Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “upgrading”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,369 records · Page 76

Soil Sampling Results for Closure of a Portion of Solid Waste Management Unit #16

The U.S. Department of Energy/National Nuclear Security Administration (DOE/ NNSA) and National Technology & Engineering Solutions of Sandia, LLC (NTESS), the management and operating contractor for Sandia National Laboratories/California (SNL/CA), has prepared this soil sampling results report for closure of a portion of Solid Waste Management Unit (SWMU) #16. The entire network of SNL/CA sanitary sewer lines, including building laterals, was identified as SWMU #16 under a Resource Conservation and Recovery Act (RCRA) Facility Assessment conducted for SNL/CA in April 1991 (DOE 1992). Along with the previous SWMU #16 investigation results (SNL/CA 2019), the results of this investigation are intended to support closure decisions by the San Francisco Bay Regional Water Quality Control Board (RWQCB), as discussed below. SNL/CA personnel completed upgrading its sanitary sewer discharge network in 2019. These upgrades included installing new sections of underground lines and decommissioning certain sections of the old piping system by capping in place. To date, several sections of the sewer line have been abandoned-in-place by capping as new sewer lines were installed or flow was rerouted to other existing lines. To formally close these abandoned sections of the sewer line, the RWQCB required that SNL/CA personnel collect soil samples to be analyzed for contaminants potentially released from the sewer lines. SNL/CA personnel hired Weiss Associates (Weiss) of Emeryville, California to prepare a sampling and analysis plan, implement the sampling plan and report the results of the investigation under Purchase Order #2166257. The Sampling and Analysis Plan for Partial Closure of Solid Waste Management Unit #16 (SAP) was submitted to the RWQCB on August 14, 2020 by Weiss on behalf of SNL/CA. The RWQCB approved the SAP on September 30, 2020 after Weiss updated the method detection limit and reporting limits for total polychlorinated biphenyls (PCBs) and individual aroclors. Soil sampling was conducted in accordance with the SAP except that fewer locations were sampled due to site constraints, as discussed below. This report presents the results of the sampling effort and documents all associated field activities including borehole clearing, soil sample collection, storage and transportation to the analytical laboratories, borehole backfilling and surface restoration, and storage of investigation-derived waste (IDW) for future profiling and disposal by SNL/CA waste management personnel.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Smart Labs Final Report Summer 2021

The Smart Labs Project at Los Alamos National Laboratory (LANL) is an initiative derived from The University of California, Irvine and is part of the Department of Energy’s (DOE) Better Buildings Challenge. These carbon abatement strategies aim to reduce energy consumption of laboratories while also maintaining health and safety requirements. Smart Labs designs incorporate seven key principles which are: digital control systems, demand-based ventilation, low power-density demand-based lighting, exhaust fan discharge velocity optimization, pressure drop optimization, fume hood flow optimization, and commissioning with automated cross-platform fault detection. As the ALDCP Smart Labs team for the summer of 2021, the scope of the project is to determine the energy savings within building 03-1698 (Material Science Laboratory - MSL). Over the past couple of years, the Sustainability Group has been adding Smart Labs upgrades into the MSL building and the summer team would like to understand the impact made for the overall energy consumption/demand and safety for the building, determine the overall return on investment (ROI), and recommend more Smart Labs upgrades that can be added to the MSL building. The goal is to enable the UI FOD (Utilities and Infrastructure Facility Operation Division) to promote more Smart Labs projects in the future and further the reputation LANL and DOE facilities have of being leading examples of developers of high performing buildings.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Energy Savings Performance Contracting for Small Projects

Energy Savings Performance Contracting (ESPC) is a budget-neutral approach to make building improvements that reduce energy and water use and increase operational efficiency. ESPC can help public-sector planners use tomorrow’s energy savings to fund today's facility and infrastructure upgrades. This resource highlights strategies and case studies for implementing ESPC in smaller towns, rural counties, and small school districts to complete energy upgrades and maximize energy and cost savings.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Sandia National Laboratories FY21 Progress Report

The Energetic Neutrons campaign led by Sandia National Laboratories (SNL) had a successful year testing electronic devices and printed circuit boards (PCBs) under 14 MeV neutron irradiation at OMEGA. During FY21 Sandia’s Neutron Effects Diagnostics (NEDs) and data acquisition systems were upgraded to test novel commercial off-the-shelf and Sandia-fabricated electronic components that support SNL’s National Security mission. The upgrades to the Sandia platform consisted of new cable chains, sample mount fixtures and a new fiber optics platform for testing optoelectronic devices.

