Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “error correction”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,387 records · Page 77

Modeling of Rolling Element Bearing Mechanics: Computer Program Updates

The Rolling Element Bearing Analysis System (REBANS) extends the capability available with traditional quasi-static bearing analysis programs by including the effects of bearing race and support flexibility. This tool was developed under contract for NASA-MSFC. The initial version delivered at the close of the contract contained several errors and exhibited numerous convergence difficulties. The program has been modified in-house at MSFC to correct the errors and greatly improve the convergence. The modifications consist of significant changes in the problem formulation and nonlinear convergence procedures. The original approach utilized sequential convergence for nested loops to achieve final convergence. This approach proved to be seriously deficient in robustness. Convergence was more the exception than the rule. The approach was changed to iterate all variables simultaneously. This approach has the advantage of using knowledge of the effect of each variable on each other variable (via the system Jacobian) when determining the incremental changes. This method has proved to be quite robust in its convergence. This technical memorandum documents the changes required for the original Theoretical Manual and User's Manual due to the new approach.

Ryan, S. G.↗

Systematic Errors in Stereo PIV When Imaging through a Glass Window

This document assesses the magnitude of velocity measurement errors that may arise when performing stereo particle image velocimetry (PIV) with cameras viewing through thick, refractive window and where the calibration is performed in one plane only. The effect of the window is to introduce a refractive error that increases with window thickness and the camera angle of incidence. The calibration should be performed while viewing through the test section window, otherwise a potentially significant error may be introduced that affects each velocity component differently. However, even when the calibration is performed correctly, another error may arise during the stereo reconstruction if the perspective angle determined for each camera does not account for the displacement of the light rays as they refract through the thick window. Care should be exercised when applying in a single-plane calibration since certain implicit assumptions may in fact require conditions that are extremely difficult to meet in a practical laboratory environment. It is suggested that the effort expended to ensure this accuracy may be better expended in performing a more lengthy volumetric calibration procedure, which does not rely upon the assumptions implicit in the single plane method and avoids the need for the perspective angle to be calculated.

Green, Richard↗

Active readout-error mitigation

Mitigating errors is a significant challenge for near-term quantum computers. One of the most important sources of errors is related to the readout of the quantum state into a classical bit stream. A variety of techniques have been proposed to mitigate these errors with post-hoc corrections. Here, we propose a complementary scheme to actively reduce readout errors on a shot-by-shot basis by encoding single qubits, immediately prior to readout, into multiqubit states. The computational resources of our technique are independent of the circuit depth and are compatible with the error rates and connectivity of many current devices. We analyze the potential of our approach using two types of error-correcting codes, and, as a proof of principle, we demonstrate an 80% improvement in readout error on the IBMQ Mumbai quantum computer.

97 MATHEMATICS AND COMPUTING↗

Airdata Measurement and Calibration

This Section provides a brief introduction to airdata measurement and calibration. Readers will learn about typical test objectives, quantities to measure, and flight maneuvers and operations for calibration. The Section informs readers about tower-flyby, trailing cone, pacer, radar-tracking, and dynamic airdata calibration maneuvers. Readers will also begin to understand how some data analysis considerations and special airdata cases, including high-angle-of-attack flight, high-speed flight, and nonobtrusive sensors are handled. This section is not intended to be all inclusive; readers should review AGARDograph 300, Volume 1, "Calibration of Airdata Systems and Flow Direction Sensors" for more detailed information. [11-1] References 11-2, 11-3, and 11-4 also supply pertinent information to better understand airdata measurement and calibration and related terminology. Airdata are vital to successfully complete an aircraft's mission and are derived from the air surrounding the aircraft. These airdata encompass indicated and true airspeed, pressure altitude, ambient air temperature, angles of attack and sideslip, Mach number, and rate of climb. Typically, pitot and static pressures are sensed and converted (by mechanical means in the instruments themselves) into indications on the altimeter, vertical speed indicator, airspeed indicator, and Machmeter. Similarly, measured local flow angles establish angles of attack and sideslip, and the outside air temperature is measured and indicated in the cockpit. (Instruments that can perform the conversion, such as airspeed indicators, altimeters, and Machmeters, do not correct for errors in the input values.) These measured parameters are commonly input to the airdata computer which, using appropriate algorithms and correction factors (or calibrations, as discussed later), can provide other parameters, such as true airspeed, required by the aircraft's avionics or flight control system. The presence of the aircraft in the airstream causes input errors to the measuring instruments - the aircraft disturbs the air that it flies through, thereby also disturbing the airdata measurements. Figure 11-1 shows the airflow around an airplane wing. The air above the wing has lower pressure than the ambient air, while the pressure below the wing is higher than the ambient air. Compressibility and shock waves also disturb the air and affect the measurements. Compressibility effects become important above approximately Mach number 0.3. As a result the static pressure around an airplane varies considerably with location. Local flow angles also differ from the free-stream flow direction. In straight-and-level flight the airflow rises to the wing leading edge and falls below the trailing edge, causing errors in flow direction measurements. To some extent these errors can be studied in wind tunnels, but wind-tunnel measurements cannot replace in-flight measurements.

