate capital and operational costs associated with the production, compression, and distribution of hydrogen from a nuclear facility. Alongside this costing analysis, market analyses were conducted by NREL and ANL on the electric and hydrogen markets respectively in the PJM interconnect. Utilizing the electricity data market projections in the PJM interconnect from NREL and hydrogen demand/pricing projections from ANL a five variable sweep over component capacities, discount rates, and hydrogen pricing was completed using the stochastic framework RAVEN (Risk Analysis Virtual ENVironment) through its resource dispatch plugin HERON (Heuristic Energy Resource Optimization Network). Each combination of variables was evaluated stochastically four times over a seventeen year timespan from 2026-2042 (inclusive) to determine the most economically advantageous solution. Following the five variable sweep an optimization was conducted about the best sweep point to determine optimal component sizing and setpoints. Results suggest positive gain is achievable at all projected hydrogen market pricing levels and at all discount rates. However, exact component sizing and net returns vary based on these values and if incorrect sizing is selected; major net losses can occur. The optimal result occurred with set points as follows: high hydrogen prices, the largest possible HTSE unit in the sweep set at 7.47 kg/sec [645.4 tpd], a contractual hydrogen market agreement 7.29 kg/sec [629.8 tpd], and a hydrogen storage size 115,188 kg. The analysis suggested that with a discount rate of 8%, a ΔNPV = 1.2 billion over the seventeen year span can be achieved. The results illuminate that by operating in multiple markets the nuclear facility is capable of avoiding sale of electricity during times of low electricity market pricing, while maintaining the ability to capitalize on the high electricity market pricing. It should be noted that the analysis conducted in this report is a differential cash flow analysis and as such does not present profit levels. Instead it highlights the net benefit between building and competing in the hydrogen market utilizing nuclear facilities and conducting business as usual in the electricity markets. Additionally, results presented in this report exhibit conservatism due to four key assumptions: Given the limited knowledge on SOFC stack degradation due to thermal gradients the high temperature steam electrolysis plant is not allowed to thermally cycle. This limitation decreases electricity generation capacity in the nuclear plant, reducing capacity payments and the maximum output to the electrical grid. This analysis considers building a separate hydrogen pipeline for use in the nuclear facility. Research is currently being conducted to determine if existing natural gas pipelines can accommodate direct hydrogen injection. If hydrogen can be integrated into existing natural gas pipelines then a capital savings of ~$19,000,000 per kg/sec [1 kg/sec = 86.4 tpd] of installed HTSE capacity could be realized. Fast transients in the electric grid are typically served by flywheels and electric batteries. With electrolysis only operation the nuclear plant can flex its electricity just as quickly. However, for this analysis, the ancillary services market has been neglected. Should the nuclear plant have the ability to operate in the ancillary services market during periods when it is producing hydrogen, an additional substantial income stream that would increase overall system profitability could be considered. Subsidies for non-emitting generation technologies are not introduced in the cash flow analysis, but instead are completed assuming zero subsidies. Profitability is based solely on electricity pricing. Electric pricing is assumed to never go negative. Instead, it is assumed overall system curtailment by the Independent System Operator (ISO) will occur in such a manner that pricing remains at or above zero. This assumption inflates the “business as usual” scenario, thus decreasing the ΔNPV calculated. If negative pricing scenarios continue to occur as they do today, one would expect a further increase in ΔNPV. Overall, results advocate that, through market diversification, nuclear power plants have the potential to substantially increase current profit margins, increase market penetration, and ultimately solidify their place as a mainstay in energy production.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Port Graham Community Building Biomass Heating Design Project

Native Village of Port Graham completed preconstruction activities to prepare for construction and operations of a cord wood biomass heating system to five or more community buildings in Port Graham, Alaska. Project Description Native Village of Port Graham (NVPG) completed preconstruction activities that pave the way towards reduced local energy costs through the construction and operations of a cord wood biomass heating system. NVPG plans include installation of a GARN WHS 3200 Boiler that uses cord wood as fuel source. Implementation of the 700,000 Btu per hour output biomass community building heat utility would heat 5-community buildings in Port Graham, Alaska. Heating system is estimated to displace 85% of the heating fuel oil or 5365 gallons of fuel on an annual basis with an estimated peak output of 600,000 Btu per hour. Estimated savings is $15,112.00 per year. The construction cost estimate made to install the new biomass boiler system is estimated $251,693.47 with an additional Boiler Building expansion cost estimated at $97,828.40. Total installed cost is estimated $349,521.87. The WHS 3200 Boiler would be placed inside a new structure at the old community Water Plant Building site that is controlled by NVPG. Design of the new biomass heat plant and hot water loop system was completed by Richmond Engineering, NVPG contractor for the project. A hot water heat loop system running off the boiler is designed to be placed underground on lands controlled by NVPG and stubbed to feed hot water to existing base board heating system in the following community buildings: 1. Anesia Anahonak Moonin Health and Dental Clinic 2. Native Village of Port Graham offices 3. Port Graham Public Safety Building/Fire Department 4. Port Graham Corporation Office Building which also houses the Port Graham Museum and Head Start Center 5. North Pacific Rim Housing Authority Workshop/Old Fire Hall Existing community buildings fuel oil heating systems are to be retro-fitted to accommodate hot water from the proposed wood-burning GARN Boiler, once installed, and rely on the existing fuel oil-fired hot water heating equipment for backup. The boiler would use an estimated 125 bone dry tons, equivalent to 100 cords, woody biomass feedstock obtained from local lands per year. Project would use local labor as described in the Port Graham Biomass Project, report completed by Chena Power, Inc. and Winters and Associates as part of the in-kind support to the U. S. Department of Energy (DOE) project for work on a project for State of Alaska’s Alaska Energy Authority (AEA). NVPG will likely initiate operations of the biomass boiler system even though several operational variations were studied. Obtaining the fuel source could be done by contractors, PGVC employees, or NVPG employees. Feeding the system would likely be done by NVPG employees. A majority of the buildings heated would be owned by NVPG. The PGVC office would be heated as well as the Old Fire Hall used as a workshop and storage area for North Pacific Rim Housing Authority. One methodology studied to charge for cost of utilizing the community building biomass system would use a percentage of use of hot water generated by the biomass hot water system based on past heating oil usage in relation to all buildings heated by biomass hot water. The method is better described in the Port Graham Biomass Project report. Fuel source agreements have been drafted to enter into agreements with area landowners. One Native allotment owner has asked Chugachmiut Forestry to begin a timber sale process to sell timber off her lands, specifically wind thrown timber that was determined to be of sufficient quantity to supply to the proposed biomass heating system for approximately 5-years. On NVPG’s behalf, Chugachmiut has presented to PGVC three different documents, attached, that could lead to a sale of woody biomass fuel for the project for up to 25-years, the expected life of the project. PGVC has signed a letter of intent to negotiate a sale of woody biomass material April 30, 2015. Chugachmiut Forestry has conducted two different field forest measurements of Native allotment lands and PGVC forest and timber lands. Lands deemed road accessible for biomass harvest were analyzed for this project. Forestry then conducted three different analyses and developed two reports to determine forest biomass on a tons per acre basis in addition to timber volume measurements taken for forest management purposes. Permits required were limited. For the biomass building, the Kenai Peninsula Borough did not require a permit. State of Alaska, Department of Public Safety, Division of Fire and Life Safety requires a plan review for fire and life safety requirements called an application for Fire and Life Safety Plan Review that would require a registered design professional to sign the document. State of Alaska State Forest Practices Act is required to be followed for any timber sale or harvest. This Act also requires consultation with Alaska Department of Fish and Game when operations are in close proximity or cross anadromous waters. Native allotment lands require following U. S. Bureau of Indian Affairs timber sale contracting process and approval.

