SEARCH · Engineering Papers
Results for “availability assessment”
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Estimation of Inherent Safety Margins in Loaded Commercial Spent Nuclear Fuel Casks
We completed a novel assessment to determine the unquantified and uncredited safety margins (i.e., the difference between the licensing basis and as-loaded calculations) available in as-loaded spent nuclear fuel (SNF) casks. This assessment was performed as part of a broader effort to assess issues and uncertainties related to the continued safety of casks during extended storage and transportability following extended storage periods. Detailed analyses crediting the actual as-loaded cask inventory were performed for each of the casks at three decommissioned pressurized water reactor (PWR) sites to determine their characteristics relative to regulatory safety criteria for criticality, thermal, and shielding performance. These detailed analyses were performed in an automated fashion by employing a comprehensive and integrated data and analysis tool—Used Nuclear Fuel-Storage, Transportation & Disposal Analysis Resource and Data System (UNF-ST&DARDS). Calculated uncredited criticality margins from 0.07 to almost 0.30 Δk eff were observed; calculated decay heat margins ranged from 4 to almost 22 kW (as of 2014); and significant uncredited transportation dose rate margins were also observed. The results demonstrate that, at least for the casks analyzed here, significant uncredited safety margins are available that could potentially be used to compensate for SNF assembly and canister structural performance related uncertainties associated with long-term storage and subsequent transportation. The results also suggest that these inherent margins associated with how casks are loaded could support future changes in cask licensing to directly or indirectly credit the margins. Work continues to quantify the uncredited safety margins in the SNF casks loaded at other nuclear reactor sites.
Maximizing Operational Efficiencies in Waste Management on the Hanford Plateau Remediation Contract in a Down-turned Market - 13484
Recent changes in DOE priorities and funding have pressed DOE and its contractors to look for innovative methods to sustain critical operations at sites across the Complex. At the Hanford Site, DOE Richland Operations and its prime contractor, CH2M Hill Plateau Remediation Company (CHPRC), have completed in-depth assessments of the Plateau Remediation Contract (PRC) operations that compared available funding to mission and operational objectives in an effort to maintain requisite safety and compliance margins while realizing cost savings that meet funding profiles. These assessments included confirmation of current baseline activities, identification of potential efficiencies, barriers to implementation, and potential increased risks associated with implementation. Six operating PRC waste management facilities were evaluated against three possible end-states: complete facility closure, maintaining base operations, and performing minimum safe surveillance and maintenance activities. The costs to completely close evaluated facilities were determined to be prohibitively high and this end-state was quickly dropped from consideration. A summary of the analysis of remaining options by facility, efficiencies identified, impact to risk profiles, and expected cost savings is provided in Table I. The expected cost savings are a result of: - right-sizing and cross-training work crews to address maintenance activities across facilities; - combining and sequencing 'like-moded' operational processes; - cross-cutting emergency planning and preparedness staffing; - resource redistribution and optimization; - reducing areas requiring routine surveillance and inspection. For the efficiencies identified, there are corresponding increases in risk, including a loss of breadth and depth of available resources; lengthened response time to emergent issues; inability to invest in opportunities for improvement (OFIs); potential single-point failures or non-compliancies due to resource scarcity; limited cross-training capability; and reduced capability to respond to changes in DOE priorities. Finally, there are many challenges to achieving these cost savings. With a workforce nearing retirement effective succession planning becomes critical to success and requires establishing a balance between the cost of hiring and training and cost-saving activities. With six active waste management facilities spread across nearly 15 square miles, scheduling and deploying cross-trained surveillance and maintenance teams is a logistical challenge, particularly as the loss of funding has not diminished emphasis by regulatory agencies placed on the safe and compliant performance of DOE and its contractors. As reflected in Table I, efficiencies are currently being implemented on the Hanford Plateau Remediation Contract (PRC) that deliver cost savings that align with the current site budget while maintaining critical capabilities. It is currently estimated that these efficiencies will result in a cost savings of approximately $9 million for FY13 in base and minimum safe operations on the PRC - a cost reduction of more than 13 percent over FY12 and nearly 30 percent over FY09 levels. (authors)