Haering, Edward A., Jr.↗

Evaluation of the Super ESPC Program: Level 2 -- Recalculated Cost Savings

This report presents the results of Level 2 of a three-tiered evaluation of the U.S. Department of Energy Federal Energy Management Program's Super Energy Savings Performance Contract (Super ESPC) Program. Level 1 of the analysis studied all of the Super ESPC projects for which at least one Annual Measurement & Verification (M&V) Report had been produced by April 2006. For those 102 projects in aggregate, we found that the value of cost savings reported by the energy service company (ESCO) in the Annual M&V Reports was 108% of the cost savings guaranteed in the contracts. We also compared estimated energy savings (which are not guaranteed, but are the basis for the guaranteed cost savings) to the energy savings reported by the ESCO in the Annual M&V Report. In aggregate, reported energy savings were 99.8% of estimated energy savings on the basis of site energy, or 102% of estimated energy savings based on source energy. Level 2 focused on a random sample of 27 projects taken from the 102 Super ESPC projects studied in Level 1. The objectives were, for each project in the sample, to: repeat the calculations of the annual energy and cost savings in the most recent Annual M&V Report to validate the ESCO's results or correct any errors, and recalculate the value of the reported energy, water, and operations and maintenance (O&M) savings using actual utility prices paid at the project site instead of the 'contract' energy prices - the prices that are established in the project contract as those to be used by the ESCO to calculate the annual cost savings, which determine whether the guarantee has been met. Level 3 analysis will be conducted on three to five projects from the Level 2 sample that meet validity criteria for whole-building or whole-facility data analysis. This effort will verify energy and cost savings using statistical analysis of actual utility use, cost, and weather data. This approach, which can only be used for projects meeting particular validity criteria, is described in Shonder and Florita (2003) and Shonder and Hughes (2005). To address the first objective of the Level 2 analysis, we first assembled all the necessary information, and then repeated the ESCOs' calculations of reported annual cost savings. Only minor errors were encountered, the most common being the use of incorrect escalation rates to calculate utility prices or O&M savings. Altogether, our corrected calculations of the ESCO's reported cost savings were within 0.6% of the ESCOs' reported cost savings, and errors found were as likely to favor the government as they were the ESCO. To address the second objective, we gathered data on utility use and cost from central databases maintained by the Department of Defense and the General Services Administration, and directly from some of the sites, to determine the prices of natural gas and electricity actually paid at the sites during the periods addressed by the annual reports. We used these data to compare the actual utility costs at the sites to the contract utility prices. For natural gas, as expected, we found that prices had risen much faster than had been anticipated in the contracts. In 17 of the 18 projects for which the comparison was possible, contract gas prices were found to be lower than the average actual prices being paid. We conclude that overall in the program, the estimates of gas prices and gas price escalation rates used in the Super ESPC projects have been conservative. For electricity, it was possible to compare contract prices with the actual (estimated) marginal prices of electricity in 20 projects. In 14 of these projects, the overall contract electricity price was found to be lower than the marginal price of electricity paid to the serving utility. Thus it appears that conservative estimates of electricity prices and escalation rates have been used in the program as well. Finally we calculated the value of the reported energy savings using the prices of utilities actually paid by the sites instead of the contract prices. In 16 of the 22 projects (where this calculation was possible), the recalculated annual cost savings were greater than the annual cost savings reported by the ESCO. In the aggregate for the 22 projects analyzed, the annual cost savings calculated using actual energy prices were found to be 111% of the ESCO-reported savings. Using statistical methods to expand this estimate to the entire 102-project population of Super ESPC projects, we estimate that the total annual cost savings calculated using actual energy prices instead of contract energy prices are about 110% of the reported annual cost savings. We can combine the results of the Level 1 and Level 2 studies to estimate overall cost savings realized by the government for the entire 102-project population of Super ESPC projects examined in Level 1.