09 BIOMASS FUELS↗

Final Report on Portable Laser Coating Removal Systems Field Demonstrations and Testing

Processes currently used throughout the National Aeronautics and Space Administration (NASA) to remove corrosion and coatings from structures, ground service equipment and small components results in waste streams consisting of toxic chemicals, spent media blast materials, and waste water. When chemicals are used in these processes they are typically high in volatile organic compounds (VOC) and are considered hazardous air pollutants (HAP). When blast media is used, the volume of hazardous waste generated is increased significantly. Many of the coatings historically used within NASA contain toxic metals such as hexavalent chromium, and lead. These materials are highly regulated and restrictions on worker exposure continue to increase. Most recently the EPA reduced the permissible exposure limit (PEL) for hexavalent chromium. The new standard lowers OSHA's PEL for hexavalent chromium from 52 to 5 micrograms of Cr(V1) per cubic meter of air as an 8-hour time-weighted average. Hexavalent chromium is found in the pretreatment and primer coatings used within the Shuttle Program. In response to the need to continue to protect assets within the agency and the growing concern over these new regulations, NASA is researching different ways to continue the required maintenance of both facility and flight equipment in a safe, efficient and environmentally preferable manner. The use of laser energy to remove prepare surfaces for a variety of processes, such as corrosion and coating removal, weld preparation and non destructive evaluation is a relatively new technology that has shown itself to be environmentally preferable and in many cases less labor intensive than currently used removal methods. The development of a Portable Laser Coating Removal System (PLCRS) started as the goal of a Joint Group on Pollution Prevention (JG-PP) project, led by the Air Force, where several types of lasers in several configurations were thoroughly evaluated. Following this project, NASA decided to evaluate the best performers on processes and coatings specific to the agency. Laser systems used during this project were all of a similar design, most of which had integrated vacuum systems in order to collect materials removed from substrate surfaces during operation. Due to the fact that the technology lends itself to a bide variety of processes, several site demonstrations were organized in order to allow for greater evaluation of the laser systems across NASA. The project consisted of an introductory demonstration and a more in-depth evaluation at Wright-Patterson Air Force Base. Additionally, field demonstrations occurred at Glenn Research Center and Kennedy Space Center. During these demonstrations several NASA specific applications were evaluated, including the removal of coatings within Orbiter tile cavities and Teflon from Space Shuttle Main Engine gaskets, removal of heavy grease from Solid Rocket Booster components and the removal of coatings on weld lines for Shuttle and general ground service equipment for non destructive evaluation (NDE). In addition, several general industry applications such as corrosion removal, structural coating removal, weld-line preparation and surface cleaning were evaluated. This included removal of coatings and corrosion from surfaces containing lead-based coatings and applications similar to launch-structure maintenance and Crawler maintenance. During the project lifecycle, an attempt was made to answer process specific concerns and questions as they arose. Some of these initially unexpected questions concerned the effects lasers might have on substrates used on flight equipment including strength, surface re-melting, substrate temperature and corrosion resistance effects. Additionally a concern was PPE required for operating such a system including eye, breathing and hearing protection. Most of these questions although not initially planned, were fully explored as a part of this project. Generally the results from tesng were very positive. Corrosion was effectively removed from steel, but less successfully from aluminum alloys. Coatings were able to be removed, with varying results, generally dark, matte and thin coatings were easier to remove. Steel and aluminum panels were able to be cleaned for welding, with no known deleterious effects and weld-lines were able to have coatings removed in critical areas for NDE while saving time as compared to other methods.

Rothgeb, Matthew J.↗

Progress in the development of the neutron flux monitoring system of the French GEN-IV SFR: simulations and experimental validations [ANIMMA--2015-IO-392]

France has a long experience of about 50 years in designing, building and operating sodium-cooled fast reactors (SFR) such as RAPSODIE, PHENIX and SUPER PHENIX. Fast reactors feature the double capability of reducing nuclear waste and saving nuclear energy resources by burning actinides. Since this reactor type is one of those selected by the Generation IV International Forum, the French government asked, in the year 2006, CEA, namely the French Alternative Energies and Atomic Energy Commission, to lead the development of an innovative GEN-IV nuclear- fission power demonstrator. The major objective is to improve the safety and availability of an SFR. The neutron flux monitoring (NFM) system of any reactor must, in any situation, permit both reactivity control and power level monitoring from startup to full power. It also has to monitor possible changes in neutron flux distribution within the core region in order to prevent any local melting accident. The neutron detectors will have to be installed inside the reactor vessel because locations outside the vessel will suffer from severe disadvantages; radially the neutron shield that is also contained in the reactor vessel will cause unacceptable losses in neutron flux; below the core the presence of a core-catcher prevents from inserting neutron guides; and above the core the distance is too large to obtain decent neutron signals outside the vessel. Another important point is to limit the number of detectors placed in the vessel in order to alleviate their installation into the vessel. In this paper, we show that the architecture of the NFM system will rely on high-temperature fission chambers (HTFC) featuring wide-range flux monitoring capability. The definition of such a system is presented and the justifications of technological options are brought with the use of simulation and experimental results. Firstly, neutron-transport calculations allow us to propose two in-vessel regions, namely the above-core and under-core structures. We verify that they comply with the main objective, that is the neutron power and flux distribution monitoring. HTFC placed in these two regions can detect an inadvertent control rod withdrawal that is a postulated initiating event for safety demonstration. Secondly, we show that the HTFC reliability is enhanced thanks to a more robust physical design and the fact that it has been justified that the mineral insulation is insensitive to any increase in temperature. Indeed, the HTFC insulation is subject to partial discharges at high temperature when the electric field between their electrodes is greater than about 200 V/mm or so. These discharges give rise to signals similar to the neutron pulses generated by a fission chamber itself, which may bias the HTFC count rate at start-up only. However, as displayed in Figure 1, we have experimentally verified that one can discriminate neutron pulses from partial discharges using online estimation of pulse width. Thirdly, we propose to estimate the count rate of a HTFC using the third order cumulant of its signal that is described by a filtered Poisson process. For such a statistic process, it is known that any cumulant, also called cumulative moment, is proportional to the process intensity that is here the count rate of a fission chamber. One recalls that the so-called Campbelling mode of such a detector is actually based on the signal variance, which is the second-order cumulant as well. The use of this extended Campbelling mode based on the third-order cumulant will permit to ensure the HTFC response linearity over the entire neutron flux range using a signal processing technique that is simple enough to satisfy design constraints on electric devices important for nuclear safety. We also show that this technique, named high order Campbelling method (HOC), is significantly more robust than another technique based on the change in the HTFC filling gas, which consists in adding a few percent of nitrogen. Finally, we also present an experimental campaign devoted to the required calibration process of the so-called HOC method. The Campbelling results show a good agreement with the simple pulse counting estimation at low count rates. It is also shown that the HOC technique provides a linear estimation of the count rates at higher power levels as well.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Woody Feedstock 2022 State of Technology Report

