Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,387 records · Page 77

Forward Bay Cover Separation Modeling and Testing for the Orion Multi-Purpose Crew Vehicle

Spacecraft multi‐body separation events during atmospheric descent require complex testing and analysis to validate the flight separation dynamics model and to verify no recontact. NASA Orion Multi‐Purpose Crew Vehicle (MPCV) teams examined key model parameters and risk areas to develop a robust but affordable test campaign in order to validate and verify the Forward Bay Cover (FBC) separation event for Exploration Flight Test‐1 (EFT‐1). The FBC jettison simulation model is highly complex, consisting of dozens of parameters varied simultaneously, with numerous multi‐parameter interactions (coupling and feedback) among the various model elements, and encompassing distinct near‐field, mid‐field, and far‐field regimes. The test campaign was composed of component‐level testing (for example gas‐piston thrusters and parachute mortars), ground FBC jettison tests, and FBC jettison air‐drop tests that were accomplished by a highly multi‐disciplinary team. Three ground jettison tests isolated the testing of mechanisms and structures to anchor the simulation models excluding aerodynamic effects. Subsequently, two air‐drop tests added aerodynamic and parachute parameters, and served as integrated system demonstrations, which had been preliminarily explored during the Orion Pad Abort‐1 (PA‐1) flight test in May 2010. Both ground and drop tests provided extensive data to validate analytical models and to verify the FBC jettison event for EFT‐1, but more testing is required to support human certification, for which NASA and Lockheed Martin are applying knowledge from Apollo and EFT‐1 testing and modeling to develop a robust but affordable human spacecraft capability.

Ali, Yasmin↗

Investigation of Spiral Bevel Gear Condition Indicator Validation Via AC-29-2C Using Damage Progression Tests

This report documents the results of spiral bevel gear rig tests performed under a NASA Space Act Agreement with the Federal Aviation Administration (FAA) to support validation and demonstration of rotorcraft Health and Usage Monitoring Systems (HUMS) for maintenance credits via FAA Advisory Circular (AC) 29-2C, Section MG-15, Airworthiness Approval of Rotorcraft (HUMS) (Ref. 1). The overarching goal of this work was to determine a method to validate condition indicators in the lab that better represent their response to faults in the field. Using existing in-service helicopter HUMS flight data from faulted spiral bevel gears as a "Case Study," to better understand the differences between both systems, and the availability of the NASA Glenn Spiral Bevel Gear Fatigue Rig, a plan was put in place to design, fabricate and test comparable gear sets with comparable failure modes within the constraints of the test rig. The research objectives of the rig tests were to evaluate the capability of detecting gear surface pitting fatigue and other generated failure modes on spiral bevel gear teeth using gear condition indicators currently used in fielded HUMS. Nineteen final design gear sets were tested. Tables were generated for each test, summarizing the failure modes observed on the gear teeth for each test during each inspection interval and color coded based on damage mode per inspection photos. Gear condition indicators (CI) Figure of Merit 4 (FM4), Root Mean Square (RMS), +/- 1 Sideband Index (SI1) and +/- 3 Sideband Index (SI3) were plotted along with rig operational parameters. Statistical tables of the means and standard deviations were calculated within inspection intervals for each CI. As testing progressed, it became clear that certain condition indicators were more sensitive to a specific component and failure mode. These tests were clustered together for further analysis. Maintenance actions during testing were also documented. Correlation coefficients were calculated between each CI, component, damage state and torque. Results found test rig and gear design, type of fault and data acquisition can affect CI performance. Results found FM4, SI1 and SI3 can be used to detect macro pitting on two more gear or pinion teeth as long as it is detected prior to progressing to other components or transitioning to another failure mode. The sensitivity of RMS to system and operational conditions limit its reliability for systems that are not maintained at steady state. Failure modes that occurred due to scuffing or fretting were challenging to detect with current gear diagnostic tools, since the damage is distributed across all the gear and pinion teeth, smearing the impacting signatures typically used to differentiate between a healthy and damaged tooth contact. This is one of three final reports published on the results of this project. In the second report, damage modes experienced in the field will be mapped to the failure modes created in the test rig. The helicopter CI data will then be re-processed with the same analysis techniques applied to spiral bevel rig test data. In the third report, results from the rig and helicopter data analysis will be correlated. Observations, findings and lessons learned using sub-scale rig failure progression tests to validate helicopter gear condition indicators will be presented.

gears↗

Forward Bay Cover Separation Modeling and Testing for the Orion Multi-Purpose Crew Vehicle

