Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Power System Operation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,405 records · Page 78

Techno-Economic Analysis and Optimization of a Compressed-Air Energy Storage System Integrated with a Natural Gas Combined-Cycle Plant

To address the rising electricity demand and greenhouse gas concentration in the environment, considerable effort is being carried out across the globe on installing and operating renewable energy sources. However, the renewable energy production is affected by diurnal and seasonal variability. To ensure that the electric grid remains reliable and resilient even for the high penetration of renewables into the grid, various types of energy storage systems are being investigated. In this paper, a compressed-air energy storage (CAES) system integrated with a natural gas combined-cycle (NGCC) power plant is investigated where air is extracted from the gas turbine compressor or injected back into the gas turbine combustor when it is optimal to do so. First-principles dynamic models of the NGCC plant and CAES are developed along with the development of an economic model. The dynamic optimization of the integrated system is undertaken in the Python/Pyomo platform for maximizing the net present value (NPV). NPV optimization is undertaken for 14 regions/cases considering year-long locational marginal price (LMP) data with a 1 h interval. Design variables such as the storage capacity and storage pressure, as well as the operating variables such as the power plant load, air injection rate, and air extraction rate, are optimized. Results show that the integrated CAES system has a higher NPV than the NGCC-only system for all 14 regions, thus indicating the potential deployment of the integrated system under the assumption of the availability of caverns in close proximity to the NGCC plant. The levelized cost of storage is found to be in the range of 136–145 $/MWh. Roundtrip efficiency is found to be between 74.6–82.5%. A sensitivity study with respect to LMP shows that the LMP profile has a significant impact on the extent of air injection/extraction while capital expenditure reduction has a negligible effect.

25 ENERGY STORAGE↗

Assessment of the burning-plasma operational space in ITER by using a control-oriented core-SOL-divertor model

In future tokamaks, the control of burning plasmas will require careful regulation of the plasma density and temperature. Along with the design of effective burn-control systems, understanding how the fusion power varies in the density-temperature space is vital for the operation of fusion power plants. Here in this work, the steady-state operational space of ITER is studied using a control-oriented core-plasma model coupled to a two-point model of the scrape-off-layer (SOL) and divertor regions. The two models are coupled through the exchange of input-output parameters. The deuterium and tritium recycling from the wall are output parameters of the SOL-divertor model that are used as input parameters in the core-plasma density balance. Furthermore, the separatrix temperature, which is an output parameter of the SOL-divertor model, is incorporated into the radial core-plasma temperature profiles. Therefore, the temperature-dependent power balance of the plasma core is intimately linked to the SOL-divertor model. Both the power entering the SOL from the core, as determined by the core-plasma power balance, and the separatrix density, as dictated by the core-plasma density balance, are input parameters to the SOL-divertor model. They are control knobs in the SOL-divertor model that can be regulated using the core-plasma actuators: auxiliary power and pellet injection. There are various operational limitations, such as the saturation of the aforementioned actuators, that will prevent ITER from accessing certain high-fusion plasma regimes. The achievable tritium concentration in the fueling lines and the maximum sustainable heat load on the divertor will impose further restrictions. By accounting for these limitations, the ITER operational space is computed based on the coupled core-SOL-divertor model and visualized using Plasma Operation Contour (POPCON) plots that map performance metrics, such as the fusion to auxiliary power ratio, over the density-temperature space. Comparisons are drawn between plasmas with different recycling, confinement, and SOL-divertor conditions.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Data-Centric Approach to Capture Non-Polynomial Nonlinear Dynamics

We propose an analytical construction of observable functions in the extended dynamic mode decomposition (EDMD) algorithm. EDMD is a numerical method for approximating the spectral properties of the Koopman operator. The choice of observable functions is fundamental for applying EDMD to nonlinear problems arising in systems and control. Existing methods either start from a set of dictionary functions and look for the subset that best fits the underlying nonlinear dynamics or rely on machine learning algorithms to “learn” observable functions. Conversely, in this paper, we start from the dynamical system model and lift it through the Lie derivatives, rendering it into a polynomial form. This proposed transformation into a polynomial form is exact and provides an adequate set of observable functions. The strength of the proposed approach is its applicability to a broader class of nonlinear dynamical systems, particularly those with nonpolynomial functions and compositions thereof. Moreover, it retains the physical interpretability of the underlying dynamical system and can be readily integrated into existing numerical libraries. We demonstrate the proposed approach with an application to electric power systems. The modeled system consists of a single generator connected to an infinite bus, where nonlinear terms include sine and cosine functions. The results demonstrate the effectiveness of the proposed procedure in off-attractor nonlinear dynamics for estimation and prediction; the observable functions obtained from the proposed construction outperform methods that use dictionary functions comprising monomials or radial basis functions.