The U.S. Department of Energy promotes production of advanced liquid transportation fuels from lignocellulosic biomass by funding fundamental and applied research that advances the state of technology (SOT). As part of its involvement in this mission, Idaho National Laboratory completes an annual SOT report for n th -plant and 1 st -plant woody biomass feedstock logistics. The purpose of the SOT is to provide the status of feedstock supply system technology development for woody biomass to biofuels relative to technical targets and cost goals from specific design cases, based on data and experimental results. Conventional feedstock supply systems need to be modified to meet the demands of conversion pathways, specifically to have the ability to adjust the quality of the raw biomass materials. Advanced systems incorporate innovative methods of material handling, preprocessing and supply chain configuration. In advanced designs, variability of the raw biomass can be reduced to produce feedstocks of a uniform format, moving toward biomass commoditization. Against this backdrop, the 2022 Woody SOT for low-ash woody feedstocks utilizes feedstock fractionation by incorporating technologies that can separate the biomass into its anatomical fractions (wood, bark, needle, and extrinsic ash) to reduce impurities and attempt to maximize the retention of usable fractions that satisfy downstream quality considerations. By using a series of air classification steps, this strategy can reduce the extrinsic ash in forest residues, separate out a majority of the incoming needles (which can be supplied to alternate markets), and maximize the retention of whitewood in the usable fraction. The fractionated forest residues are then mixed with clean-pine chips in a 50-50 blend to prepare the feedstock for the desired conversion pathway. The n th -plant analysis estimated the delivered cost for the feedstock at $\$$69.23/dry ton (2016$\$$) which represents a $\$$6.64/dry ton decrease compared to the cost estimate of the 2021 Woody SOT supply system for low-ash woody feedstocks. The quality requirements in the 2022 Woody SOT were identical to those of the 2021 Woody SOT at = 1.00 wt % ash and = 50.51 wt% carbon. The cost savings derive primarily from reductions in dry matter losses during air classification. The GHG emissions for the n th -plant analysis were estimated at 178.39 kg CO2e/dry ton compared to 178.71 kg CO 2 e/dry ton in the 2021 Woody SOT, a decrease of 0.32 kg CO2e/dry ton. The small change stems from an increase in emissions attributed to preprocessing and slightly larger savings in emissions from transportation. In the 1 st -plant analysis of the 2022 Woody SOT system, the average throughput was estimated to be approximately 2,128 dry tons/day or 96.51% of the name plate capacity. During the simulation the daily throughput ranged from 1,090 dry tons/day to 2,200 dry tons/day, or 49.43% to 99.75% of the daily nameplate capacity. After the year of operation 722,403 tons of processed feedstock were produced in total without regard to quality considerations (99.64% of the annual nameplate capacity). The variability in throughput was primarily caused by equipment failures in the system. Regular failures, downtime caused by routine maintenance per manufacturer guidelines, contributed to a majority 62.50% of failures and 62.60% of downtime. Failures due to wear were the other cause of disruption within the system, impacting the rotary shear and orbital screen and accounting for 37.50% of the failures and 37.40% of the total downtime. Ultimately the system was on stream for 87.84% during the simulation period, which is only 2.16 percentage points below the nth-plant assumption for on-stream time. The production cost of the system averaged $\$$71.66/dry ton. The costs ranged from a minimum of $\$$71.23/dry ton to a maximum of $\$$2,115.30/dry ton. When dry matter losses (disposed low-quality fractions as well as other losses such as in grinders) were considered the costs increased to an average of $\$$75.11/dry ton with a minimum of $\$$74.69/dry ton and a maximum of $\$$2,136.86/dry ton...

09 BIOMASS FUELS↗

DECONTAMINATION OF ZIRCALOY CLADDING HULLS FROM SPENT NUCLEAR FUEL

The feasibility of decontaminating spent fuel cladding hulls using hydrofluoric acid (HF) was investigated as part of the Global Energy Nuclear Partnership (GNEP) Separations Campaign. The concentrations of the fission product and transuranic (TRU) isotopes in the decontaminated hulls were compared to the limits for determining the low level waste (LLW) classification in the United States (US). The {sup 90}Sr and {sup 137}Cs concentrations met the disposal criteria for a Class C LLW; although, in a number of experiments the criteria for disposal as a Class B LLW were met. The TRU concentration in the hulls generally exceeded the Class C LLW limit by at least an order of magnitude. The concentration decreased sharply as the initial 30-40 {micro}m of the cladding hull surface were removed. At depths beyond this point, the TRU activity remained relatively constant, well above the Class C limit. Reprocessing of spent nuclear fuel generates a cladding waste which would likely require disposal as a Greater than Class C LLW in the US. If the cladding hulls could be treated to remove a majority of the actinide and fission product contamination, the hulls could potentially meet acceptance criteria for disposal as a LLW or allow recycle of the Zr metal. Discard of the hulls as a LLW would result in significant cost savings compared to disposal as a Greater than Class C waste which currently has no disposition path. During fuel irradiation and reprocessing, radioactive materials are produced and deposited in the Zircaloy cladding. Due to short depths of penetration, the majority of the fission products and actinide elements are located in the ZrO{sub 2} layer which forms on the surface of the cladding during fuel irradiation. Therefore, if the oxide layer is removed, the majority of the contamination should also be removed. It is very difficult, if not impossible to remove all of the activity from spent fuel cladding since traces of U and Th in the unirradiated Zircaloy adsorb neutrons generating higher actinides in the bulk material. During fuel irradiation, {sup 92}Zr is also converted to radioactive {sup 93}Zr by neutron adsorption. Methods for decontaminating and conditioning irradiated Zircaloy cladding hulls have been investigated in Europe, Japan, and the US during the last 35 years; however, a method to decontaminate the hulls to an activity level which meets US acceptance criteria for disposal as a LLW was not deployed on a commercial scale. The feasibility of decontaminating spent fuel cladding hulls was investigated as part of the GNEP Separations Campaign. Small-scale experiments were used to demonstrate the removal of the ZrO{sub 2} layer from Zircaloy coupons using dilute solutions ({le}1.0 M) of HF. The most effective conditions resulted in dissolution rates which were less than approximately 2 mg/cm{sup 2}-min. With dissolution rates in this range, uniform removal of the oxide layer was obtained and a minimal amount of Zircaloy metal was dissolved. To test the HF decontamination process, experiments were subsequently performed using actual spent fuel cladding hulls. Decontamination experiments were performed to measure the fission product and actinide concentrations as a function of the depth of the surface removed from the cladding hull. The experimental methods used to perform these experiments and a discussion of the results and observations are presented in the following sections.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Fluor Hanford ALARA Center is a D and D Resource

The mission at the Hanford Nuclear Reservation changed when the last reactor plant was shut down in 1989 and work was started to place all the facilities in a safe condition and begin decontamination, deactivation, decommissioning, and demolition (D and D). These facilities consisted of old shutdown reactor plants, spent fuel pools, processing facilities, and 177 underground tanks containing 53 million gallons of highly radioactive and toxic liquids and sludge. New skills were needed by the workforce to accomplish this mission. By 1995, workers were in the process of getting the facilities in a safe condition and it became obvious improvements were needed in their tools, equipment and work practices. The Hanford ALARA Program looked good on paper, but did little to help contractors that were working in the field. The Radiological Control Director decided that the ALARA program needed to be upgraded and a significant improvement could be made if workers had a place they could visit that had samples of the latest technology and could talk to experienced personnel who have had success doing D and D work. Two senior health physics personnel who had many years experience in doing radiological work were chosen to obtain tools and equipment from vendors and find a location centrally located on the Hanford site. Vendors were asked to loan their latest tools and equipment for display. Most vendors responded and the Hanford ALARA Center of Technology opened on October 1, 1996. Today, the ALARA Center includes a classroom for conducting training and a mockup area with gloveboxes. Two large rooms have a containment tent, several glove bags, samples of fixatives/expandable foam, coating displays, protective clothing, heat stress technology, cutting tools, HEPA filtered vacuums, ventilation units, pumps, hydraulic wrenches, communications equipment, shears, nibblers, shrouded tooling, and several examples of innovative tools developed by the Hanford facilities. See Figures I and II. The ALARA Center staff routinely researches and tests new technology, sponsor vendor demonstrations, and redistribute tools, equipment and temporary shielding that may not be needed at one facility to another facility that needs it. The ALARA Center staff learns about new technology in several ways. This includes past radiological work experience, interaction with vendors, lessons learned, networking with other DOE sites, visits to the Hanford Technical Library, attendance at off-site conferences and ALARA Workshops. Personnel that contact the ALARA Center for assistance report positive results when they implement the tools, equipment and work practices recommended by the ALARA Center staff. This has translated to reduced exposure for workers and reduced the risk of contamination spread. For example: using a hydraulic shear on one job saved 16 Rem of exposure that would have been received if workers had used saws-all tools to cut piping in twenty-nine locations. Currently, the ALARA Center staff is emphasizing D and D techniques on size-reducing materials, decontamination techniques, use of remote tools/video equipment, capture ventilation, fixatives, using containments and how to find lessons learned. The ALARA Center staff issues a weekly report that discusses their interaction with the workforce and any new work practices, tools and equipment being used by the Hanford contractors. Distribution of this weekly report is to about 130 personnel on site and 90 personnel off site. This effectively spreads the word about ALARA throughout the DOE Complex. DOE EM-23, in conjunction with the D and D and Environmental Restoration work group of the Energy Facility Contractors Organization (EFCOG) established the Hanford ALARA Center as the D and D Hotline for companies who have questions about how D and D work is accomplished. The ALARA Center has become a resource to the nuclear industry and routinely helps contractors at other DOE Sites, power reactors, DOD sites, and sites in England, Europe and Indonesia. Other ALARA Centers are located at the Savannah River Site and Los Alamos National Lab.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Phenix Decommissioning Project - Overview

