Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “DECOMMISSIONING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,405 records · Page 78

A High Power CW Input Coupler with Reduced Static and Dynamic Losses

Each niobium cavity employed in superconducting accelerators requires a power coupler that supplies it with up to hundreds of kW’s of CW RF power, which is delivered to the 2K or 4K cold cavity from a Room Temperature (RT) source. Coupler design is a challenging task. It should transmit the minimum possible thermal power flow to the cavity, because a single watt at 2K requires 1 kW of cryogenic system power to remove it. Since the coupler connects the cold cavity to a Room Temperature (RT) power source, it transmits a static thermal load due to its thermal conductivity. Also, the coupler experiences heating by RF fields. This dissipated power partially penetrates to the 2K zone, and is called a dynamic load. From one point of view, the coupler should have low thermal conductivity, in order to decrease the static load. Stainless steel (SS) is usually used for that reason, but it also has low electrical conductivity, which introduces a high dynamic load. Copper plating on the SS is required to improve the electrical conductivity, but it is not reliable and often flakes. One copper flake might cause an electrical discharge and contaminate the surface of the niobium cavity, thus spoiling its Q-factor. In that case, decommissioning of the entire cryomodule is required to restore the cavity Q-factor, which means it is a tremendously expensive procedure. That is why an improved reliability coupler is of very high interest. As a result, the main idea of the proposed project is to completely eliminate the unreliable copper plating by employing solid copper shields to screen the SS pipe from RF fields.

43 PARTICLE ACCELERATORS↗

Status of Metallic Structural Materials for Molten Salt Reactors

In the US and around the world, significant interest surrounds development and deployment of nuclear systems using molten salts to transfer heat. Several configurations are being explored, including the use of fluoride salts either as the primary coolant of a reactor with solid fuel or with the fissile material dissolved in the salt. Molten Salt Reactors (MSRs) with fluoride salt typically have a thermal neutron spectrum. There are also fast-spectrum reactors that could use chloride salts to transfer heat. As a result of operation of the Molten Salt Reactor Experiment (MSRE) at Oak Ridge National Laboratory during the 1960s, a system with uranium fuel dissolved in a fluoride-salt medium is the most well-established technology. A nickel alloy with about 6%Cr and molybdenum as a solid solution strengthening agent was developed and deployed for all structural applications in this reactor. The alloy was commercialized as Hastelloy N. During these experiments and in post-decommissioning characterization of material behavior, it was determined that the most significant challenges for structural materials are embrittlement, from helium introduced by transmutation of Ni, and corrosion and grain boundary embrittlement from the fission product tellurium. The MSRE had an outlet temperature of approximately 650°C. The mechanical properties of Hastelloy N are not sufficient to support long-term operation of an MSR above this temperature. Qualification of a material for use in the ASME Boiler and Pressure Vessel Code, Section III, “Rules for Construction of Nuclear Facility Components,” Division 5, “High Temperature Reactors,” will facilitate licensing with the Nuclear Regulatory Commission. Hastelloy N has not been qualified for use in nuclear construction, and significant additional characterization would be required for Code qualification. Given that this alloy is susceptible to He embrittlement and has limited high-temperature strength, it is not recommended that Code qualification be pursued. Instead, it is recommended that a systematic development program be initiated to develop new nickel alloys that contain a fine, stable dispersion of intermetallic particles to trap He at the interface between the matrix and particle and with increased solid solution strengthening from addition of refractory elements. Extensive screening of attractive alloy compositions for elevated temperature strength, microstructural stability, weldability, and resistance to He embrittlement (characterized using ion implantation) will lead to an alloy down-selection for commercialization and Code qualification.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Closure Report for the Central Facilities Area Sewage Treatment Plant Lagoon 3 and Land Application Area

