Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “mission progress”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,387 records · Page 77

Electric propulsion - A far reaching technology

It is shown that a starprobe could be built to perform a flyby mission to Proxima Centauri in approximately 400 years. This vehicle would use familiar fission nuclear reactor and ion propulsion system technologies to achieve a burn-out velocity of 0.0122c. Fine engineering and progressive technology refinements are shown to be the key to operating, and further improving, the capability of this long burn time propulsion system.

Aston, G.↗

Remote sensing contribution to land surface hydrology

Progress that has been made over the past decade in developing technology for hydrological observations from operational aircraft is described. Particular attention is given to research on soil moisture, snow cover, and vegetation. Future missions such as the ESA ERS-1 and Canada's Radarsat mission are considered.

Salomonson, V. V.↗

High energy density aluminum-oxygen cell

An alternative to a secondary battery as the power source for vehicle propulsion is a fuel cell. An example of this is the metal-air fuel cell using metals such as aluminum, zinc, or iron. Aluminum is a particularly attractive candidate, having high energy and power densities, being environmentally acceptable, and having a large, established industrial base for production and distribution. An aluminum-oxygen system is currently under development for a UUV test vehicle, and recent work has focussed upon low corrosion aluminum alloys and an electrolyte management system for processing the by-products of the energy-producing reactions. This paper summarizes the progress made in both areas. Anode materials capable of providing high utilization factors over current densities ranging from S to 150 mA/sq cm have been identified. These materials are essential to realizing an acceptable mission life for the UUV. With respect to the electrolyte management system, a filter/precipitator unit has been successfully operated for over 250 hours in a large scale, half-cell system.

Rudd, E. J.↗

Firsthand Perspective on the Microgravity Environment

Extended periods of microgravity simply cannot be created on Earth and rely on orbiting spacecraft in low earth orbit. These low microgravity levels are one of the most critical resources for most experiments being conducted aboard the space shuttle and those proposed for the International Space Station. A second critical resource for successfully conducting many of these experiments in space is the presence of human beings. Trained mission specialists and payload specialists become the eyes and ears of the scientists on the ground. In their function as in-flight technicians and "observers" they are important for reporting first hand the progress of the experiments, as well as being on call to trouble shoot malfunctioning equipment and, make necessary repairs. Unfortunately, as important as astronauts are to the successful performance of many experiments, they can be in conflict with the first goal of achieving as pristine a microgravity environment as possible. A simple astronaut sneeze has been calculated to induce a perturbation of 10(exp -5) g which may adversely affect some of the more sensitive experiments. A first hand perspective of what it is like to work in this environment and ways crewmembers can work more effectively to minimize disturbances will be discussed as well as ways that the ground can assist crewmembers to protect the microgravity environment.

Thomas, Donald A.↗

Launch Conditions Might Affect the Formation of Blood Vessel in the Quail Chorioallantoic Membrane

AS 2 part of the first joint USA-Russian MIR/Shuttle program, fertilized quail eggs were flown on the MIR 18 mission. Post-flight examination indicated impaired survival of both the embryos in space and also of control embryos exposed to vibrational and g-forces simulating the conditions experienced during the launch of Progress 227. We hypothesized that excess mechanical forces and/or other conditions during the launch might cause abnormal development of the blood supply in the chorioallantoic membrane (CAM) leading to the impaired survival of the embryos. The CAM, a highly vascularized extraembryonic organ, provides for the oxygen exchange across the egg shell and is thus pivotal for proper embryonic development. To test our hypothesis, we compared angiogenesis In CAMS of eggs which were either exposed to the vibration and g-force profile simulating the conditions at launch of Progress 227 (synchronous controls), or kept under routine conditions in a laboratory Incubator (laboratory controls). At various time points during Incubation, the eggs were fixed in paraformaldehyde for subsequent dissection. At the time of dissection, the CAM was carefully lifted from the egg shell and examined as whole mounts by bright-field and fluorescent microscopy. The development or the vasculature (angiogenesis) was assessed from the density of blood vessels per viewing field and evaluated by computer aided image analysis. We observed a significant decrease In blood-vessel density in the synchronous controls versus "normal" laboratory controls beginning from day 10 of Incubation. The decrease in vascular density was restricted to the smallest vessels only, suggesting that conditions during the launch and/or during the subsequent Incubation of the eggs may affect the normal progress of angiogenesis in the CAM. Abnormal angiogenesis In the CAM might contribute to the impaired survival of the embryos observed in synchronous controls as well as in space.