The first heading of your manuscript must be 'Introduction'. Phenix is the only remaining French fast breeder reactor after the shutdown of Superphenix (1999) and Rapsodie (1983). Phenix is located inside the Marcoule nuclear site along the Rhone river near Bagnols-sur-Ceze in southeastern France. Phenix is one of the facilities belonging the French Atomic Energy Commission (CEA) on the Marcoule site. It is a fast breeder reactor (FBR) developed at the end of the 1960's. that has been in operation since 1973 and was connected to the power grid in 1974. It is a second generation prototype developed while the first generation FBR, Rapsodie, was still in operation. Phenix is a 250 electrical MW power plant. During the first 20 years of operation, its main aim was to demonstrate the viability of sodium-cooled FBRs. Since the 1991 radioactive waste management act, Phenix has become an irradiation tool for the actinide transmutation program. To extend its operating life for 6 additional cycles, it was necessary to refurbish the plant; this involved major work performed from 1999 to 2003 at a total cost of about 250 M??. Today, with a realistic expectation, the final shutdown is planned for the beginning of 2009. The main objective of the Phenix dismantling project is to eliminate all the process equipment and clean all the building to remove all the radioactive zones. To reach this objective, three main hazards must be eliminated: Fuel (criticality hazard), Sodium, Radioactive equipment. The complexity of decommissioning a facility such as Phenix is increased by: - the lack of storage facility for high radioactive material, - the decision to treat all the radioactive sodium and sodium waste inside the plant, - the very high irradiation of the core structures due to the presence of cobalt alloys. On the other hand, Phenix plant is still under operating with a qualified staff and the radioactivity coming from structural activation is well known. After the final shutdown, the first operations will be conducted by the same staff under the same safety report. Another interesting fact is that the decommissioning funds project exist and are available. The CEA decided to begin the dismantling phase without waiting because after a period of decay it is not really cheaper or easier to work. This approach needs interim storage facilities not long after the final shutdown. For the low- and intermediate-level radioactive waste there are national storage centers but for the high-level wastes, each operator must manage its waste until a suitable disposal site is available. At Marcoule a new storage facility is now being designed and scheduled to begin operating after 2013-2014. After removal of the fuel and core elements, the primary sodium will be drained and eliminated by a carbonation process. To ensure biological shielding, the reference scenario calls for filling the primary vessel with water. The most radioactive structures (dia-grid and core support) will be cut up with remote tools, after which the rest of the structure will be cut up manually. Phenix contains about 1450 metric tons of sodium. The CEA initially planned to build ATENA, a new facility for all radioactive sodium waste from R and D and FBR facilities. For various reasons, but mainly to save money, the CEA decided to treat all radioactive sodium and sodium waste in the framework of the Phenix dismantling project. There are no real difficulties in the dismantling schedule because of the advanced state of development of the processes selected for the ATENA project. Because of the knowledge already obtained, the issues concern project management, waste management and human resources reduction more than technical 0014challe.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Nuclear Data Uncertainty Quantification for Adjoint-Weighted Quantities via XGPT in Monte Carlo Codes

The Total Monte Carlo method (TMC) is an innovative approach to nuclear data uncertainty propagation. In TMC, a large number of independent ENDF files are randomly generated starting from nuclear models parameters and their uncertainties. These files are then processed with NJOY or similar codes to produce a set of formatted continuous-energy cross sections (i.e., ACE files), and independent Monte Carlo neutron transport simulations are run with these different ACE files as input. Finally the distributions of the considered response functions are obtained directly from the results of the Monte Carlo runs. Despite several improvements of the TMC method, this approach is often considered an inefficient way of propagating nuclear data uncertainties, as it requires several computationally expensive Monte Carlo runs. Covariance-based methods present important advantages for several applications, especially when different sources of uncertainties are to be investigated. For this reason, sensitivity analysis and uncertainty quantification capabilities are being implemented in several Monte Carlo neutron transport codes. On the other hand, the fact that no artificial multi-group covariance matrices are required and that higher moments of the responses distributions can be easily obtained, are definite advantages of the TMC method. In an effort to overcome the limitations of both approaches, a new method, called eXtended Generalized Perturbation Theory (XGPT) is under development. When performing nuclear data uncertainty propagation, such XGPT approach does not require generating discretized (i.e., multigroup) covariance matrices, and allows to estimate higher moments of the response probability distributions, via linear perturbation theory. One of the promising applications of the XGPT method involves its adoption in conjunction with the Proper Orthogonal Decomposition (POD) of nuclear data, to build a Reduced Order Model (ROM) for the approximation of thousands of independent TMC results in a single criticality source simulation. In the present work, this approach is employed for the first time to evaluate the impact of uncertainty in nuclear data on adjoint-weighted quantities. The method has been implemented in an extended version of the Serpent-2.1.24 Monte Carlo code and is demonstrated on two fast spectrum benchmarks, focusing on {sup 208}Pb nuclear data. A new method for propagating nuclear data uncertainties in criticality source Monte Carlo simulations has been developed. This eXtended Generalized Perturbation Theory (XGPT) approach allows to accurately reproduce reference Total Monte Carlo (TMC) uncertainty estimates in a single criticality source simulation. The present work aims to demonstrate that the proposed method can quantify nuclear data uncertainty based on adjoint-weighted quantities. The XGPT approach was applied to evaluate the impact of {sup 208}Pb nuclear data uncertainties on the effective prompt neutron lifetime (l{sub eff}) in two fast spectrum systems. The obtained XGPT results show a good agreement with the reference TMC results, obtained from independent Monte Carlo runs with {sup 208}Pb nuclear data from random TENDL-2013 evaluations. The XGPT method, implemented in a extended version of the Serpent Monte Carlo code and adopted along with the Proper Orthogonal Decomposition (POD) of the nuclear data, is able to provide an accurate reduced order model to approximate thousands TMC results within a single run, ensuring a large saving in computational requirements. The effect of {sup 208}Pb nuclear data uncertainties appears to be rather large. This is consistent with previous studies that adopted the same input random evaluations data from TENDL. (authors)

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Herbaceous Feedstock 2018 State of Technology Report