extended dynamic mode decomposition↗

Impact of simultaneous activities on frequency fluctuations — comprehensive analyses based on the real measurement data from FNET/GridEye

Simultaneous human activities such as the Super Bowl game would cause certain impacts on frequency fluctuations in power systems. With the help of FNET/GridEye measurements, this work aims to give comprehensive analyses on the frequency fluctuations during Super Bowl LIV held on Feb. 2, 2020, so as to better understand several phenomena caused by simultaneous activities and help system operation and control. First, recent developments of FNET/GridEye are introduced briefly. Second, the frequency fluctuations of Eastern Interconnection (EI), western electricity coordinating council (WECC), and electric reliability council of Texas (ERCOT) power systems during Super Bowl LIV are analyzed. Third, frequency fluctuations of Super Bowl Sunday and ordinary Sundays in 2020 are compared. Finally, the differences of frequency fluctuations among different years during the Super Bowl and their change trend are also given. Furthermore, several possible explanations including the simultaneity of electricity consumption at the beginning of commercial breaks and the halftime show, the increasing usage of the Internet, and the increasing size of TV screens are illustrated in detail in this work.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Renewable Integration in Hybrid ac-dc Systems using Multi-port Autonomous Reconfigurable Solar power plant (MARS)

To increase inertia and improve primary frequency response of future grids, grid-forming inverters connecting PV to grid and energy storage systems (ESSs) are likely to play an important role. Moreover, high-voltage direct current (HVdc) links will also be an enabler to transfer remote PV generation and for improved grid stability. That is, with increased penetration of PV, discrete development of PV and ESS connecting to transmission ac grid and HVdc links is one of the solutions for stable operation of grid. Here, an integrated concept for integration of PV and ESS to transmission ac grid and HVdc links is proposed that is named as multi-port autonomous reconfigurable solar power plant (MARS). The proposed integrated development reduces the cost associated with respect to discrete development of PV-ESS systems connecting to transmission ac grid and HVdc links. The integrated development incorporates advanced control methods to provide inertial and primary frequency response, reactive power support, and transient stability to manage PV and ESS resources. In this paper, high-fidelity switched system model of the integrated system and grids are developed and detailed simulation results are provided to showcase the stable operation of the integrated system and provision of grid support functions.

14 SOLAR ENERGY↗

Cybersecurity Resiliency of Marine Renewable Energy Systems Part 2: Cybersecurity Best Practices and Risk Management

Marine renewable energy (MRE) is an emerging source of power for marine applications, marine devices, and coastal communities. This energy source relies on industrial control systems and IT to support operations and maintenance activities, which create a pathway for an adversary to gain unauthorized access to systems and data and disrupt operations. Incorporating cybersecurity risk prevention measures and mitigation capabilities from inception, development, operation, to decommissioning of the MRE system and components is paramount to the protection of energy generation and the security of network architecture and infrastructure. To improve the resilience of MRE systems as a predictable, affordable, and reliable source of energy, cybersecurity guidance was developed to enable operators to assess cybersecurity risks and implement security measures commensurate with the risk. This publication is the second of a two-part series, with Part 1 addressing a framework to determine cybersecurity risk by assessing the vulnerability of an MRE system to potential cyber threats and the consequences a cyberattack would have on the end user. This Part 2 publication describes an approach to select appropriate cybersecurity best practices commensurate with the MRE system's cybersecurity risk. The guidance includes 86 cybersecurity best practices, which are associated with 36 cybersecurity domains and grouped into nine categories. The best practices follow the core functions of the National Institute of Science and Technology Cybersecurity Framework (e.g., identify, detect, protect, respond, and and recover) and insights from both maritime and energy industry guidance documents to identify security measures effective in protecting information and operational technology assets prevalent in MRE systems.

