Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “FERMILAB”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,405 records · Page 78

Search for Hidden Sector and Dark Matter Particles Produced at Fermilab's NuMI Target

In the long tradition of exotic searches at fixed-target experiments, we plan to use the NuMI beam-target and the NOvA Near Detector to observe potential signatures of Hidden Sector or Dark Matter particles, either directly produced within the target or through theoretically postulated mediators. Expecting mostly scattering events on electrons or nucleons as their signatures, an example of a mediator generated scalar dark matter particles is used to discuss the target production profile of a dark matter beam. This channel explores the capabilities of the detector to observe neutral-current events from electron-neutrino scattering interactions.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

BEAM EXTRACTION FROM THE RECYCLER RING TO P1 LINE AT FERMILAB

The transfer line for beam extraction from the Recycler ring to P1 line provides a way to deliver 8 GeV kinetic energy protons from the Booster to the Delivery ring, via the Recycler, using existing beam transport lines, and without the need for new civil construction. It was designed in 2012. The kicker magnets at RR520 and the lambertson magnet at RR522 in the RR were installed in 2014 Summer Shutdown, the elements of RR to P1 Stub (permanent quads, trim quads, correctors, BPMs, the toroid at 703 and vertical bending dipole at V703 (ADCW) were installed in 2015 Summer Shutdown. On Tuesday, June 21, 2016, beam line from the Recycler Ring to P1 line was commissioned. The detailed results will be presented in this report.

43 PARTICLE ACCELERATORS↗

The muon g-2 experiment at Fermilab

A new measurement of the anomalous magnetic moment of the muon, $a_{\mu} \equiv (g-2)/2$, will be performed at the Fermi National Accelerator Laboratory with data taking beginning in 2017. The most recent measurement, performed at Brookhaven National Laboratory and completed in 2001, shows a 3.5 standard deviation discrepancy with the standard model prediction of $a_\mu$. The new measurement will accumulate 21 times those statistics using upgraded detection and storage ring systems, enabling a measurement of $a_\mu$ to 140 ppb, a factor of 4 improvement in the uncertainty the previous measurement. This improvement in precision, combined with recent and ongoing improvements in the evaluation of the QCD contributions to the $a_\mu$, could provide a 7.5$\sigma$ discrepancy from the standard model if the current difference between experiment and theory is confirmed, a possible indication of new physics.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Reuse Recycler: High Intensity Proton Stacking at Fermilab

After a successful career as an antiproton storage and cooling ring, Recycler has been converted to a high intensity proton stacker for the Main Injector. We discuss the commissioning and operation of the Recycler in this new role, and the progress towards the 700 kW design goal.

43 PARTICLE ACCELERATORS↗

Fermilab Heroes of the LHC: Joel Butler

Particle physics research is both international and collaborative, with large national laboratories working together to most efficiently advance science. Joel Butler, Distinguished Scientist at Fermi National Accelerator Laboratory is the leader of the Compact Muon Solenoid experiment at the CERN laboratory in Europe. In this video, Joel tells us a bit about what it’s like.

43 PARTICLE ACCELERATORS↗

The Muon $g$-$2$ Experiment at Fermilab

A new measurement of the anomalous magnetic moment of the muon, $a_{\mu} \equiv (g-2)/2$, will be performed at the Fermi National Accelerator Laboratory with data taking beginning in 2017. The most recent measurement, performed at Brookhaven National Laboratory (BNL) and completed in 2001, shows a 3.5 standard deviation discrepancy with the standard model value of $a_\mu$. The new measurement will accumulate 21 times the BNL statistics using upgraded magnet, detector, and storage ring systems, enabling a measurement of $a_\mu$ to 140 ppb, a factor of 4 improvement in the uncertainty the previous measurement. This improvement in precision, combined with recent improvements in our understanding of the QCD contributions to the muon $g$-$2$, could provide a discrepancy from the standard model greater than 7$\sigma$ if the central value is the same as that measured by the BNL experiment, which would be a clear indication of new physics.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

LLRF System for the Fermilab Muon g-2 and Mu2e Projects

The Mu2e experiment measures the conversion rate of muons into electrons and the Muon g-2 experiment measures the muon magnetic moment. Both experiments require 53 MHz batches of 8 GeV protons to be re-bunched into 150 ns, 2.5 MHz pulses for extraction to the g-2 target for Muon g-2 and to a delivery ring with a single RF cavity running at 2.36 MHz for Mu2e. The LLRF system for both experiments is implemented in a SOC FPGA board integrated into the existing 53 MHz LLRF system in a VXI crate. The tight timing requirements, the large frequency difference and the non-harmonic relationship between the two RF systems provide unique challenges to the LLRF system design to achieve the required phase alignment specifications for beam formation, transfers and beam extinction between pulses. The new LLRF system design for both projects is described and the results of the initial beam commissioning tests for the Muon g-2 experiment are presented.

43 PARTICLE ACCELERATORS↗

Prospects for a Muon Spin Resonance Facility in the Fermilab MuCool Test Area

This paper investigates the feasibility of re-purposing the MuCool Test Area (MTA) beamline and experimental hall to support a Muon Spin Resonance (MuSR) facility, which would make it the only such facility in the US. This report reviews the basic muon production concepts studied and operationally implemented at TRIUMF, PSI, and RAL and their application in the context of the MTA facility. Two scenarios were determined feasible. One, an initial minimal-shielding and capital-cost investment stage with a single secondary muon beamline that utilizes an existing high- intensity beam absorber and, another, upgraded stage, that implements an optimized production target pile, a proximate high-intensity absorber, and optimized secondary muon lines. A unique approach is proposed which chops or strips a macropulse of H$^-$ beam into a micropulse substructure – a muon creation timing scheme – which allows Muon Spin Resonance experiments in a linac environment. With this timing scheme, and attention to target design and secondary beam collection, the MTA can host enabling and competitive Muon Spin Resonance experiments.

43 PARTICLE ACCELERATORS↗