The U.S. Department of Energy (DOE) promotes the production of advanced liquid transportation fuels from lignocellulosic biomass by funding fundamental and applied research that advances the state of technology (SOT). As part of its involvement with this mission, Idaho National Laboratory (INL) completes an annual SOT report for biomass feedstock logistics. This report summarizes supply system impacts of Bioenergy Technologies Office (BETO)-funded research and development efforts at INL and elsewhere (such as the High-Tonnage Feedstock Logistics projects (Webb et al. 2013a, Webb et al. 2013b, Webb et al. 2013c, Webb and Sokhansanj 2014, Sokhansanj et al. 2014) that lead to improvements in feedstock supply systems. These include improvements to and observed performance of innovative harvest and collection methods, storage technologies, transportation and handling approaches, and advanced preprocessing technologies. Biomass quality and variability, and the interface between feedstock quality and conversion performance are key drivers in addition to delivered feedstock cost. In this report, we estimate the benefits of R&D improvements to individual supply system unit operations, and present the status of feedstock logistics technology development for converting biomass into biofuels. These analyses are supported by experimental data where possible, and help to align the SOT relative to the cost goals defined in the Multi-Year Program Plan. The 2018 Herbaceous SOT aligned feedstock logistic design with current biorefinery’s design capacity utilized by biochemical conversion platform. Currently biochemical conversion platform utilizes a 725,000 dry ton/year biorefiney design for the techno economic analysis. Hence, feedstock delivered cost in the 2018 Herbaceous SOT is calculated based on biorefinery’s 725,000 dry ton design capacity instead of 800, 000 dry ton capacity utilized in the 2017 Herbaceous SOT. Biomass availabilities in this SOT were updated to year 2018 data from the 2016 Billion-Ton Report (BT16) (DOE 2016a), with the exception of switchgrass, for which the 2018 Herbaceous SOT utilized the 2019 switchgrass availability data from BT16. The BT16 report (DOE 2016a) does not project switchgrass availability in 2018; the soonest switchgrass is available in the BT16 report is 2019. Therefore, availability of switchgrass for this analysis was that projected for 2019. The 2018 Herbaceous SOT incorporates same technologies utilized in the 2017 Herbaceous SOT. However, a sensitivity analysis is performed to understand the impact of variation of process parameters on those technologies on feedstock logistic cost. New R&D data that shows the variations of process parameters affecting process performance is incorporated in the 2018 SOT to measure the variations in delivered feedstock cost. The 2018 Herbaceous SOT has also provided projected delivered feedstock of 2022 design case based on near term technical target under BETO funded R&D project. Finally, updated biorefinery size of 725,000 dry ton/year was incorporated within least-cost formulation model to select optimal siting and depot scales during optimization of the least cost blend. This modification to the optimization algorithm allows the trade-off between the cost of increased supply radius and the savings from selecting biomass from higher producing counties to be assessed. Such optimization has also showed the economic benefit of decentralized depots in comparison to centralized preprocessing co-located with the biorefinery by decoupling the biorefinery and feedstock locations. The 2018 Herbaceous SOT report documents the current modeled cost of a herbaceous feedstock supply system (from harvest to the pretreatment reactor throat, including grower payment) for hydrocarbon fuel production via biochemical conversion, based on equipment and processes now available or potentially available in the near term. The modeled cost also considers both the required quality and the availability of the biomass resources. The 2018 Herbaceous SOT predicts a modeled delivered feedstock cost of $83.67/dry ton (2016$); this is a $0.23/dry ton (2016$) decrease from the 2017 Herbaceous SOT. The modification of biorefinery’s designed capacity and increased projected biomass availability in the same supply shed contributed to this modeled cost reduction. The least-cost formulation model to optimally site and scale local distributed preprocessing depots also contributed to the cost reduction by considering county-level grower payment and distance from the biorefinery as variables in the optimization algorithm. Sensitivity analysis on various process parameters that affect delivered feedstock cost in the 2018 Herbaceous SOT shows that the delivered cost could varies from $80.45-$88.83/dry ton. The top factors that causes such variations are: effective baling rate, bale density, hammer mill throughput, interest rate and storage dry matter loss.

09 BIOMASS FUELS↗

Deactivation and Decommissioning Planning and Analysis with Geographic Information Systems

From the mid-1950's through the 1980's, the U.S. Department of Energy's Savannah River Site produced nuclear materials for the weapons stockpile, for medical and industrial applications, and for space exploration. Although SRS has a continuing defense-related mission, the overall site mission is now oriented toward environmental restoration and management of legacy chemical and nuclear waste. With the change in mission, SRS no longer has a need for much of the infrastructure developed to support the weapons program. This excess infrastructure, which includes over 1000 facilities, will be decommissioned and demolished over the forthcoming years. Dis-positioning facilities for decommissioning and deactivation requires significant resources to determine hazards, structure type, and a rough-order-of-magnitude estimate for the decommissioning and demolition cost. Geographic information systems (GIS) technology was used to help manage the process of dis-positioning infrastructure and for reporting the future status of impacted facilities. Several thousand facilities of various ages and conditions are present at SRS. Many of these facilities, built to support previous defense-related missions, now represent a potential hazard and cost for maintenance and surveillance. To reduce costs and the hazards associated with this excess infrastructure, SRS has developed an ambitious plan to decommission and demolish unneeded facilities in a systematic fashion. GIS technology was used to assist development of this plan by: providing locational information for remote facilities, identifying the location of known waste units adjacent to buildings slated for demolition, and for providing a powerful visual representation of the impact of the overall plan. Several steps were required for the development of the infrastructure GIS model. The first step involved creating an accurate and current GIS representation of the infrastructure data. This data is maintained in a Computer Aided Design (CAD) system and had to be imported into a GIS framework. Since the data is maintained in a different format in CAD, import into GIS involved several spatial processing steps to convert various geometric shapes present in the CAD data to self-closing polygons. The polygons represent facility footprints in plan or map view. Once these were successfully imported and converted, building identifier attributes from the CAD had to be associated with the appropriate polygons in GIS. Attributes are stored as graphical information in a CAD system and are not 'attached' to a building in a relational sense. In GIS, attributes such as building names, building area, hazards, or other descriptive information, must be associated or related to the spatial polygon representing a particular building. This spatial relationship between building polygons and the descriptive attribute information is very similar to relating tables of information in a relational database in which each table record has a unique identifier that can be used to join or relate that table to other tables of information present in the database. The CAD building identifiers were imported into the GIS and several spatial processing steps were used to associate building polygons with the correct identifiers. These spatial steps involved determining the intersection of and nearest identifiers with each building polygon in the GIS. Automating this process in GIS saved a significant amount of time. Once a current and geographically correct representation of the infrastructure data had been created in GIS, field-engineering teams collected information for each facility. This information included the building area, radiological hazards and the associated area, industrial hazards such as asbestos or mercury, structure type (e.g. hardened, industrial, nuclear), annual surveillance and monitoring cost, and other engineering data. The facility engineering data was used in a simple model to determine the rough-order-of-magnitude cost for decontaminating and demolishing each facility. Finally, the engineering and cost data was linked to the GIS model so that this data could be rapidly displayed and analyzed in its geographic context. Once the GIS representing SRS infrastructure and associated descriptive attribute information was developed, detailed maps depicting the future status of all site facilities were created. These maps display the relationship between known waste units and buildings that will be decommissioned and demolished. Cost and hazard information was also depicted illustrating areas and facilities that could present a particular demolition challenge. Although the GIS was quite helpful as an engineering and planning tool, its real power was evident in communicating the impact of the facilities disposition plan to senior management and other stakeholders.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Florida International University Research on Soil and Groundwater Contamination at DOE's Hanford and Savannah River Sites - 18547