03 NATURAL GAS↗

Reply to “Comment on ‘Comparative study of ab initio nonradiative recombination rate calculations under different formalisms’ ”

As pointed out by the comments of Wickramaratne et al., there was indeed an algebra error in our original publication [Phys. Rev. B 91, 205315 (2015)] in calculating the 1D model. We have corrected this error, and did a renewed calculation and comparison of the 1D model and other approximated models. The revised comparison provides some insights for the origin of the difference between the full phonon spectrum electron-phonon coupling static formula results and other approximated results, especially for how to evaluate the amplitude of electron-phonon coupling.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Lightning Reporting at 45th Weather Squadron: Recent Improvements

The 45th Weather Squadron (45 WS) provides daily lightning reports to space launch customers at CCAFS/KSC. These reports are provided to assess the need to inspect the electronics of satellite payloads, space launch vehicles, and ground support equipment for induced current damage from nearby lightning strokes. The 45 WS has made several improvements to the lightning reports during 2008-2009. The 4DLSS, implemented in April 2008, provides all lightning strokes as opposed to just one stroke per flash as done by the previous system. The 45 WS discovered that the peak current was being truncated to the nearest kilo amp in the database used to generate the daily lightning reports, which led to an up to 4% underestimate in the peak current for average lightning. This error was corrected and led to elimination of this underestimate. The 45 WS and their mission partners developed lightning location error ellipses for 99% and 95% location accuracies tailored to each individual stroke and began providing them in the spring of 2009. The new procedure provides the distance from the point of interest to the best location of the stroke (the center of the error ellipse) and the distance to the closest edge of the ellipse. This information is now included in the lightning reports, along with the peak current of the stroke. The initial method of calculating the error ellipses could only be used during normal duty hours, i.e. not during nights, weekends, or holidays. This method was improved later to provide lightning reports in near real-time, 24/7. The calculation of the distance to the closest point on the ellipse was also significantly improved later. Other improvements were also implemented. A new method to calculate the probability of any nearby lightning stroke. being within any radius of any point of interest was developed and is being implemented. This may supersede the use of location error ellipses. The 45 WS is pursuing adding data from nine NLDN sensors into 4DLSS in real-time. This will overcome the problem of 4DLSS missing some of the strong local strokes. This will also improve the location accuracy, reduce the size and eccentricity of the location error ellipses, and reduce the probability of nearby strokes being inside the areas of interest when few of the 4DLSS sensors are used in the stroke solution. This will not reduce 4DLSS performance when most of the 4DLSS sensors are used in the stroke solution. Finally, several possible future improvements were discussed, especially for improving the peak current estimate and the error estimate for peak current, and upgrading the 4DLSS. Some possible approaches for both of these goals were discussed.

Finn, Frank C.↗

Presearch Data Conditioning in the Kepler Science Operations Center Pipeline

We describe the Presearch Data Conditioning (PDC) software component and its context in the Kepler Science Operations Center (SOC) pipeline. The primary tasks of this component are to correct systematic and other errors, remove excess flux due to aperture crowding, and condition the raw flux light curves for over 160,000 long cadence (~thirty minute) and 512 short cadence (~one minute) targets across the focal plane array. Long cadence corrected flux light curves are subjected to a transiting planet search in a subsequent pipeline module. We discuss the science algorithms for long and short cadence PDC: identification and correction of unexplained (i.e., unrelated to known anomalies) discontinuities; systematic error correction; and excess flux removal. We discuss the propagation of uncertainties from raw to corrected flux. Finally, we present examples of raw and corrected flux time series for flight data to illustrate PDC performance. Corrected flux light curves produced by PDC are exported to the Multi-mission Archive at Space Telescope [Science Institute] (MAST) and will be made available to the general public in accordance with the NASA/Kepler data release policy.

