Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Geodetics”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,405 records · Page 78

DPOD2020: A DORIS Extension of the ITRF2020 for Precise Orbit Determination

As one of the tracking systems used to determine orbits of the altimeter mission satellites (such as TOPEX/Poseidon, Envisat, Jason-1/-2/-3, CryoSat-2, Saral/Altika, Sentinel-3A/-3B, HY-2A/C/D, Jason-CS/Sentinel-6A, SWOT), DORIS (Doppler Orbitography Radiopositionning Integrated by Satellite) allows to determine positions and velocities of tracking stations that define a stable reference for the estimation of the precise orbits and thus are fundamental for the quality of the altimeter data and derived mean sea level products. Due to the time evolution of the DORIS ground network, some stations included in the 2020 realization of the International Terrestrial Reference Frame (ITRF2020) have been decommissioned and since 2021.0 a few new stations were added to the tracking network. Therefore, to satisfy operational requirements for POD (Precise Orbit Determination) and routine delivery of geodetic products, the International DORIS Service (IDS) regularly updates the DPOD (DORIS terrestrial reference frame for Precise Orbit Determination). The DPOD solutions include mean positions and velocities of all the DORIS stations since 1993.0 derived from the stacking of the latest IDS weekly combined series aligned to the current ITRF. In this paper, we first present the stacking process of the DPOD2020 version 1.0. Then, we address the validation procedure of the DPO2020 including comparison with ITRF2020 and POD tests. For eighty percent of all the time segments of all the DORIS stations, the station position differences between DPOD2020 version 1.0 and ITRF2020 are smaller than ten millimeters. The major position differences between these two solutions are associated with the DORIS sites either localized in the South Atlantic Anomaly region or with time spans smaller than one year. Compared to DPOD2014, the DPOD2020 shows reduction of the main statistics of the DORIS-to-DORIS tie residuals (differences between the estimated and measured ties). The POD tests showed similar results for DPOD2020 and DPOD2014 for most of the altimetric satellites (TOPEX/Poseidon, Jason-1, CryoSat-2, Jason-3). In addition, we observed better POD results with DPOD2020 for the latest altimetric satellite Sentinel-3A as well as a slight degradation for Jason-2. That degradation was fully explained by slightly worst results for the stations localized in the South Atlantic Anomaly region.

DORIS↗

Investigating Biases in VLBI Clock Functions and Position Solutions

A systematic bias causing a statistically significant drift between group delay and phase delay measurements in geodetic Very Long Baseline Interferometry (VLBI)has long been present. The cause of this drift remains unknown, although it is readily reproduced in VLBI experiments including a short baseline such as those conducted with the twin 13-meter telescopes at the Wettzell observatory, given the station names WETTZ13N and WETTZELL. This statistical incompatibility has been an obstacle in adopting phase delays in routine VLBI processing. The aim of this study is to provide additional evidence to aid in identifying the source of this systematic bias. A series of four regular VLBI experiments are processed with both group delays and phase delays, and post fit residuals, estimated positions, and clock functions are presented with and without phase calibration applied. These results are also computed for individual intermediate frequency bands.

Geodesy↗

The VGOS High Road: From Inception and Prototyping to Operations to Maturation and Beyond

Legacy S/X has been the production system of the IVS since the inception of the service. VGOS was declared operational in 2020 after a visionary journey that involved designing, prototyping, and demonstrating the feasibility of the new observing system to generate high-quality geodetic products. And a fledgling VGOS network of between 8 and 10 stations has been contributing IVS products operationally ever since. That VGOS network had further increased by the end of 2022 to 12 stations, and counting. Currently, the VGOS observing program encompasses the 24-hour VGOS-OPS and VGOS-RD session series; further, a weekdaily VGOS Intensive series has been established (with other VGOS Intensives being set up). In addition to the network, VGOS correlation capabilities have also expanded to try to keep pace with the increased VGOS correlation load, morphing into a multi-center distributed correlator. In this poster, we will provide a status overview of the infrastructure realization efforts of the VGOS station network and the correlation centers as well as plans for a bright VGOS future.

