Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Operations and Maintenance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,387 records · Page 77

NASA’s Exploration Ground Systems Program: Technology Demonstrations and Risk Reduction for Sustainable Surface Operations

This presentation discusses NASA’s Exploration Ground Systems (EGS) Program Technology Infusion Strategy and the results from EGS technology demonstration projects, including Integrated Health Management capabilities for Condition Based and Predictive Maintenance, conservation of cryogenic fluids, and logistics management/commonality of maintenance equipment, tools, and consumables. The presentation also discusses how technologies and capabilities implemented for ground systems (i.e. automated/ autonomous operations and maintenance) can be leveraged to help reduce risk for sustainable lunar surface operations.

Technology Infusion↗

Development and integration of the infrared telescope for Spacelab

A description is given of the design features of the Small Helium-Cooled Infrared Telescope (IRT) being developed for the 1983 Spacelab 2 mission and the problems encountered during the development of its (1) superfluid helium system requirements, (2) interfaces with Spacelab, and (3) Kennedy Space Center prelaunch operations requirements and restrictions. The IRT comprises cryogenic, IR optical, mechanical, and electronics subsystems. Attention is given the preflight management of superfluid helium by a vacuum maintenance assembly (VMA), which will operate almost continuously until launch and then be deactivated to fly as unavoidable ballast. The objective of IRT design and development is the meeting of IR science and engineering objectives with a relatively low-cost system.

Urban, E. W.↗

Space Shuttle Operations and Infrastructure: A Systems Analysis of Design Root Causes and Effects

This NASA Technical Publication explores and documents the nature of Space Shuttle operations and its supporting infrastructure and addresses fundamental questions often asked of the Space Shuttle program why does it take so long to turnaround the Space Shuttle for flight and why does it cost so much? Further, the report provides an overview of the cause-and effect relationships between generic flight and ground system design characteristics and resulting operations by using actual cumulative maintenance task times as a relative measure of direct work content. In addition, this NASA TP provides an overview of how the Space Shuttle program's operational infrastructure extends and accumulates from these design characteristics. Finally, and most important, the report derives a set of generic needs from which designers can revolutionize space travel from the inside out by developing and maturing more operable and supportable systems.

McCleskey, Carey M.↗

Rotor blade imbalance fault detection for variable-speed marine current turbines via generator power signal analysis

Marine hydrokinetic (MHK) turbines extract renewable energy from oceanic environments. However, due to the harsh conditions that these turbines operate in, system performance naturally degrades over time. Thus, ensuring efficient condition-based maintenance is imperative towards guaranteeing reliable operation and reduced costs for marine hydrokinetic power. This work proposes a novel framework aimed at identifying and classifying the severity of rotor blade pitch imbalance faults experienced by marine current turbines (MCTs). In the framework, a Continuous Morlet Wavelet Transform (CMWT) is first utilized to acquire the wavelet coefficients encompassed within the 1P frequency range of the turbine's rotor shaft. From these coefficients, several statistical indices are tabulated into a six-dimensional feature space. Next, Principle Component Analysis (PCA) is employed on the resulting feature space for dimensionality reduction, and then the application of a K-Nearest Neighbor (KNN) machine learning algorithm is utilized for fault detection and severity classification. The effectiveness of the proposed framework is validated using a high-fidelity MCT numerical simulation platform, where results demonstrate that the presence of a pitch imbalance fault can be accurately detected 100% of the time and correctly classified based upon severity more than 97% of the time.

42 ENGINEERING↗

Space Telescope design for maintenance

The Space Telescope is the first free-flying spacecraft designed to be serviced and repaired by EVA astronauts performing in-orbit maintenance tasks necessary to replace failed or worn-out components. The Telescope's operational profile anticipates in-orbit maintenance approximately two and one half years after initial launch, spacecraft return to ground after five years, and relaunch about one year later. Component design for in-orbit maintenance is being verified by 1-G and neutral buoyancy simulation techniques. Skylab experience led to the implementation of this approach which has significant economic benefits compared to 'one-time-use' space hardware.

Field, E. L.↗

Solar power satellite system definition study. Volume 3: Operations and systems synthesis, phase 2

The results of the operations analyses are reported. Some of these analyses examined operations aspects of space vehicle in-space maintenance. Many of the analyses explored in great depth operations concerned the LEO Base cargo handling operations. Personnel transportation operations and cargo packaging were also analyzed. These operations analyses were performed to define the operational requirements for all of the SPS system elements so that equipment and facilities could be synthesized, and to make estimates of the manpower requirements. An overall, integrated, end-to-end description of the SPS operations is presented. The detailed operations analyses, upon which this integrated description was based, are included.

