Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Requirements Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,405 records · Page 78

Scientific Data Compression for Large Scale Computational Fluid Dynamics (CFD) Simulations

This Cooperative Research and Development Agreement (CRADA) between Oak Ridge National Laboratory (ORNL) and General Electric (GE) investigated methods for reducing the size of large computational fluid dynamics (CFD) simulation datasets using scientific data compression techniques. The work focused on adapting the MultiGrid Adaptive Reduction of Data (MGARD) compression framework and integrating it with high-performance I/O and visualization tools used in CFD workflows. MGARD uses hierarchical multilevel decomposition to enable error-controlled compression of floating-point scientific data while preserving quantities of interest. During the project, MGARD compression was integrated with the ADIOS I/O framework and visualization tools such as ParaView to enable efficient storage, transfer, and analysis of simulation data. The collaboration also explored approaches for improving compression performance for CFD data defined on unstructured meshes. Results demonstrate that scientific data compression can significantly reduce storage requirements and improve data management for large-scale CFD simulations.

97 MATHEMATICS AND COMPUTING↗

Inspector General Semiannual Report to Congress - October 1, 2008 - March 31, 2009

On behalf of the Department of Energy's Office of Inspector General, I am pleased to submit our Semiannual Report to Congress for the period ending March 31, 2009. The Report highlights key accomplishments of the Office of Inspector General, particularly pertaining to our efforts to ensure the economy, efficiency, and effectiveness of Department of Energy operations. Details pertaining to some of our most significant reviews and projects are presented in the Report. This reporting period has been quite eventful. On February 17, 2009, the President signed the American Recovery and Reinvestment Act of 2009. The stated intent of this new legislation is to strengthen the U.S. economy through the creation of new jobs, aiding State and local governments with budget shortfalls, cutting taxes for working families, and investing in the long-term health of the Nation's economic prosperity. The Recovery Act establishes the status of the Nation's energy supply as a prime focus. Specifically, the Department of Energy will receive approximately $40 billion for various energy, environmental, and science programs and initiatives. The passage of this legislation makes the coming months an exciting and transformative time for the Department of Energy and the Office of Inspector General. In recognition of the need for effective oversight to protect taxpayer interests, the Recovery Act includes the creation of the Recovery Act Accountability and Transparency Board and mandates specific actions by the Inspectors General. I will be a permanent member of this newly created Board, along with nine other Inspectors General whose agencies are significant recipients of Recovery Act funds. Since the passage of the legislation, my office has developed a strategy consistent with the objectives outlined in the Recovery Act. The overarching goal of the strategy is to ensure that the taxpayers interests relating to the performance and results of the Recovery Act are protected. During this reporting period, my office issued two reports pertaining to the Recovery Act. In our first report entitled, 'The American Recovery and Reinvestment Act at the Department of Energy', we identified 'lessons learned' based on prior work with the intention of providing the Department with a resource as it moves forward with its Recovery Act-related efforts. Secondly, we recently issued a report entitled, 'The Department of Energy's Acquisition Workforce and its Impact on Implementation of the American Recovery and Reinvestment Act of 2009', which describes the current status of the Department's acquisition workforce, positive actions that have already been taken, and the challenges that remain in light of the impact of the Recovery Act. Additionally, although not initiated as a Recovery Act report, shortly after the passage of the legislation, we issued a related report entitled, 'The Department of Energy's Loan Guarantee Program for Innovative Energy Technologies', in which we evaluated the Department's progress in establishing internal and operational controls over the program. Further, we have conducted nearly 40 fraud awareness briefings to nearly 2,000 Department and contractor officials. While such briefings are a routine part of our work, these particular briefings were specifically designed to heighten awareness of the vulnerabilities, risks, and potential fraud schemes related to the Recovery Act. The work of safeguarding public resources and the public trust is a collaborative effort that stretches across government, including agency management and the Congress. Much work has been done, but more remains and we look forward to the coming challenges.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Special Report on Review of "The Department of Energy's Quality Assurance Process for Prime Recipients' Reporting for the American Recovery and Reinvestment Act"

