Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “RISK ASSESSMENT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,387 records · Page 77

Occurrence and ecological risk of pharmaceuticals in river surface water of Bangladesh

Highlights: • Twelve pharmaceuticals were investigated in river surface water. • Nine pharmaceuticals were detected at ng L{sup −1} level. • MNZ was dominant followed by TMP, ERY-H{sub 2}O and SMX. • Contamination of SMX, TMP and TYL was associated with fed aquaculture. • Preliminary ecological risk assessment showed the medium to low risks. Pharmaceutical contamination in the aquatic environment is a global issue that affects aquatic animals, micro-organisms and human health. The occurrence and preliminary ecological risk of 12 (11 antibiotics and 1 antiepileptic drug) pharmaceuticals were investigated for the first time in the surface water of the old Brahmaputra River, where open-water-fed aquaculture activities are being practiced in Bangladesh. The pharmaceuticals were quantified by high-performance liquid chromatography tandem mass spectrometry (HPLC-MS/MS), operated with positive electrospray ionization (ESI{sup +}) and a multiple reaction monitoring (MRM) mode. Nine pharmaceuticals were detected in the river surface water, whereas three were below the limit of detection (LOD). Metronidazole was detected in all the samples with concentrations ranging from 0.05 to 13.51 ng L{sup −1}. Trimethoprim had the second highest frequency of detection (95%) with the highest concentration (17.20 ng L{sup −1}). The ranges of concentration and detection frequency of sulfonamides and macrolides were < LOD-11.35 and < LOD-16.68 ng L{sup −1}; 35–70 and 60–85%, respectively, whereas carbamazepine was in the range of < LOD-8.80 ng L{sup −1} and had a detection frequency of 65%. The concentrations of sulfamethoxazole, trimethoprim, erythromycin-H{sub 2}O and tylosin were distinctly higher in the fed aquaculture areas. The principal component analysis confirmed that fed aquaculture activities contributed most of the pharmaceutical contamination in the river surface water. Hospitals, nursing homes, sewage wastewater or surface runoff from the surrounding areas might all contribute to the presence of metronidazole and carbamazepine. The preliminary ecological risk assessment revealed that sulfamethoxazole, erythromycin-H{sub 2}O and tylosin showed medium risk, and carbamazepine displayed low risk to sensitive aquatic organisms for maximum measured concentrations. Thus, this study suggests that pharmaceutical contamination in different rivers and seasons needs to be quantified, and ecological as well as human health risks need to be assessed in Bangladesh.

54 ENVIRONMENTAL SCIENCES↗

The Approach of the Environmental Consequences and Impacts during Transport of Radioactive Materials (RAM)-A Safety Case - 16420

International Atomic Energy Agency (IAEA) works, together with Member States (MS), to provide a strong, sustainable and visible global nuclear safety and security framework, protecting people and the environment from the harmful effects of ionizing radiation. In the announcement of this IAEA Conference it is underlined that 'nuclear safety and security are to a great extent scientific in nature, a regulatory body with responsibilities for nuclear facilities and other licensed activities involving radioactive material needs to have permanent access to supporting expertise'. This can be provided internally to the regulatory body or through an external entity such as a TSO in order to provide a competent and timely response to regulatory needs, and the development and maintenance of an appropriate knowledge base and associated tools and services, including training and tutoring services, are the main areas on which the conference will focus. This paper presents certain results obtained during carrying out the IAEA-Romanian Scientific Research Contract entitled: 'Romanian Contribution to the Development of Methodology for Risk Assessment and State Management of Nuclear Security Regime (Risk and Radiological Consequences)' where the author served as CSI (Chief Scientific Investigator) a part of the IAEA CRP-(Coordinated Research Project) on the: 'Development of Methodology for Risk Assessment and State Management of Nuclear Security Regime'. Also, potential risks and their possible radiological consequences to peoples and environment must not be underestimated. However, the assessment of risk must be realistic and quantified, and the requirements placed on the appropriate. The IAEA regulations for the Safe Transport of Radioactive Material, 2012 Edition, Specific Safety Requirements, SSR-6, are applicable to the national and international carriage of radioactive material by all modes of transport- by road, by rail, by air, by sea or by inland waters. The Radioactive Material to be transported must be categorized on the basis of its activity concentration, total activity, fissile characteristics (if any) and other relevant subsidiary characteristics. Packaging and package requirements are then specified on the basis of the hazard of the contents and range from normal commercial packaging (for low hazard contents) to strict design and performance requirements (for higher hazard contents). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