97 MATHEMATICS AND COMPUTING↗

Stochastic Analysis for Long Term Capital Structures, Systems, and Components Refurbishment and Replacement

As commercial Nuclear Power Plants (NPPs) pursue extended plant operation in the form of Second License Renewal (SLR), opportunities exist for these plants to provide capital investments to ensure long-term safe and economic performance. At the current time, several utilities have announced an intention to pursue extended operation for one or more of their NPPs via SLR . The goal of this research is to develop a risk-informed approach to evaluate and prioritize plant capital investments made in preparation for, and during the period of, extended plant operations to support decisions for NPP operations. Since the capital investments are influenced by various factors, such as markets, safety and regulatory, the decision-making process of NPP operations should take into account relevant factors for balancing risks, costs and profits. The traditional method of capital budgeting is based on the priority list of candidate projects using economic measures such as benefit-investment ratio, net present value (NPV) and internal rate of return. In the literatures, the problem of capital budgeting or the variant can be represented by an appropriate knapsack problem. The knapsack approach to capital budgeting takes as input as investment, along with the cost and profit of each project. The objective of capital budgeting is to find the combination of the binary decisions for every investment such that the overall profit is as large as possible. The output is a collection of projects to be carried out, and we refer this selected collection of projects as a project portfolio. One limitation of traditional optimization models for capital budgeting is that they do not account for risk/uncertainty in profit and cost streams associated with individual projects, they do not account for risk in resource availability in future years [1,2,3]. Projects can incur cost over-runs, especially when projects are large, performed infrequently, and when there is risk regarding technical viability, external contractors, and/or suppliers of requisite parts and materials. Occasionally, projects are performed ahead of schedule and with cost savings. Planned budgets for capital improvements can be cut and key personnel may be lost. Or, there may be surprise windfalls in budgets for maintenance activities due to decreased costs for “unplanned” maintenance. In these cases, how should we resolve capital budgeting when we have risk forecasts for costs, profits and budgets? One approach we proposed in this summary is to re-solve the optimization models based on assumed statistical distributions of given parameters. If these distributions were not available, a two-stage stochastic optimization approach can be used to provide priority lists to decision-makers to support better risk-informed decisions [4, 5]. In this summary, we will only focus on the first approach.

42 ENGINEERING↗

A New Proposal Generalized Predictive Control Algorithm With Polynomial Reference Tracking Applied for Sodium Fast Reactors

This paper proposes a generalized predictive control (GPC) with constraints and orthonormal Laguerre functions using the simplified model of the primary system (reactor core and intermediate heat exchanger (IHX)) of a prototypical sodium fast reactor (SFR). This paper develops a multiple-input multiple-output (MIMO) GPC with input constraints able to track polynomial references of any degree applied in coolant temperature difference across the core and fractional power. The manipulated variables of the GPC-SFR are the reactivity and the sodium flow rate of the primary and secondary pipes. Moreover, orthonormal Laguerre functions and step down condition number techniques were also applied to avoid the numerical ill-conditioning issue in quadratic programming of large systems. Thus, a GPC type-2 was designed to control fractional power, coolant temperature difference across the core and sodium tank temperature of the SFR primary system when temperature references change according to a linear ramp after reaching their steady-state operation, sustaining 100% power operation on the reactor. In order to analyze the load tracking capability of the GPC-SFR type-2, the load following from 100% fractional power (FP) to 60% FP at 0.8% FP/min rate is simulated. Constraints on the rate of coolant temperature difference across the core and reactivity were applied for the design safety. For comparison criteria, this paper compares the GPC-SFR type-2 with the GPC-SFR type-1, i.e., standard model predictive control (MPC), to verify the viability and superior performance of the proposal regarding: (a) ramp-tracking capability of temperature and load; (b) the rejections of a reactivity disturbance of -1 cent and a secondary sodium inlet temperature disturbance of +10°F; and (c) a simulation with uncertainty in reactor design. The simulations show that the GPC-SFR type-2 overcome the GPC-SFR type-1 robustness and performance.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Numerical study of advanced solar receiver tubes based on a coupled thermo-mechanical analysis for concentrated solar power tower plant