The American Recovery and Reinvestment Act of 2009 (Recovery Act) was established to jumpstart the U.S. economy, create or save millions of jobs, spur technological advances in health and science, and invest in the Nation's energy future. The Department of Energy (Department) will receive an unprecedented $37 billion in Recovery Act funding to support a variety of science, energy, and environmental initiatives. The majority of the funding received by the Department will be allocated to various recipients through grants, cooperative agreements, contracts, and other financial instruments. To ensure transparency and accountability, the Office of Management and Budget (OMB) requires that recipients report on their receipt and use of Recovery Act funds on a quarterly basis to FederalReporting.gov. OMB also specifies that Federal agencies should develop and implement formal procedures to help ensure the quality of recipient reported information. Data that must be reported by recipients includes total funding received; funds expended or obligated; projects or activities for which funds were obligated or expended; and the number of jobs created and/or retained. OMB requires that Federal agencies perform limited data quality reviews of recipient data to identify material omissions and/or significant reporting errors and notify the recipients of the need to make appropriate and timely changes to erroneous reports. As part of a larger audit of recipient Recovery Act reporting and performance measurement and in support of a Government-wide review sponsored by the Recovery Accountability and Transparency Board, we completed an interim review to determine whether the Department had established a process to ensure the quality and accuracy of recipient reports. Our review revealed that the Department had developed a quality assurance process to facilitate the quarterly reviews of recipient data. The process included procedures to compare existing information from the Department's financial information systems with that reported to FederalReporting.gov by recipients. In addition, plans were in place to notify recipients of anomalies and/or errors exposed by the quality assurance process. While the Department has made a good deal of progress in this area, we did, however, identify several issues which could, if not addressed, impact the effectiveness of the quality assurance process.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Analysis Methodology for Balancing Authority Cooperation in High Penetration of Variable Generation

With the rapidly growing penetration level of wind and solar generation, the challenges of managing variability and the uncertainty of intermittent renewable generation become more and more significant. The problem of power variability and uncertainty gets exacerbated when each balancing authority (BA) works locally and separately to balance its own subsystem. The virtual BA concept means various forms of collaboration between individual BAs must manage power variability and uncertainty. The virtual BA will have a wide area control capability in managing its operational balancing requirements in different time frames. This coordination results in the improvement of efficiency and reliability of power system operation while facilitating the high level integration of green, intermittent energy resources. Several strategies for virtual BA implementation, such as ACE diversity interchange (ADI), wind only BA, BA consolidation, dynamic scheduling, regulation and load following sharing, extreme event impact study are discussed in this report. The objective of such strategies is to allow individual BAs within a large power grid to help each other deal with power variability. Innovative methods have been developed to simulate the balancing operation of BAs. These methods evaluate the BA operation through a number of metrics — such as capacity, ramp rate, ramp duration, energy and cycling requirements — to evaluate the performances of different virtual BA strategies. The report builds a systematic framework for evaluating BA consolidation and coordination. Results for case studies show that significant economic and reliability benefits can be gained. The merits and limitation of each virtual BA strategy are investigated. The report provides guidelines for the power industry to evaluate the coordination or consolidation method. The application of the developed strategies in cooperation with several regional BAs is in progress for several off-spring projects.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Information management system breadboard data acquisition and control system.

Description of a breadboard configuration of an advanced information management system based on requirements for high data rates and local and centralized computation for subsystems and experiments to be housed on a space station. The system is to contain a 10-megabit-per-second digital data bus, remote terminals with preprocessor capabilities, and a central multiprocessor. A concept definition is presented for the data acquisition and control system breadboard, and a detailed account is given of the operation of the bus control unit, the bus itself, and the remote acquisition and control unit. The data bus control unit is capable of operating under control of both its own test panel and the test processor. In either mode it is capable of both single- and multiple-message operation in that it can accept a block of data requests or update commands for transmission to the remote acquisition and control unit, which in turn is capable of three levels of data-handling complexity.

