Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “power system simulation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,387 records · Page 77

BioSentinel: Forging the path for Deep Space CubeSat Missions

The BioSentinel mission was launched in 2022 aboard the SLS launch vehicle as part of the Artemis-I campaign and continues mission operations into 2024. The 6U CubeSat has been characterizing deep space radiation at large distances from Earth. This presentation gives a status of the mission performance to date, as well as some of the lessons learned from project. BioSentinel has achieved unprecedented performance as an SLS secondary payload due to preparation, planning, and a robust design. Pre-launch antenna and interface testing with both DSN and ESA confirmed command and data pathways and allowed for operational flexibility in the critical early hours post-deployment. Mission Operations simulations prior to launch identified potential risks and trained operators to respond in flight, preparing the team to react quickly and successfully to detumble the spacecraft and enter a power-positive state. The spacecraft would not have survived without the inclusion of the trailblazing 3D-printed composite cold gas propulsion system. The non-standard tank geometry enabled efficient use of the limited space available in the CubeSat form factor as well as the capability to detumble the spacecraft and manage momentum for extended mission durations, while providing sufficient margin to execute potential delta-V maneuvers. Following the conclusion of the primary science mission, the Linear Energy Transfer (LET) Spectrometer has continued to collect solar and galactic radiation data from its unique location in heliocentric orbit. The free space dataset offered by the BioSentinel LET is a valuable source of data for both model validation and future mission planning. As the spacecraft travels farther from Earth it is poised to provide longitudinally distributed measurements of solar particle events during solar maximum. NASA Ames led development of the BioSentinel spacecraft to operate for long durations in deep space. The novel subsystems and COTS components that comprise the BioSentinel bus can serve as a template for future deep space missions, while the lessons the team has learned from well over a year of continuous operations will enable improved performance in the generation of deep space CubeSat missions.

BioSentinel↗

Optimal Control Allocation for Distributed Electric Propulsion in A Series/Parallel Partial Hybrid Powertrain

The SUbsonic Single Aft eNgine (SUSAN) Electrofan is a NASA concept transport aircraft representative of technology anticipated for a 2040 entry-into-service date. The powertrain consists of a single thrust-producing geared turbofan engine with generators driving a series/parallel partial hybrid power/propulsion system. The architecture includes 16 underwing contrarotating fans, eight on each side. The distributed fans can be used by the flight control system to augment or replace the rudder function. This paper sets up the optimal control problem of setpoint determination for individual wingfans in the distributed propulsion system, accounting for electrical string efficiencies, saturations, and failures. The solution minimizes power consumption while maintaining thrust and torque on the airframe for maneuvering. Additionally, thrust that would have been lost due to temporary fan speed or power saturation is optimally redistributed to maintain overall desired thrust and torque on the aircraft. A simulation of a coordinated turn utilizing the distributed electric propulsion for yaw rate control in a multiple wingfan failure scenario demonstrates the robustness of the powertrain design to failures and helps define its limitations.

Distributed Electric Propulsion↗

Optimal Control Allocation for Distributed Electric Propulsion in A Series/Parallel Partial Hybrid Powertrain

The SUbsonic Single Aft eNgine (SUSAN) Electrofan is a NASA concept transport aircraft representative of technology anticipated for a 2040 entry-into-service date. The powertrain consists of a single thrust-producing geared turbofan engine with generators driving a series/parallel partial hybrid power/propulsion system. The architecture includes 16 underwing contrarotating fans, eight on each side. The distributed fans can be used by the flight control system to augment or replace the rudder function. This paper sets up the optimal control problem of setpoint determination for individual wingfans in the distributed propulsion system, accounting for electrical string efficiencies, saturations, and failures. The solution minimizes power consumption while maintaining thrust and torque on the airframe for maneuvering. Additionally, thrust that would have been lost due to temporary fan speed or power saturation is optimally redistributed to maintain overall desired thrust and torque on the aircraft. A simulation of a coordinated turn utilizing the distributed electric propulsion for yaw rate control in a multiple wingfan failure scenario demonstrates the robustness of the powertrain design to failures and helps define its limitations.

Distributed Electric Propulsion↗

Performance analysis and simulation of the SPS reference phase control system

The major elements required in the operation of an SPS which employs retrodirectivity as a means of pointing the beam to Earth include the spacetenna, the rectenna, and the pilot signal transmitter. The phase control system is faced with several problems: (1) path delay variations due to imperfect SPS circular orbits; (2) ionospheric effects; (3) initial phase beam forming; (4) beam pointing; (5) beam safing; (6) high power phase noise effects; and (7) interference. The use of SOLARISM, a computer program to select pilot signal parameters and evaluate SPS performance is described.