Twicken, Joseph D.↗

On the estimation of gravitational wave spectrum from cosmic domain walls

We revisit the production of gravitational waves from unstable domain walls analyzing their spectrum by the use of field theoretic lattice simulations with grid size 1024{sup 3}, which is larger than the previous study. We have recognized that there exists an error in the code used in the previous study, and the correction of the error leads to the suppression of the spectrum of gravitational waves at high frequencies. The peak of the spectrum is located at the scale corresponding to the Hubble radius at the time of the decay of domain walls, and its amplitude is consistent with the naive estimation based on the quadrupole formula. Using the numerical results, the magnitude and the peak frequency of gravitational waves at the present time are estimated. It is shown that for some choices of parameters the signal of gravitational waves is strong enough to be probed in the future gravitational wave experiments.

79 ASTRONOMY AND ASTROPHYSICS↗

Automated label flows for excited states of correlation functions in lattice gauge theory

Extracting excited states from lattice gauge theory correlation functions can be achieved through $χ^2$ minimization fits or algebraic approaches such as the variational method and Prony's method. Performing any kind of error analysis often leads to overlapping confidence regions of model parameters, even when the spectrum is not particularly dense. To correctly estimate errors, one must beware of mislabeling the states. In this work, we provide an algorithm that we call automated label flows which consistently and systematically identifies a deterministic labeling of states. This is a black-box approach in the sense that it gives a sensible set of labels without user guidance. Further, as an example, we pair one black box method with another, analyzing a lattice correlation function from real data using automated label flows in the context of Prony's method.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Differential spectral responsivity measurement of photovoltaic detectors with a light-emitting-diode-based integrating sphere source

We present an experimental realization of differential spectral responsivity measurement by using a light-emitting diode (LED)-based integrating sphere source. The spectral irradiance responsivity is measured by a Lambertian-like radiation field with a diameter of 40mm at the peak wavelengths of the 35 selectable LEDs covering a range from 280 to 1550nm. The systematic errors and uncertainties due to lock-in detection, spatial irradiance distribution, and reflection from the test detector are experimentally corrected or considered. In addition, we implemented a numerical procedure to correct the error due to the broad spectral bandwidth of the LEDs. The overall uncertainty of the DSR measurement is evaluated to be 2.2% (k=2) for Si detectors. To demonstrate its application, we present the measurement results of two Si photovoltaic detectors at different bias irradiance levels up to 120mW/cm{sup 2}.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

RighTime: A real time clock correcting program for MS-DOS-based computer systems

A computer program is described which effectively eliminates the misgivings of the DOS system clock in PC/AT-class computers. RighTime is a small, sophisticated memory-resident program that automatically corrects both the DOS system clock and the hardware 'CMOS' real time clock (RTC) in real time. RighTime learns what corrections are required without operator interaction beyond the occasional accurate time set. Both warm (power on) and cool (power off) errors are corrected, usually yielding better than one part per million accuracy in the typical desktop computer with no additional hardware, and RighTime increases the system clock resolution from approximately 0.0549 second to 0.01 second. Program tools are also available which allow visualization of RighTime's actions, verification of its performance, display of its history log, and which provide data for graphing of the system clock behavior. The program has found application in a wide variety of industries, including astronomy, satellite tracking, communications, broadcasting, transportation, public utilities, manufacturing, medicine, and the military.

