Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Timeline”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,405 records · Page 78

Using Advanced Modeling to Accelerate the Scale-Up of Carbon Capture Technologies

Carbon capture and storage (CCS) is one of many approaches that are critical for significantly reducing domestic and global CO2 emissions. The U.S. Department of Energy’s Clean Coal Technology Program Plan envisions 2nd generation CO2 capture technologies ready for demonstration-scale testing around 2020 with the goal of enabling commercial deployment by 2025 [1]. Third generation technologies have a similarly aggressive timeline. A major challenge is that the development and scale-up of new technologies in the energy sector historically takes up to 15 years to move from the laboratory to pre-deployment and another 20 to 30 years for widespread industrial scale deployment. In order to help meet the goals of the DOE carbon capture program, the Carbon Capture Simulation Initiative (CCSI) was launched in early 2011 to develop, demonstrate, and deploy advanced computational tools and validated multi-scale models to reduce the time required to develop and scale up new carbon capture technologies. The CCSI Toolset (1) enables promising concepts to be more quickly identified through rapid computational screening of processes and devices, (2) reduces the time to design and troubleshoot new devices and processes by using optimization techniques to focus development on the best overall process conditions and by using detailed device-scale models to better understand and improve the internal behavior of complex equipment, and (3) provides quantitative predictions of device and process performance during scale up based on rigorously validated smaller scale simulations that take into account model and parameter uncertainty[2]. This article focuses on essential elements related to the development and validation of multi-scale models in order to help minimize risk and maximize learning as new technologies progress from pilot to demonstration scale.

Miller, David↗

Exploratory Data analysis ENvironment eXtreme scale (EDENx)

EDENx is a multivariate data visualization tool that allows interactive user driven analysis of large-scale data sets with high dimensionality. EDENx builds on our earlier system, called EDEN to enable analysis of more dimensions and larger scale data sets. EDENx provides an initial overview of summary statistics for each variable in the data set under investigation. EDENx allows the user to interact with graphical summary plots of the data to investigate subsets and their statistical associations. These plots include histograms, binned scatterplots, binned parallel coordinate plots, timeline plots, and graphical correlation indicators. From the EDENx interface, a user can select a subsample of interest and launch a more detailed data visualization via the EDEN system. EDENx is best suited for high-level, aggregate analysis tasks while EDEN is more appropriate for detail data investigations.

Steed, Chad Allen↗

Connected Traveler

The Connected Traveler project is a multi-disciplinary undertaking that seeks to validate potential for transformative transportation system energy savings by incentivizing efficient traveler behavior. This poster outlines various aspects of the Connected Traveler project, including market opportunity, understanding traveler behavior and decision-making, automation and connectivity, and a projected timeline for Connected Traveler's key milestones.

33 ADVANCED PROPULSION SYSTEMS↗

Online Measurement of the Energy Spread of Multi-Turn Beam in the Fermilab Booster at Injection

We have developed a computer program interfaced with the ACNET environment of Fermilab accelerators to measure energy spread of the proton beam from the LINAC at an injection into the Booster. It uses a digitizing oscilloscope and provides users an ability to configure the scope settings for optimal data acquisition from a resistive wall current monitor. When the program is launched, a) a one shot timeline is generated to initiate beam injection into the Booster, b) a gap of about 40 ns is produced in the injected beam using a set of fast kickers, c) collects line charge distribution data from the wall current monitor for the first 200 μs from the injection and d) performs complete data analysis to extract full beam energy spread of the beam. The program also gives the option to store the data for offline analyses. We illustrate a case with an example. We also present results on beam energy spread as a function of beam intensity from recent measurements.

43 PARTICLE ACCELERATORS↗

2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review—Biodiesel Cellulosic Ethanol Research Project (Hendry County Sustainable Biofuels Center)

The presentation provides an overview of the Biodiesel Cellulosic Ethanol Research Project (Hendry County Sustainable Biofuels Center). It summarizes the project history, timeline, budget, partners, objectives, goals, future plans and in closer detail reviews the used approaches and technical accomplishments. The main project goals were (1) developing strategies and tools that assist in the creation of economically and environmentally sustainable bioenergy industries within ecologically-sensitive regions such as South Florida and, in particular, the greater Everglades, (2) using these bioenergy strategies and tools in evolving the existing agricultural, urban, and ecological sectors towards more sustainable structures and practices and (3) using bioenergy as a focal point in the larger effort to mitigate climate change and sea level rise, realities with particularly catastrophic consequences for South Florida. The project started on Oct 1, 2010 and ended on Feb 28, 2013. It yearly average budget was $369,770, with the Dept. of Energy annual cost share of $317,167. The main project partners were Hendry County, University of Florida - Institute of Food and Agricultural Sciences, Intelligentsia International, Inc., Edison State College and University of South Florida. Used approaches, main accomplishments and results in the categories of (1) technical research, (2) education and (3) business development are presented in detail. The project uniqueness is mainly related to the use of system approaches and integrating several systems analyses. Relevance of the project applicable to sustainability of bioenergy, food production, & restoration is explained, critical success factors are challenges are outlined and future work drafted. Finally, the main publications and presentations catalogue list is presented.