Nuclear weapons production and other defense-related activities at U.S. Department of Energy (DOE) sites have resulted in radionuclide and heavy metal contamination in surface and subsurface environments nationwide. The DOE Office of Environmental Management (DOE EM) faces a number of environmental challenges that are technically complex and unique to EM with tremendous associated cleanup costs. The success of the DOE EM mission will require development and insertion of innovative approaches and novel technologies to address the significant challenges associated with the remaining cleanup of contaminated sites. A key focus of the applied research portfolio addresses data gaps related to the behavior and chemistry of radionuclides of concern as well as the co-mingling of these contaminants in groundwater at EM sites such as Hanford, Savannah River, Oak Ridge and others. Florida International University (FIU) is conducting research in conjunction with Pacific Northwest National Laboratory (PNNL) and savannah River National Laboratory (SRNL) scientists to support environmental remediation efforts at Hanford and SRS. This research is focused on remediation technologies for contaminated soil and groundwater as well as the assessment of the fate and transport of contaminants in the environment. The overall objective is to reduce contaminant mobility through the development and application of state-of-the-art scientific and environmental remediation technologies. The FIU strategy is to conduct basic science research that fills knowledge gaps and complements work conducted at DOE sites. Support to Hanford includes contributing to the understanding of {sup 99}Tc chemistry and the fate and transport mechanisms of co-mingled contaminants including {sup 99}Tc, U(VI), Cr, and iodine (I). FIU has also provided basic science research that supports a treatability study currently underway at Hanford, which uses ammonia gas injection to manipulate pH and immobilize U(VI) in the subsurface. In addition, support for long-term monitored natural attenuation is provided through geophysical research that monitors subsurface contaminant and microbial responses. Research to evaluate the environmental factors that control the fate and transport of contaminants and co-contaminants in soil and groundwater is being performed for SRS. This research has contributed to the development, design, and deployment of innovative strategies to enhance the natural attenuation processes and to validate novel in situ remediation technologies. The SRS EM test bed demonstrations directly benefit SRS cleanup initiatives. Current investigations focus on natural organic compounds, such as humate, as a potential amendment for the treatment of uranium in groundwater associated with the SRS F-Area Seepage Basins plume, investigates the synergy between humate and silica to optimize the pH adjustment strategy for uranium remediation and investigates the interaction of Tc and I with soil from the Four Mile Branch wetland. Collaborative relationships between FIU and the national laboratories have provided synergy and benefits over the years to FIU, the national laboratories, the DOE complex, and the DOE EM mission. By working closely with the national laboratories, FIU research is not only closely aligned with the cleanup mission priorities at the DOE sites, but complements and supports the work at national laboratories. This coordination and leveraging of research efforts results in time- and cost-savings, and accelerates progress in the DOE EM environmental restoration mission. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

2018 Research Highlight in Manufacturing: Global Value Chain and Manufacturing Analysis on Geothermal Power Plant Turbines

Currently, geothermal project developers customize the size of the power plant to fit the resource being developed. The turbine is designed and sized to optimize efficiency and resource utilization for electricity production; most often, other power plant components are then chosen to complement the turbine design. These custom turbine designs demand one-off manufacturing processes, which result in higher manufacturing setup costs, longer lead-times, and higher capital costs overall in comparison to larger-volume line manufacturing processes. In contrast, turbines produced in standard increments, manufactured in larger volumes, could result in lower costs per turbine. In this study, we developed a manufacturing cost model to identify requirements for equipment, facilities, raw materials, and labor. Then we used discounted cash flow (DCF) analysis to calculate the minimum sustainable price (MSP). We analyzed three different cases 1) 1 MWe geothermal ORC turboexpander 2) 5 MWe ORC turboexpander and 3) 20 MWe geothermal steam turbine, and calculated the cost of manufacturing the major components, such as the impellers/blades, shaft/rotor, nozzles, inlet guide lanes, disks, and casings. The results showed that MSP could highly vary between 893 $/kW and 30 $/kW based on turbine size, standardization and volume of manufacturing. The analysis also showed that the economy of scale applies both to the size of the turbine and the number manufactured in a single run. As an example, the unit price of a 5 MW standard design turbine could be 150 $/W cheaper than the custom design. Sensitivity analysis indicated that these savings come largely from reduced labor costs for design and engineering and manufacturing setup. In addition to manufacturing cost savings, there is a delivery time saving up to 10 months, which could have a positive effect to construction financing operation time. Another advantage of these standard turbines is their adaptability to different geothermal systems by operating at off-design conditions. We also modeled off-design turbine efficiencies within the commercially-favorable operating range of a standard ORC compared to custom-designed ORC equipment. Than we used these performance calculations and power output capacities in a discounted cash flow (DCF) analysis of plant operations and financing, thereby creating representative techno economic models of a total geothermal power plant. I this scope we used NREL's System Advisor model (SAM) and performed DCF analysis of standard and custom design turbines using results from IPSEpro over range of temperatures of interest. In this scope 63 different off-design cases were analyzed. This helped us to answer the question; 'Can today`s capital cost savings compensate the future revenue losses due to lower electricity generation?' The results showed that, the net capital cost savings for the modeled 5 MW case study may reach up to +$1,298,672. Also, the difference between NPV of standard design and custom design turbine could reach up to +$733,940. To sum up, when all the things mentioned above are taken into consideration, it can be said that, the standard turbines are competitive over a wide range of temperatures and flow rates and the give positive NPV differences for certain cases near their design point.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Global Value Chain and Manufacturing Analysis on Geothermal Power Plant Turbines

Currently, geothermal project developers customize the size of the power plant to fit the resource being developed. The turbine is designed and sized to optimize efficiency and resource utilization for electricity production; most often, other power plant components are then chosen to complement the turbine design. These custom turbine designs demand one-off manufacturing processes, which result in higher manufacturing setup costs, longer lead-times, and higher capital costs overall in comparison to larger-volume line manufacturing processes. In contrast, turbines produced in standard increments, manufactured in larger volumes, could result in lower costs per turbine. In this study, we developed a manufacturing cost model to identify requirements for equipment, facilities, raw materials, and labor. Then we used discounted cash flow (DCF) analysis to calculate the minimum sustainable price (MSP). We analyzed three different cases 1) 1 MWe geothermal ORC turboexpander 2) 5 MWe ORC turboexpander and 3) 20 MWe geothermal steam turbine, and calculated the cost of manufacturing the major components, such as the impellers/blades, shaft/rotor, nozzles, inlet guide lanes, disks, and casings. The results showed that MSP could highly vary between 893 /kW and 30 /kW based on turbine size, standardization and volume of manufacturing. The analysis also showed that the economy of scale applies both to the size of the turbine and the number manufactured in a single run. As an example, the unit price of a 5 MW standard design turbine could be 150 /W cheaper than the custom design. Sensitivity analysis indicated that these savings come largely from reduced labor costs for design and engineering and manufacturing setup. In addition to manufacturing cost savings, there is a delivery time saving up to 10 months, which could have a positive effect to construction financing operation time. Another advantage of these standard turbines is their adaptability to different geothermal systems by operating at off-design conditions. We also modeled off-design turbine efficiencies within the commercially-favorable operating range of a standard ORC compared to custom-designed ORC equipment. Than we used these performance calculations and power output capacities in a discounted cash flow (DCF) analysis of plant operations and financing, thereby creating representative techno economic models of a total geothermal power plant. I this scope we used NREL's System Advisor model (SAM) and performed DCF analysis of standard and custom design turbines using results from IPSEpro over range of temperatures of interest. In this scope 63 different off-design cases were analyzed. This helped us to answer the question; 'Can today's capital cost savings compensate the future revenue losses due to lower electricity generation?' The results showed that, the net capital cost savings for the modeled 5 MW case study may reach up to plus 1,298,672. Also, the difference between NPV of standard design and custom design turbine could reach up to 733,940. To sum up, when all the things mentioned above are taken into consideration, it can be said that, the standard turbines are competitive over a wide range of temperatures and flow rates and the give positive NPV differences for certain cases near their design point.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Enhancement of Optical Efficiency of CSP Mirrors for Reducing O&M Cost via Near-Continuous Operation of Self-Cleaning Electrodynamic Screens (EDS). Final Report