Becker, G. Thomas↗

Feasibility study of real-time planning for stereotactic radiosurgery

Purpose: 3D rotational setup errors in radiotherapy are often ignored by most clinics due to inability to correct or simulate them accurately and efficiently. There are two types of rotation-related problems in a clinical setting. One is to assess the affected dose distribution in real-time if correction is not applied and the other one is to correct the rotational setup errors prior to the initiation of the treatment. Here, the authors present the analytical solutions to both problems. Methods: (1) To assess the real-time dose distribution, eight stereotactic radiosurgery (SRS) cases were used as examples. For each plan, two new sets of beams with different table, gantry, and collimator angles were given in analytical forms as a function of patient rotational errors. The new beams simulate the rotational effects of the patient during the treatment setup. By using one arbitrary set of beams, SRS plans were recomputed with a series of different combinations of patient rotational errors, ranging from (-5 Degree-Sign , -5 Degree-Sign , -5 Degree-Sign ) to (5 Degree-Sign , 5 Degree-Sign , 5 Degree-Sign ) (roll, pitch, and yaw) with an increment of 1 Degree-Sign and compared with those without rotational errors. For each set of rotational errors, its corresponding equivalent beams were computed using the analytical solutions and then used for dose calculation. (2) To correct for the rotational errors, two new sets of table, gantry, and collimator angles were derived analytically to validate the previously published derivation. However, in the derivation, a novel methodology was developed and two sets of table, gantry, and collimator angles were obtained in analytical forms. The solutions provide an alternative approach to rotational error correction by rotating the couch, gantry, and collimator rather than the patient. Results: For demonstration purpose, the above-derived new beams were implemented in a treatment planning system (TPS) to study the rotational effects on the SRS cases. For each case, the authors have generated ten additional plans that accounted for different rotations of the patient. They have found that rotations have an insignificant effect on the minimal, maximum, mean doses, and V{sub 80%} of the planning target volume (PTV) when the rotations were relatively small. This was particularly true for the small and near-spherical targets. They, however, did change V{sub 95%} significantly when the rotations approached 5 Degree-Sign . The theory has been validated with clinical SRS cases and proven to be practical and viable. The preliminary results demonstrate that the rotational effects are patient-specific and depend on several important factors, such as the PTV size, the PTV location, and the beam configuration. The solutions given in this paper are of great potential values in clinical applications. Conclusions: They have derived the analytical solutions to a new set of table, gantry, and collimator angles for a given treatment beam configuration as a function of patient rotational errors. One solution was used to assess the dosimetric effects of an imperfect patient setup and the other one was used to correct for the setup errors without rotating the patient. Compared to the widely adopted method of rotation effect assessment by importing the rotational CT images into TPS, the equivalent beam approach is simple and accurate. The analytical solutions to correcting for rotational setup errors prior to treatment were also derived. Based on the initial clinical investigations, they firmly believe that clinically viable real-time treatment planning and adaptive radiation therapy are feasible with this novel method.

60 APPLIED LIFE SCIENCES↗

New analysis of neutron-lifetime experiments

The experiments on measuring the neutron lifetime have been analyzed. The newest and most exactly measured neutron lifetime [Phys. Lett. B 605, 72 (2005)] (878.5 {+-} 0.8 s) differs from the world average value [Phys. Lett. B 667, 1 (2008)] (885.7 {+-} 0.8 s) by 6.5 standard deviations. In this context, an analysis and Monte Carlo simulation of the experiments [Phys. Lett. B 483, 15 (2000)] and [Phys. Rev. Lett. 63, 593 (1989)] have been performed. Systematic errors of about -6 s are found in both experiments. A table with the results of measuring the neutron lifetime is presented with corrections and additions. The new world average value for the neutron lifetime is found to be 880.0 {+-} 0.9 s.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Errata Sheet for the Closure Report for Corrective Action Unit 538: Spill Sites, Nevada Test Site, Nevada with ROTC-1, Revision 0

This Erratum is being issued to DOE/NV--1185 ROTC-1 for the CAU 538 Closure Report to correct three items. The original ROTC which was issued on November 30, 2011 corrected the Use Restriction for CAS 12-29-06 to remove a coordinate point from the Use Restriction. However, the ROTC contained three errors as follows: 1. The number of digits after the decimal place on the UR form was one while the map displayed two digits after the decimal place. The UR form and map were aligned as part of this Erratum so that only a single digit was shown after the decimal place. 2. On the figure (Figure 1) included with the UR form issued as part of ROTC-1, CAU 538 was incorrectly called out as CAU 583. This error was corrected as part of this Erratum. 3. The coordinates on the UR form were developed from NAD 27 while the coordinate system stated on the form was UTM, Zone 11, NAD 83 meters. The coordinates were corrected on the UR form, developed as part of this Erratum, to reflect the UTM, Zone 11, NAD 83 meters system.

54 ENVIRONMENTAL SCIENCES↗

The Application of V&V within Reuse-Based Software Engineering

Verification and Validation (V&V) is performed during application development for many systems, especially safety-critical and mission-critical systems. The V&V process is intended to discover errors as early as possible during the development process. Early discovery is important in order to minimize the cost and other impacts of correcting these errors. In reuse-based software engineering, decisions on the requirements, design and even implementation of domain assets can can be made prior to beginning development of a specific system. in order to bring the effectiveness of V&V to bear within reuse-based software engineering. V&V must be incorporated within the domain engineering process.

Addy, Edward↗