09 BIOMASS FUELS↗

National Electric Code Scope

Presentation on the issue of the limits of the scope of the National Electric Code and the likelihood that it will be resolved in the next cycle of its revision. Includes a timeline for public input.

17 WIND ENERGY↗

Adding Impacts and Mitigation Measures to OpenEI's RAPID Toolkit

The Open Energy Information platform hosts the Regulatory and Permitting Information Desktop (RAPID) Toolkit to provide renewable energy permitting information on federal and state regulatory processes. One of the RAPID Toolkit's functions is to help streamline the geothermal permitting processes outlined in the National Environmental Policy Act (NEPA). This is particularly important in the geothermal energy sector since each development phase requires separate land analysis to acquire exploration, well field drilling, and power plant construction permits. Using the Environmental Assessment documents included in RAPID's NEPA Database, the RAPID team identified 37 resource categories that a geothermal project may impact. Examples include impacts to geology and minerals, nearby endangered species, or water quality standards. To provide federal regulators, project developers, consultants, and the public with typical impacts and mitigation measures for geothermal projects, the RAPID team has provided overview webpages of each of these 37 resource categories with a sidebar query to reference related NEPA documents in the NEPA Database. This project is an expansion of a previous project that analyzed the time to complete NEPA environmental review for various geothermal activities. The NEPA review not only focused on geothermal projects within the Bureau of Land Management and U.S. Forest Service managed lands, but also projects funded by the Department of Energy. Timeline barriers found were: extensive public comments and involvement; content overlap in NEPA documents, and discovery of impacted resources such as endangered species or cultural sites.

15 GEOTHERMAL ENERGY↗

Translator Plan: A Coordinated Vision for Fiscal Years 2018-2020

In June of 2017, the Translator Group met to develop this coordinated three-year vision plan, incorporating key feedback and aligning to ARM’s mission priorities. This plan responds to a shift in how we determine our priorities, given the new needs of the ARM Facility. In the past, individual Translators have determined priorities in conversation with individual DOE Atmospheric System Research (ASR) working groups. To better support ARM’s Decadal Vision (https://www.arm.gov/publications/programdocs/doe-sc-arm-14-029.pdf), however, the Translator Group is instead developing a coordinated response to needs from our user community to better balance resources and skills among participants. This approach agrees with direction from ARM leadership and the ARM-ASR Coordination Team (AACT). To develop this plan the Translator Group reviewed feedback received from the User Executive Committee (UEC) and the Triennial Review, as well as priorities from ASR working groups and Principal Investigators (PIs), the LES ARM Symbiotic Simulation and Observation (LASSO) project, and new instrumentation and activities as described by the ARM Technical Director. In particular, we are responding to the advice that we were trying to do too much, and should focus on providing additional support to data quality, uncertainty assessment, a timeline for producing core VAPs from ARM Mobile Facility (AMF) campaigns, and supporting key aspects of the Decadal Vision.

value-added products, User Executive Committee, AR↗

Enabling an Interactive Grid: A Strategic Vision for Interoperability

This whitepaper proposes that ecosystems of organizations integrating smart technology use such a vision to align their directions and transcend immediate challenge. It then offers a framework for developing a stakeholder roadmap for these integration ecosystems to achieve their vision, including tools to measure the state of interoperability, and a process to identify gaps and prioritize technologies, policies, and timelines.

der integration↗

Uranium Accumulation Discoveries at Y-12 (Paper)

In June 2017, reduction operations at the Y-12 National Security Complex (Y-12) experienced a uranium accumulation event that compromised the nuclear criticality safety (NCS) of reduction operations. This event led to the execution of an extensive Extent-of-Condition (EOC) review aimed at identifying the location of other significant uranium masses in unintended locations. This paper describes the reduction process, the equipment in which unexpected accumulation was discovered, and the timeline of events leading to the discovery. It highlights the multi-disciplinary effort taken by production to recover from the event and resume operations. Lastly, it includes a description of the inconsistencies between operational conditions and Criticality Safety Evaluation (CSE) assumptions and how the EOC led to the discovery of four more accumulations within Y-12 processes.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Uranium Accumulation Discoveries at Y-12 (Presentation)

In June 2017, reduction operations at the Y-12 National Security Complex (Y-12) experienced a uranium accumulation event that compromised the nuclear criticality safety (NCS) of reduction operations. This event led to the execution of an extensive Extent-of-Condition (EOC) review aimed at identifying the location of other significant uranium masses in unintended locations. This paper describes the reduction process, the equipment in which unexpected accumulation was discovered, and the timeline of events leading to the discovery. It highlights the multi-disciplinary effort taken by production to recover from the event and resume operations. Lastly, it includes a description of the inconsistencies between operational conditions and Criticality Safety Evaluation (CSE) assumptions and how the EOC led to the discovery of four more accumulations within Y-12 processes.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Efforts to Streamline Permitting of Geothermal Projects in the United States

Geothermal permitting timelines in the United States can be a deterrent to new investment, with geothermal project development taking as long as seven to ten years. The Energy Policy Act of 2005 (EPAct 2005) in part aimed to streamline aspects of the geothermal permitting process on federally managed public lands. This article summarizes the general regulatory process for developing geothermal projects in the United States and thereafter discusses efforts proposed or undertaken by the U.S. Congress, U.S. Forest Service, U.S. Bureau of Land Management, state governments, and project developers to increase permitting efficiency.