Over the past decade, techno-economical advancements in solar energy systems, particularly the improvement in the conversion efficiency of PV modules made with mono-crystalline silicon solar cells from 12% to 20%, as well as the cost reduction in manufacturing by a factor of about 10%, have made it possible to achieve a levelized cost of electricity (LCOE) in PV plants that is comparable to, or less than, the cost of deriving electricity from fossil fuels. Operating PV plants in mid-latitude sun-belt regions, where the solar irradiance level is highest, provides a high annual energy-yield (kWh/kWp) due to two factors: (1) the availability of predictable high solar irradiance throughout the year with the fewest interruptions in solar flux from clouds and rain, and (2) the increased conversion efficiency of crystalline solar cells, as recombination loss has decreased with increased intensity of the sunlight that illuminates the silicon solar cells. Semi-arid and desert regions, however, are plagued by high atmospheric dust concentrations and frequent sand storms. The deposition of a layer of dust on the optical surfaces of solar collectors such as PV modules and concentrating mirrors reduces the transmission efficiency of sunlight that actually reaches the solar cells or receivers, resulting in high energy-yield soiling loss. There are two major cost components to operating a solar plant: (1) installation costs, and (2) operation-and-maintenance (O&M) costs. There is no fuel cost; hence operating a solar plant in a semi-arid or desert region provides high returns on investment if soiling losses are mitigated via efficient cleaning methods and optimized cleaning frequency. If solar collectors are not cleaned, the accumulation of dust layers on solar collectors may cause the operation of such plants in arid regions to become economically unviable. Washing solar collectors with water and detergent, as is most commonly done now, is an efficient method for cleaning. The conventional approach in utility-scale solar plants is to use a large truck with a water tank and pump system for spraying deionized water on the surface of the solar collectors. Robotic cleaning with brushes, used for many solar plants, requires lesser water for cleaning. The water consumed using semi-automated cleaning of PV modules in utility-scale solar plants is approximately 2 liters/m 2 per cleaning cycle. The total optical surface area of the solar collectors in 1 TW-scale solar installation will be more than 3 × 109 m 2 ; hence an enormous amount of water be needed for cleaning. There simply is not enough fresh water in the sun-belt areas of the world for predicted cleaning needs. In solar power plants, the estimated cost of cleaning solar collectors includes expenses related to the equipment used, labor, cost of transportation of water, the energy required for cleaning, plus ancillary costs whereas the cost of water is not considered. The water used is obtained from sources located close to plant sites, unmindful of the environmental and societal impact as the power plants are oftentimes located in regions that face severe drought. This practice is very similar to the cost calculations in deriving the levelized cost of electricity (LCOE) in conventional power plants based on burning fossil fuel such as coal and gas, while disregarding the cost of climate change and health effects. Unless a water-free or low-water cleaning method is established, the expansion of solar plants may lose public support in areas suffering long intervals of drought. The goal of this research project has been the development and application of the Electrodynamic Screen (EDS) as a means for a water-free, scalable cleaning process applicable to solar-power installations, including rooftop applications. We describe here the development of an EDS film-based cleaning process as an emerging method for use on PV modules, parabolic troughs, and heliostats. This report aims to show the feasibility of integrating or retrofitting EDS films onto the optical surfaces of solar collectors (both PV and CSP) while maintaining high transmission or reflection efficiency. The cleaning action provided by the EDS film is an active method to remove dust deposits by electrodynamic force. Current lab-scale prototype EDS films, retrofitted onto solar panels and mirrors, have shown to be capable of maintaining optical transmission or specular-reflection efficiencies higher than 90% of initial values under clean conditions. The optical surfaces of solar collectors laminated with EDS films can remove more than 90% of deposited dust when the EDS is activated for less than two minutes. As an electrodynamic dust removal process, the EDS film-based method is designed primarily for the removal of dust in solar installations located in semi-arid and desert areas, where the atmosphere is often dry and dusty and rainfall is infrequent. While EDS film application minimizes water consumption and facilitates cleaning as frequently as needed, it has limitations in removing contaminants such as soot, organic pollutants deposited as fine films on the surface, and bird droppings. The dust removal efficiency of the EDS is maximum at relative humidity RH is 40 to 50% and decreases at when RH > 65%. Many solar plant sites undergo diurnal and seasonal cycles of high ambient, early afternoon temperatures and an RH that reaches the dew point early in the morning. These variations in atmospheric conditions do not limit the operation of the EDS film. This report presents a brief review of the progress and the potential of EDS film technology for mitigating the impact of dust on solar collectors via water-free cleaning, as well as current technical challenges regarding efficiency and durability. Our experimental data on the performance of EDS films show that: (1) the dust-removal efficiency (DRE) can reach levels higher than 90%, (2) the specular reflectivity (SR) of EDS film-laminated second-surface mirrors reach levels in excess of 90%, (3) the specular reflectivity restoration (SRR) can exceed 90%, (4) the output-power restoration (OPR) of PV modules can exceed 95%, and (5) the optical transmission efficiency (TE) of the EDS films can be greater than 90%. Working with Sandia National Laboratories (NM), Corning Research and Development Corporation (NY), Eastman Kodak (NY), Tomark-Worthen Industries (NH), and EDS Chile SPA (Chile), we have produced EDS film-laminated PV modules and demonstrated their self-cleaning functions without requiring water. We have demonstrated that the operational range of EDS films will cover the expected ambient temperature of solar fields at RH cycling varying from 20 to 95% as long as the EDS films are activated in the RH range 20 to 50%. (Typical solar-field climates in deserts and semi-arid lands often reach near dew point in coastal areas.) Our experiments on the application of hydrophobic-fluorinated nanoparticle coatings on EDS film surfaces show that the EDS operational range can be extended to higher RH levels that approach the dew point. At Eastman Kodak, as one of our industrial partners, we were able to establish a process for manufacturing EDS films using flexographic printing of the electrodes onto transparent polymer films. This process utilizes an existing manufacturing line at Eastman Kodak that allows fabrication of medium-scale EDS films (26 cm × 30 cm). The manufacturing process has the capacity to produce EDS films at high production speeds. The medium-scale EDS films that have been printed at Kodak were evaluated in the lab at Boston University. The EDS films produced at Kodak were laminated at Tomark-Worthen using an industrial scale vacuum laminator to produce EDS film stacks, which can be affixed onto the optical surfaces of PV modules or concentrating mirrors. The EDS film stack consists of the EDS films that have Willow® Glass (WG) which has a thickness of 100 μm as the front surface. The WG sheets obtained from Corning Research and Development Corporation are customized in size and shape to cover the active area of the EDS films. The back surface of the EDS film stack is integrated onto the optical surface of the solar panel or mirror using optically clear adhesive (OCA) films or silicone adhesives. The OCA films (thickness 25 μm) are produced by 3M. The EDS film stacks have the architecture: WG/OCA/EDS Film/OCA/ over PV module or solar mirror. The power-supply units needed for activating the electrodes of the EDS film were designed and produced at Boston University. These power supply units provide three-phase, 1.2 kV voltage pulses at a very low current (micro-ampere) level and at a low frequency (≈ 5 Hz). The voltage pulses are applied to the electrodes in a sequence such that the train of pulses resembles a unidirectional traveling wave of electrical field on the surface of the EDS film. The dust particles on the surface become charged electrostatically and are levitated by the Coulomb force. The lateral sweeping action of the traveling electric field created by the three-phase voltages pulses then sweeps the dust off the surface. The energy consumed by the EDS electrodes is less than 0.2 Wh/m 2 /cleaning cycle, enabling energy-efficient restoration of output power (OPR) of PV module or specular reflectivity restoration (SRR) for solar mirrors. The EDS system consists of (1) an EDS film stack laminated onto the solar collectors, (2) connection of the EDS film to its power supply unit and (3) Interconnection of the power supply to PV modules or solar mirrors. Design, construction and assessment of field-testing units that have EDS stack laminated PV modules for evaluating the performance of the EDS films in solar fields is being carried out at BU. Our progress under this project, aimed at the advancement of EDS film technology, has reached DOE Technology Readiness Level (TRL) 6. Based on the extensive laboratory evaluations and limited field trials, as well as contacts with potential users, we believe that the technology has reached its commercial stage. We are conducting a cost analysis using the National Renewable Energy Laboratory (NREL) System Advisory Model (SAM) and are preparing for field trials of EDS films in different solar fields in the US, Chile, India and in the Middle East. A brief description of EDS film performance, construction and testing of the field-test unit, autonomous operation of the field-test unit for evaluating EDS performance in increasing energy yield, associated revenue savings, and water conservation is presented.