VLBI↗

Impact of DORISx Post Seismic Deformation and Seasonal Corrections on the DPOD2020 Solution

As one of the tracking systems used for the altimeter missions (such as TOPEX/Poseidon, Envisat, Jason-1/-2/-3, CryoSat-2, Saral/AltiKa, Sentinel-3A/-3B, HY-2A/C/D, Jason-CS/Sentinel-6A, SWOT), the position of the DORIS tracking stations provides a fundamental reference for the estimation of the precise orbits and so, by extension is fundamental for the quality of the altimeter data analysis and derived products. Due to the time evolution of the DORIS ground network, stations included in ITRF2020 may have been decommissioned and stations that were added to the tracking network after 2021.0 are, by definition, not part of ITRF2020. Therefore, to satisfy operational requirements for precise orbit determination and routine delivery of geodetic products, the International DORIS Service maintains the DORIS terrestrial reference frame for Precise Orbit Determination (DPOD) solutions. Since 2016, the DPOD products are computed by the IDS Combination Center (CC) as a DORIS cumulative position and linear velocity solution aligned to the latest available ITRF and using the latest IDS weekly combined series. Mid-2023, the IDS CC started the computation of the second version of the DPOD2020 based on the IDS 20 weekly solutions from 1993.0 to 2023.0. With that new solution, the IDS CC will include Post Seismic Deformation (PSD) corrections for some DORIS sites such as Socorro Island. These DPOD PSD corrections are determined from the analysis of DORIS coordinate time series only. The second version will also include optional annual and semi-annual station corrections. The presentation will describe the analysis used for extracting the PSD and seasonal DORIS station corrections, compare such corrections to those derived for ITRF2020, and evaluate the impact these new corrections have on station positioning and satellite POD.

Guilhem Moreaux↗

On The Processing of Log Files for Monitoring Antenna Health

In order to improve the quality of geodetic results, we have developed an infrastructure for timely processing of telemetry from IVS observing stations. We check every hour for new log files with telemetry from both VLBI observing sessions, single dish experiments, and stow-in data collection and automatically process them. The telemetry data we use is the system temperature, phase calibration phases and amplitudes, system equivalent flux density, and the differences between formatter clock and GPS clock. For the system temperature and phase calibration, processing includes filtering out outliers and computing averages and rms of the scatter in each scan. Furthermore, for the phase calibration we also compute the group delay and detect spurious signals. Cleaned and post-processed telemetry is archived. Our process detects abnormalities, such as, anomalously high system temperature, unstable phase calibration phases, jumps in the GPS and formatter clock differences, and others. With our procedure, the latency of detection of station abnormalities is reduced to less than two hours. Early detection of abnormalities reduces the amount of affected data since station personnel get early alerts. We discuss our experience of running this system since 2022.

Phase Calibration↗

From Formal Errors Towards Realistic Uncertainties

Evaluation of uncertainties of geodetic parameter estimates is the problem that is not yet solved in a satisfactory way. A direct evaluation of the uncertainties derived from a least square solution is labeled "formal" and is usually biased, sometimes up to an order of magnitude. Customary, the use of formal errors for scientific analysis is discouraged. We claim that the root of the problem is neglecting off-diagonal elements in the variance-covariance matrix of the noise in the data. A careful reconstruction of the full variance-covariance matrix, including the off-diagonal terms greatly improves realism of uncertainty estimates derived from least squares. We processed the dataset of VLBI group delays and built a prior variance-covariance of the atmosphere-driven noise based on analysis of the output of NASA high-resolution numerical weather models. We found that the uncertainties of parameter estimates derived from this least square solution that uses such variance-covariance matrices become much closer to realistic errors. We consider approaches for implementation of this method in routine data analysis of space geodesy data.

Leonid Petrov↗

Satellite Laser Ranging at Brandal

Space Geodesy Satellite Laser Ranging (SGSLR) is a component of NASA’s Space Geodesy Project. It is an initiative to renew and expand NASA’s Geodetic Network. SGSLR at Ny-Ålesund is being developed, deployed, and integrated into the NASA Network by KBR Wyle, in partnership between NASA and Kartverket.

