Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Telecommunication”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,405 records · Page 78

The MGS Avionics System Architecture: Exploring the Limits of Inheritance

Mars Global Surveyor (MGS) avionics system architecture comprises much of the electronics on board the spacecraft: electrical power, attitude and articulation control, command and data handling, telecommunications, and flight software. Schedule and cost constraints dictated a mix of new and inherited designs, especially hardware upgrades based on findings of the Mars Observer failure review boards.

Mars Global Surveyor MGS↗

Statistical Analysis of Interference Between Earth Stations and Earth-Orbiting Satellites

Determination of the potential for radio frequency interference between Earth stations and orbiting spacecraft is often desirable. This information can be used to select frequencies for radio systems to avoid interference or it can be used to determine if coordination between radio systems is necessary. Also, it is useful for planning emission standards and filtering requirements for future telecommunications equipment. A model is developed that will determine the statistics of interference between Earth stations and elliptical orbiting spacecraft. The model uses orbital dynamics, detailed antenna patterns, and spectral characteristics to obtain accurate levels of interference at the victim receiver. The model is programmed into a computer simulation to obtain long term statistics of interference.

satellite communications interference geometry↗

Smart Data Node in the Sky (SDNITS): communications system

In this paper we will discuss: the steps for adequately designing such a complex telecommunications system 'Smart Data Node In The Sky (SDNITS)'; algorithm development for this process; specifications to be levied on the interfacing subsystems; type of the system e.g., the usual Radio Frequency system or a laser communications system.

communication smart node technology system archite↗

The Mars Reconnaissance Orbiter mission operations: architecture and approach

The Mars Reconnaissance Orbiter (MRO) was launched on August 12, 2005 by an Atlas V launch vehicle from Cape Canaveral Air Force Station. MRO will carry a rich set of science instruments to Mars and provide global, regional survey, and targeted observations. In addition, a set of engineering instruments providing optical navigation, Ka band telecommunication and UHF relay services to future Mars missions are part of the MRO payload.

MRO↗

The Deep Space Network large array

The Deep Space Network (DSN) is primarily used for telecommunications with scientific spacecraft engaged in solar system exploration.

DSN↗

Precision of radio science instrumentation for planetary exploration

The Deep Space Network is the largest and most sensitive scientific telecommunications facility Primary function: providing two-way communication between the Earth and spacecraft exploring the solar system Instrumented with large parabolic reflectors, high-power transmitters, low-noise amplifiers & receivers.

Radio Science Recever↗

Coverage and control of constellations of elliptical inclined frozen lunar orbits

A great deal of scientific interest exists regarding the permanently shadowed craters near the poles of the Moon where there may be frozen volatiles. These regions, particularly the Moon's South Pole, have been proposed for extensive robotic and human exploration. Unfortunately, they are typically not in view of Earth, and would require some form of communication relay to facilitate exploration via robotic and/or human missions. One solution for such a relay is a long-lived constellation of lunar telecommunication orbiters providing focused coverage at the pole of interest. Robust support requires this coverage to be continuous, redundant, and, in order to minimize costs, this constellation should consist of 3 satellites or fewer.

lunar constellation design↗

Risk-based analysis and decision making in multi-disciplinary environments

A risk-based decision-making process conceived of and developed at JPL and NASA, has been used to help plan and guide novel technology applications for use on spacecraft. These applications exemplify key challenges inherent in multi-disciplinary design of novel technologies deployed in mission-critical settings. 1) Cross-disciplinary concerns are numerous (e.g., spacecraft involve navigation, propulsion, telecommunications). These concems are cross-coupled and interact in multiple ways (e.g., electromagnetic interference, heat transfer). 2) Time and budget pressures constrain development, operational resources constrain the resulting system (e.g., mass, volume, power). 3) Spacecraft are critical systems that must operate correctly the first time in only partially understood environments, with no chance for repair. 4) Past experience provides only a partial guide: New mission concepts are enhanced and enabled by new technologies, for which past experience is lacking. The decision-making process rests on quantitative assessments of the relationships between three classes of information - objectives (the things the system is to accomplish and constraints on its operation and development), risks (whose occurrence detracts from objectives), and mitigations (options for reducing the likelihood and or severity of risks). The process successfully guides experts to pool their knowledge, using custom-built software to support information gathering and decision-making.

technology↗

Balloon Support Systems Performance for the Cosmic Rays Energetics and Mass Mission

The Ballooncraft Support Systems were developed by NASA Wallops Flight Facility for use on ULDB class balloon missions. The support systems have now flown two missions supporting the Cosmic Rays Energetics and Mass (CREAM) experiment. The first, CREAM I, flown in December 2004, was for a record breaking 41 days, 21 hours, and the second, flown in December 2005, was for 28 days, 9 hours. These support systems provide CREAM with power, telecommunications, command and data handling ioc!uding Plight computers, mechanical structures, thermal management and attitude control to help ensure a successful scientific mission. This paper will address the performance and success of these support systems over the two missions.

