Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “continuous operation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,387 records · Page 77

International Space Station Environmental Control and Life Support System Status: 2002-2003

The International Space Station (ISS) Environmental Control and Life Support (ECLS) system includes regenerative and non-regenerative technologies that provide the basic life support functions to support the crew, while maintaining a safe and habitable shirtsleeve environment. This paper provides a summary of the U.S. ECLS system activities over the past year, covering the period of time between April 2002 and March 2003. The ISS continued permanent crew operations, with the start of Phase 3 of the ISS Assembly Sequence. Work continued on the Phase 3 pressurized elements with Node 3 just completing its final design review so that it can proceed towards manufacturing and the continued manufacturing of the regenerative ECLS equipment that will be integrated into Node 3.

Wiliams, David E.↗

QuikSCAT follow - on concept study

Global, real-time observations of the speed and direction of winds over the oceans ocean surface vector winds [OSVW]) are high priority measurements for National Oceanic and Atmospheric Administration’s (NOAA’s) weather forecasting, prediction, and hazard warning communities. At present, these data are provided by the experimental National Aeronautics and Space Administration (NASA) QuikSCAT satellite sensor, which is operating well beyond its design lifetime. To continue to meet the Nation’s need for operational OSVW observations beyond QuikSCAT, NOAA tasked the Jet Propulsion Laboratory (JPL) to design and provide costs for a set of QuikSCAT Follow-On mission options. Three scenarios were examined: 1) a QuikSCAT Replacement mission with capabilities commensurate to QuikSCAT, 2) a next-generation Extended Ocean Vector Winds Mission (XOVWM), as recommended in the National Research Council’s decadal survey to provide significantly improved all-weather, allwind, high spatial resolution measurements, and 3) an XOVWM Constellation consisting of two XOVWM observatories to provide improved temporal resolution. In parallel, NOAA asked its users to provide a quantitative assessment of each option’s benefit to NOAA. This report presents the JPL design, risk assessment, and cost for each of three options, together with a summary of the NOAA users’ benefit assessment. The report concludes that though all options are technically feasible for immediate implementation and have a risk posture consistent with a NOAA operational mission, the XOVWM options provide significant observational benefits. While a QuikSCAT Replacement option would continue current operational measurement capabilities, there is a strong and clearly defined operational need for improved capabilities in high winds (e.g., hurricanes or extra-tropical cyclones), heavy precipitation, and near coasts to enable significantly improved severe storm and coastal hazard forecasts, which are provided only by the XOVWM options.

Rodriquez, Ernesto↗

VALENTInE: A Concept for a New Frontiers Class Long Duration In-Situ Balloon Mission to Venus