Assessing induced seismicity risk at CO 2 storage projects: Recent progress and remaining challenges
Not Available
Laser ultrasonic assessment of the effects of porosity and microcracking on the elastic moduli of nuclear graphites
Not Available
A Nowcasting Approach for Low-Earth-Orbiting Hyperspectral Infrared Soundings within the Convective Environment
Low-Earth-orbiting (LEO) hyperspectral infrared (IR) sounders have significant yet untapped potential for characterizing thermodynamic environments of convective initiation and ongoing convection. While LEO soundings are of value to weather forecasters, the temporal resolution needed to resolve the rapidly evolving thermodynamics of the convective environment is limited. Here, we have developed a novel nowcasting methodology to extend snapshots of LEO soundings forward in time up to 6 h to create a product available within National Weather Service systems for user assessment. Our methodology is based on parcel forward-trajectory calculations from the satellite-observing time to generate future soundings of temperature (T) and specific humidity (q) at regularly gridded intervals in space and time. The soundings are based on NOAA-Unique Combined Atmospheric Processing System (NUCAPS) retrievals from the Suomi National Polar-Orbiting Partnership (Suomi NPP) and NOAA-20 satellite platforms. The tendencies of derived convective available potential energy (CAPE) and convective inhibition (CIN) are evaluated against gridded, hourly accumulated rainfall obtained from the Multi-Radar Multi-Sensor (MRMS) observations for 24 hand-selected cases over the contiguous United States. Areas with forecast increases in CAPE (reduced CIN) are shown to be associated with areas of precipitation. The increases in CAPE and decreases in CIN are largest for areas that have the heaviest precipitation and are statistically significant compared to areas without precipitation. These results imply that adiabatic parcel advection of LEO satellite sounding snapshots forward in time are capable of identifying convective initiation over an expanded temporal scale compared to soundings used only during the LEO satellite overpass time.
Representative Agricultural Pathways and Scenarios for Regional Integrated Assessment of Climate Change Impacts, Vulnerability, and Adaptation: Chapter - 5
The global change research community has recognized that new pathway and scenario concepts are needed to implement impact and vulnerability assessment where precise prediction is not possible, and also that these scenarios need to be logically consistent across local, regional, and global scales. For global climate models, representative concentration pathways (RCPs) have been developed that provide a range of time-series of atmospheric greenhouse-gas concentrations into the future. For impact and vulnerability assessment, new socio-economic pathway and scenario concepts have also been developed, with leadership from the Integrated Assessment Modeling Consortium (IAMC).This chapter presents concepts and methods for development of regional representative agricultural pathways (RAOs) and scenarios that can be used for agricultural model intercomparison, improvement, and impact assessment in a manner consistent with the new global pathways and scenarios. The development of agriculture-specific pathways and scenarios is motivated by the need for a protocol-based approach to climate impact, vulnerability, and adaptation assessment. Until now, the various global and regional models used for agricultural-impact assessment have been implemented with individualized scenarios using various data and model structures, often without transparent documentation, public availability, and consistency across disciplines. These practices have reduced the credibility of assessments, and also hampered the advancement of the science through model intercomparison, improvement, and synthesis of model results across studies. The recognition of the need for better coordination among the agricultural modeling community, including the development of standard reference scenarios with adequate agriculture-specific detail led to the creation of the Agricultural Model Intercomparison and Improvement Project (AgMIP) in 2010. The development of RAPs is one of the cross-cutting themes in AgMIP's work plan, and has been the subject of ongoing work by AgMIP since its creation.
Automated Spacelab Stowage Expert System for SLS missions
Issues related to the development of the Automated Spacelab Stowage Expert System (ASSESS) are examined including the problem domain, design, and status. The ASSESS concept is designed to configure stowage items into Spacelab lockers with an expert-system approach in which knowledge is available for every item and locker and for the complete heuristics. ASSESS employs the Knowledge Engineering Environment for development, and graphic displays present data on the items, lockers, and general system status. The automatic and manual modes are presented; the former provides the capability for an automatic solution to the stowage of a set of items into Spacelab lockers based on stowage heuristics defined and/or set by the user. The approach and heuristics algorithms are shown to permit the effective practical solution of NP-hard problems.
