Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,387 records · Page 77

EHS Health Assessment & Health Action Plan Report CY 2017

The (EHS) Health Action Plan initiative targets the key health risks identified through the 8-15-80 model by engaging employees to change their own healthcare story. (EHS) identified the most prevalent of the health risks amongst our population through Health Risk Assessment (HRA) and used that data to build Health Action Plans. Our 2017 Health Action Plans addressed inadequate sleep, increasing energy, stress, weight management, physical inactivity, hypertension, dyslipidemia, managing and preventing diabetes, managing low back pain, allergies & asthma, digestive health, tobacco use, and living well or maintaining low risk for those individuals who do not have a chronic condition to manage. These plans connect employees with our onsite registered dietitians, fitness professionals, health coaches, physical therapists and physicians as appropriate. In addition to addressing the physical aspects of health, the plans also emphasized pre/post-assessments to encourage building behavioral and emotional skills that promote health and facilitate lifestyle changes over a minimum of three months - just one risk reduction or behavior change to make an impact on their Division as well as Sandia's overall risk levels and ultimately healthcare costs.

99 GENERAL AND MISCELLANEOUS↗

EHS Health Assessment & Health Action Plan Report CY 2017

The (EHS) Health Action Plan initiative targets the key health risks identified through the 8-15-80 model by engaging employees to change their own healthcare story. (EHS) identified the most prevalent of the health risks amongst our population through Health Risk Assessment (HRA) and used that data to build Health Action Plans. Our 2017 Health Action Plans addressed inadequate sleep, increasing energy, stress, weight management, physical inactivity, hypertension, dyslipidemia, managing and preventing diabetes, managing low back pain, allergies & asthma, digestive health, tobacco use, and living well or maintaining low risk for those individuals who do not have a chronic condition to manage. These plans connect employees with our onsite registered dietitians, fitness professionals, health coaches, physical therapists and physicians as appropriate. In addition to addressing the physical aspects of health, the plans also emphasized pre/post-assessments to encourage building behavioral and emotional skills that promote health and facilitate lifestyle changes over a minimum of three months - just one risk reduction or behavior change to make an impact on their Division as well as Sandia's overall risk levels and ultimately healthcare costs.

99 GENERAL AND MISCELLANEOUS↗

KTF Sub-Area Plan: Overview & Summary

The KTF Sub-Area Plan is currently under development. Finalization awaits decisions regarding the long-term future of the site. The sub-area plan will build upon previous master plans, facilities and infrastructure (F&I) revitalization plans, and building studies. Planning concepts under consideration are: (1) Replace facilities with a combination of new permanent and non-permanent space; and (2) Complete deferred maintenance at remaining facilities.

99 GENERAL AND MISCELLANEOUS↗

TTR Sub-Area Plan: Overview & Summary

The TTR Sub-Area Plan is currently under development and is significantly influenced by National Nuclear Security Administration (NNSA) decisions about permitting and environmental regulatory compliance issues. The sub-area plan will build upon previous draft master plans, F&I revitalization plans, and building studies. Planning concepts under consideration are: Continue to use and preserve large tracts of land for large-scale mission-related testing; Identify investments to protect, sustain, and recapitalize infrastructure, facilities, and equipment assets; Identify opportunities to dispose of obsolete facilities and consolidate common functions in order to reduce operating costs.