Because of significantly reduced wastewater discharges to the Central Facilities Area Sewage Treatment Plant, wastewater has not been land applied since 2011. The future need to land apply wastewater was evaluated. Based on the current wastewater flows into the Central Facilities Area Sewage Treatment Plant, expected future missions at Central Facilities Area, and the discovery in 2014 that Lagoon 3 was leaking at an unacceptable rate, it was determined that the Central Facilities Area Sewage Treatment Plant is significantly oversized and that Lagoons 1 and 2 could be converted to total evaporation lagoons. Therefore, the decision was made to remove the existing sludge in Lagoon 3 and transfer it to Lagoon 2 for additional treatment, decommission Lagoon 3 and the land application area, and terminate the wastewater reuse permit. A closure plan was submitted and approved by the Idaho Department of Environmental Quality in 2016. This report describes the closure activities that were performed. Closure activities included: • Characterizing the soil/liner in Lagoon 3 to determine whether further characterization and/or remediation will be required under the Comprehensive Environmental Response, Compensation, and Liability Act. • Based on the results from the soil/liner sampling, determining whether additional sampling will be required for the land application area. • Removing the sludge in Lagoon 3 and placing it in Lagoon 2. • Puncturing the Lagoon 3 soil/liner to prevent ponding of storm water and becoming a source for vectors. • Installing a permanent cap on the inlet piping to Lagoon 3. Samples were collected on November 10, 2016, and were submitted for analysis to an off-site laboratory. Data validation and evaluation were performed by Portage, INC. Sample results confirmed that there is no hazard to human health and the environment and that Lagoon 3 and the land application area could be closed. In August 2017, sludge was removed from Lagoon 3 and placed in Lagoon 2, the soil/liner was punctured in 4 places, and caps were installed on the primary and bypass inlet lines.

99 GENERAL AND MISCELLANEOUS↗

Natural Resource Assessment for the Proposed Environmental Management Disposal Facility (EMDF), Oak Ridge, Tennessee

A major contributor to the success of decommissioning, demolition, and remediation activities at the East Tennessee Technology Park by the U.S. Department of Energy (DOE) Oak Ridge Office of Environmental Management (OREM) has been the availability of an onsite Low-Level Waste (LLW) landfill. However, the existing LLW landfill is near capacity, with cleanup of excess facilities at the Y-12 National Security Complex (Y-12) and Oak Ridge National Laboratory (ORNL) pending. Timely provision of additional disposal capacity on the Oak Ridge Reservation (ORR) is required to remedy the threats to human health and the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Fundamentals of Pellet-Clad Debonding

This project focused on providing a fundamental mechanistic understanding of the complex degradation mechanisms associated with Pellet/Clad Debonding (PCD) through the use of a unique suite of novel synthesis of surrogate spent nuclear fuel, in-situ nanoscale experiments on surrogate interfaces, multi-modeling, and characterization of decommissioned commercial spent fuel. The understanding of a broad class of metal/ceramic interfaces degradation studied within this project provided the technical basis related to the safety of high burn-up fuel, a problem of interest to the DOE.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Passivation of Stainless Steel for Tritium Service

The goal of this project was to develop a method to passivate stainless steel components using electropolishing techniques and heat treatment methods. The process is intended to limit the in growth and isotope exchange of hydrogen with tritium and deuterium as well as other undesired contaminants of standard gas mixtures. This process has been named Q-Passivation, to set is apart from standard industrial passivation methods and a patent application has been submitted and publish on the process. The basis used for the development of this process was taken from the surface analytical data collected from decommissioned commercial tritium containment vessels that are used to hold standard gas mixtures. The information gained from the surface analysis along with the methods to eliminate residual hydrogen contamination will provide a reasonable method for passivation. Barriers in fabricating test vessels for tritium have delayed production for tritium exposure trials. Some of these barriers include base metal composition that may meet compositional specifications but does not meet a quality inspection as it contains inclusions, additional phases, and other metallurgical anomalies. A number of issues and challenges were encountered during this project that should be resolved. These challenges include base material specification, a non-destructive quality assurance technique, the use of other materials aside from 304L stainless steel, and reuse of expired standard gas containers.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Mercury Remediation Technology Development for Lower East Fort Poplar Creek - FY2018 Update