Spacecraft multi-body separation events during atmospheric descent require complex testing and analysis to validate the flight separation dynamics models used to verify no re-contact. The NASA Orion Multi-Purpose Crew Vehicle (MPCV) architecture includes a highly-integrated Forward Bay Cover (FBC) jettison assembly design that combines parachutes and piston thrusters to separate the FBC from the Crew Module (CM) and avoid re-contact. A multi-disciplinary team across numerous organizations examined key model parameters and risk areas to develop a robust but affordable test campaign in order to validate and verify the FBC separation event for Exploration Flight Test-1 (EFT-1). The FBC jettison simulation model is highly complex, consisting of dozens of parameters varied simultaneously, with numerous multi-parameter interactions (coupling and feedback) among the various model elements, and encompassing distinct near-field, mid-field, and far-field regimes. The test campaign was composed of component-level testing (for example gas-piston thrusters and parachute mortars), ground FBC jettison tests, and FBC jettison air-drop tests that were accomplished by a highly multi-disciplinary team. Three ground jettison tests isolated the testing of mechanisms and structures to anchor the simulation models excluding aerodynamic effects. Subsequently, two air-drop tests added aerodynamic and parachute elements, and served as integrated system demonstrations, which had been preliminarily explored during the Orion Pad Abort-1 (PA-1) flight test in May 2010. Both ground and drop tests provided extensive data to validate analytical models and to verify the FBC jettison event for EFT-1. Additional testing will be required to support human certification of this separation event, for which NASA and Lockheed Martin are applying knowledge from Apollo and EFT-1 testing and modeling to develop a robust human-rated FBC separation event.

Ali, Yasmin↗

Rocket Sled Propelled Testing of a Supersonic Inflatable Aerodynamic Decelerator

Decelerators (IADs) have traditionally been tested in wind tunnels. As the limitations of these test facilities are reached, other avenues must be pursued. The IAD being tested is a Supersonic IAD (SIAD), which attaches just aft of the heatshield around the perimeter of an entry body. This 'attached torus' SIAD is meant to improve the accuracy of landing for robotic class missions to Mars and allow for potentially increased payloads. The SIAD Design Verification (SDV) test aims to qualify the SIAD by applying a targeted aerodynamic load to the vehicle. While many test architectures were researched, a rocket sled track was ultimately chosen to be the most cost effective way to achieve the desired dynamic pressures. The Supersonic Naval Ordnance Research Track (SNORT) at the Naval Air Warfare Center Weapons Division (NAWCWD) China Lake is a four mile test track, traditionally used for warhead and ejection seat testing. Prior to SDV, inflatable drag bodies have been tested on this particular track. Teams at Jet Propulsion Laboratory (JPL) and NAWCWD collaborate together to design and fabricate one of the largest sleds ever built. The SDV sled is comprised of three individual sleds: a Pusher Sled which holds the solid booster rockets, an Item Sled which supports the test vehicle, and a Camera Sled that is pushed in front for in-situ footage and measurements. The JPL-designed Test Vehicle has a full-scale heatshield shape and contains all instrumentation and inflation systems necessary to inflate and test a SIAD. The first campaign that is run at SNORT tested all hardware and instrumentation before the SIAD was ready to be tested. For each of the three tests in this campaign, the number of rockets and top speed was increased and the data analyzed to ensure the hardware is safe at the necessary accelerations and aerodynamic loads.

Supersonic Inflatable Aerodynamic Decelerators (SI↗

Development of Test Protocols for International Space Station Particulate Filters

Air quality control on the International Space Station (ISS) is a vital requirement for maintaining a clean environment for the crew and the hardware. This becomes a serious challenge in pressurized space compartments since no outside air ventilation is possible, and a larger particulate load is imposed on the filtration system due to lack of gravitational settling. The ISS Environmental Control and Life Support System (ECLSS) uses a filtration system that has been in use for over 14 years and has proven to meet this challenge. The heart of this system is a traditional High-Efficiency Particulate Air (HEPA) filter configured to interface with the rest of the life support elements and provide effective cabin filtration. The filter element for this system has a non-standard cross-section with a length-to-width ratio (LW) of 6.6. A filter test setup was designed and built to meet industry testing standards. A CFD analysis was performed to initially determine the optimal duct geometry and flow configuration. Both a screen and flow straighter were added to the test duct design to improve flow uniformity and face velocity profiles were subsequently measured to confirm. Flow quality and aerosol mixing assessments show that the duct flow is satisfactory for the intended leak testing. Preliminary leak testing was performed on two different ISS filters, one with known perforations and one with limited use, and results confirmed that the testing methods and photometer instrument are sensitive enough to detect and locate compromised sections of an ISS BFE.Given the engineering constraints in designing spacecraft life support systems, it is anticipated that non-industry standard filters will be required in future designs. This work is focused on developing test protocols for testing the ISS BFE filters, but the methodology is general enough to be extended to other present and future spacecraft filters. These techniques for characterizing the test duct and perform leak testing can be applied to conducting acceptance testing and inventory testing for future manned exploration programs with air revitalization filtration needs, possibly even for in-situ filter element integrity testing for extensively long-duration missions. We plan to address the unique needs for test protocols for crewed spacecraft particulate filters by preparing the initial version of a standard, to be documented as a NASA Technical Memorandum (TM).

