The JPL resource allocation planning and scheduling office (RAPSO) baseline mission planning set
Explore the source record for details and available documents.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
One of the NASA technology development program at the Jet Propulsion Laboratory aims to increase the information return capability while reducing the size of the spacecraft via laser communications.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
High accuracy geodetic solutions at the few ppb level have become fairly standard with data from a global network of P-code Global Positioning System (GPS) receivers. Used as a measurement tool, it has numerous scientific applications including the monitoring of crustal motion, volcanic and post-seismic uplift, co- and post-seismic displacements in fault zones and media delay calibration and monitoring.
Radial velocity measurements of the G3V/IV star HD 195019 revealed the presence of an orbiting companion with m sin(i) = 3.5 Jupiter masses and a period of 18 days. Here we present new visability measurements obtained at the Palomar Testbed Interferometer which rule out any companion in an orbit consistent with the spectroscopic data and having more than 1% of the flux of the primary star in the near-infrared K band.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
The HYDROS mission is under development by NASA as part of its Earth System Science Pathfinder program. HYDROS is designed to provide global maps of the Earth's soil moisture and freeze/thaw state every 2-3 days, for weather and climate prediction, water and carbon cycle studies, natural hazards monitoring, and national security applications.
An external calibration technique for SIM involves measurement of calibration stars whose positions must already be known to an accuracy of 2 milliarcseconds. We demonstrate a procedure that effectively 'bootstraps' calibration star positions from an ab initio catalog to the required accuracy by observing them with the uncalibrated SIM instrument.
Explore the source record for details and available documents.
A viewgraph presentation describing the Submillimeter Probe of the Evolution of Cosmic Structure (SPECS) mission is shown. The topics include: 1) Context: community planning and study status; 2) Science goals; 3) Mission requirements; 4) Mission concepts for SPIRIT and SPECS; and 5) Tethered formation flying, a key enabling technology.
The Keck Interferometer Nuller (KIN) is one of the major scientific and technical precursors to the Terrestrial Planet Finder Interferometer (TPF-I) mission. KIN's primary objective is to measure the level of exo-zodiacal mid-infrared emission around nearby main sequence stars, which requires deep broad-band nulling of astronomical sources of a few Janskys at 10 microns. A number of new capabilities are needed in order to reach that goal with the Keck telescopes: mid-infrared coherent recombination, interferometric operation in 'split pupil' mode, N-band optical path stabilization using K-band fringe tracking and internal metrology, and eventually, active atmospheric dispersion correction. We report here on the progress made implementing these new functionalities, and discuss the initial levels of extinction achieved on the sky.
The two dimensinal bifurcated inlet, down selected for the HSR program, and the engine bay cowling consist of many sealing interfaces. The variable geometry characteristics of this inlet and the size of the propulsion system impose new sealing requirements for commercial transport aircraft. Major inlet systems requiring seal development and testing include the ramp system, the bypass/take-off system, and the inlet/engine interface. Engine bay cowling seal interfaces include the inlet/cowling interface, the keel split line, the hinge beam/engine bay cowling, and the nozzle/cowling interface. These seals have to withstand supersonic flight operating temperatures and pressures with typical commercial aircraft reliability and lives. The operating conditions and expected seal lives will be identified for the various interfaces. Boeing's SST seal development program will also be discussed.
The Human Research Program (HRP) delivers human health and performance countermeasures, knowledge, technologies, and tools to enable safe, reliable, and productive human space exploration. This Integrated Research Plan (IRP) describes the program s research activities that are intended to address the needs of human space exploration and serve HRP customers. The timescale of human space exploration is envisioned to take many decades. The IRP illustrates the program s research plan through the timescale of early lunar missions of extended duration. The document serves several purposes for the Human Research Program: The IRP provides a means to assure that the most significant risks to human space explorers are being adequately mitigated and/or addressed, The IRP shows the relationship of research activities to expected outcomes and need dates, The IRP shows the interrelationships among research activities that may interact to produce products that are integrative or cross defined research disciplines, The IRP illustrates the non-deterministic nature of research and technology activities by showing expected decision points and potential follow-on activities, The IRP shows the assignments of responsibility within the program organization and, as practical, the intended solicitation approach, The IRP shows the intended use of research platforms such as the International Space Station, NASA Space Radiation Laboratory, and various space flight analogs. The IRP does not show all budgeted activities of the Human research program, as some of these are enabling functions, such as management, facilities and infrastructure
Fundamental to vehicle health management is the deployment of systems incorporating advanced technologies for predicting and detecting anomalous conditions in highly complex and integrated environments. Integrated structural integrity health monitoring, statistical algorithms for detection, estimation, prediction, and fusion, and diagnosis supporting adaptive control are examples of advanced technologies that present considerable verification and validation challenges. These systems necessitate interactions between physical and software-based systems that are highly networked with sensing and actuation subsystems, and incorporate technologies that are, in many respects, different from those employed in civil aviation today. A formidable barrier to deploying these advanced technologies in civil aviation is the lack of enabling verification and validation tools, methods, and technologies. The development of new verification and validation capabilities will not only enable the fielding of advanced vehicle health management systems, but will also provide new assurance capabilities for verification and validation of current generation aviation software which has been implicated in anomalous in-flight behavior. This paper describes the research focused on enabling capabilities for verification and validation underway within NASA s Integrated Vehicle Health Management project, discusses the state of the art of these capabilities, and includes a framework for prioritizing activities.
This slide presentation reviews the mission architecture for the Titan mission. The presentation includes information on mission architecture options, probe delivery options, and Enceladus lighting.
The primary purpose of this document is to present the technology development plan for the XMS detector system. It covers the current status (including assessment of the Technology Readiness Level, TRL, and a justification of the level assigned), the roadmap to progress to a level between TRL 5 and TRL 6 by the middle of 2012, and an assessment of the associated cost. A secondary purpose of this document is to address the Action Items raised at the XMS Phase-A Study Mid-Term Review that pertain to the detector system (AI #4, #8, and #9).