The search for more sustainable energy to match the growing energy demand begins with finding more dispatchable resources such as solar energy. As one of the promising solar technologies, concentrated solar power (CSP) has a full capacity to store thermal energy for extended operation. Nevertheless, some key components in CSP systems usually face extreme environment, such as uneven solar flux, cyclic thermal expansion, structural degradation on the solar absorber tubes in a Concentrated Solar Power Tower (CSPT) Plant. In this study, we applied Multiphysics simulation to explore the benefits of introducing optimized fins for heat transfer enhancement and uniform temperature distribution, the goal is to improve the thermal efficiency of such advanced solar absorber tubes. The results of this study can supply design guidance for the manufacturing process of absorber tubes, and eventually can benefit the solar energy community for the next generation of molten salt based CSP system.

14 SOLAR ENERGY↗

Optimal Power System Black start using Inverter-Based Generation

Power system black start readiness is part of the system planning. Utility planners perform periodic studies to assess if their power system is capable of total restoration following a black out. Hydro and diesel generators are the most commonly used black start capable resources by power utilities. However, with increasing penetration of solar generation, inverter-based resources can be considered to provide black start capability. Since the solar inverters can be located at multiple locations throughout the power system, and in view of their unique characteristics, an optimal real-time capable plan is helpful for system operators for faster black start. Black start optimization is a multi stage mixed-integer non-linear optimization which is extremely hard to solve. In this paper, we propose an optimal black start methodology that is easier to solve and scalable in real-time. We demonstrate the proposed methodology on two test systems and illustrate how inverter-based resources can contribute and improve power system restoration.

power system restoration, blackstart, Inverter-bas↗

Tri-Level Linear Programming Model for Automatic Load Shedding Using Spectral Clustering

Traditional load shedding schemes can be inadequate in grids with high renewable penetration, leading to unstable events and unnecessary grid islanding. Although for both manual and automatic operating modes load shedding areas have been predefined by grid operators, they have remained fixed, and may be sub-optimal due to dynamic operating conditions. In this work, a distributed tri-level linear programming model for automatic load shedding to avoid system islanding is presented. Preventing islanding is preferred because it reduces the need for additional load shedding besides the disconnection of transmission lines between islands. This is crucial as maintaining the local generation-demand balance is necessary to preserve frequency stability. Furthermore, uneven distribution of generation resources among islands can lead to increased load shedding, causing economic and reliability challenges. This issue is further compounded in modern power systems heavily dependent on non-dispatchable resources like wind and solar. The upper-level model uses complex power flow measurements to determine the system areas to shed load depending on actual operating conditions using a spectral clustering approach. The mid-level model estimates the area system state, while the lower-level model determines the locations and load values to be shed. The solution is practical and promising for real-world applications.

Baquedano-Aguilar, Mario D.↗

Front-End Engineering and Design: Project Tundra Carbon Capture System (Final Report)