Mercury (Hg) remediation is a high priority for the US Department of Energy (DOE) Oak Ridge Office of Environmental Management (OREM). Mercury contamination in the environment can be found at all three DOE facilities in Oak Ridge, but probably the greatest environmental risk concern relative to Hg on the Oak Ridge Reservation is associated with historical Hg losses at and near the Y-12 National Security Complex (Y-12). Water and fish from East Fork Poplar Creek (EFPC) downstream of Y-12 exceed regulatory thresholds. Because of the complexities of Hg transport and fate in the aquatic environment, conventional remedial options for EFPC are highly uncertain. DOE is using a phased, adaptive management approach to Hg remediation at Y-12, with a focus in the next few years on construction of the Mercury Treatment Facility (MTF) to treat the most contaminated Y-12 outfall entering EFPC (DOE 2017a; DOE 2017b). Once operational, the MTF will provide additional protection against inadvertent releases of Hg into the stream from decontamination and decommissioning of Y-12 Hg-use buildings. Although it is anticipated that the MTF will substantially decrease Hg water concentrations and flux in the upper part of EFPC, research and technology development is needed to develop appropriate and longer-term remedial solutions for the downstream environment. Since late 2014, OREM and UCOR/RSI (URS | CH2M Oak Ridge LLC/Restoration Services, Inc.) have supported Oak Ridge National Laboratory (ORNL) Environmental Sciences Division staff in conducting field and laboratory studies to develop Hg remedial technology solutions for lower EFPC (LEFPC). A technology development strategy for lower EFPC was developed in 2014 that was consistent with the adaptive management paradigm and DOE’s Technology Readiness Level (TRL) guidelines (Peterson et al. 2015). Initially, a thorough review of the literature and site-specific information was conducted to develop a broad number of potential technologies that might be applied in lower EFPC. An adaptive management approach was then used to focus on technologies that might have the most promise and potential remediation benefit. Field and laboratory studies conducted during 2014–2018 have (1) identified the major drivers of Hg flux and bioaccumulation in EFPC and (2) narrowed the list of highmerit technologies that might be of use in remediating the downstream environment.

54 ENVIRONMENTAL SCIENCES↗

Standard review plan for evaluating nuclear power reactor license termination plans

This standard review plan (SRP) guides the staff of the U.S. Nuclear Regulatory Commission (NRC) in conducting safety reviews of license termination plans (LTPs). The principal purpose of this SRP is to ensure the quality and uniformity of NRC staff reviews and to present a well-defined base from which to evaluate the requirements for terminating the license of a nuclear power plant. It is also the purpose of this SRP to make information about regulatory matters widely available, so that interested members of the public and the nuclear industry can gain a better understanding of the NRC staff's review process. Specific guidance for licensees is included in Regulatory Guide 1.179, "Standard Format and Content of License Termination Plans for Nuclear Power Reactors." Licensees may also use this SRP to assist in developing an LTP. The SRP presents the acceptance criteria for all areas of review for license termination, and identifies the matters to be reviewed, the basis for the review, and the conclusions that are sought. For example, NUREG-1757, "Consolidated Decommissioning Guidance" offers additional guidance on how to demonstrate compliance with the unrestricted release, restricted release, and alternative criteria for license termination, in accordance with Title 10 of the Code of Federal Regulations (10 CFR), Part 20, "Standards for Protection against Radiation," Subpart E, "Radiological Criteria for License Termination." To avoid duplication of information, this SRP references applicable sections of NUREG-1757 for additional guidance. In addition, the NRC has issued supplemental guidance that will subsequently be consolidated into NUREG-1757 to address partial site release before LTP approval, and compliance with 10 CFR Part 20, Subpart E. It should be noted that the memorandum of understanding (MOU) between the Environmental Protection Agency and NRC may contain consultation triggers for some radionuclides that may be lower than the NUREG-1757 Vol. 2 Revision 1, Appendix H screening values.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Preliminary Evaluation of Removing Used Nuclear Fuel From Nine Shutdown Sites

The Blue Ribbon Commission on America's Nuclear Future identified removal of stranded used nuclear fuel at shutdown sites as a priority so that these sites may be completely decommissioned and put to other beneficial uses (BRC 2012). In this report, a preliminary evaluation of removing used nuclear fuel from nine shutdown sites was conducted. The shutdown sites included Maine Yankee, Yankee Rowe, Connecticut Yankee, Humboldt Bay, Big Rock Point, Rancho Seco, Trojan, La Crosse, and Zion. At these sites a total of 7649 used nuclear fuel assemblies and a total of 2813.2 metric tons heavy metal (MTHM) of used nuclear fuel are contained in 248 storage canisters. In addition, 11 canisters containing greater-than-Class C (GTCC) low-level radioactive waste are stored at these sites.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Special Analysis: 2016-002, Analysis of Cover Erosion and Enhanced Infiltration at Pit 25, TA-54 Area G