Source record↗

Comparison of the Neutronic Performance of IRP-1 and IRP-2 at SNS

The Spallation Neutron Source (SNS) operated from start-up, in May 2006, through December, 2017 before replacing the Inner Reflector Plug (IRP). This component is the most costly and time-consuming “regular maintenance” replacement foreseen in the operation of the First Target Station (FTS). The IRP includes beryllium reflector blocks, steel and aluminum support structures, aluminum moderator vessels (which in turn include gadolinium and cadmium neutron poisons) and water coolant systems. The lifetime of this multi-million dollar component is driven by poison and decoupler burnup in moderator vessels. The moderators include these neutron poisons to best match neutron beam performance with scattering instrument needs. The burnup that comes with use changes the performance of the moderators until they no longer server their intended purpose. The reasonable desire to maximize the IRP lifetime means that the moderator performance at the Beginning Of Life (BOL) is significantly “over poisoned” and different from the performance at moderator End Of Life (EOL). Upon installation of the second IRP article, IRP-2, the SNS Neutronics team characterized the performance of the neutron beamlines in order to assess the differences between them, primarily by comparing the EOL performance of IRP-1 to the BOL performance of IRP-2. While IRP-2 was largely similar to IRP-1 in its conceptual design, there were some differences in the specific design of IRP-2 to support enhanced manufacturability, and the change from IPR-1 to IRP-2 coincided with the replacement of the light water in the IRP cooling loop with heavy water, as had been intended in the SNS design but not implemented during construction because of heavy water availability.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Supercritical Carbon Dioxide Primary Power Large-Scale Pilot Plant

The United States electrical power generation fleet encompasses a wide range of technologies, ranging from traditional combustion-based power generation, to nuclear power, to renewable energy. While the distribution of these assets continues to shift due to economic and regulatory influences, coal combustion continues to be a key part of the US energy portfolio. Despite the relative maturity of coal combustion technology, improvements in overall fuel-to-power efficiency and generation flexibility are still possible and will improve both the economic and environmental factors of coal combustion. Echogen Power Systems proposes to lead a world-class team including the University of Missouri, Electric Power Research Institute and Louis Perry Associates in the design, construction and operation of a 10MWe coal-fired supercritical carbon dioxide (sCO 2 ) large-scale pilot. This transformational technology uses sCO 2 as a working fluid instead of water to achieve high thermodynamic efficiencies that can significantly exceed advanced steam-Rankine cycles. Further, the compact nature of sCO 2 turbomachinery offers capital cost and footprint advantages, and the low maintenance of a water-free power cycle can significantly reduce operation and maintenance (O&M) costs over conventional steam-Rankine systems. Recent integration studies of sCO 2 with coal combustion power plants highlight the significant improvements in plant efficiency that sCO 2 can offer relative to even advanced steam Rankine cycles. At commercial scales, coal-sCO 2 plant net efficiency is predicted to be 39-44.0% (HHV), or 10-20% higher output than conventional steam-Rankine systems, which will significantly improve the competitiveness of coal-fired generation. This proposal builds upon projects previously funded by the Department of Energy, including DE-FE0025959 (High-Efficiency Thermal Integration of Closed Supercritical CO 2 Brayton Power Cycles with Oxy-Fired Heaters) and DE-NE0008470 (Conceptual Design for sCO 2 Power Cycle Test Facility). An appropriately-scaled and properly designed and operated pilot project is essential to overcome the natural risk-aversion of the power generation industry and project financing community. The 10 MWe coal-fired sCO 2 pilot power plant proposed herein will reduce the technical and economic risk of this transformational technology, enabling commercial deployment at the conclusion of the project. For the second phase of this project, Echogen lead a team that completed and refined the pilot system conceptual system and key component designs resulting in the completion of a front-end-engineering-design (FEED) study, completed the NEPA review process, completed the permitting process for construction and operation, refined the techno-economic analysis of the proposed system at commercial scale and received commitments for Phase III cost share. The end result of the program will be to demonstrate the technical and economic superiority of the sCO 2 power cycle for coal-fired operation. Major risk elements will have been retired with sufficient operation at high power to enable the power generation industry to move forward with the first commercial deployment of this transformational system.

01 COAL, LIGNITE, AND PEAT↗

The Flight Telerobotic Servicer (FTS) NASA's first operational robotic system

NASA has completed the preliminary definition phase of the Flight Telerobotic Servicer (FTS) and is now preparing to begin the detailed design and fabrication phase. The FTS will be designed and built by Martin Marietta Astronautics Group in Denver, CO, for the Goddard Space Flight Center, in support of the Space Station Freedom Program. The design concepts for the FTS are discussed, as well as operational scenarios for the assembly, maintenance, servicing and inspection tasks which are being considered for the FTS. The upcoming Development Test Flight (DTF-1) is the first of two shuttle test flights to test FTS operations in the environment of space and to demonstrate the FTS capabilities in performing tasks for Space Station Freedom. Operational planning for DTF-1 is discussed as well as development plans for the operational support of the FTS on the space station.