Energy Master Planning: Identifying Framing Constraints that Scope Your Technology Options
This paper addresses the framing constraints for building and community energy projects that must be considered when energy master planning (EMP) is conducted. The constraints cover emissions, sustainability, resilience, regulations and directives, and regional and local limitations such as available energy types, local conditions, and project requirements. The paper reflects development results from participants in an International Energy Agency project on energy master planning and in a U.S. Department of Defense project on technology integration to achieve resilient, low-energy use military installations. It identifies a comprehensive list of framing constraints categorized into locational threats, locational resources, energy and water distribution and storage systems, building and facility, indoor environmental, and equipment in buildings and district systems constraints. In addition, it identifies limits for these constraints that exist in seven participating countries. Some framing constraints can profoundly impact technology selection while others impact the installation of technologies (as in hardening) and have little to no impact on technology selection. Furthermore, framing constraints can be assessed in different ways and there are resources available to help EMP stakeholders evaluate them. Finally, a case is made that identifying and applying framing constraints early in EMP can bring efficiencies and better focus to the EMP process. We come to the conclusion that (1) for holistic energy planning, it is essential to identify and assess the framing constraints that bound an optimized EMP solution, (2) framing constraints limits should be evaluated as either hard or soft or promising technologies may fall out of an EMP analysis, (3) to maintain consistent quality in the EMP process, the identification of framing constraints and their limits, and perhaps their evaluation, should be standardized, (4) a standardized approach could establish a baseline that can be used, built upon, and improved, (5) as automated EMP tools are improved or developed, the resources in this paper could possibly contribute to their interworkings relative to technology screening, and (6) continued climate change and resulting aggressive goal setting will likely drive a continued and strong emphasis on EMP.
Droughts in Wind and Solar Power: Assessing Climate Model Simulations for a Net‐Zero Energy Future
Abstract Understanding and predicting “droughts” in wind and solar power availability can help the electric grid operator planning and operation toward deep renewable penetration. We assess climate models' ability to simulate these droughts at different horizontal resolutions, ∼100 and ∼25 km, over Western North America and Texas. We find that these power droughts are associated with the high/low pressure systems. The simulated wind and solar power variabilities and their corresponding droughts during historical periods are more sensitive to the model bias than to the model resolution. Future climate simulations reveal varied future change of these droughts across different regions. Although model resolution does not affect the simulation of historical droughts, it does impact the simulated future changes. This suggests that regional response to future warming can vary considerably in high‐ and low‐resolution models. These insights have important implications for adapting power system planning and operations to the changing climate.
Satellite-based Investigation of Power-Line Vegetation Encroachment in the US (SILVANUS)
Rapid wide-area assessments of vegetation encroachment on transmission and distribution line rights-of-way (ROW) is a highly desirable capability for understanding risks to the power grid during severe weather and wildfire events. Conventional assessments are time-consuming and expensive due to the need for in-situ inspections and the use of aerial assets. Performing conventional assessments on a wide area would require immense resources and time that might not be available within the horizon of an expected adverse event. Developing a capability to accurately assess vegetation encroachment into ROWs will enable faster analysis of potential grid vulnerabilities in NAERM. This project sought to develop a prototype capability for rapid ROW vegetation encroachment assessments by using Puerto Rico as a test case. Puerto Rico is a heavily forested island territory frequently impacted by tropical cyclones that threaten the electric grid by downing trees across transmission and distribution lines. Multispectral satellite imagery (MSI) enable very high resolution (i.e., 0.5 - 2 meter) assessment of vegetation conditions at scale and with revisit times appropriate for regular monitoring (e.g., weekly to quarterly, depending on cloud cover) of the entire island. Synthetic aperture radar (SAR) data from satellites was also investigated as solution to the cloud-cover issue as they are active sensors that emit and receive a microwave signal rather than relying on solar illumination, and are therefore unaffected by cloud cover and can collect data during day or night. Finally, MSI-derived digital surface models (DSMs) map the height of objects relative to sea level, and were assessed for their ability to estimate the height of forest canopies relative to coincident transmission lines. The results of the mapping investigation are described in this report.