Filtration↗

Validation of Heat Transfer Correlations in Line Chill-Down Tests of Cryogenic Fluid in SINDA/FLUINT

Line chill-down is an important process in cryogenic tank propellant management, storage, and usage Complex flow dynamics during these processes: boiling heat transfer (film, transition, and nucleate) Understanding boiling phenomena can lead to efficient line chill-down systems that use less propellant, propellant stored, reducing cost for space missions Line Chill-down heat transfer was modelled using SINDA/FLUINT version 5.8 (SF) Multiple chill-down tests were modelled using: heat transfer correlations readily available in SF using HTN/HTC TIES heat transfer empiricisms developed by the University of Florida (UF) based on a series of liquid nitrogen chill-down tests using SF HTU TIES Chill-down tests modelled: liquid nitrogen tests conducted by the University of Florida horizontal flow, upward flow, and downward flow (Reynolds Numbers ranging 850-231,000)liquid hydrogen tests conducted by NASA Glenn Research Center vertical upward flow (Reynolds Number range of 18,400 - 433,000)The flow rate was measured far downstream of the test section, near the system exit. Where to set the flow rate? SF was highly sensitive, and sometime unstable, setting the test flow rate downstream (the outlet) of the test section model and setting the test pressure upstream (the inlet) of the test section model higher flow rate oscillations at the entrance of the model's test section SF was more stable setting the test flow rate upstream (than the downstream flow rate set case)test pressure was used as an inlet (SF plenum) to set the thermodynamic state (temperature and quality) coming into the system setting the appropriate downstream pressure was the unknown. The pressure drops predicted by SF for the downstream set flow rate boundary condition were much smaller than test section measured pressure drops. The multiphase pressure drop correlations used internally in SF may need to be adjusted. Models with an upstream flow rate set assumed a pressure drop that was small

cryogenic modeling↗

Oro-Nasal Mask Versus Two-Way Non-Rebreathing Valves for Maximal Aerobic Capacity Testing in Astronauts

Astronauts complete maximal aerobic capacity (VO2pk) testing as part of their annual fitness assessment (AFA) as well as several times once assigned to an International Space Station mission. Historically, the 2-Way T-Shape Non-Rebreathing valve with a mouthpiece and nose clip (“Mouthpiece”) has been used in these tests. The testing procedure was updated to use the oro-nasal mask (“Mask”) for the AFA starting in June 2017. Astronauts who used the mask during their AFA requested it be certified to be used for all mission associated tests. Considering the criticality of the data and the schedule constraints of astronauts, it is imperative that the requested hardware change provide data with equivalent reliability and repeatability as provided by the mouthpiece. PURPOSE: To assess the reliability and validity of mask vs. mouthpiece by comparing submaximal and VO2pkdata within subjects (approximately 1 year apart). METHODS: Each of 17 active astronauts completed a VO (sub 2pk) test with the mouthpiece (first) and the mask (second) for their AFA. The VO (sub 2pk) test was conducted on a cycle ergometer with a metabolic cart. The nominal protocol started with a 3-minute warm-up at 50 Watts (W) and increased 25W every minute until volitional fatigue (Light: 45W start; 15W increase). The VO (sub 2pk)s were compared between tests and the expected day-to-day variation (plus or minus 5 percent) was used as the threshold for determining agreement between tests. Submaximal values were plotted and evaluated visually for deviations between mask and mouthpiece. RESULTS: VO (sub 2pk) values were more than 5 percent different, despite similar test times, between mouthpiece and mask in 6 of 17 comparisons, 3 of which were higher with the mask (9.0 plus or minus 5.9 percent) while 3 were lower (minus10.8 plus or minus 2.0 percent) with the mask. The submaximal data did not indicate a leak in either apparatus during these tests. An Astronaut Strength & Conditioning Rehabilitation specialist confirmed that the measured differences in VO (sub 2pk) of these 6 astronauts was consistent with observed changes in exercise habits during the year that separated the two tests. CONCLUSION: After being presented with the results of this data mining effort the mask was accepted for use in all tests, excepting that, if a leak is detected without resolve, the test will be repeated (if schedule allows) and remaining tests will be completed with the mouthpiece.