Evan Hoffman↗

On The Processing of Log Files for Monitoring Antenna Health

In order to improve the quality of geodetic results, we have developed an infrastructure for timely processing of telemetry from IVS observing stations. We check every hour for new log files with telemetry from both VLBI observing sessions, single dish experiments, and stow-in data collection and automatically process them. The telemetry data we use is the system temperature, phase calibration phases and amplitudes, system equivalent flux density, and the differences between formatter clock and GPS clock. For the system temperature and phase calibration, processing includes filtering out outliers and computing averages and rms of the scatter in each scan. Furthermore, for the phase calibration we also compute the group delay and detect spurious signals. Cleaned and post-processed telemetry is archived. Our process detects abnormalities, such as, anomalously high system temperature, unstable phase calibration phases, jumps in the GPS and formatter clock differences, and others. With our procedure, the latency of detection of station abnormalities is reduced to less than two hours. Early detection of abnormalities reduces the amount of affected data since station personnel get early alerts. We discuss our experience of running this system since 2022.

VLBI↗

A Photonic Clockwork for Deployed Timing and Radar

We present an environmentally robust photonic RF/microwave clockwork with low size, weight, and power (SWaP) for next-generation, field-deployable timing and radar applications. Compared to microwave references, optical local oscillators offer superior fractional frequency stability and phase-noise performance. When transferred with high fidelity into the RF/microwave domain, this “optical advantage” promises unparalleled performance across both private-industry and government (e.g., defense and space-agency) applications including very-long-baseline interferometry (VLBI), alternative positioning, navigation, and timing (PNT), multi-static synthetic aperture radar (MSAR), and geodetic sensing. However, this potential has yet to be fully realized outside the metrology lab primarily due to the high-SWaP and excessive environmental susceptibility of both the optical reference itself as well as the optical frequency comb (OFC) required to transfer the optical stability into the RF/microwave domain. Here, we present two demonstrations of a low-SWaP, environmentally robust photonic clockwork used to make a high-fidelity optical-microwave link with the stability and phase-noise performance relevant to the applications described above. Additionally, operational-testing results of the OFC subsystem under application-relevant environmental conditions will be presented to show pathway to field deployment of this critical subsystem.

Guangning Yang↗

International DORIS Service (IDS): The IDS at 20 and the IVS at 25; Together on a Long Journey

This is an invited presentation to the the IVS General Meeting 2024 to celebrate the 25th anniversary of the International VLBI Service (IVS). The presentation shares aspects of the common journey of the International DORIS Service (IDS), and IVS over the last 20 years, as sibling services of the International Association of Geodesy, and as space geodetic techniques that contribute to the International Terrestrial Reference Frame (ITRF).

DORIS↗

Sea Ice Deformation Is Not Scale Invariant Over Length Scales Greater Than A Kilometer

In March and April 2021, buoys were deployed in the Beaufort Sea, Arctic Ocean, to measure sea-ice horizontal deformation over spatial scales that had not been previously achieved. Geodetic-quality position measurements allowed measurements of strain-rate over lengths from about 200 m to 2 km. Conventional ice-drifters extended spatial coverage up to about 100 km. Past studies find there is multi-fractal behavior for horizontal sea-ice deformation from 10 to 1000 km. Our results demonstrate that such behavior does not hold when including spatial scales below 10 km. We find that sea-ice deformation is not scale in variant between the scale of individual sea-ice floes and aggregates of floes. Therefore, we cannot expect the same physical laws or forcing to describe sea-ice kinematics over these regimes, nor can we assume log-log linear behavior for mean deformation. Using this scaling behavior as a metric to validate models that resolve sea ice floes and their interactions is hence not recommended.