NASA's New Approach for Evaluating Risk Reduction Due to Space Shuttle Upgrades

As part of NASA's intensive effort to incorporate quantitative risk assessment (QRA) tools in the Agency's decision-making process concerning Space Shuttle risk, NASA has developed a powerful risk assessment tool called the Quantitative Risk Assessment System (QRAS). The QRAS is a tool designed to estimate Space Shuttle risk and evaluate Space Shuttle upgrades. This paper presents an overview of the QRAS with focus on its application for evaluating the risk reduction due to proposed Space Shuttle upgrades. The application includes a case study from the Space Shuttle main engine (SSME). The QRAS overview section of the paper includes the QRAS development process, the technical approach to model development, the QRA quantification methods and techniques, and observations concerning the complex modeling involved in QRAS. The application section of the paper describes a practical case study using QRAS models for evaluating critical Space Shuttle Program upgrades, specifically a proposed SSME nozzle upgrade. This paper presents the method for evaluating the proposed upgrade by comparing the current nozzle (old design with well-established probabilistic models) to the channel wall nozzle (new design at the preliminary design level).

Safie, Fayssal M.↗

Environmental Biosciences Program Quarterly Report

Current research projects have focused Environmental Biosciences Program (EBP) talent and resources on providing the scientific basis for risk-based standards, risk-based decision making and the accelerated clean-up of widespread environmental hazards. These hazards include trichloroethylene, low-dose ionizing radiation (gamma and neutron) and alpha radiation from plutonium. Trichloroethylene research has been conducted as a joint collaborative effort with the University of Georgia. Work on the trichloroethylene research projects has been slowed as a result of funding uncertainties. The impact of these funding uncertainties has been discussed with the United States Department of Energy (DOE). Laboratory work has been completed on several trichloroethylene risk assessment projects, and these projects have been brought to a close. Plans for restructuring the performance schedule of the remaining trichloroethylene projects have been submitted to the department. A comprehensive manuscript on the scientific basis of trichloroethylene risk assessment is in preparation. Work on the low-dose radiation risk assessment projects is also progressing at a slowed rate as a result of funding uncertainties. It has been necessary to restructure the proponency and performance schedule of these projects, with the project on Low-Dose Radiation: Epidemiology Risk Models transferred to DOE Office of Science proponency under a separate funding instrument. Research on this project will continue under the provisions of the DOE Office of Science funding instrument, with progress reported in accordance with the requirements of that funding instrument. Progress on that project will no longer be reported in quarterly reports for DE-FC09-02CH11109. Following a meeting at the Savannah River Site on May 8, 2008, a plan was submitted for development of an epidemiological cohort study and prospective medical surveillance system for the assessment of disease rates among workers at the Savannah River Site (SRS). This project will be incorporated into the ongoing project on Population Health Risks in the Vicinity of the Savannah River Site. During a meeting at the SRS on October 21, 2008, a presentation was made on EBP participation in the development and operation of an Epidemiology Consortium at the SRS. A follow-up meeting with SRS officials is planned for 29 and 30 January 2009 at Medical University of South Carolina (MUSC).An epidemiology project on population health risk assessment is being conducted to assess health risks among populations in the vicinity of the SRS. This project is using the capabilities of the EBP GIS for the geographical assessment of cancer and non-cancer disease rates, as well as the potential association of population health risks with environmental exposures. Although funding uncertainties have slowed progress on some aspects of this project, it has not been necessary to restructure the performance schedule to date.