Buxton, R.↗

Loftid Aeroshell Engineering Development Unit Structural Testing

NASA’s Hypersonic Inflatable Aerodynamic Decelerator (HIAD) technology was selected for a Technology Demonstration Mission under the Space Technology Mission Directorate in 2017. HIAD is an enabling technology that can facilitate atmospheric entry of heavy payloads to planets such as Earth and Mars using a deployable aeroshell. The deployable nature of the HIAD technology allows it to avoid the size constraints imposed on current rigid aeroshell entry systems. This enables use of larger aeroshells resulting in increased entry system performance (e.g. higher pay-load mass and/or volume, higher landing altitude at Mars). The Low Earth Orbit Flight Test of an Inflatable Decelerator (LOFTID) is currently scheduled for late-2021. LOFTID will be launched out of Vandenberg Air Force Base as a secondary payload on an Atlas V rocket. The flight test features a 6m diameter, 70-deg sphere-cone aeroshell and will provide invaluable high-energy orbital re-entry flight data. This data will be essential in supporting the HIAD team to mature the technology to diameters of 10m and greater. Aeroshells of this scale are applicable to potential near-term commercial applications and future NASA missions. Currently the LOFTID project has completed fabrication of the engineering design unit (EDU) inflatable structure (IS) and the flexible thermal protection system (F-TPS). These two components along with the rigid nose and center body comprise the HIAD aeroshell system. This EDU aeroshell is the precursor to the LOFTID aeroshell that will be used for flight. The EDU was built to verify the design given the subtle differences between the LOFTID aeroshell and past aeroshell designs that have been fabricated under the NASA HIAD project. To characterize the structural performance of the LOFTID aeroshell design, three structural tests will be performed. The first test to be conducted is static load testing, which will induce a uniform load across the forward surface of the aeroshell to simulate the expected pressure forces during atmospheric entry. The IS integrated with the rigid center body will first be tested alone to provide data for analytical model correlation, and then the F-TPS will be integrated for a second series of static load testing of the full aeroshell system. Instrumentation will be employed during the test series to measure component loads during testing, and a laser scanner will be used to generate a 3D map of the aeroshell surface to verify that the shape of the structure is acceptable at the simulated flight loads. After static load testing, pack and deployment testing will be conducted multiple times on the integrated system to demonstrate the aeroshell’s ability to fit within the required packed volume for the LOFTID mission without experiencing significant damage. Finally, the aeroshell will undergo modal testing to characterize its structural response. This presentation will discuss the setup and execution of each of the three tests that the EDU aeroshell will undergo. In addition, initial results of the testing will be presented outlining key findings as LOFTID moves for-ward with fabrication of the flight aeroshell.

Swanson, G. T.↗

Flow Characterization of the NASA Langley Unitary Plan Wind Tunnel, Test Section 2: Computational Results