The Los Alamos National Laboratory (LANL) generates radioactive waste as a result of various activities. Operational waste is generated from a wide variety of research and development activities including nuclear weapons development, energy production, and medical research. Environmental restoration, and decontamination and decommissioning (D&D) waste is generated as contaminated sites and facilities at LANL undergo cleanup or remediation. The majority of this waste is low-level radioactive waste (LLW) and is disposed of at the Technical Area 54 (TA-54), Area G disposal facility. U.S. Department of Energy (DOE) Order 435.1 (DOE, 2001) requires that radioactive waste be managed in a manner that protects public health and safety, and the environment. To comply with this order, DOE field sites must prepare site-specific radiological performance assessments for LLW disposal facilities that accept waste after September 26, 1988. Furthermore, sites are required to conduct composite analyses that account for the cumulative impacts of all waste that has been (or will be) disposed of at the facilities and other sources of radioactive material that may interact with the facilities.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Independent Verification Activities Assessing the Open-Air Readiness of Building H2/G2 Combined Tunnel Floor, Characterization Zone 6, at the Separations Process Research Unit Niskayuna, New York

The U.S. Department of Energy (DOE) Separations Process Research Unit (SPRU) Field Office (DOE-SPRU) in Niskayuna, New York, requested that the Oak Ridge Institute for Science and Education (ORISE) perform on-site independent verification (IV) activities in conjunction with the decommissioning of the H2 Building at the SPRU facility. The scope of the ORISE IV effort was independent data reviews, in-process verification, and the collection of independent survey data and volumetric structural concrete samples.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Fuel Fabrication Facility Study for FCF HALEU

Nuclear energy technology developers seek to bring to market new advanced reactor designs and new light water reactor fuel designs, many of which would deploy fuel made from uranium with 235 U enrichment ranging from 5% to 19.75%. There is currently no commercial supply of uranium in this enrichment range, which is higher than used in today’s light water reactors but still lower than the safeguards limit of 20% 235 U. This limitation is a barrier to development of demonstration of these new nuclear energy technologies. As a means to address this near-term need, DOE and Idaho National Laboratory (INL) has considered how the HALEU product from sodium-bonded spent fuel treatment in the INL Fuel Conditioning Facility (FCF), located at the Materials and Fuels Complex (MFC), might be provided and fabricated into some of the new fuel designs. The evaluation presented in this report addresses the potential establishment of two types of fuel fabrication capability at INL, represented generically as a ceramic-type (or pellet-type) fuel fabrication line and a metallic fuel fabrication line. Because the FCF HALEU feedstock contains residual transuranic contamination and a relatively small amount of residual fission products, fabrication with that material is necessarily performed inside of engineered confinement barriers, such as gloveboxes, which would be filled with inert gas for most of the fuel types considered. The throughput rate of the fabrication lines envisioned is 2.5 metric tons of HALEU fuel per year, which is judged to be sufficiently representative of engineering-scale. Space in three existing buildings was identified for consideration in this study of pre-conceptual equipment layouts. The scope and nature of the work needed to prepare each of the three buildings for each type of fuel fabrication was identified (though not in engineering detail), and three-dimensional models of envisioned fabrication equipment were laid out in each of the buildings to assess adequacy of space. The study concluded that either type of fuel fabrication line can feasibly be installed and operated in either of the three buildings. However, each of the three buildings presents different challenges in preparation, due to accommodating current missions that would need to be relocated or necessary decontamination and decommissioning work to free-up space for fuel fabrication, or due to complications of accessibility. Rough order-of-magnitude (ROM) cost estimates for preparing buildings begin at $10M ( 20%/+50%) and would increase with increased complexity of building modifications. The cost of fabrication equipment and gloveboxes is roughly estimated to be $21M (-20%/+50%) for a metallic fuel fabrication line and $27M (-20%/+50%) for a ceramic/intermetallic fuel fabrication line. Nominal operating costs are estimated to be $7M per year (in 2019 dollars), increasing from lower amounts needed as the operating crew is being assembled and trained.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Solar Bankability Data to Advance Transactions and Access (SB-DATA) Final Technical Report