Venus and Earth are similar in bulk composition, size, density, and approximate distance from the Sun, yet Venus’s modern-day climate and surface geology is distinctly different [1]. Previous missions to Venus revealed unusual volcanic features, possible continental crust, widespread volcanic plains, a weak magnetic field [2], and insights into the Venusian atmosphere [3,4]. Unfortunately, data from these missions were limited in spatial and temporal resolution and global extent. A future mission to Venus is critical to address fundamental questions surrounding the chemical composition and dynamics of the Venusian atmosphere [5], its geologic history [6,7], its internal structure [8,9], and its habitability throughout time [10,11]. We present the Venus Air and Land Expedition: a Novel Trailblazer for In situ Exploration (VALENTInE) mission to meet this need. VALENTInE is a variable altitude balloon that will passively float in Venus’s atmosphere between 45 and 55 km altitude. VALENTInE will acquire atmospheric data at varying latitudes and longitudes in addition to mapping the surface geomorphology and mineralogy across multiple terrains. Mission Objectives: The VALENTInE mission concept is driven by four main science objectives: 1. Determine whether the driving force of the superrotation of Venus’s atmosphere is caused by horizontal or vertical momentum transport. 2. Determine whether the atmospheric composition and noble gas inventory of the Venusian atmosphere is a product of outgassing from the initial protoplanetary source or if there are significant contributions from exogenic sources. 3. Determine whether the tesserae regions (particularly Aphrodite Terra) are felsic and relatively older than surrounding regions. 4. Determine if there is any evidence of a recent dynamo preserved in the rock record of Venus. Mission Overview: A balloon architecture provides a robust system that can survive long-term in the Venusian environment while taking accurate measurements of the lower cloud deck and surface. Two prior balloon missions to Venus, VEGA 1 and VEGA 2 in 1984, have demonstrated the potential for such planetary exploration; however, these missions were short-lived (46 hr), with limited range (54 km). Our spacecraft concept consists of a battery powered balloon with a gondola and flyby carrier stage (Fig. 1). Our novel design allows for at least 15 days of atmospheric exploration, including multiple ascents and descents in the Venus atmosphere. VALENTInE is baselined to launch in 2032, cruise on solar power for 128 days, enter, descend, and inflate (EDI) into Venus’s atmosphere above Aphrodite Terra, and float in Venus’s atmosphere for a total nominal mission duration of 15 days. The balloon, able to control its altitude by changing its buoyancy, will make one full circumnavigation every 4–8 days and move poleward ~1 o latitude per day; it will be passively directed by the horizontal air currents on Venus. The balloon can only be controlled in the z direction, and the expected latitude range is ±10° from EDI. The balloon itself will be a tracer for atmospheric structures such as zonal winds [5, 12]. During the 15-day operational period, there will be five dips to 45 km for a compositional study of the lower atmosphere and geological and magnetic mapping of the surface. Dips are used to take images and measurements closer to the surface and to obtain in situ vertical atmospheric profiles between 45 and 55 km. Instruments: The VALENTInE instrument payload will allow for extensive study of the geology, atmosphere, and interior of Venus. The instrument suite consists of six instruments. The mission profile for each instrument is shown in Fig. 2. Lower Atmosphere Meteorology Analyzer (LAMA) is an atmospheric structure instrument consisting of a thermometer, barometer, and accelerometer to continuously measure temperature and pressure as a function of altitude, longitude, and latitude. TracE and Noble Gas Investigator (TENGI) is aneutral mass spectrometer used to sample the dense atmosphere. TENGI will operate continuously at 45 km and 55 km and will measure D/H ratios, as well as Ne, Ar, and O isotopic ratios. Kilometer Scale Spectral Imager (KSSI) is amultispectral imager (850-1150 nm) used to resolve surface features on the order of km. Near InfraRed Multispectral Photometer (NIRMP) is an Infrared (IR) photometer used to image the surface through the clouds to characterize mineral assemblages at five different areas of the surface. NIRMP will be operated during dwell. ELevation REConnaissance (ELREC) is a light detection and ranging (LIDAR) instrument used for measuring topography at five different areas of the surface. The ELREC data will be combined with those of NIRMP to determine mineral assemblages and how they correlate to topography. Magnetic Exploration and Interior Detective (MEID) is a magnetometer used to detect any near-surface magnetic anomalies. The magnetometer will continuously operate at all altitudes. Mission Design: The spacecraft’s propulsion system will have a wet mass of 930 kg and will be launched on an Atlas V rocket. The spacecraft will jettison the payload upon arrival in Venus’s atmosphere before decelerating to orbital velocity. Figure 2. Notional power-dip profile while the balloon is on the dayside. Risks and Challenges: Raising and lowering the spacecraft to dip beneath the haze layer require a large amount of energy. This issue was partly compensated by limiting the number of dips over the 15 day prime mission. Power needs for pumping helium are reduced by slowing the descent speed, which consequently increases spatial resolution of in situ measurements between 45 and 55 km. The main limitation for the duration of the mission is the need to carry 15 days’ worth of batteries. The bus experiences external Venusian temperatures ranging from ~27°C at 55 km altitude to ~110°C at 45 km altitude. These high atmospheric temperatures require thermal protection for the bus (instruments, electronics, and flight systems) during its descent, dwell at 45 km, and ascent. The bus is maintained at a mechanically safe temperature range of -10°C to 50°C using white external paint, multi-layer insulation (MLI), mechanical/thermal isolation (e.g. Ti, composites), and ~57 kg of Phase Change Materials (PCM). Images and spectra taken below the haze dominate the available data transmission regardless of the time spent at 45 km. Therefore, less time at the lower altitude mainly reduces the coverage of in situ measurements there. Further, we assumed an unrealistically low-density material for the helium storage tanks on the gondola. However, this issue is partially resolved if we were to jettison 75% of the spent helium storage tanks. After the entry process, the balloon volume remains mostly inflated and storage tanks are required only for reducing balloon volume in dipping to 45 km. This mission was planned against an expected New Frontiers 5 (NF5) cost cap of $1B, as the NF5 call had not yet been released. The mission we describe fits within the predicted cost cap if the flyby carrier stage, responsible for powering the spacecraft during cruise and for relaying in situ measurements back to Earth, can be contributed by another space agency. Acknowledgments: We thank the JPL Planetary Science Summer School, especially A. Nash, J. Scully, K. Mitchell, L. Lowes, and J. Armijo, and our mentors from JPL Team X. Thank you to our review panel for their insightful review. References: [1] Kane, S. et al. (2019) JGR:Ps, 124 , 2015–2028. [2] Phillips, J. L., & Russell, C. T. (1987). JGR: Space Physics , 92 (A3), 2253-2263. [3] Nakamura, M. et al. (2018) Earth Planets Space, 70 (1), 144. [4] Svedhem, H. et al. (2009) JGR:P 114 (E5). [5] Limaye et al. (2009) Decadal Survey White Paper . [6] Ivanov, M. and Head, J. (2011) PSS, 59 (13) , 1559-1600. [7] Smrekar, S. et al. (2018) Space Sci Rev, 214 (5), 88. [8] O’Rourke, J. et al. (2018) EPSL, 502 , 46-56. [9] O’Rourke J. et al. (2019) GRL , (46), 5768–5777 [10] Way, M. et al. (2016) GRL, 43 (16), 8376-8383. [11] Way, M. et al. (2020) JGR:P, 125 (5), e2019JE006276. [12] Preston, R. A. et al. (1986) Science, 231 (4744), 1414-1416.