Jennifer K. Hutchings↗

Recent Progress at the International Laser Ranging Service (ILRS)

The International Laser Ranging Service (ILRS) is experiencing significant growth. New stations are being built and brought into operation, expanding the spatial and temporal coverage of the Satellite Laser Ranging (SLR) observations. Some of these stations are multi-technique Core Sites that allow us to exploit the combined strengths of different geodetic space techniques. New satellites are strengthening the ILRS contribution to the International Terrestrial Reference Frame (ITRF), and expanding the spectrum of satellite applications supported by the ILRS. New analysis, modeling, and data processing techniques continue to improve the science products. New campaigns are continuing to expand SLR applications into relativity and the study of non-gravitational forces. The ILRS is currently participating in the Galileo for Science campaign (G4S_2.0 project), funded by the Italian Space Agency (ASI), which aims to perform a set of measurements in the field of gravitation with the Galileo satellites, taking advantage of the accuracy of the on-board atomic clocks and, in particular, of GSAT0201and GSAT0202 by exploiting their relatively high eccentricity (~0.16). New activities underway in Lunar Laser Ranging (LLR), with the imminent launch and deployment of the upcoming Next Generation Lunar Retroreflector - 1 (NGLR-1) to the lunar surface. Some new satellites supported by the ILRS are now exploring means of capturing Space Debris, while some ILRS stations run local laser ranging projects to track space debris, contributing to the maintenance of various data catalogs. Time transfer experiments are also expanding the application of laser ranging, linking two fully characterized optical clocks at different locations with SLR (Einstein Synchronization) providing measurements of height differences, demonstrating the feasibility of a physical height system. Two-way and one-way transponders activity has been underway since the LASSO experiment in the 1990’s. More experiments are underway or planned. Applications include time and frequency transfer and clock synchronization between ground and space, interplanetary laser ranging, and fundamental physics. This presentation will give an update on ILRS activities and the impact that these activities have had and will have on ILRS data products.

Lunar Laser Ranging↗

Regional quantitative play fairway analysis: methodology global examples and application for the East African Rift system

Most volcanic arcs and active rifts around the world host producing geothermal systems. Many undiscovered and/or undeveloped systems remain in each of these areas, including magmatic-heated systems, amagmatic extension-related systems, and blind resources lacking active surface manifestations in both types of settings. However, not all volcanic centers or extensional terranes have the same geothermal potential. For example, even when high heat flow is present, permeability is commonly a limiting factor to resource development. A tool recently adapted for the geothermal industry is play fairway analysis, which calculates the regional probability of power-capable resources based on the spatial coincidence of key geologic conditions. In a geothermal setting, these key geologic conditions are heat, permeability, and fluids. Higher enthalpy systems also benefit from suitable cap rock. These parameters can be assessed through multiple geologic, geochemical, and geophysical data sets and integrated quantitatively to produce a single geothermal play fairway map. Potential input data sets include but are not limited to: 1) tectonic setting; 2) structural setting; 3) faults attributed by recency of rupture and slip rate; 3) geodetic crustal stain models; 5) gravity; 6) earthquake distribution; 7) thermal models; 8) geochemistry from springs, wells, and fumaroles; 9) temperature from springs, wells, and fumaroles; 10) fumarole size and type; and 11) age of volcanism. Recent play fairway studies have been completed for volcanic arcs and the dominantly amagmatic, extensional Great Basin region, USA, but have yet to be applied to the East African Rift System (EARS). Previous estimates of total geothermal resource capacity in the EARS is ~20 GWe, but only three areas are currently in production as of 2015: Olkaria and Eburru in Kenya, and Aluto-Langano in Ethiopia for a total installed capacity of <0.7 GWe. Many more volcanic centers host potential resources. In addition, amagmatic and/or blind systems also have potential in the EARS. Play fairway analysis can highlight regions most prospective for geothermal resource development, help identify locations prospective for undiscovered resources, prioritize overall exploration and development efforts, and refine estimates for total undeveloped resource potential.