Henry, M. K.↗

Space Station EVA System Evolution Study

Evaluation of Space Station Freedom support of manned exploration is in progress to identify SSF EVA system evolution requirements and capabilities. The output from these studies will provide data to support the preliminary design process to ensure that Space Station EVA system requirements for future missions (including the Transportation Node) are adequately considered and reflected. The study considers SSF support of future missions and the EVA system baseline to determine adequacy of EVA requirements and capabilities, and to identify additional requirements, capabilities, and necessary technology upgrades. EVA demands levied by formal requirements and indicated by evolution mission scenarios are high for the out-years of Space Station Freedom. An EVA system designed to meet the baseline requirements can easily evolve to meet evolution demands with few exceptions. Results to date indicate that upgrades or modifications to the EVA system may be necessary to meet all forseeable hangar induced EVA environments. Work continues to quantity the EVA capability in this regard. Evolution mission scenarios with EVA in and around unshielded nuclear propulsion engines are inconsistent with anthropomorphic EVA capabilities.

Rouen, Michael N.↗

Measurement of Global Precipitation: Introduction to International GPM Program

The Global Precipitation Measurement (GPM) Program is an international cooperative effort whose objectives are to (a) obtain better understanding of rainfall processes, and (b) make frequent rainfall measurements on a global basis. The National Aeronautics and Space Administration (NASA) of the United States and the Japanese Aviation and Exploration Agency (JAXA) have entered into a cooperative agreement for the formulation and development of GPM. This agreement is a continuation of the partnership that developed the highly successful Tropical Rainfall Measuring Mission (TRMM) that was launched in November 1997; this mission continues to provide valuable scientific and meteorological information on rainfall and the associated processes. International collaboration on GPM from other space agencies has been solicited, and discussions regarding their participation are currently in progress. NASA has taken lead responsibility for the planning and formulation of GPM. Key elements of the Program to be provided by NASA include a Core satellite instrumented with a multi-channel microwave radiometer, a Ground Validation System and a ground-based Precipitation Processing System (PPS). JAXA will provide a Dual-frequency Precipitation Radar for installation on the Core satellite and launch services. Other United States agencies and international partners may participate in a number of ways, such as providing rainfall measurements obtained from their own national space-borne platforms, providing local rainfall measurements to support the ground validation activities, or providing hardware or launch services for GPM constellation spacecraft.

Hwang, P.↗

Measurement of Global Precipitation

The Global Precipitation Measurement (GPM) Program is an international cooperative effort whose objectives are to (a) obtain increased understanding of rainfall processes, and (b) make frequent rainfall measurements on a global basis. The National Aeronautics and Space Administration (NASA) of the United States and the Japanese Aviation and Exploration Agency (JAXA) have entered into a cooperative agreement for the formulation and development of GPM. This agreement is a continuation of the partnership that developed the highly successful Tropical Rainfall Measuring Mission (TRMM) that was launched in November 1997; this mission continues to provide valuable scientific and meteorological information on rainfall and the associated processes. International collaboration on GPM from other space agencies has been solicited, and discussions regarding their participation are currently in progress. NASA has taken lead responsibility for the planning and formulation of GPM, Key elements of the Program to be provided by NASA include a Core satellite bus instrumented with a multi-channel microwave radiometer, a Ground Validation System and a ground-based Precipitation Processing System (PPS). JAXA will provide a Dual-frequency Precipitation Radar for installation on the Core satellite and launch services. Other United States agencies and international partners may participate in a number of ways, such as providing rainfall measurements obtained from their own national space-borne platforms, providing local rainfall measurements to support the ground validation activities, or providing hardware or launch services for GPM constellation spacecraft. This paper will present an overview of the current planning for the GPM Program, and discuss in more detail the status of the lead author's primary responsibility, development and acquisition of the GPM Microwave Imager.

