Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “In Space Assembly”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,405 records · Page 78

Space Ops 2002: Bringing Space Operations into the 21st Century. Track 3: Operations, Mission Planning and Control. 2nd Generation Reusable Launch Vehicle-Concepts for Flight Operations

With the successful implementation of the International Space Station (ISS), the National Aeronautics and Space Administration (NASA) enters a new era of opportunity for scientific research. The ISS provides a working laboratory in space, with tremendous capabilities for scientific research. Utilization of these capabilities requires a launch system capable of routinely transporting crew and logistics to/from the ISS, as well as supporting ISS assembly and maintenance tasks. The Space Shuttle serves as NASA's launch system for performing these functions. The Space Shuttle also serves as NASA's launch system for supporting other science and servicing missions that require a human presence in space. The Space Shuttle provides proof that reusable launch vehicles are technically and physically implementable. However, a couple of problems faced by NASA are the prohibitive cost of operating and maintaining the Space Shuttle and its relative inability to support high launch rates. The 2nd Generation Reusable Launch Vehicle (2nd Gen RLV) is NASA's solution to this problem. The 2nd Gen RLV will provide a robust launch system with increased safety, improved reliability and performance, and less cost. The improved performance and reduced costs of the 2nd Gen RLV will free up resources currently spent on launch services. These resource savings can then be applied to scientific research, which in turn can be supported by the higher launch rate capability of the 2nd Gen RLV. The result is a win - win situation for science and NASA. While meeting NASA's needs, the 2nd Gen RLV also provides the United States aerospace industry with a commercially viable launch capability. One of the keys to achieving the goals of the 2nd Gen RLV is to develop and implement new technologies and processes in the area of flight operations. NASA's experience in operating the Space Shuttle and the ISS has brought to light several areas where automation can be used to augment or eliminate functions performed by crew and ground controllers. This experience has also identified the need for new approaches to staffing and training for both crew and ground controllers. This paper provides a brief overview of the mission capabilities provided by the 2nd Gen RLV, a description of NASA's approach to developing the 2nd Gen RLV, a discussion of operations concepts, and a list of challenges to implementing those concepts.

Hagopian, Jeff↗

Mothers of Invention: Hubble Engineers Push Robotic 'Evolution' to Save Telescope, Enable New Exploration

Robotic technology being developed out of necessity to keep the Hubble Space Telescope operating could also lead to new levels of man-machine team-work in deep-space exploration down the road-if it survives the near-term scramble for funding. Engineers here who have devoted their NASA careers to the concept of humans servicing the telescope in orbit are planning modifications to International Space Station (ISS) robots that would leave the humans on the ground. The work. forced by post-Columbia flight rules that killed a planned shuttle-servicing mission to Hubble, marks another step in the evolution of robot-partners for human space explorers. "Hubble has always been a pathfider for this agency," says Mike Weiss. Hubble deputy program manager technical. "When the space station was flown and assembled, Hubble was the pathfinder. not just for modularity, but for operations, for assembly techniques. Exploration is the next step. Things we're going to do on Hubble are going to be applied to exploration. It's not just putting a robot in space. It's operating a robot in space. It's adapting that robot to what needs to be done the next time you're up there."

Morring, Frank, Jr.↗

Shape Memory Actuated Normally Open Permanent Isolation Valve

A valve assembly for an in-space propulsion system includes an inlet tube, an outlet tube, a valve body coupling the inlet tube to the outlet tube and defining a propellant flow path, a valve stem assembly disposed within the valve body, an actuator body coupled to the valve body, the valve stem assembly extending from an interior of the valve body to an interior of the actuator body, and an actuator assembly disposed within the actuator body and coupled to the valve stem assembly, the actuator assembly including a shape memory actuator member that when heated to a transition temperature is configured to enable the valve stem assembly to engage the outlet tube and seal the propellant flow path.

Ramspacher, Daniel J.↗

The Space Station Freedom Flight Telerobotic Servicer - The design and evolution of a dexterous space robot

The Flight Telerobotic Servicer (FTS) will provide a telerobotic capability to the Space Station in the early assembly phases of the program and will be used for assembly, maintenance, and inspection throughout the lifetime of the Station. Here, the FTS design approach to the development of autonomous capabilities is discussed. The FTS telerobotic workstations for the Shuttle and Space Station, and facility for on-orbit storage are examined. The rationale of the FTS with regard to ease of operation, operational versatility, maintainability, safety, and control is discussed.

Mccain, Harry G.↗

Pre-Launch Risk Reduction Activities Conducted at KSC for the International Space Station

In the development of any large scale space-based multi-piece assembly effort, planning must include provisions for testing and verification; not only of the individual pieces but also of the pieces together. Without such testing on the ground, the risk to cost, schedule and technical performance increases substantially. This paper will review the efforts undertaken by the International Space Station (ISS), including the International Partners, during the pre-launch phase, primarily at KSC, to reduce the risks associated with the on-orbit assembly and operation of the ISS.