54 ENVIRONMENTAL SCIENCES↗

2011 Performance Assessment Community of Practice Technical Exchange – Summary

The Performance Assessment Community of Practice (PA CoP) was developed in 2008 to improve consistency and quality in the preparation of performance assessments (PAs) and risk assessments across the Department of Energy (DOE) Complex. The term, PA, is used to represent all of these modeling applications in this report. The PA CoP goals are to foster the exchange of information among PA practitioners and to share lessons learned from PAs conducted for DOE, commercial disposal facilities, and international entities. Technical exchanges and workshops are a cornerstone of PA CoP activities. Previous technical exchanges have addressed Engineered Barriers (2009 - http://www.cresp.org/education/workshops/pacop/), the Advanced Simulation Capability for Environmental Management and the Cementitious Barriers Partnership (2010 - http://srnl.doe.gov/copexchange/links.htm). Each technical exchange also includes summary presentations regarding activities at DOE, the Nuclear Regulatory Commission (NRC) and other organizations (e.g., International Atomic Energy Agency (IAEA)) as well as a number of presentations from selected sites to provide insight and perspective from on-going modeling activities. Through the deployment of PA Assistance Teams, the PA CoP has also been engaged in the development of new PAs across the DOE Complex. As a way of improving consistency in the preparation of new PAs, the teams provide technical advice and share experiences, noteworthy practices, and lessons learned from previous Low-Level Waste Disposal Facility Federal Review Group (LFRG) reviews. Teams have provided support for PAs at Hanford, Idaho, Paducah and Portsmouth. The third annual PA CoP Technical Exchange was held on May 25-26, 2011 in Atlanta, GA. The PA CoP Steering Committee Meeting held its first meeting on May 24 prior to the Technical Exchange. Decision making using models and software quality assurance were the topical emphasis for the exchange. A new feature at the 2011 technical exchange was the use of panel discussions to solicit feedback from regulators and practitioners. This report summarizes discussions and recommendations from the steering committee meeting and presentations and feedback obtained at the technical exchange. Appendix I includes the steering committee meeting agenda and Appendix II includes the agenda for the technical exchange and a screenshot of the presentations and video files that are available online.

99 GENERAL AND MISCELLANEOUS↗

Probabilistic Assessment of Risks from Solar Energetic Particle Events

Solar energetic particle events pose a radiation hazard for space crews and a risk of harmful radiation effects in spacecraft electronics. To assess these risks, engineers need to know the worst-case environment that they must plan for or design to withstand. Depending on the application, engineers may need to know the instantaneous worst-case environment, the radiation environment that accumulates during one solar particle event or the cumulative worst-case environment for their entire mission. Also, depending on their application, they will need to know this environment at a confidence level which they will specify. We will present a probabilistic model for the peak fluxes, event-integrated fluences and mission-integrated fluences for solar protons and heavy ions. The model will provide these worst-case environments at user-specified confidence levels. Examples of the use of this model will also be shown.

Adams, James H., Jr.↗

SAPHIRE 8 New Features and Capabilities

The Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) software performs probabilistic risk assessment (PRA) calculations. SAPHIRE is used in support of NRC’s risk-informed programs such as the Accident Sequence Precursor (ASP) program, Management Directive 8.3, “NRC Incident Investigation Program,” or the Significance Determination Process (SDP). It is also used to develop and run the Standardized Plant Analysis Risk (SPAR) models. SAPHIRE Version 8 is a new version of the software with an improved interface and capabilities to support risk-informed programs. SAPHIRE Version 8 is designed to easily handle larger and more complex models. Applications of previous SAPHIRE versions indicated the need to build and solve models with a large number of sequences. Risk assessments that include endstate evaluations for core damage frequency and large, early release frequency evaluations have greatly increased the number of sequences required. In addition, the complexity of the models has increased since risk assessments evaluate both potential internal and external events, as well as different plant operational states. Special features of SAPHIRE 8 help create and run integrated models which may be composed of different model types. SAPHIRE 8 includes features and capabilities that are new or improved over the current Version 7 to address the new requirements for risk-informed programs and SPAR models. These include: • Improved User Interfaces • Model development • Methods • General Support Features