Effects of Climate Change on Federal Hydropower: Report to Congress
This is a formal Department of Energy report to Congress. It outlines the findings of an assessment directed by Congress in Section 9505 of the SECURE Water Act of 2009 (Public Law 111-11), the US Department of Energy (DOE), in consultation with the federal Power Marketing Administrations (PMAs) and other federal agencies, including federal dam owners, has prepared a comprehensive assessment examining the effects of climate change on water available for hydropower at federal facilities and on the marketing of power from these federal facilities.
Selection of Next Priority IMPACT Medical Conditions Based on Available Terrestrial and Spaceflight Data
BACKGROUND: As the era of exploration class missions begins, identification of medical conditions that may occur and require management becomes essential for the modeling of medical risk. To this end, NASA has developed IMPACT (Informing Mission Planning via Analysis of Complex Tradespaces), a suite of tools to assist in assessment of medical risk analysis. It has incorporated an initial list of the 120 conditions of highest concern, labeled the IMPACT condition list 1.0 (ICL 1.0). This abstract describes a method for prioritizing the 92 conditions included on the Proposed Future Conditions List (PFCL) for inclusion in future iterations of the ICL. OVERVIEW: To construct the Prioritized Proposed Future Conditions List (P-PFCL), each condition on the PFCL was scored as “low,” “medium,” or “high” on each of four variables: incidence, likelihood of significant task impairment, diagnostic and treatment complexity, and treatment futility. Qualitative assessment using clinical judgement was utilized to score complexity, futility, and likelihood of impairment. Incidence was assessed quantitatively using spaceflight data and/or analog populations where available then assigned a score using established cutoffs. Logarithmic numerical values were assigned to each category label. A Prioritization Score was generated for each condition by taking the product of incidence and likelihood of task impairment (risk) divided by the product of complexity and futility (difficulty of care), with higher values corresponding to higher priority for future inclusion in the ICL. DISCUSSION: The described methods allow for the generation of a ranked P-PFCL to act as a decision support tool for selection of the next generation of modeled medical conditions. Some of the conditions ranked highly on the P-PFCL include EVA-related upper and lower extremity sprain/strain, iron deficiency, delirium, and hypertension, among others. While this effort does not attempt to quantify the absolute risk associated with each condition, it does attempt to semi-quantitatively estimate the risk of each condition relative to the other possible conditions. This tool in concert with subject matter expert opinion could optimize the future use of limited resources thereby producing a more accurate medical risk model, which will be essential to the upcoming exploration class missions.
Advancing Risk‐Informed Decision Making in Managing Defense Nuclear Waste in the United States: Opportunities and Challenges for Risk Analysis
Abstract An omnibus spending bill in 2014 directed the Department of Energy to analyze how effectively Department of Energy (DOE) identifies, programs, and executes its plans to address public health and safety risks that remain as part of DOE's remaining environmental cleanup liabilities. A committee identified two dozen issues and associated recommendations for the DOE, other federal agencies, and the U.S. Congress to consider, as well as other stakeholders such as states and tribal nations. In regard to risk assessment, the committee described a risk review process that uses available data, expert experience, identifies major data gaps, permits input from key stakeholders, and creates an ordered set of risks based on what is known. Probabilistic risk assessments could be a follow‐up from these risk reviews. In regard to risk management, the states, in particular, have become major drivers of how resources are driven. States use different laws, different priorities, and challenge DOE's policies in different ways. Land use decisions vary, technology choices are different, and other notable variations are apparent. The cost differences associated with these differences are marked. The net result is that resources do not necessarily go to the most prominent human health and safety risks, as seen from the national level.