As the next phase of Project Tundra, Minnkota Power Cooperative (MPC) completed a front-end engineering and design (FEED) study to install a post-combustion CO 2 capture system (CCS) at the MPC operated (Square Butte Electric Cooperative-owned) Milton R. Young Station (MRYS) Unit 2 (MRY2), a 477-MW power plant fueled by North Dakota lignite. The project team completed the FEED with Fluor’s Econamine FG Plus℠ (EFG+) technology and is taking the next steps leading up to start of construction. Team members included FEED technical lead Fluor Enterprises (Fluor); owner’s engineer and balance of plant (BOP) engineer Burns & McDonnell (BMcD); leading carbon capture consultants (David Greeson Consulting, Hunt International Energy Services); environmental consultants (AECOM, Agora Environmental), other BOP engineering consultants (Golder Associates, Nels); cost-share funding agency, the North Dakota Industrial Commission (NDIC); and the Energy & Environmental Research Center (EERC). Project Tundra’s goal is to implement carbon capture, utilization, and storage (CCUS) in North Dakota, while preserving the use of lignite. Future options could lead to revitalizing legacy oil fields and creating a new CO 2 enhanced oil recovery (EOR) industry. The topic of this report is the FEED study for the carbon dioxide capture portion of Project Tundra. Building on the findings of a pre-FEED study for MRY2, the key deliverables contained in this FEED study are: a) design, costing, and performance data needed to commence project financing activities; b) engineering and material balances required to file for all project permits; and c) a final project schedule. Based on the results of the previous pre-FEED study, MPC and its team evaluated two options to provide the large amount of steam needed to operate the CCS: 1) installation of new natural gas package boilers and a new pipeline to supply natural gas to the facility and 2) extraction of steam from the existing MRYS steam turbine generator. The FEED study was performed using the package boilers option, as it was deemed to have the lowest technical risk, overall cost, and cost uncertainty. A key feature of the design, however, was the mixing the natural gas boilers’ flue gas with the MRY2 flue gas. This increased the size of the CCS system. This design also enabled the tie-in of Unit 1 flue gas for times when Unit 2 is offline. The CCS was designed to capture a combined 12,978 short tons per day (STPD) of CO 2 from the flue gases produced by the existing MRY Unit 2 along with flue gas produced by the new boiler package within the CCS. The 12,978 STPD CO 2 capture is achieved by normally processing 100% of the total available MRY Unit 2 flue gas (considering full load operation) and 100% of the boiler package flue gas, then removing 90% of the CO 2 available from the processed flue gas streams.

01 COAL, LIGNITE, AND PEAT↗

Optimizing Communication in 2D Grid-Based MPI Applications at Exascale

The new reality of exascale computing faces many challenges in achieving optimal performance on large numbers of nodes. A key challenge is the efficient utilization of the message-passing interface (MPI), a critical component for process communication. This paper explores communication optimization strategies to harness the GPU-accelerated architectures of these supercomputers. We focus on MPI applications where processors form a two-dimensional process grid, a common arrangement in applications involving dense matrix operations. This configuration offers a unique opportunity to implement innovative strategies to improve performance and maintain effective load distribution. We study two applications— Dist-FW (Apsp:all-pair-shortest-path) and HPL-MxP (LU factorization with Mixed precision)—on two accelerated systems: Summit (IBM Power and NVIDIA V100) and Frontier (AMD EPYC and MI250X). These supercomputers are operated by the Oak Ridge Leadership Computing Facility (OLCF) and are currently ranked #1 and #5 on the Top500 list. We show how to scale up both applications to exascale levels and tackle the MPI challenges related to implementation, synchronization, and performance. We also compare the performance of several communication strategies at an unprecedented scale. Accurately predicting application performance becomes crucial for cost reduction as the computational scale grows. To address this, we suggest a hyperbolic model as a better alternative to the traditional one-sided asymptotic model for predicting future application performance at such large scales.

Lu, Hao↗

Inverter Controls for Smooth Transition Operation and Voltage Balancing of Networked Microgrids

With increasing penetrations of distributed energy resources (DERs), researchers have extensively studied the formation and networking of microgrids to improve reliability during distribution system outages. However, these operations might require DERs in the microgrids to switch between grid-following (GFL) and grid-forming (GFM) modes of operation. A smooth transition between the operation modes should be ensured to have a stable system operation and to avoid nuisance tripping. Additionally, as we network microgrids, inverter control schemes with voltage-balancing controls are needed for unbalanced distribution networks. This paper presents the design of a GFM and GFL capable inverter control scheme for reliable operation in networked microgrids with mechanisms for 1) smooth transition between the GFL and GFM modes, and 2) negative sequence voltage control for voltage balancing. Using electromagnetic transient (EMT) simulations, the control scheme is first tested on a simple two-source power system using a digital real-time simulator. Next, a real-world distribution feeder with unbalanced loading and multiple DERs is used to demonstrate stable operation during the networking of microgrids with voltage balance support.