Lindsey, W. C.↗

The development of a solar powered residential heating and cooling system

A solar energy collector design is disclosed that would be efficient for both energy transfer and fluid flow, based upon extensive parametric analyses. Thermal design requirements are generated for the energy storage systems which utilizes sensible heat storage in water. Properly size system components (including the collector and storage) and a practical, efficient total system configuration are determined by means of computer simulation of system performance.

Oneill, M. J.↗

UAS Integration in the NAS Flight Test 6: Full Mission Results

Recent standards development efforts for the integration of Unmanned Aircraft Systems (UAS) into the National Airspace System (NAS) such as those in RTCA Inc. Special Committee 228 (SC-228) have focused on relatively large UAS transitioning to and from Class A airspace. In an effort to expand the range of vehicle classes that can access the NAS, the NASA UAS Integration in the NAS project has investigated Low Size, Weight, and Power (Low SWaP) technologies that would allow smaller UAS to detect-and-avoid (DAA) traffic. Through batch and human in the loop (HITL) simulation studies, the UAS Integration in the NAS DAA subproject have identified candidate performance standards that would contribute to enabling extended Low SWaP, UAS operations under 10,000 feet. These candidate performance standards include minimum field of regard (FOR) values for Low SWaP air surveillance sensors as well as a DAA well-clear (DWC) definition which can be applied to non-cooperative traffic to reduce the required maneuver initiation range. To test the assumptions of the project’s simulation studies and validate the candidate performance standards, a live flight research event was executed at NASA Armstrong Flight Research Center. The UAS Integration in the NAS Project Flight Test 6 Full Mission sought to characterize UAS pilot responses to traffic conflicts using a representative Low SWAP DAA system in an operational NAS environment. To achieve this, live, virtual and constructive distributed environment (LVC-DE) elements were combined to simulate a sector of Oakland center airspace and induce encounters with a live, manned aircraft. A Navmar Applied Sciences Tigershark XP was used as the UAS ownship and was integrated into the test architecture to enable it to be controlled from a Vigilant Spirit Control Station (VSCS) research ground control station. Qualified UAS pilots were recruited to act as subject pilots under test (SPUT) to control the Tigershark XP in a simulated mission while coordinating with a participating air traffic controller in simulated airspace. The intruder speed, intruder equipage and encounter geometry were varied between six scripted encounters per SPUT. Various metrics were collected including pilot reaction time from the onset of DAA alert, ATC coordination rate, probability and severity of losses of DAA well clear, and subjective ratings of system acceptability. The implications of these results on the development of standards for Low SWAP DAA systems will be discussed.

UAV↗

Re-Engineering the ISS Payload Operations Control Center During Increased Utilization and Critical Onboard Events

With an increase in the utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS realtime operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art media wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project.

Marsh, Angela L.↗

Excavator Design Validation

The Excavator Design Validation tool verifies excavator designs by automatically generating control systems and modeling their performance in an accurate simulation of their expected environment. Part of this software design includes interfacing with human operations that can be included in simulation-based studies and validation. This is essential for assessing productivity, versatility, and reliability. This software combines automatic control system generation from CAD (computer-aided design) models, rapid validation of complex mechanism designs, and detailed models of the environment including soil, dust, temperature, remote supervision, and communication latency to create a system of high value. Unique algorithms have been created for controlling and simulating complex robotic mechanisms automatically from just a CAD description. These algorithms are implemented as a commercial cross-platform C++ software toolkit that is configurable using the Extensible Markup Language (XML). The algorithms work with virtually any mobile robotic mechanisms using module descriptions that adhere to the XML standard. In addition, high-fidelity, real-time physics-based simulation algorithms have also been developed that include models of internal forces and the forces produced when a mechanism interacts with the outside world. This capability is combined with an innovative organization for simulation algorithms, new regolith simulation methods, and a unique control and study architecture to make powerful tools with the potential to transform the way NASA verifies and compares excavator designs. Energid's Actin software has been leveraged for this design validation. The architecture includes parametric and Monte Carlo studies tailored for validation of excavator designs and their control by remote human operators. It also includes the ability to interface with third-party software and human-input devices. Two types of simulation models have been adapted: high-fidelity discrete element models and fast analytical models. By using the first to establish parameters for the second, a system has been created that can be executed in real time, or faster than real time, on a desktop PC. This allows Monte Carlo simulations to be performed on a computer platform available to all researchers, and it allows human interaction to be included in a real-time simulation process. Metrics on excavator performance are established that work with the simulation architecture. Both static and dynamic metrics are included.