Mission Concept↗

Operating Reserves in ReEDS

This presentation provides an overview of the formulation for operating reserves in the Regional Energy Deployment System (ReEDS), a capacity expansion model. It describes the three reserve products modeled in ReEDS--regulation, spinning (contingency), and flexibility--and highlights recent updates to the modeling approach, including modifications to how storage provides reserves, the constraints on commitment for generators that provide reserves, and the costs for thermal units to provide spinning reserve. The presentation benchmarks operating reserve provision in ReEDS against comparable simulations in PLEXOS, finding that the improved formulation is different but yields results that are holistically similar to those in production cost modeling. In this presentation we also investigate the impact of different reserve options in the model (e.g., allowing wind and solar to provide operating reserves) on the solution. The results thus far indicate that most switches related to operating reserves exert little influence on the outcome on the results. Future work will continue to explore operating reserves in capacity expansion models, particularly for models with different temporal resolution.

14 SOLAR ENERGY↗

TPSAS-NF1676L-32967-DND

The Stratospheric Aerosol and Gas Experiment III (SAGE III) was delivered to the International Space Station (ISS) on 23 February 2017. The SAGE III payload was robotically installed on Ex-PRESS Logistics Carrier-4 (ELC-4) on the S3 Truss and began acquiring science measurements on 17 March 2017. The SAGE III telescope and instrument assembly employs the methods of solar occultation and lunar occultation to retrieve near-global vertical profiles of atmospheric ozone, water vapor, nitrogen dioxide, multiwavelength aerosol extinctions, and other gaseous species and atmospheric state parameters. The activities on the ISS contribute to a dynamic operational environment. The attitude changes, EVAs, and the arrival and departure of vehicles require continual consideration when operating. After operating for two years, the SAGE III payload has planned over 20,000 occultation events and acquired approximately 17,000. A significant number of the missed events were because of visiting vehicles blocking the field of view. Using instrument data from these blocked events, the SAGE III team has mapped the structure of the ISS from the perspective of the instrument. Error Correction and Detection (EDAC) methods are necessary to preserve the functionality of the instrument software. On SAGE III the Hexapod Electrical Unit (HEU), which controls the orientation of the telescope, reports whenever an EDAC occurs. By analyzing the EDAC messages in the HEU telemetry, information concerning the orbital environment of the ISS can be obtained. To be presented is a summary of operational considerations when working on ISS along with how instrument data can be used to map the structural and electromagnetic environment of ISS.