This is an abstract for an invited paper at the AIAA Aviation Conference, June 2021. The work described here is part of an effort of coordinated experiments in the Unitary Plan Wind Tunnel (UPWT) facility at the NASA Langley Research Center (LaRC) and matching CFD simulations. The primary goal of the work is to assess the productivity and true predictive accuracy of CFD, absent any guidance from experiment, in the high supersonic speed range as compared to experiments performed at the NASA LaRC’s UPWT facility. This report concerns CFD simulation of the primary flow-path in the empty wind tunnel, including the settling chamber, nozzle, test section, and some of the tunnel downstream of the test section. The Mach number in the test section ranges from M~2.4 to M~4.6, and the required area ratio variation is achieved by translation of a nozzle block which constricts the area of a loosely S-shaped throat. Flow past protuberances in the settling chamber and into this S-bend throat are predicted by CFD to generate streamwise vorticity that may, or may not, persist through the throat and into the test section as coherent vortices. Some flow conditions are notably unsteady at frequencies well below those of turbulence, due to unsteady separated flow ahead of the nozzle block. The bulk flow moves at velocities ranging from 'walking speed' in the settling chamber to M~4.6 in the test section. Heat transfer to the settling chamber walls and buoyancy are significant at high Mach number. Subtle variations in surface curvature in the nozzle generate Mach waves that propagate into the test section. CFD of the empty tunnel serves two purposes. Firstly, the full-tunnel simulations are used to provide upstream boundary conditions for CFD of vehicle aerodynamics which are generally performed in a domain confined to the wind tunnel test section; these companion studies are addressed in other papers. Secondly, it is a challenging test for CFD to resolve all of the empty tunnel flow phenomena relevant to flow in the test section. It requires a more complete definition of geometry than was originally anticipated. In addition, it requires good spatial and temporal accuracy, and turbulence modeling that performs well on specific phenomena such as corner flows. The boundary conditions and solution algorithms must perform well from incompressible to almost hypersonic speeds. The final state of the pre-test CFD was a product of an iterative self-improvement process. The initial simulations of the empty tunnel were deficient in many respects, but hints to those deficiencies were recognized in the solutions, and remedies were implemented. Possible further improvements will be studied in the post-test phase when comparisons with experimental data are possible. The CFD was performed by five separate collaborative teams using four different flow solvers: FUN3D, Overflow, Star-CCM+ and USM3D. The level of effort of these teams varied significantly, but each made important contributions to the goals of the work. A concerted effort to use uncertainty quantification methods (UQ) in CFD is also a goal of this work. To this end, variations in CFD results due to grid refinement, turbulence modeling, and boundary conditions have been characterized. Code-to-code variation is another means of assessing CFD uncertainty. All CFD solvers predict similarity among the primary flow features; these include the variation of Mach number due to changes in Reynolds number, and the bulk flow angularity due to tunnel-wall curvature. All CFD solvers also predict similar trends in secondary flows, such as the downwash in the side-wall boundary layers. Three of the high-spatial resolution simulations give similar predictions of a complex secondary flow phenomena, streamwise vortices generated in the S-bend throat that persist into the side-wall boundary layers of the test section. Two of the highest-resolution simulations, run with the same turbulence model in different CFD solvers, gave encouragingly similar predictions of a complex tertiary flow phenomenon, small transient "sprites" of upwash flows, resulting from vortices that presumably originate in the separated flow near the leading edge of the nozzle block. While the CFD was done in a "blind pre-test" mode, requests from the experimental team for CFD results pertaining to unsteadiness and total temperature variations in the test section resulted in CFD runs that included a cooled wall in settling chamber. This then led to a change in the standard practice for running the Overflow results, which would not have occurred without this "release" of this experimental information. CFD was also used to guide some measurements. The paper will focus on establishing the consensus among CFD results and understanding differences among those results. Initial findings from the efforts to characterize CFD uncertainty have been done and will be included in the paper.

Robert Edward Childs↗

Green Run Modal Test of the NASA Space Launch System Core Stage

The Core Stage of the new NASA Space Launch System (SLS) is a 212-foot tall rocket assembly—consisting primarily of two fuel tanks, an engine section, and four RS-25 rocket engines—capable of sending crew and large payloads to the moon and beyond with 1.6 million pounds of thrust. Currently, the Core Stage is in the B2 Test Stand at Stennis Space Center, undergoing a series of structural and functional tests, designated the Green Run test series. The ultimate goal of Green Run is to verify analytical models and confirm proper subsystem operation of the Core Stage. In January 2020, Green Run testing began with an experimental modal analysis test performed by the Marshal Space Flight Center modal test team. The desired free boundary condition of the Core Stage was achieved by suspending the massive spacecraft from the B2 Test Stand crane. Modal excitation was provided by a pair of 250-lb electro-dynamic shakers for multi-shaker random vibration testing, as well as a 12-pound impact hammer for impact testing. Modal response was measured with 550 accelerometers channels distributed on both the Core Stage and the B2 Test Stand crane. Following one very long night of testing, frequency response functions were calculated from the measured time histories in the target mode frequency range of 2.5 Hz to 15 Hz, and mode shapes, frequencies, and damping values were successfully extracted. The case-study presented in this paper will discuss the SLS Core Stage, the modal test setup and procedure, as well as a brief overview of the test results. Challenges associated with testing such a large, suspended structure in an outdoor environment will be discussed as well.

Green Run↗

Environmental Testing of the OVEN System for Lunar Water Extraction and Prospecting