Mallary, W. E.↗

Simulator evaluation of display concepts for pilot monitoring and control of space shuttle approach and landing. Phase 2: Manual flight control

A study of the display requirements for final approach management of the space shuttle orbiter vehicle is presented. An experimental display concept, providing a more direct, pictorial representation of the vehicle's movement relative to the selected approach path and aiming points, was developed and assessed as an aid to manual flight path control. Both head-up, windshield projections and head-down, panel mounted presentations of the experimental display were evaluated in a series of simulated orbiter approach sequence. Data obtained indicate that the experimental display would enable orbiter pilots to exercise greater flexibility in implementing alternative final approach control strategies. Touchdown position and airspeed dispersion criteria were satisfied on 91 percent of the approach sequences, representing various profile and wind effect conditions. Flight path control and airspeed management satisfied operationally-relevant criteria for the two-segment, power-off orbiter approach and were consistently more accurate and less variable when the full set of experimental display elements was available to the pilot. Approach control tended to be more precise when the head-up display was used; however, the data also indicate that the head-down display would provide adequate support for the manual control task.

Gartner, W. B.↗

An image based information system - Architecture for correlating satellite and topological data bases

The paper describes the development of an image based information system and its use to process a Landsat thematic map showing land use or land cover in conjunction with a census tract polygon file to produce a tabulation of land use acreages per census tract. The system permits the efficient cross-tabulation of two or more geo-coded data sets, thereby setting the stage for the practical implementation of models of diffusion processes or cellular transformation. Characteristics of geographic information systems are considered, and functional requirements, such as data management, geocoding, image data management, and data analysis are discussed. The system is described, and the potentialities of its use are examined.

Bryant, N. A.↗

Formulation of advanced consumables management models: Environmental control and electrical power system performance models requirements

Software design specifications for developing environmental control and life support system (ECLSS) and electrical power system (EPS) programs into interactive computer programs are presented. Specifications for the ECLSS program are at the detail design level with respect to modification of an existing batch mode program. The FORTRAN environmental analysis routines (FEAR) are the subject batch mode program. The characteristics of the FEAR program are included for use in modifying batch mode programs to form interactive programs. The EPS program specifications are at the preliminary design level. Emphasis is on top-down structuring in the development of an interactive program.

Daly, J. K.↗

Development of Integrated Programs for Aerospace-vehicle design (IPAD): Reference design process

The airplane design process and its interfaces with manufacturing and customer operations are documented to be used as criteria for the development of integrated programs for the analysis, design, and testing of aerospace vehicles. Topics cover: design process management, general purpose support requirements, design networks, and technical program elements. Design activity sequences are given for both supersonic and subsonic commercial transports, naval hydrofoils, and military aircraft.

Meyer, D. D.↗

Definition and analytical evaluation of a power management system for tilt-rotor aircraft

The paper reviews the special design criteria which apply to power management in a tilt-rotor aircraft. These include the need for accurate and fast control of rpm and thrust, while accounting for the dynamic interactions between rotor systems caused by cross-shafting and aircraft lateral/directional response. The power management system is also required to provide acceptable high speed sensitivity to longitudinal turbulence. It is shown that the criteria can best be met using a single governor adjusting the collective pitch by an amount proportional to a combination of the average rpm and the integral of the average rpm of the two rotors. This system is evaluated and compared with other candidate systems in hover and cruise flight.