Andrew J Peterson↗

Potential Advantages of Conducting Short Duration Visits to the Martian Surface

Recent NASA concepts for human missions to Mars, including the Evolvable Mars Campaign and Design Reference Architecture 5.0, have focused on the conduct of missions with long duration stays on the Martian surface. The decision to focus on long duration missions (typically to a single site) is driven by a desire to increase the perceived sustainability of the human Mars campaign, predicated on the assumption that sustainability is best achieved by maximizing the level of activity on the surface, providing for continuous growth in operations, and promoting pioneering of Mars. However, executing a series of long duration missions to a single site is not the only option for human exploration of Mars that has been proposed. Other architectures have been evaluated that focus on missions with short duration surface stays, with each mission visiting a separate site on the surface. This type of architecture is less efficient in that elements are not typically reused from one mission to the next but requires a far less complex surface architecture. There are potentially valid arguments to be made that a short duration, multiple site approach could result in different types of advantages when compared to the long duration, single site approach to Mars exploration, particularly for initial human missions to Mars. These arguments revolve around four areas: Achieved Value, Risk Mitigation, Developmental Affordability, and Operational Affordability & Flexibility. The question of Achieved Value relates to the prioritization of goals for Martian exploration. As discussed, goals related to pioneering and expanding human presence are often referenced as justifications for the long duration approach. However, there are other competing goals, including science and exploration. While there is not a clear consensus among planetary scientists, many have argued that the value of being able to visit multiple sites could outweigh the value of continually visiting a single site. Risk Mitigation is a major concern for initial human missions to Mars. There are a number of hazards related to operating on the Martian surface that are not well characterized. It may be desirable to conduct a series of short duration missions to better understand the nature of these risks prior to committing to a long duration mission. Developmental Affordability relates to the ability of NASA and its partners to develop and deploy the proposed architecture. Any human missions to Mars will be among the most complex endeavors ever undertaken. The capabilities that must be developed to enable any human Mars missions are extremely challenging. The total design, development, test, and evaluation (DDT&E) budget required to develop just the essential capabilities alone will be substantial. If additional surface capabilities are required to support long duration surface stays, the development effort could be unaffordable. Operational Affordability & Flexibility relates to the continued costs to execute the Mars campaign. Long duration missions, even with some amount of in-situ resource utilization, require a significant level of resupply for every mission. This requires additional launches and in-space transportation assets, increasing the operational complexity and total operational cost. This paper will explore each of the four potential advantages of short duration missions in detail. The authors will present comparisons between proposed long duration and short duration architectures through an evaluation of relevant performance, cost, and risk metrics.

Stromgren, Chel↗

Design and Development of the Astro-H 3-Stage ADR

The Japanese Astro-H mission will include the Soft X-ray Spectrometer (SXS) instrument provided by NASA/GSFC. The SXS will perform imaging spectroscopy in the soft x-ray band using a 6x6 array of silicon microcalorimeters operated at 50 mK. The detectors will be cooled by a 3-stage adiabatic demagnetization refrigerator (ADR). The configuration allows the ADR to operate with both a 1.3 K superfluid helium bath and a 4.5 K cryocooler as its heat sink. Initially, when liquid helium is present, the two coldest stages of the ADR will operate in a single-shot mode to cool the detectors from 1.3 K. The 3rd stage may be used to transfer heat from the liquid to the cryocooler to extend its lifetime. When the liquid is depleted, the two warmest stages will operate in a continuous mode to establish a 1.3 K base temperature, from which the cold stage will operate in a single-shot mode to cool the detectors. This paper will describe the design and operating modes of the ADR, as well as details of individual components.