distributed energy resources↗

HEAT AND MASS TRANSFER IN HUMIDIFYING REGENERATOR FOR A SUB-ATMOSPHERIC HYBRID HEAT ENGINE

Heat and mass transfer processes in advanced modular sub-atmospheric hybrid heat engine have been evaluated for technical and economic feasibility. The presented concept combines fossil fuel energy conversion in a sub-atmospheric air turbine coupled with a reciprocating internal combustion engine to create a hybrid system for power generation. This system can achieve over 65% of net electrical or mechanical power conversion efficiency. The uniqueness of the advanced modular sub-atmospheric hybrid heat engine is in the operating conditions of the air turbine which operates at sub-atmospheric pressure and low temperature and produces power at high efficiency. This is possible due to a unique combination of the system components such as sub-atmospheric air turbine, humidifying air regenerator, and compressor inlet air cooling system. The humidifying air regenerator is the core component of the advanced sub-atmospheric turbine, which makes the turbine ultra-high efficient. It is a regenerative heat-mass exchanger to increase the working fluid (humid air) mass flow rate before the turbine and decrease the mass flow rate after the turbine. It is found that increased heat and mass transfer rate or increased air humidification in humidifying air regenerator would allow the turbine operating at lower temperature and increased efficiency. Optimal heat and mass transfer rates were found for higher efficiency, lower costs, and smaller footprint of the hybrid engine. The results of feasibility study of heat and mass transfer processes in the humidifying air regenerator are presented in this paper.

Heat Engine, Sub-atmospheric Turbine, Humidifying ↗

FRIB Beam Power Ramp-up: Status and Plans

After project completion on scope, on cost, and ahead of schedule, the Facility for Rare Isotope Beams began operations for scientific users in May of 2022. The ramp-up to a beam power of 400 kW is planned over a six-year period; 1 kW was delivered for initial user runs from in 2022, and 5 kW was delivered as of February 2023. Test runs with 10 kW 36Ar and 48Ca beams were conducted in July 2023. Upgrade plans include doubling the primary-beam energy to 400 MeV/nucleon for enhanced discovery potential (¿FRIB 400¿). This talk reports on the strategic plans towards high power operations emphasizing challenges and resolutions in beam-interception devices and targetry systems, radiation protection and controls, and legacy system renovation and integration.

43 PARTICLE ACCELERATORS↗

A comprehensive framework for validating simulation models of power system equipment using terminal measurements

Accurate simulation of power-plants is essential to the planning and operation of modern power grids. The current methods used to periodically check power-plant simulation models have many open questions about their limitations and accuracy. The research in this project explored using Monte-Carlo Experimentation (MCE) as a means for answering these important questions.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Transition Core Planning and Safety Analyses in Support of LEU Fuel Conversion of the University of Missouri Research Reactor (MURR)

