Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “hydropower”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,387 records · Page 77

Experimental Wave Tank Test for Reference Model 3 Floating-Point Absorber Wave Energy Converter Project

The U.S. Department of Energy established a reference model project to benchmark a set of marine and hydrokinetic technologies including current (tidal, open-ocean, and river) turbines and wave energy converters. The objectives of the project were to first evaluate the status of these technologies and their readiness for commercial applications. Second, to evaluate the potential cost of energy and identify cost-reduction pathways and areas where additional research could be best applied to accelerate technology development to market readiness.

16 TIDAL AND WAVE POWER↗

Passage Distribution and Federal Columbia River Power System Survival for Steelhead Kelts Tagged Above and at Lower Granite Dam, Year 2 (Rev. 1)

Steelhead (Oncorhynchus mykiss) populations have declined throughout their range in the last century and many populations, including those of the Snake River Basin are listed under the Endangered Species Act of 1973. The reasons for their decline are many and complex, but include habitat loss and degradation, overharvesting, and dam construction. The 2008 Biological Opinion calls for an increase in the abundance of female steelhead through an increase in iteroparity (i.e., repeat spawning) and this can be realized through a combination of reconditioning and in-river survival of migrating kelts. The goal of this study is to provide the data necessary to inform fisheries managers and dam operators of Snake River kelt migration patterns, survival, and routes of dam passage. Steelhead kelts (n = 487) were captured and implanted with acoustic transmitters and passive integrated transponder (PIT)-tags at the Lower Granite Dam (LGR) Juvenile Fish Facility and at weirs located in tributaries of the Snake and Clearwater rivers upstream of LGR. Kelts were monitored as they moved downstream through the Federal Columbia River Power System (FCRPS) by 15 autonomous and 3 cabled acoustic receiver arrays. Cabled receiver arrays deployed on the dam faces allowed for three-dimensional tracking of fish as they approached the dam face and were used to determine the route of dam passage. Overall, 27.3% of the kelts tagged in this study successfully migrated to Martin Bluff (rkm 126, as measured from the mouth of the Columbia River), which is located downstream of all FCRPS dams. Within individual river reaches, survival per kilometer estimates ranged from 0.958 to 0.999; the lowest estimates were observed in the immediate forebay of FCRPS dams. Steelhead kelts tagged in this study passed over the spillway routes (spillway weirs, traditional spill bays) in greater proportions and survived at higher rates compared to the few fish passed through powerhouse routes (turbines and juvenile bypass systems). The results of this study provide information about the route of passage and subsequent survival of steelhead kelts that migrated through the Snake and Columbia rivers from LGR to Bonneville Dam in 2013. These data may be used by fisheries managers and dam operators to identify potential ways to increase the survival of kelts during their seaward migrations.

13 HYDRO ENERGY↗

Report to Congress on the Potential Environmental Effects of Marine and Hydrokinetic Energy Technologies

This report focuses on potential impacts of marine and hydrokinetic technologies to aquatic environments (i.e. rivers, estuaries, and oceans), fish and fish habitats, ecological relationships, and other marine and freshwater aquatic resources. The report does not address impacts to terrestrial ecosystems and organisms that are common to other electricity-generating technologies (e.g., construction and maintenance of transmission lines) or possible effects on the human environment, including: human use conflicts, aesthetics, viewsheds, noise in the terrestrial environment, light, recreation, transportation, navigation, cultural resources, socioeconomic impacts.

13 HYDRO ENERGY↗

U.S. Renewable Energy Technical Potentials: A GIS-Based Analysis

This report presents the state-level results of a spatial analysis effort calculating energy technical potential, reported in square kilometers of available land, megawatts of capacity, and gigawatt-hours of generation, for six different renewable technologies. For this analysis, the system specific power density (or equivalent), efficiency (capacity factor), and land-use constraints were identified for each technology using independent research, published research, and professional contacts. This report also presents technical potential findings from previous reports.

09 BIOMASS FUELS↗

Hiilangaay Hydroelectric Project – Final Report

The Hiilangaay Hydroelectric Project (“Hiilangaay” or the “Project”) is a 5-megawatt hydroelectric resource currently under construction on Prince of Wales Island (POW), Alaska, approximately ten miles east of Hydaburg. The objective of the Project is to interconnect with the existing transmission grid on Prince of Wales Island, increasing the hydroelectric generation capability by 5 MW, eliminating the need for diesel generation, increasing the reliability of the electrical system, and allowing the interconnected portion of the island to have 100 percent renewable energy generation. Pre-construction activities including construction planning, permit coordination and compliance, and final design have made it possible to move forward with construction of the Hiilangaay Project. Despite repeated delays to the schedule, persistence and long-term planning will culminate in the construction of the Project, and make Prince of Wales Island independent of diesel-fueled energy