The DOE project “Solar Bankability Data to Advance Transactions and Access”, known in the solar industry and referred to in this report as “Orange Button”, had project objectives of convening key stakeholder participants in the solar project lifecycle to develop a data taxonomy that meets to the solar industry’s needs for standardized data types for use in solar projects. Additional Orange Button deliverables included the development of an online data exchange to act as a clearinghouse of data that conformed to the data standard and additional solar industry data, and a Solar Data Translation Platform that could transform legacy solar project data to conform to the Orange Button data standard. All of these objectives were achieved. The Smart Electric Power Alliance (SEPA) provided program management, industry participant recruiting and convening, worked with the solar industry to define the scope of the Orange Button data taxonomy, and documented and delivered the taxonomy data requirements to funded project partners to develop both the taxonomy and the data conversion tools. Further efforts included performing extensive industry outreach and awareness to encourage adoption of the Orange Button taxonomy by the solar industry by enumerating the cost saving benefits of using the taxonomy and the public benefit of the increased use of solar energy due to increased bankability and viability of solar development projects. Solar PV panel and component prices have fallen in the last decade, while soft costs have remained stubbornly high and can account for as much as 64% of the total cost of a new solar system. Part of the U.S. Department of Energy SunShot Initiative, Orange Button enabled the creation and adoption of industry-led open data standards for rapid and seamless information exchange across the solar value chain, from origination to decommissioning. Standardizing data will reduce soft costs by making it easier to share solar data and speeding up processes. The taxonomy is a product of solar industry participants convening to identify the pain points caused by incompatible data, and to agree on and standardize data types to be used by the actors in the solar project lifecycle. This report focuses on the SEPA led first phase of Orange Button project that included industry outreach and recruiting participants for five industry working groups, widespread industry outreach to increase awareness and encourage eventual adoption of the taxonomy, and the definition of the scope, use cases, and supporting data types of the Orange Button taxonomy. The solar industry has been receptive of the completed Orange Button taxonomy. In SEPA’s work, 401 solar industry participants facilitated by SEPA defined the scope, use cases, and requirements for the taxonomy leading to over 150 taxonomy early adopters incorporating the taxonomy into their software products serving the solar industry, and several large investors and banks have started projects to enable them to utilize the taxonomy to gain back-office efficiencies. Moving forward, as the solar industry more widely embraces the Orange Button taxonomy and begins realizing the tangible benefits of adoption at scale, we expect further pressure on solar soft costs and increases in the bankability of solar projects.

14 SOLAR ENERGY↗

Fundamental Forces, Lasting Impressions: Historical Documentation of the Sigma Press Building (TA-3-35) Volume 1

The US Department of Energy, National Nuclear Security Administration, Los Alamos Field Office (Field Office) has prepared final documentation for the resolution of adverse effects to Building 35 in Technical Area (TA) 3 at Los Alamos National Laboratory (LANL or the Laboratory). This documentation is being submitted to the New Mexico State Historic Preservation Officer (SHPO). TA-3-35, a Cold War-era press building, was determined eligible for listing in the National Register of Historic Places (Register) in the report Pressing Matters: An Evaluation of the Cold War Buildings at the Sigma Complex (LA-UR-15-28961). This report also identified Building TA-3-35 as excess property to be decontaminated, decommissioned, and demolished by the LANL Footprint Reduction Program in Fiscal Year 2016, an adverse effect requiring mitigation. The SHPO concurred with the both the eligibility determination of, and adverse impact to, Building TA-3-35 on February 29, 2016.

42 ENGINEERING↗

Identification of Potential Waste Processing and Waste Form Options for Molten Salt Reactors

The overall summary of the waste management envelope discussed in this report is represented by the diagram shown in Figure S1. The streams that are included in this discussion include the following from reactor systems in which chlorine-based salts with and without processing and fluorine-based salts with and without processing are being considered: 1) Off-gas streams (e.g., particulates, aerosols, reactive gases, 3 H, water, residual halides, N 2 , O 2 , noble gases); 2) Salt waste streams (e.g., chloride- or fluoride-based); 3) Separated salt streams (e.g., 7 Li recycle, 37 Cl recycle, eutectic salts, fission products); 4) Metal waste streams (e.g., reactor components, plenums); 5) Carbon waste streams (e.g., graphite, SiC); 6) Decommissioning and decontaminating (D&D) waste streams; 7) Operating waste streams

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterizing The Mechanical Properties of Polyurethane Foams