15 GEOTHERMAL ENERGY↗

HEP Software Foundation Community White Paper Working Group -- Data Organization, Management and Access (DOMA)

Without significant changes to data organization, management, and access (DOMA), HEP experiments will find scientific output limited by how fast data can be accessed and digested by computational resources. In this white paper we discuss challenges in DOMA that HEP experiments, such as the HL-LHC, will face as well as potential ways to address them. A research and development timeline to assess these changes is also proposed.

Berzano, Dario↗

The International Linear Collider. A Global Project

A large, world-wide community of physicists is working to realise an exceptional physics program of energy-frontier, electron-positron collisions with the International Linear Collider (ILC). This program will begin with a central focus on high-precision and model-independent measurements of the Higgs boson couplings. This method of searching for new physics beyond the Standard Model is orthogonal to and complements the LHC physics program. The ILC at 250 GeV will also search for direct new physics in exotic Higgs decays and in pair-production of weakly interacting particles. Polarised electron and positron beams add unique opportunities to the physics reach. The ILC can be upgraded to higher energy, enabling precision studies of the top quark and measurement of the top Yukawa coupling and the Higgs self-coupling. The key accelerator technology, superconducting radio-frequency cavities, has matured. Optimised collider and detector designs, and associated physics analyses, were presented in the ILC Technical Design Report, signed by 2400 scientists. There is a strong interest in Japan to host this international effort. A detailed review of the many aspects of the project is nearing a conclusion in Japan. Now the Japanese government is preparing for a decision on the next phase of international negotiations, that could lead to a project start within a few years. The potential timeline of the ILC project includes an initial phase of about 4 years to obtain international agreements, complete engineering design and prepare construction, and form the requisite international collaboration, followed by a construction phase of 9 years.

43 PARTICLE ACCELERATORS↗

Technical Requirements for Geothermal Resource Confirmation

In 2017-2018, the Bureau of Land Management's Renewable Energy Coordination Office, through its Geothermal Program, funded the National Renewable Energy Laboratory (NREL) to analyze technical and environmental considerations related to geothermal resource confirmation drilling. NREL solicited input from a group of technical and environmental experts in the geothermal industry, along with analyzing National Environmental Policy Act of 1969 (NEPA) documentation for previously approved projects. The collected data and analysis will be used by the Bureau of Land Management to examine the possibility of developing a new classification of wells and/or expediting the NEPA compliance process, which could potentially reduce permitting and regulatory compliance timelines when compared to the current process for obtaining a geothermal drilling permit for resource confirmation drilling activities. This paper provides a summary of the technical requirements for confirming a geothermal resource. The analysis showed that confirming a geothermal resource requires confirming reservoir temperature, chemistry, permeability, and flow rate. Obtaining these data requires drilling at least two-preferably three-successful wells into the resource to conduct the necessary tests, including an interference test. Bottom-hole well diameters of at least 6'' to 8'' (0.15 to 0.2 m) are needed to limit the wellbore frictional pressure drop to effectively perform well flow and interference tests. Drilling these wells requires a drill rig with a mud pump and derrick capable of holding three drill pipes. This type of rig requires a minimum well-pad size of 2.5 acres (104 m2) including surface area for a 1 million-gallon (3.8 million-liter) pit. Up to 15 acres (5x104 m2) of total surface disturbance are needed for developing access roads and well pads to drill a total of three to five wells.

15 GEOTHERMAL ENERGY↗

Environmental Concerns and Mitigation Associated with Geothermal Resource Confirmation Drilling Activities

In 2017-2018, the Bureau of Land Management's National Renewable Energy Coordination Office, through its Geothermal Program, funded the National Renewable Energy Laboratory (NREL) to analyze technical and environmental considerations related to geothermal resource confirmation drilling. NREL solicited input from a group of technical and environmental experts in the geothermal industry, along with analyzing National Environmental Policy Act of 1969 (NEPA) documentation for previously approved projects. The collected data and analysis will be used by the Bureau of Land Management to examine the possibility of developing a new classification of wells and/or expediting the NEPA compliance process, which could potentially reduce permitting and regulatory compliance timelines when compared to the current process for obtaining a geothermal drilling permit for resource confirmation drilling activities.

15 GEOTHERMAL ENERGY↗