99 GENERAL AND MISCELLANEOUS↗

Project Plan: Salt in Situ Heater Test

This project plan gives a high-level description of the US Department of Energy Office of Nuclear Energy (DOE-NE) Spent Fuel and Waste Disposition (SFWD) campaign in situ borehole heater test project planned for the Waste Isolation Pilot Plant (WIPP) site, titled the Brine Availability Test in Salt (BATS). BATS is the first stage in a planned sequence of tests to bolster the technical basis for disposal of heat generating waste in salt. This plan provides an overview of the schedule and responsibilities of the parties involved. This project is a collaborative effort by Sandia, Los Alamos, and Lawrence Berkeley National Laboratories to execute a series of small-diameter borehole heater tests in salt for the DOE-NE SFWD campaign. Design of a heater test in salt at WIPP has evolved over several years. The experiment has begun in January 2020 and the first phase will continue for several months with the possibility for follow on testing. BATS comprises a suite of modular tests, which consist of a group of adjacent horizontal boreholes in the wall of drifts at WIPP. Each test is centered around a packer-isolated heated borehole (12.2 cm [4.81 diameter) containing equipment for water-vapor collection and borehole closure monitoring, surrounded by smaller-diameter (up to 5.3 cm [2.11 diameter) satellite observation boreholes. Observation boreholes contain grouted-in temperature sensors, electrical resistivity tomography (ERT) sensors, and fiber optics; packer-isolated tracer release and sampling intervals; and acoustic emission (AE) piezoelectric sensors. A larger-diameter (12.2 cm [4.81) satellite borehole includes sorel and salt cement plugs, as part of an engineered barrier sealing test. The first two tests, to be implemented in parallel, are heated (target borehole wall temperature of 120 °C) and unheated, with similar arrays of observation borehole monitoring changes. Follow-on tests will be designed using information gathered from the first two tests, and may be conducted at other borehole wall temperatures, use multiple observation boreholes, and may include different measurement types and test designs. This 2020 update of the original 2018 project plan satisfies DOE-NE Spent Fuel and Waste Science and Technology (SFWST) milestone M3SF-205N010303034, as part of the SNL "Salt Disposal R&D" work package.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Rice Business Plan Competition (Final Report)

During the grant period, Rice University held a total of three regional Clean Energy Business Plan Competitions for graduate level students with a particular focus on attracting student startups in the clean energy space (clean tech, renewable energy, transportation, batteries, sustainability, etc.) Over the three years of the grant, the Rice Business Plan Competition awarded a total of three ${$}$50,000 DOE-sponsored prizes to the winning startups (${$}$150,000 total). The Rice Energy Business Plan Competition’s DOE Clean Tech competition leveraged the resources and infrastructure of the existing annual Rice Business Plan Competition (RBPC), which is the world’s largest and richest intercollegiate graduate-level business plan competition in the world

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Technical & Programmatic Solutions for Direct Disposal of DPCs: Draft Outline and Staffing Plan

This is a work planning document that describes technical and programmatic goals for disposition of spent nuclear fuel (SNF) that is currently in dry storage in dual-purpose canisters (DPCs), or will be in the foreseeable future. It then describes how those goals can be promoted by a research and development (R&D) program. The needed R&D is compared to the ongoing work supported by the U.S. Department of Energy in FY18, and planned for FY19 and beyond. Some additional R&D activities are recommended, and plans are presented for technical integration activities that address the efficacy of the Direct Disposal of DPCs program (WBS 1.08.01.03.05), and integration with the overall Disposal Research program (WBS 1.08.01.03). The planned deliverable for this work package in FY19 (M2SF-1951\1010305051-Analysis of Solutions for DPC Disposal; 6/19/19) will be the product of this workplan. The deliverable will evaluate technical options for DPC direct disposal, taking into account the range ofpast and current DPC designs in the existing fleet. It will describe a set of goals for successful disposition of spent fuel in DPCs. It will analyze the scope and timing of needed R&D activities (R&D Plan), and discuss the uses of generic and site-specific analyses. Where appropriate, it will use alternative management cases to represent how DPC direct disposal could be incorporated in the overall geologic disposal program, given uncertainties in program direction and funding.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Emergency Planning Considerations for Advanced Nuclear Power Reactors

The purpose of this scoping study is to develop an approach for establishing emergency planning requirements for advanced nuclear power reactors and other new reactor technologies. The approach considers existing emergency planning requirements and guidance. More specifically the study focuses on establishing criteria and process to determine the size of the plume and ingestion exposure pathway emergency planning zone. The review of emergency planning in place for existing licensed nuclear facilities provides insight and informs the suggested process for establishing this Emergency Planning Zone (EPZ) process.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Tools, Feasibility, and Cost of Monitoring Plan (SECARB Phase III 9.1.1a, b, c, d, e, f, g)