Introduction: The presence of water ice in permanently shadowed regions on the lunar surface [1] may enable a sustained human presence on the Moon with minimal need for consumables. However, in order to develop a long term utilization plan that includes the usage of in-situ water we must first understand the abundance, stratigraphy and distribution of this re-source. Multiple space agencies currently have plans for lunar water prospecting missions. The Optimized Volatile Extraction Node (OVEN) was designed for water prospecting missions that require samples to be weighed, sealed, and heated as the means of determining water concentration. This method of water quantification necessitates a fair amount of automation, so a rigorous environmental test program was performed in order to build confidence in the performance of the OVEN design. The work presented here describes the OVEN environmental test program as well as ongoing efforts to improve on the design. Vibration: The OVEN participated in two rounds of random vibration tests. The first test was a stand-alone test performed at the Energy Systems Test Area of the Johnson Space Center. The second test was an integrated test with the mobile platform developed for the Resource Prospector project. The OVEN survived both tests without damage, but the tests did provide valuable lessons learned with regards to specific operations. Thermal Vacuum: The OVEN was successfully demonstrated at a temperature range of -50 to 75 C in a thermal vacuum chamber. The need to heat motor gearboxes at lower temperatures was predetermined so this test program was completed by implementing a method of gearbox heating that used the existing circuitry within the motors. Dust: A custom dynamometer was built in order to determine the torque required to move the various mechanisms within the OVEN at a range of temperatures. The OVEN system was coated with lunar dust simulant in order to determine mechanism torques under a worst-case operating condition. Sublimation: Sublimation losses within the OVEN were quantified through a series of test configurations, including an integrated test in a thermal vacuum chamber at Glenn Research Center [2]. Current Work: The OVEN subsystem is currently not a component of any existing prospecting missions, but work continues that will take the lessons learned from previous environmental tests and improve on the design in order to be considered for future prospecting opportunities. References: [1] Colaprete, A., Schultz, P., Heldmann, J., Wooden, D., Shirley, M., Ennico, K., ... & Sollitt, L. (2010). Detection of water in the LCROSS ejecta plume. science, 330(6003), 463-468. [2] Kleinhenz, J., Smith, J., Roush, T., Colaprete, A., Zacny, K., Paulsen, G., ... & Paz, A. (2018). Volatiles Loss from water bearing regolith simulant at Lunar Environments. In Earth and Space 2018: Engineering for Extreme Environments (pp. 454-466). Reston, VA: American Society of Civil Engineers.

A Paz↗

Europa Clipper Payload Verification and Validation: Avionics-Instrument Interface Test Campaign

NASA's Europa Clipper mission will investigate Jupiter's icy moon Europa using a payload suite consisting of nine instruments to address a range of scientific objectives concerning Europa's habitability. As the project proceeds past its Critical Design Review, confidence is being built in the system's ability to achieve mission objectives through the implementation of a rigorous payload verification and validation (V&V) program. As part of this payload V&V program, instrument box-level testing was performed by the payload team to verify select instrument-avionics interface requirements. This testing was performed at JPL using the avionics testbed's Bulk Data Storage Emulator (BDSEM) with visiting instrument Test Models. This paper summarizes the Data Link test campaign involving roughly four days of functional testing per instrument, including planning, testing methods, types of issues found, and the requirement closure process. Detail is also provided on the development, deployment, and validation of a standardized analysis tool used in data reviews. This testing verified requirements related to commanding rates, loss of link, packet format, clock counters, loopback test capability, and SpaceWire jitter and skew margins. Additional risk reduction testing of basic commanding, counter behavior, science data collection and transfer, and interface swapping was also performed. Because the BDSEM venue was not originally designed to be a run for record venue, the process of characterizing venue fidelity and establishing suitability for requirement closure using data collected in this venue will also be addressed.In order to close requirements, an extensible tool was developed to post-process instrument command and telemetry data from their original binary to a human-readable format and give visibility to errors detected within the data, such as packets with Cyclic Redundancy Check errors. This tool, called payload-packet-parser, is a Python 3.9 command line tool built using a variety of open-source Python libraries. Payload-packet-parser was designed to support parsing command and telemetry packets for all Europa Clipper instruments and additional analysis tools were developed for verification of specific information interface requirements. This test campaign, including post-processing using a single parsing and verification toolset, allowed for early interface testing, alleviating testing burdens on instrument teams and buying down risk on the instrument-avionics interface by finding hardware and software issues and idiosyncrasies prior to integration with system test venues. Over twenty issues were discovered across the payload, resulting in software updates and instrument rework well in advance of any system impacts. This paper concludes with an assessment of benefits and costs of this type of testing and lessons learned.

Montanez, Leticia↗

Thermal Vacuum and Vibration Testing of the Differential Thermal Expansion Thermal Switch