Flaming, Gilbert Mark↗

Advanced Stirling Convertor (ASC)--From Technology Development to Future Flight Product

The Advanced Stirling Convertor (ASC) is being developed by Sunpower Inc. under contract to NASA s Glenn Research Center (GRC) with critical technology support tasks led by GRC. The ASC development, funded by NASA s Science Mission Directorate, started in 2003 as one of 10 competitively awarded contracts that were intended to address the power conversion needs of future Radioisotope Power Systems (RPS). The ASC technology has since evolved through progressive convertor builds and successful testing to demonstrate high conversion efficiency (38 percent), low mass (1.3 kg), hermetic sealing, launch vibration simulation, EMI characterization, and is undergoing extended operation. The GRC and Sunpower team recently delivered two ASC-E convertors to the Department of Energy (DOE) and Lockheed Martin Space Systems Company for integration onto the Advanced Stirling Radioisotope Generator Engineering Unit (ASRG EU) plus one spare. The design of the next build, called the ASC-E2, has recently been initiated and is based on the heritage ASC-E with design refinements to increase reliability margin and offer higher temperature operation and improve performance. The ASC enables RPS system specific power of about 7 to 8 W/kg. This paper provides a chronology of ASC development to date and summarizes technical achievements including advancements toward flight implementation of the technology on ASRG by as early as 2013.

Wong, Wayne A.↗

Update on the activities of the GGOS Bureau of Networks and Observations

The recently reorganized GGOS Bureau of Networks and Observations has many elements that are associated with building and sustaining the infrastructure that supports the Global Geodetic Observing System (GGOS) through the development and maintenance of the International Terrestrial and Celestial Reference Frames, improved gravity field models and their incorporation into the reference frame, the production of precision orbits for missions of interest to GGOS, and many other applications. The affiliated Service Networks (IVS, ILRS, IGS, IDS, and now the IGFS and the PSMSL) continue to grow geographically and to improve core and co-location site performance with newer technologies. Efforts are underway to expand GGOS participation and outreach. Several groups are undertaking initiatives and seeking partnerships to update existing sites and expand the networks in geographic areas void of coverage. New satellites are being launched by the Space Agencies in disciplines relevant to GGOS. Working groups now constitute an integral part of the Bureau, providing key service to GGOS. Their activities include: projecting future network capability and examining trade-off options for station deployment and technology upgrades, developing metadata collection and online availability strategies; improving coordination and information exchange with the missions for better ground-based network response and space-segment adequacy for the realization of GGOS goals; and standardizing site-tie measurement, archiving, and analysis procedures. This poster will present the progress in the Bureau's activities and its efforts to expand the networks and make them more effective in supporting GGOS.

Networks↗

Titan Surface Temperatures During the Cassini Mission

By the close of the Cassini mission in 2017 the Composite Infrared Spectrometer had recorded surface brightnesstemperatures on Titan for 13 yr (almost half a Titan year). We mapped temperatures in latitude from pole to pole inseven time segments from northern mid-winter to northern summer solstice. At the beginning of the mission thewarmest temperatures were centered at 13 S where they peaked at 93.9 K. Temperatures fell off by about 4 Ktoward the north pole and 2 K toward the south pole. As the seasons progressed the warmest temperatures shiftednorthward, tracking the subsolar point, and at northern summer solstice were centered at 24 N. While moving norththe peak temperature decreased by about 1 K, reaching 92.8 K at solstice. At solstice the fall-off toward the northand south poles were 1 K and 3 K, respectively. Thus the temperature range was the same 2 K at the two poles. Ourobserved surface temperatures agree with recent general circulation model results that take account of methanehydrology and imply that hemispherical differences in Titan's topography may play a role in the north?southasymmetry on Titan.