97 MATHEMATICS AND COMPUTING↗

Space Reactor Launch Safety--An Acceptably Low Risk

Results from previous space reactor and radioisotope power source risk assessments were combined to provide a scoping assessment of the possible risks from the launch of a reactor power system for use on the surface of the moon or Mars. It is assumed that future reactor power system launches would be subject to the same rigorous safety analysis and launch approval process as past nuclear payload launches. Using the same methodology that has gained approval of past launches, it was determined that the mission risk would be 0.029 person-rem worldwide which translates to 1.5*10{sup -5} latent health effects. It is seen that the only significant sources of radiological risks from a non-operating reactor are possible inadvertent criticality accidents and the consequences of such events have been shown to be extremely low. Passive means such as spectral shift poisons or high reactor core length/diameter ratios have been shown to be able to reduce or eliminate the possibility of the more credible criticality accidents, such as flooding or sand burial. This paper advances the premise that, for design purposes, future space reactor surface-power designs should primarily address the credible accidents and not the hypothetical accidents. For launch accidents and other safety assessments, a probabilistic risk assessment approach will have to be used to assess the safety impact of all types of accidents, including the hypothetical accidents. With this approach, the design of the system will not be burdened with design features that are based on hypothetical criticality accidents having negligible risk. Moreover, there is little chance of convincingly demonstrating that these design features can substantially reduce or eliminated the risk associated with hypothetical criticality accidents.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Advancing Risk‐Informed Decision Making in Managing Defense Nuclear Waste in the United States: Opportunities and Challenges for Risk Analysis

Abstract An omnibus spending bill in 2014 directed the Department of Energy to analyze how effectively Department of Energy (DOE) identifies, programs, and executes its plans to address public health and safety risks that remain as part of DOE's remaining environmental cleanup liabilities. A committee identified two dozen issues and associated recommendations for the DOE, other federal agencies, and the U.S. Congress to consider, as well as other stakeholders such as states and tribal nations. In regard to risk assessment, the committee described a risk review process that uses available data, expert experience, identifies major data gaps, permits input from key stakeholders, and creates an ordered set of risks based on what is known. Probabilistic risk assessments could be a follow‐up from these risk reviews. In regard to risk management, the states, in particular, have become major drivers of how resources are driven. States use different laws, different priorities, and challenge DOE's policies in different ways. Land use decisions vary, technology choices are different, and other notable variations are apparent. The cost differences associated with these differences are marked. The net result is that resources do not necessarily go to the most prominent human health and safety risks, as seen from the national level.

Greenberg, Michael R.↗

Convolution Correction Factor Adjustments on Static PRA Models for Event Assessment

Current probabilistic risk assessment (PRA) models will contain cut sets that have time-constrained basic events such as switched components, recovery of failed components, and failures in time. For these cut sets that have multiple time-constrained events that interact (e.g., offsite power recover at the same time as multiple diesel generators fail to run), there is the possibility that the minimal cut set quantified result is too large. Since current PRA models typically assume that the accident scenario starts at “time zero,” the fails-to-run basic events use this starting time as the basis for their respective reliability models. Over time, the standard practice was to recognize this issue and accept it as part of the conservatism built into the event tree/fault tree PRA models. However, now that these same PRA models are being used in a regulatory forum, this conservatism needs to be addressed. Further, this issue exists not only for the baseline PRA results, but for deficiencies that have been observed or those that have the potential of occurrence, whether the deficiency is complete failure or just a degraded condition. We have found that this conservatism becomes very important when evaluating scenarios such as station blackout sequences and other loss of offsite power sequences. This paper will address the theory and implemented process used by the Systems Analysis Programs for Hands-on Integrated Reliability Evaluations (SAPHIRE) PRA software. Starting with SAPHIRE version 8, the process that was developed is to calculate a “convolution correction factor” based on three distinct calculations. The first calculation is the cut set based frequency calculated via the standard event tree/fault tree PRA model (assuming all run failures start at time equal to zero). The second calculation is to perform the exact time-constrained calculation by integrating the component failure models over the time period of interest (e.g., time to recover, a mission time). For example, this exact calculation for the case of the diesel generators is to convolve their failure models with the offsite power recovery model to obtain the exact frequency. The third calculation is to produce the convolution correction factor by dividing the exact frequency calculation by the standard cut set frequency. This convolution correction factor is then applied to the PRA cut sets in order to remove the time-constrained conservatism. The process used to obtain the convolution correction factor for the baseline PRA is important; however, in this paper we also describe what happens when there is degradation of a component or a potential deficiency. These issues become very important in order to ensure that the convolution correction factor is re-calculated correctly. If the correction factor does not get re-calculated and the same baseline convolution correction factor is used, the final analysis result could be over conservative or under conservative. This paper will discuss how these issues are addressed and provide examples on how SAPHIRE automatically makes the necessary adjustments. MathCad verification results can be computed using the provided equations and input data.