This report completes several Phase III milestone reporting obligations in Subtask 9.1.1 and Budget Period 3 general reporting requirements, specifically Phase III milestone 9.1.1. g "Subsurface Monitoring Plan" with subparts a-g, Assessment of Feasibility, Cost & Likely Success of Cross-Well EM, crosswell acoustic, CASSM, VSP, borehole logging, repeat seismic, geochemical monitoring, and related methods and backup and archival methods. This report builds on work done for Phase II and in the first year of Phase III and reflects the integration of results of a teamwide planning meeting held in Austin at the Bureau of Economic Geology (BEG) April 8–9, 2008, and a planning and review meeting held September 23, 2008. This report provides the consensus plan for site-specific characterization and monitoring that were used to guide engineering design. The team expected that further plan modifications would be required during the engineering design, cost evaluation, and timeline adjustment that will occur prior to drilling and installation. This report was then updated to include additional adjustments needed as site characterization data were gathered during fieldwork in the summer of 2009 and as the design was finalized.

01 COAL, LIGNITE, AND PEAT↗

SECARB Complete Subcontract and Begin Deployment of Surface Monitoring Plan

This report documents the status of planning and progresses for SECARB’s Phase III Early (at Cranfield) surface monitoring plan. Proposed near surface monitoring includes an integrated plan of baseline monitoring, groundwater head measurement, groundwater sampling and modeling, groundwater geochemical analysis, and an approach to assessment of feasibility, cost, and likely success of other prospective surface monitoring methods, including groundwater, capillary fringe, vadose zone, soil and above-ground sites, variability through time and space, and separation of signal from noise. It also considers water sampling, gas sampling, engineered tracers, installed devises, and various geophysical tool sets, and optimal sampling frequencies and strategies. Surface monitoring approaches consider the results the 2007-2008 ZERT test at Montana State University, results of other international, and RCSP Phase II results. The plan selects optimum sampling sites and documents how land-owner arrangements are planned.

01 COAL, LIGNITE, AND PEAT↗

ASME Code Qualification Plan for LPBF 316 SS

This report describes a plan to qualify laser powder bed fusion (LPBF) 316 stainless steel for use with the American Society of Mechanical Engineers (ASME) Boiler & Pressure Vessel Code Section III, Division 5 rules for metallic components in high temperature nuclear reactors. Accomplishing this goal would make the material and manufacturing process available to vendors for inclusion in the next generation of advanced, high temperature reactors. The general approach adopted here is to treat LPBF 316 as if it was a completely new material and to develop a plan to qualify the material according to the current ASME practices. One key goal of this work is to explore and develop accelerated qualification approaches that might reduce the time required to qualify new materials by reducing the need for long term testing. However, the qualification plan here does not employ any accelerated qualification approaches to provide a limiting, bounding description of the number, duration, and types of testing required to qualify LPBF 316 without such techniques and to describe a comprehensive dataset that could be used to explore and validate accelerated qualification approaches in the future. The report addresses the fundamental challenges to qualifying Advanced Manufacturing (AM) materials for high temperature applications and summarizes the ASME Section III qualification process as well as current efforts to qualify LBPF and DED 316 for low temperature applications. The report then discusses specific issues, both material and logistical, related to qualifying PBF 316 steel. The final chapters of the report describe a complete test plan designed to generate sufficient data to qualify the material as well as a data management plan for how to store and manage the data to eventually provide the test data packaged needed to qualify the material with ASME.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

United States Nuclear Data Program Work Plan for Fiscal Year 2025

The work plan described in this document has been developed to cover work to be performed by the U. S. Nuclear Data Program (USNDP) during Fiscal Year (FY) 2025 that begins on October 1, 2024. This plan has been prepared in consultation with the members of the Coordinating Committee who represent the organizations participating in the program. Each Coordinating Committee member prepared a draft plan for his/her organization. Each contribution was integrated into a unified work plan. The draft plan was then circulated to the Coordinating Committee for comments and corrections before the final document was submitted to the U.S. Department of Energy (DOE).