The University of Missouri Research Reactor (MURR®) is one of six U.S. High Performance Research Reactors (USHPRR), including one critical facility, that is working with the National Nuclear Security Administration (NNSA) Office of Material Management and Minimization (M3) Reactor Conversion Program to convert from highly enriched uranium (HEU) to low-enriched uranium (LEU) fuel. The M3 Reactor Conversion USHPRR Project objectives include the development of LEU fuel element designs that will ensure safe reactor operations and to maintain the existing experimental performance of each facility. The work is being conducted through many inter-related activities being completed by four Project Pillars: Fuel Qualification (FQ), Fuel Fabrication (FF), Reactor Conversion (RC), and Cross Cutting (CC). A new type of LEU fuel based on an alloy of uranium-10 wt% molybdenum (U-10Mo) is expected to allow the conversion of those USHPRR, like MURR, requiring higher density fuels. The very-high-density LEU U-10Mo monolithic fuel is currently undergoing irradiation testing and post-irradiation examination under a planned and documented fuel qualification effort. The FQ Pillar will document fuel property and fuel performance data and qualify the fuel for use in these reactors. The FF Pillar is fabricating fuel for ongoing and future irradiation tests, as well as conducting fabrication demonstrations to validate or update preliminary fabrication assumptions. The FF Pillar is also working to develop and install commercial manufacturing capacity with the U-10Mo monolithic fuel to produce prototypic fuel. Working with the RC Pillar at Argonne, MURR has progressed through a preliminary fuel element design using preliminary data for the proposed monolithic alloy of U-10Mo. Analyses were completed in previous work that found for typical equilibrium operations with the preliminary LEU fuel element design, in conjunction with a power uprate to 12 MW and appropriate changes to the MURR Limiting safety system settings (LSSS), MURR will have adequate margins to safety for steady-state operations and postulated transient accidents and will have experimental performance in key locations that meets or exceeds current operations with HEU fuel. The purpose of this work is to develop a sequence of transition cycles that will enable MURR to transition from operation with the reactor core loaded with fresh LEU fuel elements only to typical equilibrium operations with mixed-burnup cores following conversion while meeting operational requirements on safety and experimental performance. It is expected that the use of fresh LEU fuel at conversion and subsequent low burnup of the LEU fuel elements that will initially be available for use following conversion will result in critical control blade positions that will substantially change the axial power distribution in the core and the neutron flux available in key experimental locations relative to equilibrium LEU operations. Given the constraints of MURR safety margins, operational practices, and production and research, a novel method has been developed to identify a transition sequence that minimizes the time MURR operates atypically compared to the current prototypic cycles using HEU fuel. The proposed transition sequence moves quickly to the same sort of equilibrium cycles for the LEU fuel that have already been evaluated in documented preliminary safety analyses. Although shifting the neutron flux peak to the lower half of the core during initial cycles with LEU at 12 MW reduces the experiment performance in some key locations relative to current HEU operations at 10 MW, all LEU cores provide an average performance that meets or exceeds that of HEU. An LEU cycle is reached that meets or exceeds the level of experimental performance predicted for current HEU and equilibrium LEU operations in more than 450 key locations identified by a reactor specialist at MURR by the 23rd cycle following conversion and that afterwards will enable MURR to consistently meet its experimental performance requirements. The proposed transition sequence only requires the fabrication of 34 fresh LEU elements in the first year of operation and does not exceed the anticipated availability of fresh elements that can be produced by the fuel fabricator. By the third year after conversion, 22 fresh LEU elements will be required each year, which is the same as expected for equilibrium LEU operations and the same as current operations with HEU fuel. The proposed transition sequence thus combines a relatively short time period before equilibrium burnup is achieved, a temporary increase of fuel elements needed annually relative to typical operations that are within the production capabilities of the fuel fabricator, and demonstrates comparable experimental performance of the LEU cores relative to current HEU operations. Further measures may be taken to reduce any initial experimental performance penalty even further, where possible, by repositioning certain experiments to leverage the increased performance in the lower axial experimental positions in the initial cycles following conversion or leaving the experiments in the irradiation facilities longer in order to achieve the required neutron fluence. This analysis may require refinement depending on the experimental facilities in use at the time of conversion. Nonetheless, the results presented here, including the experimental performance, core burnup, and critical control blade positions throughout the transition cycles, show that the proposed transition cycle fuel management patterns are consistent with what is expected and desired for MURR operation with LEU U-10Mo fuel. Detailed core power distributions from the neutronics models were also used to evaluate safety margins during steady-state operations for the selected transition cycles and the equilibrium LEU core. It is shown that there are adequate safety margins for both steady-state operations and postulated accident scenarios. For the steady-state operations with the preliminary LEU fuel element design the analysis predicts at least 2.49 MW margin to the onset of flow instability at the LSSS power of 15 MW. Considering the LSSS power is 125% of full license power, the margin to OFI is sufficient. In addition, the critical heat flux ratio at LSSS power is well above the requirement of CHFR > 2.0 from NUREG-1537 for all considered cases. For postulated transient accidents, the minimum margin to the fuel temperature safety limit is at least 109 °C. In summary, the proposed sequence of core loadings for MURR operations following conversion to LEU fuel and a power uprate to 12 MW provides sufficient safety margins for both steady-state operations and postulated transient accidents during a proposed sequence of transition cycles to equilibrium operations. Analysis has shown that there are some local experimental performance penalties during the initial cycles. Although there are local shifts in the experimental performance, on average all LEU cores at 12 MW have equal or higher performance than HEU at 10 MW. Temporary adjustments are being planned that will produce suitable experimental performance during these cycles. The results indicate that for the equilibrium LEU core the experimental performance exceeds that of current HEU operations in all key locations while also demonstrating sufficient safety margins.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