Tompson, Linda D.↗

Performance, Capacity and Limitations of AMSS Communications

This paper reports on the performance of Aeronautical Mobile Satellite Service (AMSS), based on simulation results, when incorporated into the Aeronautical Telecommunications Network (ATN). A comparison between its performance under current data traffic load and under future ATN traffic load was used to determine the reliability of AMSS in providing continuous communications between the ground and the aircraft over remote regions of the globe. The simulation involved modeling AMSS through the use of the published standards to ensure the accuracy of the results. Although the results indicated that there is indeed a reduced capacity (to about one-fourth) and efficiency of the system at the increased traffic load, the reduction in performance does not lead to the conclusion that an alternative to AMSS must be found. On the contrary, some modifications to the protocols controlling the operation of AMSS and updating the system with new technologies, would make it as valid a solution to the problem as it is today.

Ripamonti, Claudio↗

Simulation and Performance of Data Communication using AMSS

This paper reports the findings of a simulation of the Aeronautical Mobile Satellite Service (AMSS) to be used in the ATN (Aeronautical Telecommunications Network). The models of the protocols used in this simulation were designed to be compliant with the International Civil Aviation Organization (ICAO) Standards and Recommended Practices (SARP). The focus of this research is on the data communication capabilities of the AMSS. The simulated performance characteristics for a region of the AMSS are presented. The results are analyzed to determine the efficiency, limitations, and behavior of this service for the foreseen data communication

Ripamonti, Claudio↗

Mars Reconnaissance Orbiter Ka-band (32 GHz) Demonstration: Cruise Phase Operations

The X-band (8.41 GHz) frequency currently used for deep space telecommunications is too narrow (50 MHz) to support future high rate missions. Because of this NASA has decided to transition to Ka-band (32 GHz) frequencies. As weather effects cause much larger fluctuations on Ka-band than on X-band, the traditional method of using a few dBs of margin to cover these fluctuations is wasteful of power for Ka-band; therefore, a different operations concept is needed for Ka-band links. As part of the development of the operations concept for Ka-band, NASA has implemented a fully functioning Ka-band communications suite on its Mars Reconnaissance Orbiter (MRO). This suite will be used during the primary science phase to develop and refine the Ka-band operations concept for deep space missions. In order to test the functional readiness of the spacecraft and the Deep Space Network's (DSN) readiness to support the demonstration activities a series of passes over DSN 34-m Beam Waveguide (BWG) antennas were scheduled during the cruise phase of the mission. MRO was launched on August 12, 2005 from Kennedy Space Center, Cape Canaveral, Florida, USA and went into Mars Orbit on March 10, 2006. A total of ten telemetry demonstration and one high gain antenna (HGA) calibration passes were allocated to the Ka-band demonstration. Furthermore, a number of "shadow" passes were also scheduled where, during a regular MRO track over a Ka-band capable antenna, Ka-band was identically configured as the X-band and tracked by the station. In addition, nine Ka-band delta differential one way ranging ((delta)DOR) passes were scheduled. During these passes, the spacecraft and the ground system were put through their respective paces. Among the highlights of these was setting a single day record for data return from a deep space spacecraft (133 Gbits) achieved during one 10-hour pass; achieving the highest data rate ever from a planetary mission (6 Mbps) and successfully demonstrating Ka-band DDOR. In addition, DSN performed well. However, there are concerns with the active pointing of the Ka-band antennas as well as delivery of the monitor data from the stations. The spacecraft also presented challenges not normally associated with planetary missions mostly because of its very high equivalent isotropic radiated power (EIRP). This caused problems in accurately evaluating the in-flight EIRP of the spacecraft which led to difficulties evaluating the quality of the HGA calibration data. These led to the development of additional measurement techniques that could be used for future high-power deep space missions.