14 SOLAR ENERGY↗

United States Automotive Materials Partnership LLC (USAMP) (Final Report Compilation)

The United States Automotive Materials Partnership LLC (USAMP) was formed in 1993 as a partnership between Chrysler Corporation, Ford Motor Company, and General Motors Corporation. Since then the U.S. Department of Energy (DOE) has supported its activities with funding and technical support. The mission of the USAMP is to conduct vehicle-oriented research and development in materials and materials processing to improve the competitiveness of the U.S. Auto Industry. Its specific goals are: (1) To conduct joint research to further the development of lightweight materials for improved automotive fuel economy; and (2) To work with the Federal government to explore opportunities for cooperative programs with the national laboratories, Federal agencies such as the DOE and universities. As a major component of the DOE's Office of FreedomCAR and Vehicle Technologies Program (FCVT) collaboration with the USAMP, the Automotive Lightweighting Materials (ALM) program focuses on the development and validation of advanced materials and manufacturing technologies to significantly reduce automotive vehicle body and chassis weight without compromising other attributes such as safety, performance, recyclability, and cost. The FCVT was announced in FY 2002 and implemented in FY 2003, as a successor of the Partnership for a New Generation of Vehicles (PNGV), largely addressed under the first Cooperative Agreement. This second USAMP Cooperative Agreement with the DOE has expanded a unique and valuable framework for collaboratively directing industry and government research efforts toward the development of technologies capable of solving important societal problems related to automobile transportation. USAMP efforts are conducted by the domestic automobile manufacturers, in collaboration with materials and manufacturing suppliers, national laboratories, universities, and other technology or trade organizations. These interactions provide a direct route for implementing newly developed materials and technologies, and have resulted in significant technical successes to date, as discussed in the individual project summary final reports. Over 70 materials-focused projects have been established by USAMP, in collaboration with participating suppliers, academic/non-profit organizations and national laboratories, and executed through its original three divisions: the Automotive Composites Consortium (ACC), the Automotive Metals Division (AMD), and Auto/Steel Partnership (A/SP). Two new divisions were formed by USAMP in 2006 to drive research emphasis on integration of structures incorporating dissimilar lightweighting materials, and on enabling technology for nondestructive evaluation of structures and joints. These new USAMP divisions are: Multi-Material Vehicle Research and Development Initiative (MMV), and the Non-Destructive Evaluation Steering Committee (NDE). In cooperation with USAMP and the FreedomCAR Materials Technical Team, a consensus process has been established to facilitate the development of projects to help move leveraged research to targeted development projects that eventually migrate to the original equipment manufacturers (OEMs) as application engineering projects. Research projects are assigned to one of three phases: concept feasibility, technical feasibility, and demonstration feasibility. Projects are guided through ongoing monitoring and USAMP offsite reviews, so as to meet the requirements of each phase before they are allowed to move on to the next phase. As progress is made on these projects, the benefits of lightweight construction and enabling technologies will be transferred to the supply base and implemented in production vehicles. The single greatest barrier to automotive use of lightweight materials is their high cost; therefore, priority is given to activities aimed at reducing costs through development of new materials, forming technologies, and manufacturing processes. The emphasis of the research projects reported in this document was largely on applied research and evaluation of mass savings opportunities through the aggressive application of lightweight materials, advanced computational methods, and the demonstration of production capable manufacturing processes intended for high-volume applications, all directed towards the FreedomCAR Program goals. Priority lightweighting materials include advanced high-strength steels (AHSS), aluminum, magnesium, titanium, and composites such as metal-matrix materials, and glass- and carbon-fiber-reinforced thermosets and thermoplastics. Besides developing valuable new design and material property information, several projects have extensively used computer-based product modeling and simulation technologies to optimize designs and materials usage while addressing the cost-performance issues. The purpose of this Summary Final Closeout Report is to document the successes, degree of progress, technology dissemination efforts, and lessons learned.

36 MATERIALS SCIENCE↗

A Greenhouse-Gas Information System: Monitoring and Validating Emissions Reporting and Mitigation

Current GHG-mitigating regimes, whether internationally agreed or self-imposed, rely on the aggregation of self-reported data, with limited checks for consistency and accuracy, for monitoring. As nations commit to more stringent GHG emissions-mitigation actions and as economic rewards or penalties are attached to emission levels, self-reported data will require independent confirmation that they are accurate and reliable, if they are to provide the basis for critical choices and actions that may be required. Supporting emissions-mitigation efforts and agreements, as well as monitoring energy- and fossil-fuel intensive national and global activities would be best achieved by a process of: (1) monitoring of emissions and emission-mitigation actions, based, in part, on, (2) (self-) reporting of pertinent bottom-up inventory data, (3) verification that reported data derive from and are consistent with agreed-upon processes and procedures, and (4) validation that reported emissions and emissions-mitigation action data are correct, based on independent measurements (top-down) derived from a suite of sensors in space, air, land, and, possibly, sea, used to deduce and attribute anthropogenic emissions. These data would be assessed and used to deduce and attribute measured GHG concentrations to anthropogenic emissions, attributed geographically and, to the extent possible, by economic sector. The validation element is needed to provide independent assurance that emissions are in accord with reported values, and should be considered as an important addition to the accepted MRV process, leading to a MRV&V process. This study and report focus on attributes of a greenhouse-gas information system (GHGIS) needed to support MRV&V needs. These needs set the function of such a system apart from scientific/research monitoring of GHGs and carbon-cycle systems, and include (not exclusively): the need for a GHGIS that is operational, as required for decision-support; the need for a system that meets specifications derived from imposed requirements; the need for rigorous calibration, verification, and validation (CV&V) standards, processes, and records for all measurement and modeling/data-inversion data; the need to develop and adopt an uncertainty-quantification (UQ) regimen for all measurement and modeling data; and the requirement that GHGIS products can be subjected to third-party questioning and scientific scrutiny. This report examines and assesses presently available capabilities that could contribute to a future GHGIS. These capabilities include sensors and measurement technologies; data analysis and data uncertainty quantification (UQ) practices and methods; and model-based data-inversion practices, methods, and their associated UQ. The report further examines the need for traceable calibration, verification, and validation processes and attached metadata; differences between present science-/research-oriented needs and those that would be required for an operational GHGIS; the development, operation, and maintenance of a GHGIS missions-operations center (GMOC); and the complex systems engineering and integration that would be required to develop, operate, and evolve a future GHGIS. Present monitoring systems would be heavily relied on in any GHGIS implementation at the outset and would likely continue to provide valuable future contributions to GHGIS. However, present monitoring systems were developed to serve science/research purposes. This study concludes that no component or capability presently available is at the level of technological maturity and readiness required for implementation in an operational GHGIS today. However, purpose-designed and -built components could be developed and implemented in support of a future GHGIS. The study concludes that it is possible to develop and provide a capability-driven prototype GHGIS, as part of a Phase-1 effort, within three years from project-funding start, that would make use of and integrate existing sensing and system capabilities. As part of a Phase-2 effort, a requirements-driven, operational GHGIS could be developed, within ten years from project funding start. That schedule is driven by the development and long lead-times for some system components. The two efforts would be focused on different deliverables but could commence concurrently, to save time, if that was deemed desirable. We note that, developing and supporting an operational GHGIS will require a new approach and management, sustained funding and other support, as well as technical advances and development of purpose-built components that meet the requisite specifications. A functioning GHGIS will provide the basis for reasoned choices on how best to respond to rising GHG levels, especially when proposed U.S. actions are compared with or conditioned on the actions of other nations.

54 ENVIRONMENTAL SCIENCES↗