The Extended Stroke, Reverse Operation, Differential Expansion Thermal Switch for Extreme Variable Environments uses materials with both positive and negative coefficients of thermal expansion (CTE) arranged in concentric cylinders so that the thermal switch (TS) operates passively, opening a gap between interfaces to create a low thermal contact when cold, and closing the gap between interfaces to create a high thermal contact when hot. This paper details the testing of the TS at Marshall Space Flight Center including the pre-vibe thermal vacuum cycle test, vibration test, post-vibe thermal vacuum cycle test, and long duration thermal vacuum cycle test. The pre- and post-vibe thermal cycle and the long duration cycle test tested to hot and cold plateau initial temperatures of 40 °C, and -173 °C, respectively. The pre- and post-vibe tests required plateau holds of at least 2 hours, whereas the long duration cycle test required plateau holds of at least 20 hours. The tests each used a rate of temperature change of < 2 °C/min when transitioning between plateaus. The data collected from each thermal test is compared to show the operation of the TS both before and after the vibration test to GEVS levels, and throughout the long duration cycle test. From the data collected, the total conductance through the TS interfaces is calculated for both on (TS closed – during hot plateau) and off (TS open – during cold plateau) configurations, and the turndown ratio is also calculated. Challenges and lessons learned from the testing are also discussed.

thermal control technology↗

Characterizing Face Sheet/Core Disbonding Using the Single Cantilever Beam Test: Results from an International Round Robin

Test results from an international round robin are presented. The single cantilever beam (SCB) test was used to characterize face sheet/core disbonding in sandwich components in an effort to help standardization. Each of the seven participating laboratories performed a set of five baseline tests using the same protocol, however, using their own specific equipment. In addition, each laboratory performed two sets of tests with altered tests conditions which included using a test fixture with a translating carriage and performing the tests with different loading and unloading speeds. The orientation of the disbond front with respect to the honeycomb core cells was varied and the effect on the fracture toughness was also studied. Additional factors that could influence test results were investigated, such as the use of a saw cut starter disbond as an alternative to Teflon® release film, and the effects of using a face sheet doubler to increase the bending stiffness. For each set of tests, summary results such as load/displacements plots, observed disbond growth location and calculated energy release rates are reported and a comparison of results between labs is presented. Critical strain energy release rate measurements from SCB tests are also compared with measurements made from an alternative test, namely the double cantilever beam with uneven bending moments (DCB-UBM) test, which has been studied extensively at the Technical University of Denmark and proposed as a mixed-mode test standard. A set of recommendations are made with respect to improving the SCB test and a path to standardization is presented.

Ronald Krueger↗

Fermilab's Horizontal Test Stand Upgrade Overview and Commissioning

Cryo-assemblies with the Nb 3 Sn MQXFA low-beta quadrupoles for the High Luminosity LHC (HL-LHC) upgrade will be tested at Fermilab's magnet test facility. A total of 10 cryo-assemblies will be delivered to CERN within the US HL-LHC Accelerator Upgrade Project (AUP). The horizontal test stand at Fermilab already has been used for testing the existing LHC inner-triplet quadrupoles, but the stand and corresponding electrical and cryogenic sub-systems were not operational for more than a decade. In order to restore the test stand functions and meet the design and test requirements for the HL-LHC magnets, the existing horizontal test facility at Fermilab underwent a significant refurbishment of the cryogenic and mechanical components. Most of the upgrades were completed and verified during so called zero-magnet test by late 2020, and then final commissioning of the upgraded horizontal test stand was completed during the first cryo-assembly test in 2023. These tests verified the major cryo-mechanical installations, as well as the basic test stand operations, including controlled cooldown and operation at 1.9 K, magnet protection and process controls. Here, in this paper, overview of the Fermilab's horizontal test facility upgrade and commissioning of these upgrades are presented.

43 PARTICLE ACCELERATORS↗

Performance Testing of a Moving-Bed Gasifier Using Coal, Biomass, and Waste Plastic Blends to Generate White Hydrogen