The implementation of polyurethane foams as a permanent fixative for radioactive contamination is currently being examined within the DOE complex for its use in decontamination and decommissioning (D&D) activities. The work involving the implementation of permanent foaming fixatives in a decontamination scenario would include the filling of structures with large voids, such as gloveboxes, pipes, and tanks, where the use of a traditional 2D paint fixative is impractical or unsafe. The mechanical performance of such commercial off the shelf permanent foaming fixatives is uncharacterized with response to harsh environmental conditions often found in nuclear facilities that are undergoing D&D. To this end, SRNL embarked on a mechanical characterization of 6 polyurethane foams, 4 of which were considered flexible and 2 of which were rigid. Two tests were performed on these foams; a tensile tearing test and a compressive test, both of which were strictly guided by ASTM standards. It was found that in both harsh compressive and tensile scenarios, the Hilti brand foam outperformed all other foams, having a peak stress value higher than the closest competitor by a factor of 2.3, and a compressive yield point that was larger than the closest competitor by a factor of 1.4.

36 MATERIALS SCIENCE↗

Appendix F New Construction and Replacement of Existing Facilities at Sandia National Laboratories New Mexico

A number of construction and demolition projects are planned for the 10-year period evaluated in this Sandia National Laboratories, New Mexico (SNL/NM) site-wide environmental impact statement (SWEIS). Construction and decommissioning and demolition (D&D) activities are continually being accomplished at SNL/NM as new facilities are brought on line to replace older, less efficient facilities. The construction and D&D projects presented in this appendix are projected to take place, assuming funding and administrative/regulatory approvals are obtained, under both the No Action Alternative and the Expanded Operations Alternative. Under the Reduced Operations Alternative, no new construction projects were assumed to take place, and D&D activities were assumed to be limited to those needed to maintain a safe operating environment on the site.

42 ENGINEERING↗

U.S. Efforts in Support of Examinations at Fukushima Daiichi: 2019 Evaluations

Much is still not known about the end-state of core materials in each unit that was operating on March 11, 2011 at the Fukushima Daiichi Nuclear Power Station (Daiichi). Information obtained from Daiichi is required to inform Decontamination and Decommissioning (D&D) activities, improving the ability of the Tokyo Electric Power Company Holdings, Incorporated (TEPCO Holdings) to characterize potential hazards and to ensure the safety of workers involved with cleanup activities. This document, which has been updated to include Fiscal Year 2019 (FY2019) information, summarizes results from a U.S. effort to review Daiichi information and extract insights to enhance the safety of existing and future nuclear power plant designs. This U.S. effort, which was initiated in 2014 by the Department of Energy Office of Nuclear Energy (DOE-NE), is completed by a group of experts in reactor safety and plant operations that identify examination needs and evaluate recent Daiichi examination data to address these needs. Each year, annual reports are issued that document significant safety insights being obtained in areas of special emphasis. For FY2019, the areas emphasized by the expert panel include component performance, radionuclide surveys and sampling, debris end-state location, combustible gas effects, and plant operations and maintenance. In addition to reducing uncertainties related to severe accident modeling progression, these insights have and continue to be used to update guidance for severe accident prevention, mitigation, and emergency planning. Reduced uncertainties in modeling the events at Daiichi improve the realism of reactor safety evaluations that inform future D&D activities. In addition, the process established by this U.S. effort provides an example that Japan may wish to implement in future international efforts to support D&D. As emphasized in this FY2019 report, important insights are being gained from examinations of the affected units at Daiichi. Although many results from prior years have been moved to appendices, key areas of interest are highlighted in the main document. For example, larger intact components and fuel containing materials observed on the floor of the primary containment and retained on ex-vessel structures continue to be emphasized because of insights that may be gained with respect to vessel failure and ex-vessel interactions with structures and concrete. In addition, the main report presents insights gained by focused evaluations of plant data because of potential use of systems and components during severe accident conditions and alternate perspectives regarding accident progression that may be inferred from such data. The report also illustrates how systems analysis codes can be applied to reduce uncertainties about the progression of events at Daiichi and how practical insights obtained from Daiichi can be used to enhance radiation safety for the existing fleet. Recent and planned updates to systems analysis codes are also discussed. As in prior years, this report contains an appendix with a list of examination needs that was updated after U.S. experts reviewed recently obtained information from Daiichi. Additional details for higher priority, near-term, examination activities are also provided. This report also includes an appendix with a description of a website that was developed to assist U.S. experts by providing information in an archived retrievable location.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