15 GEOTHERMAL ENERGY↗

The Dresden Felsenkeller shallow-underground accelerator laboratory for nuclear astrophysics - Status and first physics program

Favored by the low background in underground laboratories, low-background accelerator-based experiments are an important tool to study nuclear reactions involving stable charged particles. This technique has been used for many years with great success at the 0.4 MV LUNA accelerator in the Gran Sasso laboratory in Italy, protected from cosmic rays by 1400 m of rock. However, the nuclear reactions of helium and carbon burning and the neutron source reactions for the astrophysical s-process require higher beam energies than those available at LUNA. Also the study of solar fusion reactions necessitates new data at higher energies. As a result, in the present NuPECC long range plan for nuclear physics in Europe, the installation of one or more higher-energy underground accelerators is strongly recommended. An intercomparison exercise using the same High-Purity Ge detector at several sites has shown that, with a combination of 45 m rock overburden, as can be found in the Felsenkeller underground site in Dresden, and an active veto against the remaining muon flux, in a typical nuclear astrophysics setup a background level can be achieved that is similar to the deep underground scenario as in the Gran- Sasso underground laboratory, for instance. Recently, a muon background study and geodetic measurements were carried out by the REGARD group. It was estimated that the rock overburden at the place of the future ion accelerator is equivalent to 130 m of water. The maximum muon flux measured was 2.5 m{sup -2} sr{sup -1} s{sup -1}, in the direction of the tunnel entrance. Based on this finding, a used 5 MV pelletron tandem accelerator with 250 μA up-charge current and external sputter ion source has been obtained and transported to Dresden. Work on an additional radio-frequency ion source on the high voltage terminal is in progress and far advanced. The installation of the accelerator in the Felsenkeller is expected for the near future. The status of the project and the planned access possibilities for external users will be reported, together with the instrumentation to be installed and proposals for the first solar physics measurements to be done at this new low-background facility. (authors)

43 PARTICLE ACCELERATORS↗

Environmental Restoration of Diesel-Range Organics from Project Chariot, Cape Thompson, Alaska - 16147

Cape Thompson, Alaska, is located approximately 120 miles north of Kotzebue, Alaska, within the Ogotoruk Creek valley. The remote Alaskan location is also home to the US Atomic Energy Commission (AEC) Project Chariot study area. Project Chariot was part of the Plowshare Program, created in 1957 by the AEC to study peaceful uses for atomic energy. Project Chariot began in 1958 when a scientific field team chose Cape Thompson as a potential site to excavate a harbor using a series of nuclear explosions. Between 1959 and 1962, AEC was responsible for over 40 pretest bio-environmental and geotechnical studies of the Cape Thompson area. Strong public opposition to the tests developed, which caused the project to be cancelled with no nuclear explosions ever conducted at the site. In the early 1960's, several deep boreholes were drilled to obtain subsurface, temperature, and high-explosive testing data. Refrigerated diesel was used as a drilling fluid to keep the boreholes open so that thermistors could measure subsurface temperatures. The test boreholes were named Able, Baker, Charlie, Dog, and X-1. In the summer of 2014, the US Department of Energy, Office of Legacy Management (LM) completed the remediation of remnant diesel at these sites. Prior to the 2014 remediation activities, LM conducted two separate characterization field studies to determine the nature and extent of the contamination from the 1960's drilling activities. In 2013, LM developed a remediation plan that was submitted and approved by the Alaska Department of Environmental Conservation (ADEC). The 2014 Project Chariot remediation had some unique logistical challenges and historic issues with stakeholders to overcome. Many of the historic issues centered on previous AEC scientific actions and a general mistrust of the government by the local stakeholders. Prior to and during the 2014 remediation work, an outreach campaign was implemented to discuss prior activities at the site and include stakeholders from Point Hope, Alaska, in the remediation-planning process. The remoteness of the region also provided unique logistical challenges. Because of the short field season, LM initiated several subcontracts over a year in advance. The field camp, heavy equipment, and soil storage containers were shipped by barge to the site. Personnel, food, and small materials were flown in by bush plane from Kotzebue, Alaska. Previous site characterization had identified diesel-range organics (DROs) as the primary contaminant. The cleanup levels for the site were provided by the Alaska Administrative Code (AAC) for the Arctic Zone region. The AAC cleanup level for DROs on gravel pads is 500 mg/kg and 12,500 mg/kg tundra in the arctic-zone region. To help determine the extent and direct soil excavation in the field, photoionization detectors (PIDs) were used for field screening. While the PID results provided rough limits for excavation, laboratory confirmation sampling was required to provide actual excavation guidance. All excavation locations remained open until laboratory results met AAC criteria and ADEC approved closure. The laboratory sample protocol required the bush plane to pick up samples almost daily and transfer them to Anchorage for analysis. In order to meet holding time requirements, all laboratory samples were analyzed on an expedited basis. Analytical results and ADEC approval notifications were e-mailed back to the site via satellite connection. A total of 202 laboratory analyses were needed to complete the remediation effort. At each location (Able, Baker, Charlie, Dog, and X-1), the boreholes were plugged and abandoned in accordance with ADEC regulations. Contaminated soil was excavated, and the material was placed in super-sacks and hauled to connex boxes located near the sea shore. Approximately 786 tons of material was removed and shipped by barge to the Columbia Ridge Landfill in Arlington, Oregon, for disposal. The well casings were cut and sealed below ground surface. Each location was graded to its original contours and reclaimed with native vegetation, and a geodetic survey was conducted. Tours with leaders of the Village of Point Hope and the land owner (Arctic Slope Regional Corporation) were conducted prior to the final demobilization. All remediation equipment and camp facilities were removed at the completion of the project. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Rising Water Levels and Vegetation Shifts Drive Substantial Reductions in Methane Emissions and Carbon Dioxide Uptake in a Great Lakes Coastal Freshwater Wetland