An approach for integrating toxicogenomic data in risk assessment: The dibutyl phthalate case study
An approach for evaluating and integrating genomic data in chemical risk assessment was developed based on the lessons learned from performing a case study for the chemical dibutyl phthalate. A case study prototype approach was first developed in accordance with EPA guidance and recommendations of the scientific community. Dibutyl phthalate (DBP) was selected for the case study exercise. The scoping phase of the dibutyl phthalate case study was conducted by considering the available DBP genomic data, taken together with the entire data set, for whether they could inform various risk assessment aspects, such as toxicodynamics, toxicokinetics, and dose–response. A description of weighing the available dibutyl phthalate data set for utility in risk assessment provides an example for considering genomic data for future chemical assessments. As a result of conducting the scoping process, two questions—Do the DBP toxicogenomic data inform 1) the mechanisms or modes of action?, and 2) the interspecies differences in toxicodynamics?—were selected to focus the case study exercise. Principles of the general approach include considering the genomics data in conjunction with all other data to determine their ability to inform the various qualitative and/or quantitative aspects of risk assessment, and evaluating the relationship between the available genomic and toxicity outcome data with respect to study comparability and phenotypic anchoring. Based on experience from the DBP case study, recommendations and a general approach for integrating genomic data in chemical assessment were developed to advance the broader effort to utilize 21st century data in risk assessment. - Highlights: • Performed DBP case study for integrating genomic data in risk assessment • Present approach for considering genomic data in chemical risk assessment • Present recommendations for use of genomic data in chemical risk assessment.
Uncertainty Analysis of OC5-DeepCwind Floating Semisubmersible Offshore Wind Test Campaign: Preprint
This paper examines how to assess the uncertainty levels for test measurements of the Offshore Code Comparison, Continued, with Correlation (OC5)-DeepCwind floating offshore wind system, examined within the OC5 project. The goal of the OC5 project was to validate the accuracy of ultimate and fatigue load estimates from a numerical model of the floating semisubmersible using data measured during scaled tank testing of the system under wind and wave loading. The examination of uncertainty was done after the test, and it was found that the limited amount of data available did not allow for an acceptable uncertainty assessment. Therefore, this paper instead qualitatively examines the sources of uncertainty associated with this test to start a discussion of how to assess uncertainty for these types of experiments and to summarize what should be done during future testing to acquire the information needed for a proper uncertainty assessment. Foremost, future validation campaigns should initiate numerical modeling before testing to guide the test campaign, which should include a rigorous assessment of uncertainty, and perform validation during testing to ensure that the tests address all of the validation needs.
Uncertainty Analysis of OC5-DeepCwind Floating Semisubmersible Offshore Wind Test Campaign
This paper examines how to assess the uncertainty levels for test measurements of the Offshore Code Comparison, Continued, with Correlation (OC5)-DeepCwind floating offshore wind system, examined within the OC5 project. The goal of the OC5 project was to validate the accuracy of ultimate and fatigue load estimates from a numerical model of the floating semisubmersible using data measured during scaled tank testing of the system under wind and wave loading. The examination of uncertainty was done after the test, and it was found that the limited amount of data available did not allow for an acceptable uncertainty assessment. Therefore, this paper instead qualitatively examines the sources of uncertainty associated with this test to start a discussion of how to assess uncertainty for these types of experiments and to summarize what should be done during future testing to acquire the information needed for a proper uncertainty assessment. Foremost, future validation campaigns should initiate numerical modeling before testing to guide the test campaign, which should include a rigorous assessment of uncertainty, and perform validation during testing to ensure that the tests address all of the validation needs.
Validation in the Absence of Observed Events
Here our paper addresses the problem of validating models in the absence of observed events, in the area of Weapons of Mass Destruction terrorism risk assessment. We address that problem with a broadened definition of “Validation,” based on “backing up” to the reason why modelers and decision makers seek validation, and from that basis re-define validation as testing how well the model can advise decision makers in terrorism risk management decisions. We develop that into two conditions: Validation must be based on cues available in the observable world; and it must focus on what can be done to affect that observable world, i.e. risk management. That in turn leads to two foci: 1.) the risk generating process, 2.) best use of available data. Based on our experience with nine WMD terrorism risk assessment models, we then describe three best use of available data pitfalls: SME confidence bias, lack of SME cross-referencing, and problematic initiation rates. Those two foci and three pitfalls provide a basis from which we define validation in this context in terms of four tests -- Does the model: … capture initiation? … capture the sequence of events by which attack scenarios unfold? … consider unanticipated scenarios? … consider alternative causal chains? Finally, we corroborate our approach against three key validation tests from the DOD literature: Is the model a correct representation of the simuland? To what degree are the model results comparable to the real world? Over what range of inputs are the model results useful?