99 GENERAL AND MISCELLANEOUS↗

The Use of the Integrated Medical Model for Forecasting and Mitigating Medical Risks for a Near-Earth Asteroid Mission

Introduction The Integrated Medical Model (IMM) is a decision support tool that is useful to space flight mission managers and medical system designers in assessing risks and optimizing medical systems. The IMM employs an evidence-based, probabilistic risk assessment (PRA) approach within the operational constraints of space flight. Methods Stochastic computational methods are used to forecast probability distributions of medical events, crew health metrics, medical resource utilization, and probability estimates of medical evacuation and loss of crew life. The IMM can also optimize medical kits within the constraints of mass and volume for specified missions. The IMM was used to forecast medical evacuation and loss of crew life probabilities, as well as crew health metrics for a near-earth asteroid (NEA) mission. An optimized medical kit for this mission was proposed based on the IMM simulation. Discussion The IMM can provide information to the space program regarding medical risks, including crew medical impairment, medical evacuation and loss of crew life. This information is valuable to mission managers and the space medicine community in assessing risk and developing mitigation strategies. Exploration missions such as NEA missions will have significant mass and volume constraints applied to the medical system. Appropriate allocation of medical resources will be critical to mission success. The IMM capability of optimizing medical systems based on specific crew and mission profiles will be advantageous to medical system designers. Conclusion The IMM is a decision support tool that can provide estimates of the impact of medical events on human space flight missions, such as crew impairment, evacuation, and loss of crew life. It can be used to support the development of mitigation strategies and to propose optimized medical systems for specified space flight missions. Learning Objectives The audience will learn how an evidence-based decision support tool can be used to help assess risk, develop mitigation strategies, and optimize medical systems for exploration space flight missions.

Kerstman, Eric↗

Milestone Report for MS8: Extend Quantitative Brine and CO 2 Leakage Calculations

This report summarizes results of the risk analysis and characterization of CO 2 and brine leakage potential of Farnsworth Unit (FWU) wells. U.S. DOE’s National Risk Assessment Partnership (NRAP) program works on quantitatively assess long-term environmental risks amidst significant geologic uncertainty and variability. NRAP risk assessment and computational tools are developed to quantify uncertainties and calculate risk associated with geologic sequestration of carbon dioxide (CO 2 ). For this study, we have developed a workflow from University of Utah’s physics-based reservoir simulators to performing leakage calculations using NRAP Tools. NRAP tools (NRAP-IAM-CS, RROM-Gen) are used to conduct leakage risk analysis based on Eclipse simulation results, and characterize wellbore leakage at the Farnworth Site. This report summarizes results of the risk analysis and characterization of CO 2 and brine leakage potential of Farnsworth Unit (FWU) wells.