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Environmental Monitoring Plan, Revision 5

The purpose of environmental monitoring is to promote the early identification of, and response to, potential adverse environmental impacts associated with Lawrence Livermore National Laboratory (LLNL) operations. Environmental monitoring supports the Integrated Safety Management System (ISMS), International Organization for Standardization (ISO) 14001 Environmental Management Systems standard, and U. S. Department of Energy (DOE) Order 450.1A, Environmental Protection Program. Specifically, in conformance with DOE Order 450.1A, Attachment 1, paragraph 1(b)(5), environmental monitoring enables LLNL to detect, characterize, and respond to releases from LLNL activities; assess impacts; estimate dispersal patterns in the environment; characterize the pathways of exposure to members of the public; characterize the exposures and doses to individuals and to the population; and to evaluate the potential impacts to the biota in the vicinity of LLNL. Environmental monitoring also serves to demonstrate compliance with permits and other regulatory requirements. The Environmental Monitoring Plan (EMP) addresses the sample collection and analytical work supporting environmental monitoring to ensure the following: (1) A consistent system for collecting, assessing, and documenting environmental data of known and documented quality. (2) A validated and consistent approach for sampling and analysis of samples to ensure laboratory data meets program-specific needs and requirements within the framework of a performance-based approach for analytical laboratory work. (3) An integrated sampling approach to avoid duplicative data collection. Until its cancellation in January 2003, DOE Order 5400.1 required the preparation of an environmental monitoring plan. Neither DOE Order 450.1A nor the ISO 14001 standard are as prescriptive as DOE Order 5400.1, in that neither expressly requires an EMP. However, LLNL continues to prepare the EMP because it provides an organizational framework for ensuring that this work, which is integral to the implementation of LLNL's Environmental Management System, is conducted appropriately. Furthermore, the Environmental Monitoring Plan helps LLNL ensure compliance with DOE Order 5400.5, Radiation Protection of the Public and the Environment, and DOE Order 231.1 Change 2, Environment, Safety and Health Reporting, which require the publication of an annual report that characterizes the site's environmental management performance. To summarize, the general regulatory drivers for this environmental monitoring plan are ISO 14001, DOE Order 450.1A, DOE Order 5400.5, and DOE Order 231.1. The environmental monitoring addressed by this plan includes preoperational characterization and assessment, effluent and surveillance monitoring, and permit and regulatory compliance monitoring. Additional environmental monitoring is conducted at LLNL as part of compliance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA, also known as Superfund). LLNL coordinates its ground water surveillance monitoring program with the CERCLA monitoring program to gain sampling efficiencies. (See LLNL [1992] and LLNL [2008] for information about LLNL's CERCLA activities).

54 ENVIRONMENTAL SCIENCES↗

Planning horizon affects prophylactic decision-making and epidemic dynamics

The spread of infectious diseases can be impacted by human behavior, and behavioral decisions often depend implicitly on a planning horizon?the time in the future over which options are weighed. We investigate the effects of planning horizons on epidemic dynamics. We developed an epidemiological agent-based model (along with an ODE analog) to explore the decision-making of self-interested individuals on adopting prophylactic behavior. The decision-making process incorporates prophylaxis efficacy and disease prevalence with the individuals? payoffs and planning horizon. Our results show that for short and long planning horizons individuals do not consider engaging in prophylactic behavior. In contrast, individuals adopt prophylactic behavior when considering intermediate planning horizons. Such adoption, however, is not always monotonically associated with the prevalence of the disease, depending on the perceived protection efficacy and the disease parameters. Adoption of prophylactic behavior reduces the epidemic peak size while prolonging the epidemic and potentially generates secondary waves of infection. Lastly, these effects can be made stronger by increasing the behavioral decision frequency or distorting an individual's perceived risk of infection.

