Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Federal”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,387 records · Page 77

Panel discussion: Challenges and improvements in accident dose analysis; Regulatory and industry perspective

Full text of publication follows. Design basis accident (DBA) analyses are one of several ways nuclear power plant licensees demonstrate, and the U.S. Nuclear Regulatory Commission (NRC) staff verifies, that the design and location of a nuclear power plant are appropriate and that the protection of health and safety of the public is maintained. In July 2000, the NRC staff issued Regulatory Guide 1.183, 'Alternative Radiological Source Terms for Evaluating Design Basis Accidents at Nuclear Power Reactors' (RG 1.183) [1]. RG 1.183 provides a method acceptable to the NRC staff for complying with the regulatory requirements contained in Title 10 of the Code of Federal Regulation (10 CFR) Section 50.67 (50.67), 'Accident source term' [2]. RG 1.183 also provides assumptions and parameters used to model postulated DBA radiological analyses for light-water reactors (LWR). Since the initial issuance of RG 1.183, the NRC staff and the nuclear power plant licensees have both gained substantial experience with the implementation of 10 CFR 50.67 and RG 1.183. Based on this experience, comments from licensees, the anticipation of licensing advanced LWRs, and new research, the NRC is developing a proposed revision to RG 1.183. This panel discussion will provide a discussion of that proposed revision, its potential impact on existing and future evaluations, and the industry perspective on the revised guidance. References: 1) USNRC, Regulatory Guide 1.183, 'Alternative Radiological Source Terms for Evaluating Design Basis Accidents at Nuclear Power Reactors,' Revision 0, U.S. Nuclear Regulatory Commission, Washington, D.C. (2000), Electronic copies are also available in ADAMS (http://www.nrc.gov/reading-rm/adams.html), under Accession No. ML003716792. 2) U.S. Code of Federal Regulations, Title 10 (Energy), Part 50 (Domestic Licensing of Production and Utilization Facilities), Section 67, (Accident source term), Office of the Federal Register, Washington, DC (1999). (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

INL High-Performance and Sustainable Building Strategy

High-performance buildings are reliable, cost effective, and sustainable structures that minimize energy and water use, reduce solid waste and pollutant emissions, and limit the depletion of natural resources. High-performance buildings also provide a thermally and visually comfortable working environment that increases productivity for building occupants. As Idaho National Laboratory (INL) is the nation’s premier nuclear energy research laboratory, the physical infrastructure requires continual updating and repurposing to help accomplish that mission. INL’s infrastructure must incorporate high-performance sustainable design features to be fiscally responsible and reflect an image of innovation to the public and prospective employees. INL is a large consumer of energy with annual energy costs exceeding $16M. This High-Performance and Sustainable Building Strategy will help engineering and construction project teams design sustainable facilities, reduce life cycle operating costs, and support the INL net-zero plan while providing INL employees with a safe and healthy working environment. With these goals in mind, the recommendations described in this document are intended to form INL’s foundation for sustainable and high-performance building standards. This strategy incorporates the latest federal and Department of Energy (DOE) orders and directives, including DOE Order 436.1A, “Departmental Sustainability,” the DOE Sustainability Plan (SP), the INL Site Sustainability Plan (SSP), and Code of Federal Regulations (CFR). This document identifies the requirements of the “Guiding Principles for Sustainable Federal Buildings” (Guiding Principles) and briefly highlights the Leadership in Energy and Environmental Design (LEED) Gold certification. LEED Gold certification can be used to meet many of the requirements of the Guiding Principles.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Best Practices for Resilience in Smart Grid-Interactive Efficient Buildings

The Federal Energy Management Program (FEMP) supports federal agencies' energy decisions with information and guidance on design, funding, and operations to ensure federal buildings are efficient and resilient. The modernization of building infrastructure and the evolution of buildings to support decarbonization involves complex implementation of multiple components across several systems. This includes energy-efficient equipment, on-site energy generation and storage systems, and control systems. These systems have operational modes that can operate more efficiently if they are able to behave responsively to the conditions of the electrical grid. These grid-interactive efficient buildings (GEB) allow facilities to manage power demand according to operational constraints and market signals issued by grid operators. With proper design and planning, these same capabilities have the potential to enable building and facility resilience - coordinating with microgrids, maintaining power on critical circuits to sustain essential operations, and monitoring building health and safety status during an outage. By managing the load of buildings, GEBs can also reduce the cost of backup generation and make better use of renewable power sources on site. This document outlines some of the processes and considerations to guide the design and operation of GEBs in ways that promote facility resilience.

building decarbonization↗

How To Determine and Verify Operations and Maintenance Savings in Energy Savings Performance Contracts