Andary, J.↗

National Park Service Bus Electrification Study: 2020 Report

This report summarizes important considerations for implementing BEBs in the three national park fleets, detailing information about current buses at each fleet, electric bus demonstration vehicles, as well as performance evaluations of BEBs in Zion, Bryce, and Yosemite. Results include in-use data collection results reporting metrics such as average bus speed, energy usage per trip, and daily distance traveled, as well as effects of high heating, ventilation, and air conditioning (HVAC) system use to both heat and cool the buses, emissions estimations before and after use of electric buses, operating costs, electric vehicle infrastructure, maintenance, and bus driver user experience survey information. Analysis results from this project will help the NPS understand how BEBs and future expansion of BEBs could assist in meeting their bottom line and operational goals and assist NPS in choosing appropriate locations for future BEB deployments.

33 ADVANCED PROPULSION SYSTEMS↗

Enhanced Formation Flying for the Earth Observing-1 (EO-1) New Millennium Mission

With scientific objectives for Earth observation programs becoming more ambitious and spacecraft becoming more autonomous, the need for new technical approaches on the feasibility of achieving and maintaining formations of spacecraft has come to the forefront. The trend to develop small low cost spacecraft has led many scientists to recognize the advantage of flying several spacecraft in formation, an example of which is shown in the figure below, to achieve the correlated instrument measurements formerly possible only by flying many instruments on a single large platform. Yet, formation flying imposes additional complications on orbit maintenance, especially when each spacecraft has its own orbit requirements. However, advances in automation proposed by GSFC Codes 550 and 712 allow more of the burden in maneuver planning and execution to be placed onboard the spacecraft, mitigating some of the associated operational concerns. The purpose of this analysis is to develop the fundamentals of formation flying mechanics, concepts for understanding the relative motion of free flying spacecraft, and an operational control theory for formation maintenance of the Earth Observing-1 (EO-l) spacecraft that is part of the New Millennium. Results of this development can be used to determine the appropriateness of formation flying for a particular case as well as the operational impacts. Applications to the Mission to Planet Earth (MTPE) Earth Observing System (EOS) and New Millennium (NM) were highly considered in analysis and applications. This paper presents the proposed methods for the guidance and control of the EO-1 spacecraft to formation fly with the Landsat-7 spacecraft using an autonomous closed loop three axis navigation control, GPS, and Cross link navigation support. Simulation results using various fidelity levels of modeling, algorithms developed and implemented in MATLAB, and autonomous 'fuzzy logic' control using AutoCon will be presented. The results of these analysis on the ability to meet mission and formation flying requirements will be presented.

Folta, David↗

Identification of Hydrogen Rail Maintenance Facility Hazards

Maintenance facilities for hydrogen rail, the activities conducted within such facilities, and how these activities differ from ordinary rail or hydrogen vehicle maintenance are currently being considered for the hazards specific to hydrogen. By performing a hazard and operability study (HAZOP) on numerous potential maintenance and repair scenarios, select low, medium, and high risk hazards relevant to hydrogen rail systems in such environments have been identified. The analysis resulted in 79 unique HAZOP scenarios: one scenario in the high risk category, 43 in the medium risk category, and 35 in the low risk category. Notably, large accidental releases of hydrogen due to tank rupture, aberrant defueling processes, or relief device opening within a facility are important low likelihood consequences that should nevertheless be appropriately prevented and mitigated.