The objective of this DOE-funded project by the Electric Power Research Institute, Inc. (EPRI), Hamilton Maurer International (HMI) and Sotacarbo S.p.A. (Sotacarbo), is to qualify coal, biomass, and plastic waste blends based on performance testing of selected pellet recipes in a pilot-scale updraft moving-bed gasifier. The testing will provide relevant data to advance the commercial-scale design of the moving-bed gasifier to be able to successfully use these feedstocks to produce hydrogen. In particular, the effects of the waste plastics on feedstock development (i.e., blending and pelletizing) and the resulting products (i.e., syngas compositions, organic condensate production, and ash characteristics) are a focus. The gasifier is Hamilton Mauer International, Inc. (HMI)’s moving-bed gasifier, which has been proven capable of gasifying nearly all coal ranks. It has also shown the ability in prior testing work to gasify wood chips. However, mixtures of these fuels with plastic wastes have not been prepared and gasified together. The feedstocks will be prepared by California Pellet Mill (CPM) under contract to HMI. The technical tasks and current status for this two-year research project are: Feed Procurement and Preparation: Nine different feedstocks were prepared from varying compositions of PRB coal, corn stover biomass, and car fluff waste plastics. Fuel pellets were produced by California Pellet Mill and shipped to Sotacarbo’s test facility in Italy. Test Plan Development: A test plan was created to define the test runs to be performed. The test plan detailed the different tests that were run, instrumentation used, extractive samples taken, and relevant figures of merit. Gasifier Testing: Tests are currently being performed in the pilot-scale gasifier at Sotacarbo using nine different fuel feedstocks generated from varying mixtures of coal, biomass, and plastic wastes. The testing will provide information on gasification reaction efficiency/performance, yielding relevant data for models used to scale up the gasifier design. This task will also include work to reassemble the gasifier at Sotacarbo and perform a baseline 100% coal run. Data Analysis and Reporting: Review of the data, determination of figures of merit, and interpretation of the results to be reported. The results will be used to specify the range of feedstock blends that can be successfully gasified as well as quantify gasifier outputs based on specific blends. This paper will be summarize the pelletizing procedure that insures the viability of the tri-fuel pellets for the gasification runs that are being performed at Sotacarbo’s 30mm up draft moving bed gasifier. Initial gasification tests have been conducted, and all the lab scale tri-fuel pellet gasification runs will be completed by the fall of 2022. Performance data will enable modeling of a full-scale HMI industrial scale gasifier supporting both CHP and Hydrogen production.

01 COAL, LIGNITE, AND PEAT↗

Thermal testing of the Ranger Block III SPACECRAFT in the JPL 25 ft. space simulator

In January, 1964, a test program was begun on the thermal design of the Ranger Block III Spacecraft. The tests were performed i n the newly operational JPL 25' Space Simulator over a period of 6 months . The objectives of these tests were two-fold: A. To evaluate the 25' Space Simulator as a facility for proving the thermal design of spacecrafts, and B. To verify .the thermal design of the Ranger Block III spacecraft. These two objectives are complimentary in the test series performed and are difficult to separate into distinct categories. An important part of the first objective was to learn what type of test preparation, instrumentation, and analysis was required for the meaningful evaluation of test data from the 25' Space Simulator tests. Although some experience had been gained in testing of components and incomplete spacecrafts in smaller solar simulation chambers during the early part of the Ranger program, we knew little about testing of a complete spacecraft in the 25' Space Simulator when this test program began. Test analysis requires that the energy absorbed by various spacecraft components be known. This requires a knowledge of the area of solar absorption or sunlit area, the solar energy flux density on the area, and the effective absorptance of that area. Most of the problems encountered were associated with the determination of the last two quantities since the sunlit area may be obtained directly by inspection of spacecraft surfaces. This paper will present a discussion of our experiences during the Ranger Block III thermal test series on the Thermal Test Model (TCM). The TCM was thermally equivalent to the flight type Ranger spacecraft except for the lack of an antenna dish and solar panels. Flight type structural hardware was used with surface finishes equivalent to those of the flight spacecraft. Aluminum blocks simulated the spacecraft electronics thermal masses with resistance heaters simulating the electronic power dissipation. The discussion will be presented in a semi-chronological order and will be divided into the following areas: 1. Determination of solar simulation flux density on spacecraft surfaces. 2. Problems related to decollimation of the solar simulation source. 3. Determination of effective absorptance in the solar simulation spectrum.

SPACE SIMULATOR↗

Off-Nominal Planning for the Cryogenic Vacuum Test of the JWST Optical Telescope Element/Integrated Science Instrument Module at JSC

The cryogenic thermal vacuum/thermal balance test of the James Webb Space Telescope (JWST) combined Optical Telescope Element (OTE)/Integrated Science Instrument Module (ISIM), known as the OTIS, at the Johnson Space Center (JSC) Chamber A in 2017 was likely the most complex test ever performed by NASA for an unmanned mission. The test of the combined flight Optical Telescope and ISIM elements was prefaced by years of modifications to chamber facilities, and included three extensive precursor tests of non-flight and flight hardware to establish safe and optimal test operational procedures. One critical part of the test preparation was planning for off-nominal events that could arise, including appropriate responses. In some cases, assurance of personnel and payload safety required modification of original test hardware and procedures which had to be validated before the final test could begin. This planning proved especially prescient for the OTIS test, as Hurricane Harvey struck the Houston area during the test in August 2017, and consequences for the precious payload could have been severe. This paper describes the extent of the thermal off-nominal planning undertaken for the OTIS test, including including safing for hurricanes, and some real-life effects of Hurricane Harvey on the test conduct. Documentation of the consequences and mitigations for these events are discussed. The importance of off-nominal planning for future thermal vacuum/thermal balance tests is illustrated.

Off-Nominal Planning↗