Operations and maintenance (O&M) savings frequently occur in energy savings performance contracts (ESPCs). During FY 2022, 37% of reported annual cost savings for projects awarded under the U.S. Department of Energy (DOE) ESPC indefinite delivery indefinite quantity (IDIQ) contracts and in the performance period were due to O&M or other energy- and/or water-related cost savings, with the balance (63%) from utility cost savings (i.e., energy or water cost savings). Sometimes the energy- and water-related cost savings are acknowledged and included in payments within ESPCs; other times, for various reasons, they are not. As presented in this guide, FEMP recommends including energy- and water-related cost savings that are O&M (including related repair and replacement) savings in the financial aspects of an ESPC, to the extent such savings can be documented. Inclusion of these savings will help augment project scopes and/or lower interest costs (by shortening financing terms). However, there is a burden of proof as to what constitutes acceptability in O&M savings that needs to be carefully considered and documented in individual projects. Beyond promoting a key tenet used in U.S. federal performance contracting—that savings must be from actual budgets and therefore based on the level of O&M that is actually occurring, not what should have been performed—FEMP also recommends good practice in establishing and documenting O&M baselines, formulating the rationale for baseline adjustments during the performance period, and conducting ongoing verification activities. This document concludes with five examples of how O&M savings may be handled, in situations ranging from the partial displacement of O&M contracts to consolidation and “virtualization” of servers in data centers. A key theme that permeates this guide is the importance of thoroughly documenting all conditions and assumptions used in the development of and accounting for O&M costs and savings throughout the ESPC life cycle, from baseline-setting to measurement and verification (M&V) of the savings during each year of the performance period. Doing so not only prevents internal claims of non-performance (especially in the case of staff turnover during the contract term), but also simplifies ordering agency and energy service company (ESCO) response in the event of scrutiny from oversight organizations, such as government audits. While this guide focuses on federal ESPCs, it may also be applicable when O&M savings are included in utility energy service contracts (UESCs) and non-federal ESPCs.

Voss, Phil↗

DEVELOPMENT OF A NEW TYPE A(F)RADIOACTIVE MATERIAL PACKAGING FOR THE DEPARTMENT OF ENERGY

In a coordinated effort, the Department of Transportation (DOT) and Nuclear Regulatory Commission (NRC) proposed the elimination of the Specification Packaging from 49 CFR 173.[1] In accordance with the Federal Register, issued on October 1, 2004, new fabrication of Specification Packages would no longer be authorized. In accordance with the NRC final rulemaking published January 26, 2004, Specification Packagings are mandated by law to be removed from service no later than October 1, 2008. This coordinated effort and resulting rulemaking initiated a planned phase out of Specification Type B and Type A fissile (F) material transportation packages within the Department of Energy (DOE) and its subcontractors. One of the Specification Packages affected by this regulatory change is the UN1A2 Specification Package, per DOT 49 CFR 173.417(a)(6). To maintain continuing shipments of DOE materials currently transported in UN1A2 Specification Package after the existing authorization expires, a replacement Type A(F) material packaging design is under development by the Savannah River National Laboratory. This paper presents a summary of the prototype design effort and testing of the new Type A(F) Package development for the DOE. This paper discusses the progress made in the development of a Type A Fissile Packaging to replace the expiring 49 CFR UN1A2 Specification Fissile Package. The Specification Package was mostly a single-use waste disposal container. The design requirements and authorized radioactive material contents of the UN1A2 Specification Package were defined in 49 CFR. A UN1A2 Specification Package was authorized to ship up to 350 grams of U-235 in any enrichment and in any non-pyrophoric form. The design was specified as a 55-gallon 1A2 drum overpack with a body constructed from 18 gauge steel with a 16 gauge drum lid. Drum closure was specified as a standard 12-gauge ring closure. The inner product container size was not specified but was listed as any container that met Specification 7A requirements per 49 CFR 178.350. Specification 7A containers were required to withstand Type A packaging tests required by 49CFR173.465 with compliance demonstrated through testing, analysis or similarity to other containers. The maximum weight of the 7A product container, the radioactive content, and any internal packaging was limited to 200 lbs. The total gross weight for the UN1A2 Specification Package was limited to 350 lbs. No additional restrictions were applied. Authorization for use did not require the UN1A2 Specification Package to be tested to the Normal Conditions of Transport (NCT) and Hypothetical Accident Conditions (HAC) required for performance based, Type A(F) packages certified by the NRC or DOE. The Type A(F) Packaging design discussed in this paper is required to be in compliance with the regulatory safety requirements defined in Code of Federal Regulations (CFR) 10 CFR 71.41 through 71.47 and 10 CFR71.71. Sub-criticality of content must be maintained under the Hypothetical Accident Conditions specified under 10 CFR71.73. These federal regulations, and other applicable DOE Orders and Guides, govern design requirements for a Type A(F) package. Type A(F) packages with less than an A2 quantity of radioactive material are not required to have a leak testable boundary. With this exception a Type A(F) package design is subject to the same test requirements set forth for the design of a performance based Type B packaging.