Pholsiri, Chalongrath↗

Re-Engineering the ISS Payload Operations Control Center During Increased Utilization and Critical Onboard Events

With an increase in utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four-month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS real-time operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art Video Wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project. This paper describes the logistics and lessons learned in upgrading a control center capability in the middle of complex real-time operations. Combining the efficiencies of controller interaction and new technology infusion were prime drivers for this upgrade to handle the increased utilization of science research on ISS. The success of this project could not jeopardize the current operations while these facility upgrades occurred.

Dudley, Stephanie R. B.↗

Study of the application of an implicit model-following flight controller to lift-fan VTOL aircraft

An implicit model-following flight controller is proposed. This controller is relatively simple in concept: it provides an input/output relationship that is approximately that of any selected second order system; it provides good gust alleviation; and it is self-trimming. The flight controller was applied to all axes of a comprehensive mathematical model of a lift-fan V/STOL transport. Power management controls and displays were designed to match the various modes of control provided by the flight controller. A piloted simulation was performed using a six degree of freedom simulator. The fixed-operating-point handling qualities throughout the powered lift flight envelope received pilot ratings of 3-1/2 or better. Approaches and vertical landings in IFR zero-zero conditions received pilot ratings varying from 2-1/2 to 4 depending on the type of approach and weather conditions.

Merrick, V. K.↗

Long titanium heat pipes for high-temperature space radiators

Titanium heat pipes are being developed to provide light weight, reliable heat rejection devices as an alternate radiator design for the Space Reactor Power System (SP-100). The radiator design includes 360 heat pipes, each of which is 5.2 m long and dissipates 3 kW of power at 775 K. The radiator heat pipes use potassium as the working fluid, have two screen arteries for fluid return, a roughened surface distributive wicking system, and a D-shaped cross-section container configuration. A prototype titanium heat pipe, 5.5-m long, has been fabricated and tested in space-simulating conditions. Results from startup and isothermal operation tests are presented. These results are also compared to theoretical performance predictions that were used to design the heat pipe initially.

Girrens, S. P.↗

Operating system for a real-time multiprocessor propulsion system simulator

The success of the Real Time Multiprocessor Operating System (RTMPOS) in the development and evaluation of experimental hardware and software systems for real time interactive simulation of air breathing propulsion systems was evaluated. The Real Time Multiprocessor Operating System (RTMPOS) provides the user with a versatile, interactive means for loading, running, debugging and obtaining results from a multiprocessor based simulator. A front end processor (FEP) serves as the simulator controller and interface between the user and the simulator. These functions are facilitated by the RTMPOS which resides on the FEP. The RTMPOS acts in conjunction with the FEP's manufacturer supplied disk operating system that provides typical utilities like an assembler, linkage editor, text editor, file handling services, etc. Once a simulation is formulated, the RTMPOS provides for engineering level, run time operations such as loading, modifying and specifying computation flow of programs, simulator mode control, data handling and run time monitoring. Run time monitoring is a powerful feature of RTMPOS that allows the user to record all actions taken during a simulation session and to receive advisories from the simulator via the FEP. The RTMPOS is programmed mainly in PASCAL along with some assembly language routines. The RTMPOS software is easily modified to be applicable to hardware from different manufacturers.

Cole, G. L.↗

Technology programs and related policies - Impacts on communications satellite business ventures

The DOMSAT II stochastic communication satellite business venture financial planning simulation model is described. The specification of business scenarios and the results of several analyses are presented. In particular, the impacts of NASA on-orbit propulsion and power technology programs are described. The effects of insurance rates and self-insurance and of the use of the Space Shuttle and Ariane transportation systems on a typical fixed satellite service business venture are discussed.

Greenberg, J. S.↗

Numerical simulations of collisions between rotating particles

Numerical simulations of Keplerian systems consisting of 200 mutually colliding rotating particles show that friction and surface irregularity reduce the equilibrium velocity dispersion and transfer some of the energy of random velocities to rotational velocities. The results confirm the theoretical predictions of Salo (1987). Simulations are performed for identical and different particle sizes, and for a power-law distribution of sizes. Taking rotation into account is not found to alter the previously observed Rayleigh distribution of eccentricities and inclinations, while the components of the rotational velocities are found to follow a Gaussian distribution. Application to the rarefied regions of Saturn's rings suggests that friction is able to reduce the equilibrium geometric thickness by about one-half.