ABSTRACT Coastal freshwater wetlands are critical ecosystems for both local and global carbon cycles, sequestering substantial carbon while also emitting methane (CH 4 ) due to anoxic conditions. Estuarine freshwater wetlands face unique challenges from fluctuating water levels, which influence water quality, vegetation, and carbon cycling. However, the response of CH 4 fluxes and their drivers to altered hydrology and vegetation remains unclear, hindering mechanistic modeling. To address these knowledge gaps, we studied an estuarine freshwater wetland in the Great Lakes region, where rising water levels led to a vegetation shift from emergent Typha dominance in 2015–2016 to floating‐leaved species in 2020–2022. Using eddy covariance flux measurements during the peak growing season (June–September) of both periods, we observed a 60% decrease in CH 4 emissions, from 81 ± 4 g C m −2 in 2015–2016 to 31 ± 3 g C m −2 in 2020–2022. This decline was driven by two main factors: (1) higher water levels, which suppressed ebullitive fluxes via increased hydrostatic pressure and extended CH 4 residence time, enhancing oxidation potential in the water column; and (2) reduced CH 4 conductance through plants. Net carbon dioxide (CO 2 ) uptake decreased by 90%, from −267 ± 26 g C m −2 in 2015–2016 to −27 ± 49 g C m −2 in 2020–2022. Additionally, diel CH 4 flux patterns shifted, with a distinct morning peak observed in 2015–2016 but absent in 2020–2022, suggesting changes in plant‐mediated transport and a potential decoupling from photosynthesis. The dominant factors influencing CH 4 fluxes shifted from water temperature and gross primary productivity in 2015–2016 to atmospheric pressure in 2020–2022, suggesting an increased role of ebullition as a primary transport pathway. Our results demonstrate that changes in water levels and vegetation can substantially alter CH 4 and CO 2 fluxes in coastal freshwater wetlands, underscoring the critical role of hydrological shifts in driving carbon dynamics in these ecosystems.

54 ENVIRONMENTAL SCIENCES↗

Nevada Great Basin Play Fairway Analysis Regional Data

This project focused on defining geothermal play fairways and development of a detailed geothermal potential map of a large transect across the Great Basin region (96,000 km2), with the primary objective of facilitating discovery of commercial-grade, blind geothermal fields (i.e. systems with no surface hot springs or fumaroles) and thereby accelerating geothermal development in this promising region. Data included in this submission consists of: structural settings (target areas, recency of faulting, slip and dilation potential, slip rates, quality), regional-scale strain rates, earthquake density and magnitude, gravity data, temperature at 3 km depth, permeability models, favorability models, degree of exploration and exploration opportunities, data from springs and wells, transmission lines and wilderness areas, and published maps and theses for the Nevada Play Fairway area.

130C↗