60 APPLIED LIFE SCIENCES↗

System Definition Phase and Acquisition Phase Project Plan for Small Astronomy Satellite SAS-D

This Project Plan for the Small Astronomy Satellite (SAS-D) is Goddard Space Flight Center's plan for accomplishing the project. It is issued in compliance with NASA Handbook NHB 7121.2 and NMI 7120.1, dated May 4, 1970, Subject: Approval and Implementation of Office of Space Science and Applications (OSSA) Research and Development (R&D) Projects. The Project Plan, as approved by GSFC executive management and NASA Headquarters, is the project manager's charter and defines his specific plan of action. System definition phase activities of the SAS-D Project will be a continuation of the analytical work that established the overall feasibility of the project. The system concept derived from that analytical work is defined in the Phase A (Mission Definition Phase) technical report. System definition phase activities will include detailed engineering analysis and preliminary breadboarding necessary to establish a single project approach from the feasible approaches. This document will be revised at the end of the system definition phase to provide greater detail on acquisition phase planning and to specify a specific system design.

Donald A Krueger↗

The cryogenics analysis program for Apollo mission planning and analysis

The cryogenics analysis program was developed as a simplified tool for use in premission planning operations for the Apollo command service module. Through a dynamic development effort, the program has been extended to include real time and postflight analysis capabilities with nominal and contingency planning features. The technical aspects of the program and a comparison of ground test and mission data with data generated by using the cryogenics analysis program are presented. The results of the program capability to predict flight requirements also are presented. Comparisons of data from the program with data from flight results, from a tank qualifications program, and from various system anomalies that have been encountered are discussed. Future plans and additional considerations for the program also are included. Among these plans are a three tank management scheme for hydrogen, venting profile generation for Skylab, and a capability for handling two gas atmospheres. The plan for two gas atmospheres will involve the addition of the capability to handle nitrogen as well as oxygen and hydrogen.

Scott, W.↗

Remote sensing as a source of data for outdoor recreation planning

Specific data needs for outdoor recreation planning and the ability of tested remote sensors to provide sources for these data are examined. Data needs, remote sensor capabilities, availability of imagery, and advantages and problems of incorporating remote sensing data sources into ongoing planning data collection programs are discussed in detail. Examples of the use of imagery to derive data for a range of common planning analyses are provided. A selected bibliography indicates specific uses of data in planning, basic background materials on remote sensing technology, and sources of information on environmental information systems expected to use remote sensing to provide new environmental data of use in outdoor recreation planning.

Reed, W. E.↗

Phased Project Planning Guidelines

NHB 7121.2 is the initial publication of the guidelines for implementation of the Phased Project Planning (PPP) concept prescribed by NPD 7121,1A. These guidelines are applicable to the planning and approval activities which lead to the implementation of major new research and development projects as defined in NPD 7121.1A as well as to major modifications or extensions of approved projects. They should, therefore, be reflected in the Project Approval Documents which serve as the basic documentation for project definition, guidance and control throughout NASA. The purpose of PPP is to provide, through defined phases, an adequate basis for management decisions on the extent to which project activities can be properly undertaken and commitments made. However, these guidelines do not prescribe detailed format and content of plans and other documents and reports used to apply the PPP concept. Similarly, the work content of phases and the information requirements described herein are not checklists. They are included to assist in understanding the intent of the PPP concept and should not be viewed as rigid or inflexible. PPP, as a concept for orderly planning and definition of new major R&D undertakings, must be adapted to the peculiarities of each individual case. However, the flexibility permitted for adaptation should not be considered as a license for major variation which would compromise the objectives that underlie the concept. Cognizant NASA officials are expected to pursue their project planning and definition activities in reasonable conformance with these guidelines and to request only those exceptions or deviations which are clearly necessary and justified. These guidelines will be modified as determined necessary on the basis of experience. Comments or suggestions for changes should be directed to the Office of Organization and Management.

Source record↗