Mars Reconnaissance Orbiter (MRO)↗

Implementing Distributed Operations: A Comparison of Two Deep Space Missions

Two very different deep space exploration missions--Mars Exploration Rover and Cassini--have made use of distributed operations for their science teams. In the case of MER, the distributed operations capability was implemented only after the prime mission was completed, as the rovers continued to operate well in excess of their expected mission lifetimes; Cassini, designed for a mission of more than ten years, had planned for distributed operations from its inception. The rapid command turnaround timeline of MER, as well as many of the operations features implemented to support it, have proven to be conducive to distributed operations. These features include: a single science team leader during the tactical operations timeline, highly integrated science and engineering teams, processes and file structures designed to permit multiple team members to work in parallel to deliver sequencing products, web-based spacecraft status and planning reports for team-wide access, and near-elimination of paper products from the operations process. Additionally, MER has benefited from the initial co-location of its entire operations team, and from having a single Principal Investigator, while Cassini operations have had to reconcile multiple science teams distributed from before launch. Cassini has faced greater challenges in implementing effective distributed operations. Because extensive early planning is required to capture science opportunities on its tour and because sequence development takes significantly longer than sequence execution, multiple teams are contributing to multiple sequences concurrently. The complexity of integrating inputs from multiple teams is exacerbated by spacecraft operability issues and resource contention among the teams, each of which has their own Principal Investigator. Finally, much of the technology that MER has exploited to facilitate distributed operations was not available when the Cassini ground system was designed, although later adoption of web-based and telecommunication tools has been critical to the success of Cassini operations.

Cassini Mission↗

Experimental Results for Titan Aerobot Thermo-Mechanical Subsystem Development

This paper describes experimental results from a development program focused in maturing Titan aerobot technology in the areas of mechanical and thermal subsystems. Results from four key activities are described: first, a cryogenic balloon materials development program involving coupon and cylinder tests and culminating in the fabrication and testing of an inflated 4.6 m long prototype blimp at 93 K; second, a combined lab experiment and numerical simulation effort to assess potential problems resulting from radioisotope thermal generator waste heat generation near an inflated blimp; third, an aerial deployment and inflation development program consisting of laboratory and helicopter drop tests on a near full scale (11 m long) prototype blimp; and fourth, a proof of concept experiment demonstrating the viability of using a mechanically steerable high gain antenna on a floating blimp to perform direct to Earth telecommunications from Titan. The paper provides details on all of these successful activities and discusses their impact on the overall effort to produce mature systems technology for future Titan aerobot missions.

balloon↗

An Airborne Communications Roadmap for the U.S. Federal Air Marshal Service: Overview and Status

Following the events of September 11, 2001, the responsibilities, operations and numbers of the U.S. Federal Air Marshal Service (FAMS) wer e greatly expanded. With this expansion, new critical research and te chnology needs were identified, including the need for air to ground telecommunications capabilities. To address this need, the FAMS has cr eated a working group to develop, deploy and enhance aviation communi cations with respect to security and law enforcement. This paper presents the working group's progress to date in generating a FAMS air-gro und communications roadmap identifying expected communications servic es, technology maturity, and technology gaps over a timeline. The paper includes a communications preliminary requirements summary and syst em performance characteristics needed to meet identified operational needs. The system engineering process utilized is presented beginning with the identification of users, their operational needs and relevant constraints. The operational needs are translated to desired airbor ne communications services. System technical performance requirements associated with the identified services are summarized. In addition, notional communications architectures addressing the requirements are presented. Finally, future plans to identify and assess potential ca ndidate systems and their associated technical architectures, gaps and barriers to implementation are discussed. The paper addresses the cu rrent, near term (within 5 years) and far term (10 years) timeframes for such an airborne communications system.

Martzaklis, Konstantinos S.↗

Strategic Adaptation of SCA for STRS

The Space Telecommunication Radio System (STRS) architecture is being developed to provide a standard framework for future NASA space radios with greater degrees of interoperability and flexibility to meet new mission requirements. The space environment imposes unique operational requirements with restrictive size, weight, and power constraints that are significantly smaller than terrestrial-based military communication systems. With the harsh radiation environment of space, the computing and processing resources are typically one or two generations behind current terrestrial technologies. Despite these differences, there are elements of the SCA that can be adapted to facilitate the design and implementation of the STRS architecture.

Quinn, Todd↗

Nano Goes Magnetic to Attract Big Business

Glenn Research Center has combined state-of-the-art electrical designs with complex, computer-aided analyses to develop some of today s most advanced power systems, in space and on Earth. The center s Power and On-Board Propulsion Technology Division is the brain behind many of these power systems. For space, this division builds technologies that help power the International Space Station, the Hubble Space Telescope, and Earth-orbiting satellites. For Earth, it has woven advanced aerospace power concepts into commercial energy applications that include solar and nuclear power generation, battery and fuel cell energy storage, communications and telecommunications satellites, cryocoolers, hybrid and electric vehicles, and heating and air-conditioning systems.

Source record↗