13 HYDRO ENERGY↗

American Samoa Energy Action Plan

Describes the five near-term strategies selected by the American Samoa Renewable Energy Committee (ASREC) during action planning workshops conducted in May 2013, and outlines the actions being taken to implement those strategies. Each option is tied to a priority identified in the earlier draft American Samoa Strategic Energy Plan as being an essential component of reducing American Samoa'spetroleum energy consumption. The actions described for each strategy provide a roadmap to facilitate the implementation of each strategy. This document is intended to evolve along with the advancement of the projects, and will be updated to reflect progress.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Eastern Renewable Generation Integration Study

The Eastern Interconnection (EI) is one of the largest power systems in the world, and its size and complexity have historically made it difficult to study in high levels of detail in a modeling environment. In order to understand how this system might be impacted by high penetrations (30% of total annual generation) of wind and solar photovoltaic (PV) during steady state operations, the National Renewable Energy Laboratory (NREL) and the U.S. Department of Energy (DOE) conducted the Eastern Renewable Generation Integration Study (ERGIS). This study investigates certain aspects of the reliability and economic efficiency problem faced by power system operators and planners. Specifically, the study models the ability to meet electricity demand at a 5-minute time interval by scheduling resources for known ramping events, while maintaining adequate reserves to meet random variation in supply and demand, and contingency events. To measure the ability to meet these requirements, a unit commitment and economic dispatch (UC&ED) model is employed to simulate power system operations. The economic costs of managing this system are presented using production costs, a traditional UC&ED metric that does not include any consideration of long-term fixed costs. ERGIS simulated one year of power system operations to understand regional and sub-hourly impacts of wind and PV by developing a comprehensive UC&ED model of the EI. In the analysis, it is shown that, under the study assumptions, generation from approximately 400 GW of combined wind and PV capacity can be balanced on the transmission system at a 5-minute level. In order to address the significant computational burdens associated with a model of this detail we apply novel computing techniques to dramatically reduce simulation solve time while simultaneously increasing the resolution and fidelity of the analysis. Our results also indicate that high penetrations of wind and PV (collectively variable generation (VG)), significantly impact the operation of traditional generating resources and cause these resources to be used less frequently and operate across a broader output range because wind and PV have lower operating costs and variable output levels.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Comparative Study of Barotrauma Risk during Fish Passage through Kaplan Turbines

Rapid pressure changes in hydroelectric turbine flows can cause barotrauma that can be hazardous to the passage of fish, in particular migratory juvenile salmonids. Although numerous laboratory tests have evaluated the effect of rapid decompression in fish species of relevance, numerical modeling studies offer the advantage of predicting, for new turbine designs, the potential risks of mortality and injury from rapid pressure change during turbine passage. However, rapid pressure change is only one of several hydraulic risks encountered by fish during turbine passage in addition to blade strike, shear, and turbulence. To better understand the role of rapid pressure changes, the present work focuses on the application of a computational fluid dynamics based method for evaluating the risk of pressure-related mortality to fish passing through an early 1960s era original hydroelectric Kaplan turbine at Wanapum Dam (Columbia River, Washington), and a modern advanced Kaplan turbine installed in 2005. The results show that the modeling approach acceptably reproduced the nadir pressure distributions compared to field data previously collected at the site using an autonomous sensor. Our findings show that the new advanced-design unit performs better, in terms of reduced barotrauma risk to fish from exposure to low pressures, than the original turbine unit. The outcomes allow for comparative analyses of turbine designs and operations prior to installation, an advantage that can potentially be integrated in the process of designing new turbine units to achieve superior environmental performance. Overall, the results show that modern turbine designs can achieve the multiple objectives of increasing power generation, lowering cavitation potential, and reducing barotrauma risks to passing fish.

13 HYDRO ENERGY↗

American Samoa: Energy Action Plan

This document outlines actions being taken to reduce American Samoa's petroleum consumption. It describes the four near-term strategies selected by the American Samoa Renewable Energy Committee during action-planning workshops conducted in May 2016, and describes the steps that will need to be taken to implement those strategies.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Life Cycle Greenhouse Gas Emissions from Electricity Generation

As clean energy increasingly becomes part of the national dialogue, lenders, utilities, and lawmakers need the most comprehensive and accurate information on GHG emissions from various sources of energy to inform policy, planning, and investment decisions. The National Renewable Energy Laboratory (NREL) recently led the Life Cycle Assessment (LCA) Harmonization Project, a study that gives decision makers and investors more precise estimates of life cycle GHG emissions for renewable and conventional generation, clarifying inconsistent and conflicting estimates in the published literature, and reducing uncertainty.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Iowa Hill Pumped Storage Project Investigations - Final Technical Report

This Final Technical Report is a summary of the activities and outcome of the Department of Energy (DOE) Assistance Agreement DE-EE0005414 with the Sacramento Municipal Utility District (SMUD). The Assistance Agreement was created in 2012 to support investigations into the Iowa Hill Pumped-storage Project (Project), a new development that would add an additional 400 MW of capacity to SMUD’s existing 688MW Upper American River Hydroelectric Project (UARP) in the Sierra Nevada mountains east of Sacramento, California.