Salo, H.↗

The Galileo PPS expert monitoring and diagnostic prototype

The Galileo PPS Expert Monitoring Module (EMM) is a prototype system implemented on the SUN workstation that will demonstrate a knowledge-based approach to monitoring and diagnosis for the Galileo spacecraft Power/Pyro subsystems. The prototype will simulate an analysis module functioning within the SFOC Engineering Analysis Subsystem Environment (EASE). This document describes the implementation of a prototype EMM for the Galileo spacecraft Power Pyro Subsystem. Section 2 of this document provides an overview of the issues in monitoring and diagnosis and comparison between traditional and knowledge-based solutions to this problem. Section 3 describes various tradeoffs which must be considered when designing a knowledge-based approach to monitoring and diagnosis, and section 4 discusses how these issues were resolved in constructing the prototype. Section 5 presents conclusions and recommendations for constructing a full-scale demonstration of the EMM. A Glossary provides definitions of terms used in this text.

Bahrami, Khosrow↗

Hubble Space Telescope nickel-hydrogen battery testing: An update

The Marshall Space Flight Center (MSFC) began testing the HST Ni-H2 Six Battery Test and the 'Flight Spare Battery' Tests approximately one year before the launch of the HST. These tests are operated and reported on by the MSFC, but are managed and funded by Goddard Space Flight Center in direct support of the HST program. The HST Ni-H2 batteries are built from Eagle Picher RNH-90-3 cells. The HST EPS (electrical power system) is a direct energy transfer power system. The HST Ni-H2 Six Battery Test is a breadboard of the HST EPS. The batteries in the test are composed of test module cells and packaged into three battery modules identical to the flight modules. This test is the HST EPS testbed. The 'Flight Spare Battery' Test is a simulation of one of the six battery channels on the HST. The cells in the test are from the flight spare lot of cells, which are the same lot of cells that three of the six HST flight batteries are made from. This test is the battery life test for the HST program.

Whitt, Thomas H.↗

Distributed and collaborative synthetic environments

Fast graphics workstations and increased computing power, together with improved interface technologies, have created new and diverse possibilities for developing and interacting with synthetic environments. A synthetic environment system is generally characterized by input/output devices that constitute the interface between the human senses and the synthetic environment generated by the computer; and a computation system running a real-time simulation of the environment. A basic need of a synthetic environment system is that of giving the user a plausible reproduction of the visual aspect of the objects with which he is interacting. The goal of our Shastra research project is to provide a substrate of geometric data structures and algorithms which allow the distributed construction and modification of the environment, efficient querying of objects attributes, collaborative interaction with the environment, fast computation of collision detection and visibility information for efficient dynamic simulation and real-time scene display. In particular, we address the following issues: (1) A geometric framework for modeling and visualizing synthetic environments and interacting with them. We highlight the functions required for the geometric engine of a synthetic environment system. (2) A distribution and collaboration substrate that supports construction, modification, and interaction with synthetic environments on networked desktop machines.

Bajaj, Chandrajit L.↗

Investigation of Thermal High Cycle and Low Cycle Fatigue Mechanisms of Thick Thermal Barrier Coatings

Thick thermal barrier coating systems in a diesel engine experience severe thermal low cycle fatigue (LCF) and high cycle fatigue (HCF) during engine operation. In this paper, the mechanisms of fatigue crack initiation and propagation in a ZrO2-8wt.% Y2O3 thermal barrier coating, under simulated engine thermal LCF and HCF conditions, are investigated using a high power CO2 laser. Experiments showed that the combined LCF/HCF tests induced more severe coating surface cracking, microspallation and accelerated crack growth, as compared to the pure LCF test. Lateral crack branching and the ceramic/bond coat interface delaminations were also facilitated by HCF thermal loads, even in the absence of severe interfacial oxidation. Fatigue damages at crack wake surfaces, due to such phenomena as asperity/debris contact induced cracking and splat pull-out bending during cycling, were observed especially for the combined LCF/HCF tests. It is found that the failure associated with LCF is closely related to coating sintering and creep at high temperatures, which induce tensile stresses in the coating after cooling. The failure associated with HCF process, however, is mainly associated with a surface wedging mechanism. The interaction between the LCF, HCF and ceramic coating creep, and the relative importance of LCF and HCF in crack propagation are also discussed based on the experimental evidence.

Zhu, Dongming↗