Jennings, D. E.↗

Feasibility Study for Cathodic Protection of Waste Tanks at Hanford

The Hanford Nuclear Reservation site contains approximately 211 million liters of radioactive and chemically hazardous waste arising from nuclear weapons production, beginning with World War II, and continuing through the Cold War. The waste is stored in 177 carbon-steel underground storage tanks, of which 149 are single-shell tanks (SSTs) and the remaining are double-shell tanks (DSTs). The mission of an ongoing River Protection Project is to retrieve the waste from the underground storage tanks and then treat and immobilize (i.e., vitrify) it for disposal. Waste from the older SSTs is being progressively retrieved into the newer DSTs for storage pending treatment, immobilization, and disposal. Waste chemistry controls are in place to mitigate general corrosion, pitting corrosion, and stress corrosion cracking (SCC) and minimize corrosion risks to the carbon steel tank liners of DST at the Hanford Site. The chemistry control program focuses on preserving liner integrity while balancing the need for caustic/nitrite additions that have large downstream impacts on vitrification. Some of the DSTs store salt cake or sludge waste layers contain out-of-specification interstitial liquids that contact the primary tank bottom or sidewall. Remediation of such layers through chemical additions is not practical. At the present time, the most significant leak integrity concern at Hanford is for corrosion of the tank bottoms of DSTs where the solids layer is out of specification because of hydroxide ion depletion and consequently, pH values that are less than 12. Cathodic protection (CP) has been proposed as a possible way to protect the liners of such tanks against corrosion. The objective of this project was to investigate the feasibility of applying CP to Hanford DSTs to mitigate internal corrosion of the carbon steel tank primary liners. The scope of the project included (1) a literature review on the application of CP to storage tank systems, in general, and to waste tanks at the Savannah River Site (SRS) and Hanford, (2) a review of the finite element analysis (FEA) model recently developed to evaluate potentials for a DST, and (3) the development of a boundary element analysis (BEA) model for CP for a DST. Tank AN-107, one of the Hanford DSTs, was selected for this work because (1) the bottommost waste layer in the tank is out-of-specification, and (2) electrochemical and resistivity data, based on recent waste sampling and testing, are available for this tank. The overarching conclusion of this study is that, based on the available information, it is feasible to apply CP to mitigate internal corrosion of the primary liners of the Hanford DSTs. However, significant additional information and work are required before a CP system can be designed. Recommendations for next steps in the design of the CP system will be presented.

WIERSMA, BRUCE↗

Materials challenges for the fusion nuclear science facility

The phased development and component testing mission of the Fusion Nuclear Science Facility (FNSF) implies a unique scenario for the development of structural and plasma-facing materials. The phased development of the machine and the capability to periodically remove and replace power core sectors allows for the introduction of materials and components with progressively improved operating characteristics throughout the lifetime of the machine. In addition, the machine components removed at each operational phase will provide the first opportunity to test and examine materials irradiated to useful neutron fluences in a fully integrated fusion environment. In this paper, options for structural and plasma-facing materials are considered and a preliminary set of materials identified to meet the challenges of power core components and for the machine-lifetime components such as the vacuum vessel and the structural ring. Finally, the status of FNSF-relevant materials research and development within the US fusion material program is summarized, and future directions for developing advanced materials to enable the long-term missions of an FNSF are discussed.