54 ENVIRONMENTAL SCIENCES↗

On the compatibility of established methods with emerging artificial intelligence and machine learning methods for disaster risk analysis

Abstract There is growing interest in leveraging advanced analytics, including artificial intelligence (AI) and machine learning (ML), for disaster risk analysis (RA) applications. These emerging methods offer unprecedented abilities to assess risk in settings where threats can emerge and transform quickly by relying on “learning” through datasets. There is a need to understand these emerging methods in comparison to the more established set of risk assessment methods commonly used in practice. These existing methods are generally accepted by the risk community and are grounded in use across various risk application areas. The next frontier in RA with emerging methods is to develop insights for evaluating the compatibility of those risk methods with more recent advancements in AI/ML, particularly with consideration of usefulness, trust, explainability, and other factors. This article leverages inputs from RA and AI experts to investigate the compatibility of various risk assessment methods, including both established methods and an example of a commonly used AI‐based method for disaster RA applications. This article utilizes empirical evidence from expert perspectives to support key insights on those methods and the compatibility of those methods. This article will be of interest to researchers and practitioners in risk‐analytics disciplines who leverage AI/ML methods.

Mathematical Methods In Social Sciences↗

Fire Protection Engineering Design Brief Template: Hydrogen Refueling Station

Building a hydrogen infrastructure system is critical to supporting the development of alternate- fuel vehicles. This report provides a methodology for implementing a performance-based design of an outdoor hydrogen refueling station that does not meet specific prescriptive requirements in NFPA 2, The Hydrogen Technologies Code . Performance-based designs are a code-compliant alternative to meeting prescriptive requirements. Compliance is demonstrated by comparing a prescriptive-based fueling station design with a performance-based design approach using Quantitative Risk Assessment (QRA) methods and hydrogen risk assessment tools. This template utilizes the Sandia-developed QRA tool, Hydrogen Risk Analysis Models (HyRAM), which combines reduced-order deterministic models that characterize hydrogen release and flame behavior with probabilistic risk models to quantify risk values. Each project is unique and this template is not intended to account for site-specific characteristics. Instead, example content and a methodology are provided for a representative hydrogen refueling site which can be built upon for new hydrogen applications.

08 HYDROGEN↗

NRAP-Open-IAM: Open-Source Integrated Assessment Model

NRAP Open IAM is the latest evolution in a series of quantitative models developed under the U.S. Department of Energy’s National Risk Assessment Partnership (NRAP) to address risk assessment, risk management and containment assurance questions of geological carbon storage (GCS). NRAP Open IAM allows a user to define a site specific GCS scenario, characterize important site features, events, and processes (considering uncertainty), couple together reduced order models of various system components to rapidly forecast response to CO 2 injection, and perform stochastic analysis to quantify containment effectiveness, leakage risk, and impact to receptors of concern.

Vasylkivska, Veronika S.↗

Cybersecurity Assessment for a Behind-the-Meter Solar PV System: A Use Case for the DER-CF

The world's energy production is shifting toward lower-cost, cleaner, more efficient, and sustainable sources. The increasing numbers of distributed energy resources (DERs) are allowing for the rapid transformation of electric grids toward achieving the goal of energy decarbonization. Along with cleaner and more efficient energy, however, we must also aim for a secure energy future. Solar photovoltaic (PV) systems are an important part of this transition. This paper discusses a cybersecurity risk assessment for behind-the-meter DERs using a solar PV system as a use case of the Distributed Energy Resource Cybersecurity Framework (DER-CF) developed by the National Renewable Energy Laboratory. This poster presents a conference paper on the risk assessment processes and summarizes the DER-CF's use case recommendations to strengthen the cybersecurity posture of the electric grid.

cybersecurity↗

Automated fibroglandular tissue segmentation and volumetric density estimation in breast MRI using an atlas-aided fuzzy C-means method