Kirkpatrick, Paul↗

An overview of the EASE/ACCESS space construction demonstration

Consideration is given to the development of the Experimental Assembly of Structures in EVA/Assembly Concept for Construction of Erectable Space Structures (EASE/ACCESS) space construction demonstration, which was performed during Space Shuttle mission 61-B. The mission equipment is described and illustrated and the EASE/ACCESS mission management structure is outlined. Simulations of the assembly and disassembly in the NASA neutral buoyancy simulators were used to test the mission plans. In addition, EVA training and crew performance for the mission are discussed.

Levin, George M.↗

International Space Station (ISS) S-Band Corona Discharge Anomaly Consultation

The Assembly and Contingency Radio Frequency Group (ACRFG) onboard the International Space Station (ISS) is used for command and control communications and transmits (45 dBm or 32 watts) and receives at S-band. The system is nominally pressurized with gaseous helium (He) and nitrogen (N2) at 8 pounds per square inch absolute (psia). MacDonald, Dettwiler and Associates Ltd. (MDA) was engaged to analyze the operational characteristics of this unit in an effort to determine if the anomalous behavior was a result of a corona event. Based on this analysis, MDA did not recommend continued use of this ACRFG. The NESC was requested to provide expert support in the area of high-voltage corona and multipactoring in an S-Band RF system and to assess the probability of corona occurring in the ACRFG during the planned EVA. The NESC recommended minimal continued use of S/N 002 ACRFG until a replacement unit can be installed. Following replacement, S/N 002 will be subjected to destructive failure analysis in an effort to determine the proximate and root cause(s) of the anomalous behavior.

Kichak, Robert A.↗

SSME component assembly and life management expert system

The space shuttle utilizes several rocket engine systems, all of which must function with a high degree of reliability for successful mission completion. The space shuttle main engine (SSME) is by far the most complex of the rocket engine systems and is designed to be reusable. The reusability of spacecraft systems introduces many problems related to testing, reliability, and logistics. Components must be assembled from parts inventories in a manner which will most effectively utilize the available parts. Assembly must be scheduled to efficiently utilize available assembly benches while still maintaining flight schedules. Assembled components must be assigned to as many contiguous flights as possible, to minimize component changes. Each component must undergo a rigorous testing program prior to flight. In addition, testing and assembly of flight engines and components must be done in conjunction with the assembly and testing of developmental engines and components. The development, testing, manufacture, and flight assignments of the engine fleet involves the satisfaction of many logistical and operational requirements, subject to many constraints. The purpose of the SSME Component Assembly and Life Management Expert System (CALMES) is to assist the engine assembly and scheduling process, and to insure that these activities utilize available resources as efficiently as possible.

Ali, M.↗

Geostationary earth observations - Platform operations from the Space Station

The ground, launch, and servicing operations associated with the deployment of a geostationary earth observation platform from the Space Station are discussed. The main features of a configuration developed for the next generation geostationary observation platform and its flight operations are reviewed. The total operational cost of the platform from initial launch, assembly, and test of the Space Station, and the geo insertion is estimated at $240M, with a subsequent servicing mission costing $123M.

Barberis, Neil↗

Description of the Mast Flight System

The Mast Flight System is composed of several subsystems. Primary among these is the Deployable Mast Subsystem (DMS) which consists of a beam assembly and an associated mechanism for deploying and retracting the beam. The beam assembly is a joint dominated graphite epoxy and titanium truss as is expected of future large space structures. Integral to the beam assembly are actuators, sensors and associated electronics which are available for excitation and damping as desired by the experimenter. The beam structural characteristics can also be modified as desired by the experimenter using the Parameter Modification Device installed at the end of the beam. Data measured on the beam by the sensors and commands to the actuators are transmitted along the beam digitally at 150 Hz using a standard 1553 type bus. The Modular Distributed Information Sybsystem (MDIS) computer functions as bus master and ensures that all experimental data is saved for future analysis. The MDIS computer also performs a safing function to prevent inadvertent overexcitation of the beam. Finally, the Excitation and Damping Subsystem (EDS) computer is available to the experimenter for implementation of control algorithms or any other numerical operations as desired. Data from all system sensors can be accessed by the EDS computer.