42 ENGINEERING↗

NASA's Space Launch System: Unprecedented Payload Capabilities

As part of a renewed focus on deep space exploration, NASA and its private sector and international partners are building a new super heavy-lift launch vehicle, the Space Launch System (SLS), as well as the new Orion crew vehicle, and upgrading launch facilities at Kennedy Space Center. Progress made on the Block 1 vehicle, as well as its expected performance metrics and fiscal support from the U.S. administration and Congress, have opened up additional manifest possibilities that the Agency continues to evaluate. Offering a combination of power, payload capacity and departure energy unmatched in contemporary boosters, the SLS family of launch vehicles features the world's most-proven propulsion system: solid rocket boosters and RS-25 main engines with a modified existing cryogenic in-space stage. The initial SLS configuration, Block 1, will deliver at least 26 metric tons (t) of payload to trans-lunar injection (TLI). The vehicle's flexible architecture will enable the rocket to evolve over the next decade to meet the most demanding deep space mission requirements. The second configuration, Block 1B, will deliver at least 34 to 40 t to TLI, depending on whether the crewed or cargo variant is selected. Although designed to facilitate human exploration of deep space, the vehicle also provides game-changing benefits for large science payloads and even harnesses excess capacity to provide small satellites with affordable access to deep space. For the first integrated mission of SLS and Orion, launching from Kennedy Space Center in fiscal year 2020, SLS Block 1 will send Orion on a 25.5-day mission to a distant retrograde lunar orbit with the primary objective to test and validate new systems and procedures. That first mission, called Exploration Mission-1 (EM-1), also has 13 6U-class CubeSat payloads manifested. Those payloads, which will carry out a variety of scientific experiments and technology demonstrations, will deploy in several locations along the trajectory after Orion has separated from SLS. Contractors and suppliers have made significant progress since last year manufacturing the Block 1 vehicle for EM-1. The upper stage and adapters are complete as are the four RS-25 engines. All other major components are constructed and being outfitted for flight. In fact, hardware for the second flight is currently being manufactured at locations across the United States. This paper will outline hardware, avionics and testing progress toward the first and second flights of SLS. Manifest opportunities for primary, co-manifested and secondary payloads will be discussed. An in-depth look at payload utilization and integration will be provided, as well as lessons learned from installing a secondary payload deployment system for EM-1.

Creech, Steve↗

Emerging, Photonic Based Technologies for NASA Space Communications Applications

An objective of NASA's Computing, Information, and Communications Technology program is to support the development of technologies that could potentially lower the cost of the Earth science and space exploration missions, and result in greater scientific returns. NASA-supported photonic activities which will impact space communications will be described. The objective of the RF microphotonic research is to develop a Ka-band receiver that will enable the microwaves detected by an antenna to modulate a 1.55- micron optical carrier. A key element is the high-Q, microphotonic modulator that employs a lithium niobate microdisk. The technical approach could lead to new receivers that utilize ultra-fast, photonic signal processing techniques, and are low cost, compact, low weight and power efficient. The progress in the liquid crystal (LC) beam steering research will also be reported. The predicted benefits of an LC-based device on board a spacecraft include non-mechanical, submicroradian laser-beam pointing, milliradian scanning ranges, and wave-front correction. The potential applications of these emerging technologies to the various NASA missions will be presented.

Pouch, John↗

The LWS Geospace Storm Investigations Exploring the Extremes of Space Weather

The Geospace mission of the Living With a Star program is a family of investigations focusing on the compelling science questions that advance our ability to specify, understand, and predict the societal impact of solar variance. Two key areas have been identified as combining both importance to society and potential for scientific progress: 1) characterization and understanding of the acceleration, global distribution, and variability of energetic electrons and ions in the inner magnetosphere, and 2) characterization and understanding of the ionosphere and irregularities that affect communications, navigation and radar systems. Under these broad categories specific science questions have emerged as the priority science objectives for the first Geospace Investigations: How and why do relativistic electrons in the outer zone and slot region vary during geomagnetic storms? How does the long- and short-term variability of the Sun affect the global-scale behavior of the ionospheric electron density and irregularities, especially during magnetic storms and at mid-latitudes? The first Geospace mission will attempt to answer these questions.