Shirron, Peter J.↗

Exploration Technologies for Operations

Although the International Space Station (ISS) assembly has been completed, the Operations support teams continue to seek more efficient and effective ways to prepare for and conduct the ISS operations and future exploration missions beyond low earth orbit. This search for improvement has led to a significant collaboration between the NASA research and advanced software development community at NASA Ames Research Center and the Mission Operations community at NASA Johnson Space Center. Since 2001, NASA Ames Research Center has been developing and applying its advanced intelligent systems and human systems integration research to mission operations tools for several of the unmanned Mars missions operations. Since 2006, NASA Ames Research Center has also been developing and applying its advanced intelligent systems and human systems integration research to mission operations tools for manned operations support with the Mission Operations Directorate at NASA Johnson Space Center. This paper discusses the completion of the development and deployment of a variety of intelligent and human systems technologies adopted for manned mission operations. The technologies associated with the projects include advanced software systems for operations and human-centered computing. Human-centered computing looks to the processes and procedures that people do to perform any given job, then attempts to identify opportunities to improve these processes and procedures. In particular, for mission operations, improvements are quantified by specifically identifying how a tool can increase a persons efficiency, enhance a persons functional capability, andor improve the assurance of a persons decisions. The Ames development team has collaborated with the Mission Operations team to identify areas of efficiencies through technology infusion applications in support of the Plan, Train, and Fly activities of human-spaceflight mission operations. The specific applications discussed in this paper are in the areas of mission planning systems, mission operations design modeling and workflow automation, advanced systems monitoring, mission control technologies, search tools, training management tools, spacecraft solar array management, spacecraft power management, and spacecraft attitude planning. We discuss these specific projects between the Ames Research Center and the Johnson Space Centers Mission Operations Directorate, and how these technologies and projects are enhancing the mission operations support for the International Space Station. We also discuss the challenges, problems, and successes associated with long-distance and multi-year development projects between the research team at Ames and the Mission Operations customers at Johnson Space center. Finally, we discuss how these technology infusion applications and underlying technologies might be used in the future to support on-board operations of the crew and spacecraft systems as human exploration expands beyond low earth orbit to destinations in the solar system where communications delays will require more on-board autonomy and planning by the crew. Longer communications delays will require that the ground mission operations support will be primarily strategic in nature, while the tactical level of planning, systems monitoring and control, and failure analysisisolationrecovery will be the responsibility of both the spacecraft autonomous systems and the crew. Our expectation is that the technologies

mission operations↗

Improvements in Production of Single-Walled Carbon Nanotubes

A continuing program of research and development has been directed toward improvement of a prior batch process in which single-walled carbon nanotubes are formed by catalytic disproportionation of carbon monoxide in a fluidized-bed reactor. The overall effect of the improvements has been to make progress toward converting the process from a batch mode to a continuous mode and to scaling of production to larger quantities. Efforts have also been made to optimize associated purification and dispersion post processes to make them effective at large scales and to investigate means of incorporating the purified products into composite materials. The ultimate purpose of the program is to enable the production of high-quality single-walled carbon nanotubes in quantities large enough and at costs low enough to foster the further development of practical applications. The fluidized bed used in this process contains mixed-metal catalyst particles. The choice of the catalyst and the operating conditions is such that the yield of single-walled carbon nanotubes, relative to all forms of carbon (including carbon fibers, multi-walled carbon nanotubes, and graphite) produced in the disproportionation reaction is more than 90 weight percent. After the reaction, the nanotubes are dispersed in various solvents in preparation for end use, which typically involves blending into a plastic, ceramic, or other matrix to form a composite material. Notwithstanding the batch nature of the unmodified prior fluidized-bed process, the fluidized-bed reactor operates in a continuous mode during the process. The operation is almost entirely automated, utilizing mass flow controllers, a control computer running software specific to the process, and other equipment. Moreover, an important inherent advantage of fluidized- bed reactors in general is that solid particles can be added to and removed from fluidized beds during operation. For these reasons, the process and equipment were amenable to modification for conversion from batch to continuous production.

Balzano, Leandro↗

Assessment of Blocking Contacts in Suppressing Polarization Effects in CsPbBr 3 Perovskite Detectors

The CsPbBr 3 perovskite has garnered significant attention as a room-temperature semiconductor for hard radiation detection due to straightforward synthesis, scalable crystal growth, low cost, and excellent energy resolution. However, despite these advantages, at ambient temperature, CsPbBr 3 devices may experience performance deterioration and irreversible failure due to “polarization” induced by electromigration of ions to electrical connections on the device. In this study, we tested several contact materials and their optimization deposition techniques to assess the stability of high-performance CsPbBr 3 γ-ray detectors. Metals, with low work functions (Ti, In, Sn, Sb, Pb, Bi, Al, Au, and TiC) and high-work-function (Au or Pt) contacts, were used to form different Schottky junctions using vacuum thermal evaporation, electron-beam evaporation, and sputtering methods. These detectors were tested in intermittent and continuous modes to assess their stability. Among the tested detectors, the Bi/CLB/Pt electrode configuration demonstrated superior stability, operating effectively for 11 months under periodic testing and 16 days under continuous testing. In contrast, other configurations functioned only for a few months under intermittent conditions. Upon incorporating a ~40-nm-thick TiC passivation layer on the anode side (Bi/TiC/CLB/Pt), the CLB device operated continuously for 36 days without degradation. In many cases, the failure mode of the devices was due to the degradation of the anode. Here, the chemical changes in the fresh and deteriorated anodes were characterized using scanning electron microscopy and energydispersive X-ray spectroscopy