Talcott, Ronald C.↗

Use of Human Modeling Simulation Software in the Task Analysis of the Environmental Control and Life Support System Component Installation Procedures

Virtual reality and simulation applications are becoming widespread in human task analysis. These programs have many benefits for the Human Factors Engineering field. Not only do creating and using virtual environments for human engineering analyses save money and time, this approach also promotes user experimentation and provides increased quality of analyses. This paper explains the human engineering task analysis performed on the Environmental Control and Life Support System (ECLSS) space station rack and its Distillation Assembly (DA) subsystem using EAI's human modeling simulation software, Jack. When installed on the International Space Station (ISS), ECLSS will provide the life and environment support needed to adequately sustain crew life. The DA is an Orbital Replaceable Unit (ORU) that provides means of wastewater (primarily urine from flight crew and experimental animals) reclamation. Jack was used to create a model of the weightless environment of the ISS Node 3, where the ECLSS is housed. Computer aided drawings of the ECLSS rack and DA system were also brought into the environment. Anthropometric models of a 95th percentile male and 5th percentile female were used to examine the human interfaces encountered during various ECLSS and DA tasks. The results of the task analyses were used in suggesting modifications to hardware and crew task procedures to improve accessibility, conserve crew time, and add convenience for the crew. This paper will address some of those suggested modifications and the method of presenting final analyses for requirements verification.

Estes, Samantha↗

Development of kinematic equations and determination of workspace of a 6 DOF end-effector with closed-kinematic chain mechanism

This report presents results from the research grant entitled Active Control of Robot Manipulators, funded by the Goddard Space Flight Center, under Grant NAG5-780, for the period July 1, 1988 to January 1, 1989. An analysis is presented of a 6 degree-of-freedom robot end-effector built to study telerobotic assembly of NASA hardware in space. Since the end-effector is required to perform high precision motion in a limited workspace, closed-kinematic mechanisms are chosen for its design. A closed-form solution is obtained for the inverse kinematic problem and an iterative procedure employing Newton-Raphson method is proposed to solve the forward kinematic problem. A study of the end-effector workspace results in a general procedure for the workspace determination based on link constraints. Computer simulation results are presented.

Nguyen, Charles C.↗

Large space systems technology program

Technical challenges of shuttle-era large space systems include the development of space-configured spacecraft concepts, compatibility with the space transportation system, and cost effectiveness. The objectives and organization of NASA's large space structures program are outlined and program elements are discussed. The technology for the offset wrap-rip and the maypole (hoop/column) antenna concepts are discussed as well as analysis techniques for predicting the electromagnetic performance of a broad class of large reflectors. Deployable systems, assembly methods, and modular control systems for space platforms are described. Assembly equipment and devices, surface sensors and shape control, control and stabilization, and integrated analysis and design are also considered.

James, R. L., Jr.↗

Prefabricated High-Strength Rebar Systems with High-Performance Concrete for Accelerated Construction of Nuclear Concrete Structures