Source record↗

INFORMATION: Special Report on "Management Challenges at the Department of Energy"

Responsible for some of the Nation's most important and technically advanced missions, the Department of Energy faces an array of challenges that are more wide-ranging and complex than at any time in its history. While its origins can be largely traced to the Manhattan Project, the Department has evolved into a multi-faceted agency that encompasses a broad range of scientific, environmental, and national security activities. Since its creation under the Department of Energy Organization Act in 1977, the Department has shifted its emphasis and priorities over time as the energy and security needs of the Nation have changed. The Department has recently refocused these efforts, adding particular emphasis on the science and renewable energy components of its portfolio. In this regard, the Department has taken a lead role in the implementation and execution of the energy technology initiatives related to the American Recovery and Reinvestment Act of 2009 (Recovery Act). As a means of accomplishing these initiatives, the Department received a substantial increase in its annual appropriation, rising from nearly $25 billion in 2008 to approximately $34 billion in 2009 as a result of additional funding in the Department's loan program and numerous science, energy, and national security initiatives. In addition, the Department was provided more than $36 billion in Recovery Act funding to be used over a two to three year period. Further, the Department, through existing authorities and those expanded by the Recovery Act, has been authorized to provide more than $100 billion in loan guarantees for innovative, clean energy technologies. To accomplish its vital missions, the Department employs approximately 115,000 Federal and contractor personnel and manages assets valued at more than $189 billion, including the 17 national laboratories at the heart of its science program. On an annual basis, the Office of Inspector General is required to identify what it considers to be the most significant management challenges facing the Department. Our effort addresses new or emerging issues and evaluates the Department's progress in resolving previously identified challenges. The challenges identified by this process represent risks inherent in the Department's wide ranging and complex operations, as well as those related to problems with specific management processes. As noted in past reports, we recognize that often these challenges cannot be resolved in a single year and must, therefore, be addressed through a concentrated, persistent effort over time. Consistent with our mission, the overall goal is to focus attention on significant issues with the objective of working with Department managers to enhance the effectiveness of agency programs and operations. During the past year, the Department has taken a number of actions to promote its ongoing strategy of resolving the management challenges identified in our prior reports. There have been many notable advances. However, in our judgment, on the basis of the results of our work during the past year and other risk assement tools, the following management challenges remain for Fiscal Year (FY) 2010: Contract Administration; Cyber Security; Energy Supply; Environmental Cleanup; Safeguards and Security; and Stockpile Stewardship. As with a number of Federal agencies, the Department received an unprecedented infusion of funds as a result of the Recovery Act. These funds, along with the overarching goals set forth in the Act, were transformative in nature. On a positive note, the Department and its staff have been energized by the new and evolving programmatic initiatives resulting from the Recovery Act. However, as would be expected in an effort of this magnitude, the Departmnent has experienced significantly increased management stresses and strains, impacting virtually every program and operation. In fact, the essentially unavoidable burden placed on existing human capital and other resources has, in our judgment, affected the Department's ability to resolve its existing management challenges, at least in the near term. To capture these emerging factors, as part of this report, we have added two additional Departmental management challenges: Recovery Act Implementation; and Human Capital Management.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

NASA's Space Launch System Begins Integration, Stacking in Preparation for Artemis I Launch