08 HYDROGEN↗

Risk Model for EM Decision Support Toolsets

The Government Office of Accountability (GAO) has published several reports identifying the need for the Department of Energy (DOE) Office of Environmental Management (EM) to address mounting costs for DoE's cleanup program. DOEEM could greatly benefit from independent decision tool-sets/models that would allow them to evaluate options and inform business decision at the enterprise level considering site-specific life cycle costs and system plans. Program goals: Develop a tool-set that enables EM to independently evaluate alternatives, assess outcomes from different contracting strategies, and inform critical decisions for the enterprise. Project goals: Adaption of a Risk Model for integration with complimentary tool-sets for project level decision making. Operational Events: Discrete event model that evaluates operational variables (e.g. capacity, throughput, maintenance constraints) and identify bottlenecks. Identifying and Bounding Project Risk: Identify risks that impact confidence in meeting goals (e.g. production). Life cycle Cost: Evaluate impacts of staffing levels, inventory, and capital investments on life cycle costs. Methods and approach: Monte Carlo Analysis is being executed to generate results: Input derives from Risk Register Data; Tied to Projected and Target Schedules; Incorporates float duration within the model. Assumes associated risk mitigation actions being completed within a timeline of five fiscal years. Metrics include: Confidence in Meeting Production Goal; Confidence in Safety Standards; Confidence in Continuous Operation; Other Metrics can be added as appropriate regarding specific site needs. The adapted risk model can be used as a stand alone decision tool or can be integrated complementary tool-sets (i.e. process and cost models) for project-specific decisions. These support tool-sets can then be integrated with others for site- and complex- level evaluations. Future work includes designing an adaptable and modular framework that would allow integration of multiple tool-sets for holistic and/or targeted evaluation of alternative strategies for decision making that could lead to risk and cost reduction across the enterprise.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A comparative study on deep learning models for condition monitoring of advanced reactor piping systems

Advanced nuclear reactors offer innovative applications due to their portability, reliability, resiliency, and high capacity factors. To operate them on a wider scale, reducing maintenance life-cycle costs while ensuring their integrity is essential. Autonomous operations in advanced nuclear reactors using augmented Digital Twin (DT) technology can serve as a cost-effective solution by increasing awareness about the system’s health. A key component of nuclear DT frameworks is the condition monitoring of safety systems, such as piping-equipment systems, which involves acquiring and monitoring the plant’s sensor data. Here, this research proposes a condition monitoring methodology utilizing deep learning algorithms, such as multilayer perceptions (MLP) and convolutional neural networks (CNNs), to detect degradation and its severity in nuclear piping-equipment systems. Sensor signals are processed to obtain the power spectral density and the Short-Time Fourier transform, and feature extraction methodologies are proposed to develop degradation-sensitive data repositories. The performance of MLP, one-dimensional (1D) CNN, and 2D CNN within the proposed condition monitoring framework is compared using a finite element model of a 3D piping system subjected to seismic loads as the application case study. Various approaches, such as dropout, k-Fold validation, regularization, and early stopping of training the network, are investigated to avoid overfitting the models to the input sensor data. The predictive capability and computational capacity of the deep learning algorithms are also compared to detect degradation in the Z-pipe system of the Experimental Breeder Reactor II (EBRII). The Z-pipe system is subjected to harmonic excitations that represent normal operating loads, such as pump-induced vibrations. The findings of the study indicate that the proposed artificial intelligence (AI)-driven condition monitoring framework demonstrates superior prediction accuracies with a 2D CNN, whereas the MLP exhibits higher computational efficiency.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Sealed silver oxide zinc cells for orbiting and planetary missions.

Several test programs were carried out to determine the performance and limitations of sealed, silver oxide zinc cells for (1) 24-hr synchronous orbits, (2) orbits that would require a maximum of six cycles per day, and (3) missions to other planets requiring maintenance of maximum capacity for probe operations during planet encounter. The results are summarized to provide power system designers with guidelines bearing on capacity maintenance during cycling, cycle life, charged stand effects, and internal pressure characteristics. The life of zinc silver oxide cells is shown to be limited to one to two years over the temperature range of 0 to 24 C.

Hennigan, T. J.↗

Centaur operations at the space station

A study was conducted on the feasibility of using a Centaur vehicle as a testbed to demonstrate critical OTV technologies at the Space Station. Two Technology Demonstration Missions (TDMs) were identified: (1) Accommodations, and (2) Operations. The Accommodations TDM contained: (1) berthing, (2) checkout, maintenance and safing, and (3) payload integration missions. The Operations TDM contained: (1) a cryogenic propellant resupply mission, and (2) Centaur deployment activities. A modified Space Station Co-Orbiting Platform (COP) was selected as the optimum refueling and launch node due to safety and operational considerations. After completion of the TDMs, the fueled Centaur would carry out a mission to actually test deployment and help offset TDM costs. From the Station, the Centaur could carry a single payload in excess of 20,000 pounds to geosynchronous orbit or multiple payloads.

Porter, J.↗

Space Station maintenance concept study

The relationships among NASA Space Station operational constraints and logistical requirements are presently investigated. The concepts studied locate organizational, intermediate, and depot maintenance at the Space Station, at the Kennedy Space Center (KSC), and at a depot remote from the KSC. Measures of reliability, maintainability, and availability were selected; a life-cycle study was then conducted to ascertain the optimum Space Station system maintenance concept. The results obtained indicate that orbital replacement unit MTBFs should not be less than 36,000 hours.

Nelson, Eric E.↗