36 MATERIALS SCIENCE↗

80 and 100 Meter Wind Energy Resource Potential for the United States (Poster)

Accurate information about the wind potential in each state is required for federal and state policy initiatives that will expand the use of wind energy in the United States. The National Renewable Energy Laboratory (NREL) and AWS Truewind have collaborated to produce the first comprehensive new state-level assessment of wind resource potential since 1993. The estimates are based onhigh-resolution maps of predicted mean annual wind speeds for the contiguous 48 states developed by AWS Truewind. These maps, at spatial resolution of 200 meters and heights of 60 to 100 meters, were created with a mesoscale-microscale modeling technique and adjusted to reduce errors through a bias-correction procedure involving data from more than 1,000 measurement masts. NREL used the capacityfactor maps to estimate the wind energy potential capacity in megawatts for each state by capacity factor ranges. The purpose of this presentation is to (1) inform state and federal policy makers, regulators, developers, and other stakeholders on the availability of the new wind potential information that may influence development, (2) inform the audience of how the new information was derived,and (3) educate the audience on how the information should be interpreted in developing state and federal policy initiatives.

17 WIND ENERGY↗

EIS No. 20100312 EIS Comanche Peak Nuclear Power Plant Units 3 and 4

In accordance with Section 309(a) of the Clean Air Act, EPA is required to make its comments on EISs issued by other Federal agencies public. Historically, EPA has met this mandate by publishing weekly notices of availability of EPA comments, which includes a brief summary of EPA's comment letters, in the Federal Register. Since February 2008, EPA has been including its comment letters on EISs on its Web site at: http://www.epa.gov/compliance/nepa/eisdata.html. Including the entire EIS comment letters on the Web site satisfies the Section 309(a) requirement to make EPA's comments on EISs available to the public. Accordingly, on March 31, 2010, EPA discontinued the publication of the notice of availability of EPA comments in the Federal Register. EIS No. 20100312, Draft EIS, NRC, TX, Comanche Peak Nuclear Power Plant Units 3 and 4, Application for Combined Licenses (COLs) for Construction Permits and Operating Licenses, (NUREG-1943), Hood and Somervell Counties, TX, Comment Period Ends: 10/26/2010.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Research Reactor Preparations for the Air Shipment of Highly Enriched Uranium from Romania

In June 2009 two air shipments transported both unirradiated (fresh) and irradiated (spent) Russian-origin highly enriched uranium (HEU) nuclear fuel from two research reactors in Romania to the Russian Federation for conversion to low enriched uranium. The Institute for Nuclear Research at Pitesti (SCN Pitesti) shipped 30.1 kg of HEU fresh fuel pellets to Dimitrovgrad, Russia and the Horia Hulubei National Institute of Physics and Nuclear Engineering (IFIN-HH) shipped 23.7 kilograms of HEU spent fuel assemblies from the VVR S research reactor at Magurele, Romania, to Chelyabinsk, Russia. Both HEU shipments were coordinated by the Russian Research Reactor Fuel Return Program (RRRFR) as part of the U.S. Department of Energy Global Threat Reduction Initiative (GTRI), were managed in Romania by the National Commission for Nuclear Activities Control (CNCAN), and were conducted in cooperation with the Russian Federation State Corporation Rosatom and the International Atomic Energy Agency. Both shipments were transported by truck to and from respective commercial airports in Romania and the Russian Federation and stored at secure nuclear facilities in Russia until the material is converted into low enriched uranium. These shipments resulted in Romania becoming the 3rd country under the RRRFR program and the 14th country under the GTRI program to remove all HEU. This paper describes the research reactor preparations and license approvals that were necessary to safely and securely complete these air shipments of nuclear fuel.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

AMS National Reachback Capability - New Tools for Helping Emergency Responders

The Remote Sensing Laboratory’s (RSL) Aerial Measuring System (AMS) is one of the emergency response assets belonging to the U.S. Department of Energy (DOE) National Nuclear Security Administration (NNSA). The AMS is used to detect, measure, and track radioactive material before and during emergencies to locate sources or determine contamination levels. Since September 11, 2001, increasing numbers of local, state, and federal entities have developed aerial radiation detection capabilities. NNSA has recognized a need by these entities for an AMS Reachback Center that would provide training and assistance on all aspects of AMS. The Center will assist local, state, and federal agencies in establishing the skills, resources, and training needed for a successful AMS regional operation. Beginning in January 2008, and continuing through April 2008, a pilot program was created in collaboration between NNSA and the U.S. Department of Homeland Security’s Domestic Nuclear Detection Office (DNDO). The purpose of this collaboration was to provide aerial radiological surveillance and equipment technique training to local law enforcement offices in four major U.S. cities: Chicago, Washington DC, New York, and Los Angeles. The Mobile Aerial Radiological Surveillance (MARS) training curriculum was jointly developed by NNSA and DNDO headquarters and NNSA support teams. A total of 44 students participated in the training events held during this period. The positive reaction to this program has led to the establishment of the RSL as the headquarters for the National Aerial Measuring System Reachback (NAMSR) Center. The NAMSR Center will provide an AMS Home Team stand-by duty team for local, state, and federal agencies to discuss, plan, and analyze available data for aerial responses. An additional role of the Center will be to serve as the source of subject matter experts (SME) for the training of newly established aerial radiological monitoring assets. The purpose of this paper is to review the history, success, and future plans of the National AMS Reachback Center.

