Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “US”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,405 records · Page 78

The Future Circular Collider: a Summary for the US 2021 Snowmass Process

In this white paper for the 2021 Snowmass process, we give a description of the proposed Future Circular Collider (FCC) project and its physics program. The paper summarizes and updates the discussion submitted to the European Strategy on Particle Physics. After construction of an approximately 90 km tunnel, an electron-positron collider based on established technologies allows world-record instantaneous luminosities at center-of-mass energies from the Z resonance up to tt thresholds, enabling a rich set of fundamental measurements including Higgs couplings determinations at the sub percent level, precision tests of the weak and strong forces, and searches for new particles, including dark matter, both directly and via virtual corrections or mixing. Among other possibilities, the FCC-ee will be able to (i) indirectly discover new particles coupling to the Higgs and/or electroweak bosons up to scales around 7 and 50 TeV, respectively; (ii) perform competitive SUSY tests at the loop level in regions not accessible at the LHC; (iii) study heavy-flavor and tau physics in ultra-rare decays beyond the LHC reach, and (iv) achieve the best potential in direct collider searches for dark matter, sterile neutrinos, and axion-like particles with masses up to around 90 GeV. The tunnel can then be reused for a proton-proton collider, establishing record center-of-mass collision energy, allowing unprecedented reach for direct searches for new particles up to the around 50 TeV scale, and a diverse program of measurements of the Standard Model and Higgs boson, including a precision measurement of the Higgs self-coupling, and conclusively testing weakly-interacting massive particle scenarios of thermal relic dark matter.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

TRANSSFORM Workshop Empowering the US manufacturing industry proceedings report

The U.S. Department of Energy (DOE), Office of Energy Efficiency and Renewable Energy, and Advanced Manufacturing Office (AMO) hosted the TRANSSFORM (Transformative, Resilient, Adaptive, Nimble, Sustainable, Smart, Flexible, Optimal, Robust, and Model-based1 – A Bold Vision for the Future of U.S. Manufacturing) Workshop on September 8–10, 2021. The objective of the workshop was to hear from stakeholders about how manufacturing digitalization can improve manufacturing competitiveness and reduce energy consumption and emissions production from U.S. manufacturing, and what research, development, and demonstrations are needed to have the desired impact.

manufacturing digitalization, decarbonization, IoT↗

Beyond New START: Two Forecasts for Future Russian-US Arms Control

A world without the New START Treaty (NST) or treaty-based strategic arms control cannot simply be categorised as ‘unacceptable’.1 That world is possible. It has been increasing in likelihood for some time and thus it must be both understood and anticipated. Furthermore, the NST will expire on 5 February 2026 and it could disappear much sooner, depending on the actions of either Russia or the United States. No amount of positive thinking on the value of strategic arms control or talking points about the importance of the treaty can change its status as a hostage in the broader bilateral relationship.

Political science↗

Strategies in Education, Outreach, and Inclusion to Enhance the US Workforce in Accelerator Science and Engineering

We summarize the community-based consensus for improvements concerning education, public outreach, and inclusion in Accelerator Science and Engineering that will enhance the workforce in the USA. The improvements identified reflect the product of discussions held within the 2021-2022 Snowmass community planning process by topical group AF1: Beam Physics and Accelerator Education within the Accelerator Frontier. Although the Snowmass process centers on high-energy physics, this document outlines required improvements for the entire U.S. accelerator science and engineering enterprise because education of those entering and in the field, outreach to the public, and inclusion are inextricably linked.

43 PARTICLE ACCELERATORS↗

Engaging Canadian Indigenous Communities and Public Stakeholders Through a US Site Benchmarking Trip - 19358

Canadian Nuclear Laboratories (CNL) is proposing a new approach to decommission the WR-1 reactor at its Whiteshell site near Pinawa, Manitoba Canada. To tackle WR-1 CNL is proposing in situ decommissioning, this new approach is subject to a Canadian federal environmental assessment. As part of this CNL is engaging with Indigenous communities and public stakeholders, both regionally and across the country. Nuclear in situ decommissioning is new to Canada but has been used numerous times in the United States. Throughout the environmental assessment process CNL has considered the feedback public and Indigenous groups have provided and has tried to enhance the way information is shared and respond where possible and reasonable. Feedback from some communities has been related to a greater understanding of what the in situ method looks like, how it is monitored, will it perform, and anxiety about having it in the community. CNL sought to respond to this feedback by coordinating a benchmarking trip to an in situ reactor in Hallam, Nebraska. The visit was coordinated around an annual inspection. Several regional stakeholder and Indigenous communities joined CNL on the benchmarking trip. The group witnessed and learned what a decommissioned in situ reactor looked like, how it was performing and the effect on the surrounding communities. The group learned important lessons during the visit, key among them that the entombment is working as designed and has had zero significant detectable effects to the surrounding community. All attendees are now better informed on what CNL's proposal for WR-1 represents and are in a position to better inform their communities and the process moving forward. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