Purpose: Breast magnetic resonance imaging (MRI) plays an important role in the clinical management of breast cancer. Studies suggest that the relative amount of fibroglandular (i.e., dense) tissue in the breast as quantified in MR images can be predictive of the risk for developing breast cancer, especially for high-risk women. Automated segmentation of the fibroglandular tissue and volumetric density estimation in breast MRI could therefore be useful for breast cancer risk assessment. Methods: In this work the authors develop and validate a fully automated segmentation algorithm, namely, an atlas-aided fuzzy C-means (FCM-Atlas) method, to estimate the volumetric amount of fibroglandular tissue in breast MRI. The FCM-Atlas is a 2D segmentation method working on a slice-by-slice basis. FCM clustering is first applied to the intensity space of each 2D MR slice to produce an initial voxelwise likelihood map of fibroglandular tissue. Then a prior learned fibroglandular tissue likelihood atlas is incorporated to refine the initial FCM likelihood map to achieve enhanced segmentation, from which the absolute volume of the fibroglandular tissue (|FGT|) and the relative amount (i.e., percentage) of the |FGT| relative to the whole breast volume (FGT%) are computed. The authors' method is evaluated by a representative dataset of 60 3D bilateral breast MRI scans (120 breasts) that span the full breast density range of the American College of Radiology Breast Imaging Reporting and Data System. The automated segmentation is compared to manual segmentation obtained by two experienced breast imaging radiologists. Segmentation performance is assessed by linear regression, Pearson's correlation coefficients, Student's pairedt-test, and Dice's similarity coefficients (DSC). Results: The inter-reader correlation is 0.97 for FGT% and 0.95 for |FGT|. When compared to the average of the two readers’ manual segmentation, the proposed FCM-Atlas method achieves a correlation ofr = 0.92 for FGT% and r = 0.93 for |FGT|, and the automated segmentation is not statistically significantly different (p = 0.46 for FGT% and p = 0.55 for |FGT|). The bilateral correlation between left breasts and right breasts for the FGT% is 0.94, 0.92, and 0.95 for reader 1, reader 2, and the FCM-Atlas, respectively; likewise, for the |FGT|, it is 0.92, 0.92, and 0.93, respectively. For the spatial segmentation agreement, the automated algorithm achieves a DSC of 0.69 ± 0.1 when compared to reader 1 and 0.61 ± 0.1 for reader 2, respectively, while the DSC between the two readers’ manual segmentation is 0.67 ± 0.15. Additional robustness analysis shows that the segmentation performance of the authors' method is stable both with respect to selecting different cases and to varying the number of cases needed to construct the prior probability atlas. The authors' results also show that the proposed FCM-Atlas method outperforms the commonly used two-cluster FCM-alone method. The authors' method runs at ∼5 min for each 3D bilateral MR scan (56 slices) for computing the FGT% and |FGT|, compared to ∼55 min needed for manual segmentation for the same purpose. Conclusions: The authors' method achieves robust segmentation and can serve as an efficient tool for processing large clinical datasets for quantifying the fibroglandular tissue content in breast MRI. It holds a great potential to support clinical applications in the future including breast cancer risk assessment.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Risk-based monitoring designs for detecting CO 2 leakage through abandoned wellbores: An application of NRAP’s WLAT and DREAM tools

We report that one suggested approach to managing the risk of geologic CO 2 storage projects is to perform risk-based subsurface monitoring targeting early leak detection. The challenge in risk-based monitoring is that leakage impacts are expected to be small in comparison with the footprint of the stored CO 2 plume and could be at depths ranging from the depth of storage (often ~1 km bgs) up to surficial aquifers. Addressing this challenge requires a multidisciplinary effort capable of characterizing potential subsurface leakage in terms of likelihood, location, magnitude, impacts to overlying aquifers, and uncertainty as well as innovative monitoring technology design and implementation. The National Risk Assessment Partnership (NRAP) was established to develop related risk assessment tools to provide guidance on such assessments. Here we demonstrate the application workflow of two of the NRAP computational tools, WLAT (Wellbore Leakage Analysis Tool) and DREAM (Designs for Risk Evaluation and Management), to a hypothetical CO 2 storage site based on a study area in the Midwestern United States. This workflow shows how CO 2 leakage may be estimated, evaluated, and monitored in terms of risk. Results provide guidance on monitoring configurations and technologies which minimize the time to leak detection, maximize the probability detection, and provide cost considerations.

54 ENVIRONMENTAL SCIENCES↗