61 RADIATION PROTECTION AND DOSIMETRY↗

ESPC ESA Webinar Series: ESPC ENABLE Contract Vehicle Overview

This webinar provides instructions and resources for financing distributed energy projects (e.g. on-site renewable energy, storage, and combined heat and power) using an energy savings performance contract (ESPC) energy sales agreement (ESA) through the U.S. Department of Energy's (DOE) ESPC ENABLE contract vehicle. The ESPC ENABLE contract vehicle is a streamlined procurement process that uses a standard investment grade audit tool and standard contract templates. Topics covered in the webinar include: An overview of the ESPC ENABLE contract vehicle; ESA-specific considerations for ENABLE contracts; and Case studies. This webinar also provides an overview of the resources available on the Federal Energy Management Program website, such as ESPC ENABLE templates. This webinar is the fourth of a series that provides information, best practices, and resources for implementing an ESPC ESA project. ESPC ESAs are a great option for federal sites that are motivated to reduce site costs, have no capital investment funding, and cannot use the U.S. Department of Defense 10 USC 2922a authority for long-term contracting.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

INTERFUEL: EPAct 2005 Section 701 Waiver and Compliance Process [Slides]

This presentation presents an overview of the coming changes to how federal agencies with motor vehicles and which are subject to requirements for alternative fuel use under Energy Policy Act of 2005 Section 701 will request waivers, if needed, from that requirement. The presentations provides an overview of the requirement, how those waivers have been requested in recent history, why the process is changing, and the implications of those changes for relevant federal agencies. The presentation is intended for delivery via WebEx at the June 10, 2020 meeting of the DOE-sponsored INTERFUEL working group.

99 GENERAL AND MISCELLANEOUS↗

Policy Overview and Options for Maximizing the Role of Policy in Geothermal Electricity Development

Geothermal electricity production capacity has grown over time because of multiple factors, including its renewable, baseload, and domestic attributes; volatile and high prices for competing technologies; and policy intervention. Overarching federal policies, namely the Public Utilities Regulatory Policies Act (PURPA), provided certainty to project investors in the 1980s, leading to a boom in geothermal development. In addition to market expansion through PURPA, research and development policies provided an investment of public dollars toward developing technologies and reducing costs over time to increase the market competitiveness of geothermal electricity. Together, these efforts are cited as the primary policy drivers for the currently installed capacity. Informing policy decisions depends on the combined impacts of policies at the federal and state level on geothermal development. Identifying high-impact suites of policies for different contexts, and the government levels best equipped to implement them, would provide a wealth of information to both policy makers and project developers.

15 GEOTHERMAL ENERGY↗

UESC Overview and FEMP Resources for Project Success

The first part of this webinar provides an introduction to utility energy service contracts (UESCs) and describes the features and benefits of utilizing UESCs to install energy conservation measures at federal sites. The second part introduces the newly launched UESC On-Demand Training Series and other recently published FEMP resources. The modular series of short webinars has been designed to provide in-depth understanding of UESCs and is a great resource for federal agencies and utilities interested in UESC projects.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Correction to: Capture and Emission of Charge Carriers by Quantum Well

The last paragraph of the article should read “This work is performed with financial support of the Ministry of Education and Science of the Russian Federation within the framework of the federal target program “Research and development in priority areas of development of the scientific and technological complex of Russia for 2014-2020”, Unique identifier of the work (project) RFMEFI57717X0266.”.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Superconducting qubits in Russia

Results of the two-year research in the framework of the first Russian project for superconducting qubits, supported by the Foundation for Advanced Research, Federal Agency on Atomic Energy, and the Ministry of Science and Higher Education of the Russian Federation, are presented. The main result is the demonstration of single-qubit quantum gate operations using several types of superconducting qubits with a coherence time of more than 1 μs. The project develops this breakthrough scientific and technical line of research in Russia, in fact, from scratch. The fabrication technology of submicron-scale superconducting tunnel junctions and various coherent quantum structures (qubits) based on them has been worked out; preparation and control of quantum states for such qubits, quantum tomography of prepared states, and realisation and precision control of single-qubit quantum gate operations are demonstrated. (paper)

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