CsPbBr3 perovskite↗

The Design & Development of the Ocean Color Instrument Precision Superduplex Hybrid Bearing Cartridge

A high precision, high-resolution Ocean Color Imaging (OCI) instrument is under development for the Plankton, Aerosol, Cloud, ocean Ecosystem (PACE) mission which requires a pair of medium speed mechanisms to scan the ocean surface continuously. The design of the rotating telescope (RT) mechanism operating at 360 RPM and the half-angle mirror (HAM) mechanism synchronized at 180 RPM was concern for maintaining pointing precision over the required life and continuous operations. An effort was undertaken with the manufacturer to design and analyze a special bearing configuration to minimize axial and radial runout, minimize torque, and maintain nominal contact stresses and stiffness over the operating temperature range and to maximize life. The bearing design, development effort, analysis and testing will be discussed as will the technical challenges that this specific design imposed upon the mechanism engineers. Bearing performance, runout as achieved and verified during encoder installation and operating torque will be described.

mechanism↗

Marine optical characterizations

During the past three months, the MOCE Team conducted two field experiments in Mill Creek,Chesapeake Bay, from July 24 to August 4, and at the MOBY operations site at Snug Harbor, Honolulu, Hawaii, from August 15-30, prepared two technical memoranda, and continued MOCE-2 and MOCE-3 data reduction. The primary purposes of the experiments were to test the SeaWiFS 'remote sensing reflectance' protocol, obtain turbid water data for ocean color satellite algorithm development, perform calibration for both Near Infrared (NIR) and Visible Rainbow Spectrometer system, continue assembling the operational Marine Optical Buoy, and to test the MOBY cellular phone communications link at the Lanai mooring site.

Clark, Dennis K.↗

Extending ISS Life Beyond 2030

This paper presents an overview of the International Space Station life extension project, focusing on the analytical approach used to assess its primary structure. Also addressed are life extension approaches for other affected sub-systems, including secondary structure, materials, Environmental Control and Life Support Systems (ECLSS), Electrical Power Systems (EPS), and Logistics and Maintenance (L&M). The United States On-orbit Segment (USOS) of the International Space Station (ISS) was initially designed for a 15-year on-orbit life, but with the realization of its continued importance, efforts were made to extend its operations through 2030. The paper discusses the various analyses conducted, including future operations planning, load simulation, material degradation studies, thermal analyses, and fracture analyses. The results demonstrate the feasibility and achievability of extending the ISS's life, ensuring its on-going role as a hub for scientific research, international cooperation, and educational endeavors. With the life extension process in place, continuous operations beyond 2030 are possible to maintain an uninterrupted human presence in Low Earth Orbit, facilitating the testing of new technologies, and allow for a seamless transition to new commercially owned and operated destinations.

design life↗

The Impacts of Distinct Flexibility Enhancements on the Value and Dynamics of Natural Gas Power Plant Operations

The rapid increase of renewable generation and its anticipated continued growth requires greater operational flexibility in modern power systems. Previous studies explored the addition of more flexible resources to improve system flexibility, but this may also be achieved at lower cost by enhancing existing power plants via flexibility retrofits. Potential flexibility upgrades to existing thermal plants include modifications that enable faster ramp rates, increase maximum load levels, decrease minimum load levels, and provide faster and lower cost startup operations. In this paper, we focus on improvements to existing natural gas combined cycle generators, and apply a unit commitment model to analyze the impact that each specific upgrade has on their operational dynamics and profitability from both the system perspective and from the asset owner perspective. We show that the value of each type of flexibility improvement varies depending on the capacity factor and usage pattern of the generator before the upgrade, and that the relative benefit of each type of flexibility varies. We demonstrate diminishing returns to increased flexibility when upgrading multiple generators simultaneously. Sensitivity tests for several shares of renewable generation, different generation mixes and different net load realizations confirm the generality of the results shown.

03 NATURAL GAS↗

Microgravity Manufacturing: Extending Rapid Prototyping Past the Horizon

Over the last decade, rapid prototyping (RP) technologies have continued to advance in all aspects of operation and application. From continuously advanced materials and processes development to more hard-core manufacturing uses, the RP realm has stretched considerably past its original expectations as a prototyping capability. This paper discusses the unique applications for which NASA has chosen these manufacturing techniques to be utilized in outer space.