This project aimed to reduce the field construction times and fabrication costs of reinforced concrete (RC) nuclear structures through the use of: 1) high-strength steel deformed reinforcing bar (rebar); 2) prefabricated high-strength rebar (HSR) assemblies with headed anchorages; and 3) high-strength concrete (HSC). The focus of the project was not to develop new innovations on materials, but rather to fill a major knowledge gap on the effectiveness, code conformity, and viability (i.e., practicality, commercial availability) of existing high-strength materials in nuclear structures, especially in shear walls, their connections/joints, and around penetrations. These advances promote the Nuclear Energy Enabling Technologies Advanced Methods for Manufacturing (NEET-1) goals of accelerating deployment schedules by at least 6 months and reducing component fabrication costs by 20% or more. Toward this vision, the following objectives were identified and completed: Develop limit-benefit and cost-benefit analysis frameworks: The structural and economic limits and benefits of HSR and HSC in nuclear walls were evaluated. Importantly, it was found that modest increases in concrete strength up to 10.0 ksi and rebar yield strength up to 100 ksi result in the most economic designs and improved structural performance (Barbachyn et al., 2017a and Barbachyn et al., 2017b). Also, an industry survey was distributed to determine the cost benefits associated with prefabrication. Importantly, on-site worker-hours are significantly reduced, allowing for significantly accelerated construction schedules (Devine et al. 2018b). Develop an optimization methodology for structural design: An optimization study was deemed not necessary since the trivial solution with maximized use of high-strength materials and prefabrication always resulted in the largest cost and time savings. Instead, the benefits (and limits) of high-strength materials and prefabrication on construction costs and on-site construction time were investigated through a parametric study. Cost-reductions through the use of HSR and HSC were found to be greater than 40%. Also, on-site construction time of nuclear shear walls can be reduced by up to 83% through the use of prefabricated rebar assemblies. Conduct experimental evaluations of nuclear shear walls and wall-foundation joints: A large scale experimental program was completed on shear-critical RC cantilever deep beams. From these experiments, it was demonstrated that increasing rebar yield strength had a greater effect on increasing lateral strength than increasing the concrete compressive strength. Further, using HSR together with HSC resulted in the highest lateral strength and displacement ductility (Devine et al. 2018a). Additionally, large-scale reversed-cyclic lateral load tests were conducted on RC shear walls. It was demonstrated that through the utilization of HSR and HSC, a wall with 55% reduced vertical and horizontal rebar area was able to achieve 91% of the peak lateral strength of a conventional wall using state-of-practice materials with the same geometry. Further, trim reinforcement with headed anchorages around the penetrations proved to be effective. Develop validated numerical simulation models: Numerical modeling was completed in two phases during this project using 3 different finite element software packages. The first phase used existing measured data from previous experimental studies on stocky RC walls to validate simplified predictive models. Models using two different programs were validated based on a database of 38 stocky walls (Barbachyn et al., 2017a). The second phase occurred after experimental testing using a third and more detailed finite element package. Prediction improvements for the initial stiffness, lateral deformations, damage propagation, and failure mechanisms were targeted. The resulting detailed models more accurately predicted the peak lateral strength, initial and secant stiffnesses, lateral deformations, and cracking patterns of the wall test specimens subjected to reversed-cyclic lateral loading as compared to the simplified pretest models. Develop validated design procedures, tools, and criteria: This project evaluated the accuracy of existing closed-form design equations from U.S. building design standards and previous research (Barbachyn et al. 2017a and Devine et al. 2018a). It was shown that the current predictive equations for shear strength capacity need to be revisited as they provide significant scatter and gross overestimates, indicating the potential for unconservative designs. Further, for both the deep beam and shear wall specimens, the numerical models and flexural capacity predictions provided the most accurate strength predictions. Develop cost-effective field construction procedures: To promote the use of prefabricated rebar assemblies, the following construction conditions where prefabrication would be used instead of in-place rebar tying were identified from an industry survey: 1) to save on construction schedule; 2) to improve safety and/or quality control; 3) for areas with heavy rebar congestion; and 4) for structures with significant repetition in rebar layout. All of these conditions directly apply and benefit nuclear construction where construction costs and schedules are extensive, safety and quality are of utmost importance, the reinforcement is extremely dense, and the reinforcement layout is repetitive in many regions of the shear walls. Additionally, an experimental study was conducted to investigate the changes in bar spacing (with respect to code-required rebar spacing and placement tolerances) when a horizontally assembled prefabricated two-dimensional (2D) rebar mat or three-dimensional (3D) rebar cage is lifted (or tripped) to a vertical position. It was found that the bars involved in both the lateral translation of the rebar assemblies (i.e., movement of the assembly in its horizontal position) and the tripping process were most susceptible to large spacing changes, and thus, their positions within the assembly would need to be checked after the placement of the assembly in place within the formwork. Importantly, the spacings of all of the other bars in the assembly were not affected significantly by the lateral translation and tripping process, thereby eliminating the need to recheck their positions within the assembly (Devine et al. 2018b).

36 MATERIALS SCIENCE↗

Prebiotic chemistry in space; Proceedings of Symposia B1.4 and F3.3 of the COSPAR Scientific Assembly, 30th, Hamburg, Germany, July 11-21, 1994

A two-part symposium was held concerning topics in Solar System chemistry. The first part covered the organic chemistry ofsmall bodies of the interplanetray medium. It produced papers on the evolution, spectral properties and composition of organic matter in comets, interplanetary dust and asteroids. The second part covered cryochemistry and exobiology in planetary atmospheres (gas giant planets and their satellites) and in various astronomical ices.

Source record↗

Space Station Environmental Control and Life Support System Purge Control Pump Assembly Modeling and Analysis

Preliminary results from a thermal/flow analysis of the Purge Control Pump Assembly (PCPA) indicate that pump performance (mass flow rate) is enhanced via cooling of the housing and lowering of the inlet vapor quality. Under a nominal operational profile (25% duty cycle or less), at the maximum motor dissipation, it appears that the peristaltic tubing temperature will still remain significantly below the expected UPA condenser temperature (78 F max versus approximately 105 F in the condenser) permitting condensation in the pump head.

Schunk, R. Gregory↗

NASA's Space Launch System Takes Shape

Significant hardware and software for NASA's Space Launch System (SLS) began rolling off assembly lines in 2016, setting the stage for critical testing in 2017 and the launch of new capability for deep-space human exploration. (Figure 1) At NASA's Michoud Assembly Facility (MAF) near New Orleans, LA, full-scale test articles are being joined by flight hardware. Structural test stands are nearing completion at NASA's Marshall Space Flight Center (MSFC), Huntsville, AL. An SLS booster solid rocket motor underwent test firing, while flight motor segments were cast. An RS-25 and Engine Control Unit (ECU) for early SLS flights were tested at NASA's Stennis Space Center (SSC). The upper stage for the first flight was completed, and NASA completed Preliminary Design Review (PDR) for a new, powerful upper stage. The pace of production and testing is expected to increase in 2017. This paper will discuss the technical and programmatic highlights and challenges of 2016 and look ahead to plans for 2017.

Askins, Bruce R.↗