The Artemis era of human lunar exploration is nearing take-off as NASA’s new super heavy-lift launch vehicle, the Space Launch System (SLS), begins stack-ing and integration operations in mid-2020 at Kennedy Space Center (KSC) in Florida. With a planned upgrade path to progressively more powerful vehicles and availability in crew and cargo configurations, SLS provides a unique and flexible launch solution to send crew, large-scale infrastructure and robotic probes to deep space. The SLS Block 1 vehicle, the initial variant to fly, is optimized for lunar missions with a proven propulsion system consisting of four liquid hydrogen (LH2)/liquid oxygen (LOX)-fed RS-25 engines and twin five-segment solid rocket boosters (SRBs). The Block 1 vehicle can also be outfitted with an industry-standard 5 m-class payload fairing (the “cargo” configuration) and will launch at least 27 metric tons (t) of mass to trans-lunar injection (TLI). SLS is the backbone of NASA’s Artemis program, which will return the agency’s human spaceflight program to the Moon for the first time since 1972. For the Artemis I mission, SLS will send an uncrewed Orion spacecraft to TLI, where it will enter a distant retrograde lunar orbit and fly 38,000 nmi past the Moon – farther than any spacecraft built for humans has ever traveled. The SLS Block 1 vehicle for Artemis I completed manufacturing in 2019. Several elements, including the upper stage, have been delivered to the Exploration Ground Systems (EGS) program at KSC and are being prepped for integration and stack-ing. The five-segment solid rocket boosters – the largest and most powerful ever built for flight – are also complete. The booster motor segments for the Artemis I flight are scheduled to ship from prime contractor Northrop Grumman’s Utah facilities and begin stacking and integration at KSC in June 2020. The SLS core stage is the largest rocket stage NASA has ever built in terms of volume and height, and includes the avionics and the tanks that feed cryogenic propellant to the four RS-25s (formerly Space Shuttle Main Engines [SSMEs]). They have been modified with an updated controller and nozzle insulation to protect them from the hotter launch environment. The SLS core stage is currently being test-ed at NASA’s Stennis Space Center (SSC) in a series of “green run” tests to verify it meets design and performance requirements. Following the green run test series, which is scheduled to culminate with a full-duration hot-fire of the four RS-25 engines, the core stage will ship to KSC and be stacked between the sol-id rocket boosters in the Vehicle Assembly Building (VAB). Integration of the vehicle will continue with the upper stage, known as the Interim Cryogenic Propulsion Stage (ICPS) and the Launch Vehicle Stage Adapter (LVSA) on the core stage. Another adapter, the Orion Stage Adapter (OSA), connects SLS to Orion and provides housing for 13 6U CubeSat payloads manifested on Artemis I. The CubeSats will be released in deep space after Orion separates from the vehicle, and the flight marks the first ride share opportunity for independent small-sats to deep space. The second major SLS variant to come online, Block 1B, replaces the single-engine ICPS with a four-engine LH2/LOX Exploration Upper Stage (EUS). This more powerful upper stage, along with other vehicle up-grades, will enable the Block 1B vehicle to launch 38-42 t to TLI, depending on crew or cargo configuration. The final evolution of the vehicle, Block 2, will onramp evolved solid rocket boosters to increase mass to TLI to 43-46 t, de-pending on crew or cargo configuration. The Block 1B/Block 2 vehicles can be outfitted with an 8.4 m-diameter payload fairing in 19.1 m or 27.4 m lengths, to provide unprecedented volume for payloads. With the initial Block 1 vehicle completely manufactured and the core stage in final testing before shipping to KSC, the SLS Program and its industry partners have made significant progress manufacturing subsequent vehicles. For the second Block 1 vehicle, the solid rocket motor segments are complete, as are the RS-25 engines with controllers. All five major components of the Artemis II core stage – the forward skirt, LOX and LH2 tanks, intertank and engine section – are manufactured and technicians are installing subsystems at NASA’s rocket factory, Michoud Assembly Facility. The RL-10 engine for the Artemis II ICPS is complete and panels have been machined for its LH2 tank. In addition, panels are machined for the vehicle’s two adapters, with welding scheduled to begin in summer 2020. Flight hard-ware is also in production for the third SLS vehicle, with several booster motor segments cast. The pace of development on the EUS has increased, with the goal to complete Critical Design Review (CDR) in December 2020. Several EUS test rings have been machined at Michoud. The EUS is designed to exe-cute a variety of missions – human spaceflight, deployment of deep-space infra-structure, or high-C3 missions to the outer solar system – with crew and cargo configurations available beginning in the mid-2020s. The near-term goal for the nation’s powerful new space exploration asset, however, is to launch the Arte-mis program, and send the first woman and the next man to the lunar surface. At the Astrodynamics Specialist Conference, the SLS program will update the community on the progress of the initial Block 1 vehicle in final green run test-ing, integration and stacking. In addition, this paper will provide an update to the community on the manufacturing status of subsequent Block 1 and Block 1B vehicles.

Steve Creech↗