Cooper, Ken↗

Preparing Cassini Uplink Operations for Extended Mission

The Cassini-Huygens Mission to Saturn and Titan, a joint venture between the National Aeronautics and Space Administration, the European Space Agency, and the Italian Space Agency, is conducting a four-year, prime mission exploring the Saturnian system, including its atmosphere, rings, magnetosphere, moons and icy satellites. Launched in 1997, Cassini began its prime mission in 2004. Cassini is now preparing for a new era, a two-year extended mission to revisit many of the highlights and new discoveries made during the prime mission. Because of the light time delay from Earth to Saturn, and the time needed to coordinate the complicated science and engineering activities that take place on the spacecraft, commanding on Cassini is done in approximately 40-day intervals known as sequences. The Cassini Uplink Operations team is responsible for the final development and validation of the pointing profile and instrument and spacecraft commands that are contained in a sequence. During this final analysis prior to uplink to the spacecraft, thorough and exact evaluation is necessary to ensure there are no mistakes during commanding. In order to perform this evaluation, complete and refined processes and procedures are fundamental. The Uplink Operations team is also responsible for anomaly response during sequence execution, a process in which critical decisions often are made in real-time. Recent anomalies on other spacecraft missions have highlighted two major risks in the operations process: (1) personnel turnover and the retirement of critical knowledge and (2) aging, outdated operations procedures. If other missions are a good barometer, the Cassini extended mission will be presented with a high personnel turnover of the Cassini flight team, which could lead to a loss of expertise that has been essential to the success of the prime mission. In order to prepare the Cassini Uplink Operations Team for this possibility and to continue to develop and operate safe science and engineering sequences, a review and major update of the current documentation and operations procedures was needed. This paper will address the changes made to extended mission sequence generation processes primarily due to new restrictions in spacecraft operating capability and lessons learned from prime mission. In addition, it will address the state of the prime mission operations procedures, the philosophy changes and updates that were made to those procedures in response to process improvement, and the validation of those new procedures through the training of current and new personnel. And lastly, it will address the lessons learned throughout prime mission and how the Uplink Operations team chose to incorporate those lessons into the working documentation and team knowledge. This incorporation was necessary to facilitate the success of the extended mission with potentially all new personnel at some point prior to the end of the mission.

Maxwell, Jennifer L.↗

Operational support considerations in Space Shuttle prelaunch processing

This paper presents an overview of operational support for Space Shuttle payload processing at the John F. Kennedy Space Center. The paper begins with a discussion of the Shuttle payload processing operation itself. It discusses the major organizational roles and describes the two major classes of payload operations: Spacelab mission payload and vertically-installed payload operations. The paper continues by describing the Launch Site Support Team and the Payload Processing Test Team. Specific areas of operational support are then identified including security and access, training, transport and handling, documentation and scheduling. Specific references for further investigatgion are included.

Schuiling, Roelof L.↗

Characterizing Flow Instabilities During Transient Events in the Turbine Rim Seal Cavity

Abstract Gas turbine engine design requires considerations not only for long-term steady operation but also for critical transient events. Aircraft engines undergo significant stress during takeoff and landing, while power generation turbines must be flexible for hot restarts as renewable energy sources come online and offline. During these transient cycles, engines sustain wear and degradation that can lead to a reduction in the lifespan of their components and more frequent, costly maintenance. Cooling flows are often used to mitigate these effects, but can lead to complex and problematic flow interactions. This study uses high-frequency response pressure probes and heat flux gauges in the rim seal cavity of a one-stage research turbine to characterize the properties of large-scale flow structures during transient operation. A continuous-duration turbine testing facility provides the ability to assess the importance of these transients by first reaching steady-state operation before imposing transient behaviors. Although previous studies have conducted similar measurements for steady purge flows and wheel speeds, varying these parameters to simulate transient effects revealed several unique phenomena not identifiable with discrete steady measurements. The measurement approach connects the varied transient parameter to the behavior of the flow structures to enable a better understanding of the type of instability observed and the root cause of its formation. In particular, a relationship between instability cell formation and rim sealing effectiveness was identified using experimental data and was supported through computational simulations.

Engineering↗