13 HYDRO ENERGY↗

2016 Renewable Energy Data Book

The Renewable Energy Data Book for 2016 provides facts and figures on renewable energy deployment in the United States, with context of U.S. and global energy trends. Facts include renewable electricity capacity, generation, and capacity additions for U.S. and global electricity and energy as a whole, and for specific renewable electricity generation technologies.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Development of an Environmentally Acceptable Hydraulic Fluid

Hydroelectric plants operators like the United States Army Corps of Engineers seek their traditional petroleum-based fluids with environmentally acceptable hydraulic fluids (EAHF) to reduce their impact and liability related to spills and leakages to the water and environment. Artesion, Inc. and its sub-contractor Washington State University (WSU) sought to optimize WSU’s existing EAHF blend into an improved product that would demonstrate long-term stability while meeting the EAHF requirements of the EPA’s Vessel General Permit (VGP). Multiple rounds of Design of Experiments testing were performed from WSU’s base formulation, modifying mixing ratios to generate multiple test fluids. These fluids were then tested for hydraulic fluid properties. It was found that there was a significant tradeoff between oxidative stability and biodegradability; highly stable materials were not sufficiently biodegradable, while the highly biodegradable materials quickly failed in stability tests. After four rounds of Design of Experiments, AI and WSU had found a base fluid which met the VGP, but only had a Rotating Pressure Vessel Oxidative Test (RPVOT) of 284-minute RPVOT stability, far short of the 500-minute target that would be needed for hydroelectric plants. It was determined that WSU’s route had shown initial promise but needed more refinement to be able to produce an acceptable EAHF.

36 MATERIALS SCIENCE↗

2017 Renewable Energy Data Book

The Renewable Energy Data Book for 2017 provides facts and figures on renewable energy deployment in the United States, with context of U.S. and global energy trends. Facts include renewable electricity capacity, generation, and capacity additions for U.S. and global electricity and energy as a whole, and for specific renewable electricity generation technologies.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Construction Support for New Slab Creek Powerhouse Project (Final Technical Report)

The Sacramento Municipal Utility District (SMUD) has constructed a new powerhouse and Boating Flow Release Facility (BFRF) ¼ mile downstream of the existing Slab Creek Dam with the assistance of grant funding from the Department of Energy in the amount of $1.5 million. Slab Creek Dam impounds 16,600 acre-feet of storage and has a normal full pool elevation of 1850ft. Water is conveyed from Slab Creek Reservoir through a 4.9 mile power tunnel to the 224 MW White Rock Powerhouse which discharges into Chili Bar Reservoir. A small 450 kW powerhouse located at Slab Creek Dam utilizes the original license in-stream flow requirement. The new license (FERC Project No. 2101-084) requires significantly more instream flows immediately below the dam for aquatic preservation and recreational flows over the original license. The terms of the new license allow the Slab Creek Powerhouse to utilize the original required dam releases, while the new South Fork Powerhouse will use the new instream flow requirements above the original license requirement. The South Fork Powerhouse routes flows back to the South Fork of the American River via a new penstock that is tied into the White Rock Tunnel at Adit #3. This new penstock bifurcates at the Adit #3 portal with one leg going to the BFRF and the other to the new powerhouse. The South Fork Powerhouse is a single generating unit with a capacity of 2.98 kVA. The BFRF is valve house with an energy dissipation chamber for a 60” fixed cone valve capable of passing 1,300 cfs for meeting the recreational flow requirements of the license.

power tunnel↗

Enabling Floating Solar Photovoltaic (FPV) Deployment: Review of Barriers to FPV Deployment in Southeast Asia

The purpose of this report is to improve understanding of the policy landscape for FPV systems and identify potential pathways to create an enabling policy and regulatory environment FPV systems in Southeast Asia. In this literature review, we discuss the case for FPVs in Southeast Asia by presenting the energy context and state of the grid in select Southeast Asia countries and conduct a literature review of existing and potential non-technical barriers to FPV deployment, concluding with potential policy pathways to address some of the barriers identified. Given the lack of extensive literature on the policy and regulatory environment for FPVs and the similarity with other RE technologies, this review adapts lessons from other RE technologies to the FPV context.

14 SOLAR ENERGY↗

Researcher Views on Water Data Accessibility, Usability, and Dissemination

Ultimately, the challenges that researchers face with finding, accessing, using, and disseminating water data affect their ability to do mission critical research for DOE and other sponsors. We interviewed PNNL researchers who support DOE’s Water Power Technologies Office and summarize their views on issues pertaining to data access, use, and dissemination. We also take a closer look at approaches to disseminating data to help inform WPTO and lab researcher decisions about incorporating data dissemination into future projects.

13 HYDRO ENERGY↗