Morris, J. J.↗

SUMC fault tolerant computer system

The results of the trade studies are presented. These trades cover: establishing the basic configuration, establishing the CPU/memory configuration, establishing an approach to crosstrapping interfaces, defining the requirements of the redundancy management unit (RMU), establishing a spare plane switching strategy for the fault-tolerant memory (FTM), and identifying the most cost effective way of extending the memory addressing capability beyond the 64 K-bytes (K=1024) of SUMC-II B. The results of the design are compiled in Contract End Item (CEI) Specification for the NASA Standard Spacecraft Computer II (NSSC-II), IBM 7934507. The implementation of the FTM and memory address expansion.

Source record↗

Collision avoidance in space

Collisions in earth orbital space between operational payloads and various forms of space debris (nonoperational payloads, nonfunctional mission-related objects and fragments resulting from collisions and explosions) are discussed and possible means of avoiding them are considered. From 10,000 to 15,000 objects are estimated to be in earth orbital space, most of which represent spacecraft fragments and debris too small to be detected and tracked by earth-based sensors, and it is considered likely that some of them will be or have already been involved in direct collisions with the ever increasing number of operational satellites and space stations. Means of protecting proposed large space structures and smaller spacecraft from significant damage by larger space objects, particularly in the 400-4000 km altitude range where most debris occurs, include structural redundancy and the double shielding of sensitive components. Other means of collision avoidance are the collection or relocation of satellites, rocket bodies and other objects by the Space Shuttle, the prevention of explosions and the disposal of spent rocket parts by reentry. Finally, a management structure would be required to administer guidelines for the prevention and elimination of space debris.

Kessler, D. J.↗

Avionics test bed development plan

A development plan for a proposed avionics test bed facility for the early investigation and evaluation of new concepts for the control of large space structures, orbiter attached flex body experiments, and orbiter enhancements is presented. A distributed data processing facility that utilizes the current laboratory resources for the test bed development is outlined. Future studies required for implementation, the management system for project control, and the baseline system configuration are defined. A background analysis of the specific hardware system for the preliminary baseline avionics test bed system is included.

Harris, L. H.↗

Avionics test bed development plan

The plan is for a facility for the early investigation and evaluation of new concepts for the control of large space structures, orbiter attached flex body experiments, and orbiter enhancements. This plan outlines a distributed data processing facility that will utilize the current JSC laboratory resources for the test bed development. The future studies required for implementation, the management system for project control, and the baseline system configuration are described.

Harris, L. H.↗

A user view of office automation or the integrated workstation

Central data bases are useful only if they are kept up to date and easily accessible in an interactive (query) mode rather than in monthly reports that may be out of date and must be searched by hand. The concepts of automatic data capture, data base management and query languages require good communications and readily available work stations to be useful. The minimal necessary work station is a personal computer which can be an important office tool if connected into other office machines and properly integrated into an office system. It has a great deal of flexibility and can often be tailored to suit the tastes, work habits and requirements of the user. Unlike dumb terminals, there is less tendency to saturate a central computer, since its free standing capabilities are available after down loading a selection of data. The PC also permits the sharing of many other facilities, like larger computing power, sophisticated graphics programs, laser printers and communications. It can provide rapid access to common data bases able to provide more up to date information than printed reports. Portable computers can access the same familiar office facilities from anywhere in the world where a telephone connection can be made.

Schmerling, E. R.↗

Government-to-government cooperation in space station development

A memoranda of understanding was recently signed between the United States (NASA) and three international Space Station partners - Canada, European Space Agency (ESA), and Japan. The international partners are performing parallel Phase B preliminary design studies, concurrent with the U.S., on their proposed elements/systems for possible integration and operation with the U.S. Space Station System complex. During the 21-month Space Station Phase B study, a large amount of technical interface data will have to be transferred between the U.S. and the international partners. Scheduled bilateral technical coordination meetings will also be held. The coordination and large number of interfaces required to integrate the international requirements into the Space Station require a clean interface management organizational structure and operation procedures to accomplish the integration task. The international coordination management organizational structure, management tools, and communications network are discussed including the proposed international elements/systems being studied by the international partners.

Nassiff, S. H.↗