42 ENGINEERING↗

Online Optimization of NSLS-II Dynamic Aperture and Injection Transient (Facility Improvement Project)

The Facility Improvement Project (FIP) “Methods of online optimization of NSLS-II storage ring concurrent with user operations” proposed and approved in 2018 is now complete. The first goal is the online optimization of nonlinear beam dynamics to increase the beam lifetime and injection efficiency. We have developed a model-independent optimization technique using advanced algorithms. Using this technique, we increased the NSLS-II dynamic aperture by 20% and reduced the amplitude-dependent tune shift by a factor of two. We applied sextupole optimization to the new high-chromaticity lattice, which has been developed to improve the beam stability and to increase the single-bunch beam intensity. We were able to double the injection efficiency and exceed 90%. The second goal of this project is to provide the top-off injection with minimized perturbations of the beamline user operations. To achieve the transparent injection, we optimize the matching of four storage ring injection kickers reducing the perturbation of the stored beam orbit. The first application of the online optimization resulted in a reduction of the amplitude of residual beam oscillation by a factor of six, from 1300 μm down to 200 μm. Further improvement was limited by the timing jitter of the trigger boards. Then, we replaced all trigger boards with a new design and reduced the timing jitter by a factor of five, from 5 ns down to 1 ns. This upgrade resulted in the injection transient reduction from 200 μm to 120 μm. To optimize the full set of kicker parameters, including the trigger timing, amplitude, and pulse width, we upgraded all kicker power supplies with the capability of tunable waveform width. As a result, we have reduced the injection transient to the limit of 60 μm.

43 PARTICLE ACCELERATORS↗

CO 2 to Fuels Through Novel Electrochemical Catalysis (Final Report)

Electrochemical upgrading of CO 2 into hydrocarbon fuels via CO 2 –H 2 O co-electrolysis using solid oxide electrolysis cells (SOECs) presents an encouraging approach to cost-effective storage of renewable power. In this study, we harness the unique property of protonic ceramic electrolysis cells (PCEC) and demonstrate direct electro-catalytic production of CH 4 from CO 2 –H 2 O in a unit-cell stack configuration. The unit-cell stack was developed to evaluate the scalability and the applicability of PCECs from a broader system-level viewpoint. Tradeoffs between operating conditions and performance metrics were explored and thoroughly characterized. An exceptional CH 4 -yield ratio of 34.6% from only CO 2 –H 2 O reactants was achieved under an electrolysis current of 1 A cm –2 at 450 °C. With exhaust-H 2 recycle, this value was boosted to greater than 70%. In addition, the electrochemical co-conversion of CO 2 –H 2 O offers a higher CH 4 -yield ratio compared to traditional thermo-catalytic conversion of CO 2 –H 2 under certain operating conditions, indicating possible electrochemical promotion of catalytic CO 2 methanation. The demonstrated good performance is a promising result for further scale-up and for the practical utilization of electrochemical CO 2 upgrade using PCECs. Techno-economic analyses reveal operating conditions that yield cost-competitive levelized cost of fuel production.

01 COAL, LIGNITE, AND PEAT↗

Fast Particle-Wave Interactions and Alfvén Eigenmodes in JET Tokamak Plasmas

This document serves as the closeout report of DOE Grant Award No. DE-FG02-99ER54563 with project period 1 April 2015 through 31 March 2020. The project comprised the international collaboration between MIT and EU scientists on the JET facility to improve our understanding of the physics of energetic particle-wave interactions by measuring the damping rates of stable Alfvén Eigenmodes (AEs) and unstable energetic particle driven modes. More specifically, this project involved the continued participation of MIT, the Culham Centre for Fusion Energy, the Swiss Plasma Center, and theorists from various European laboratories and from UC Irvine. Past contributions from the University of São Paulo are gratefully acknowledged. The Alfvén Eigenmode Active Diagnostic (AEAD) on JET discharges was successfully upgraded in this period and has extracted physically useful information, in primarily deuterium plasma discharges. It is expected that such experiments would be continued during the DT campaign in CY 2021 to assess the damping rates of similar modes in the presence of alpha particles, a product of fusing burning plasma. Only JET would carry out such experiments in the near term in the world. It is important to note that this collaboration was continued under DOE Grant Award No. DE-SC0014264 from 1 April 2020 through the present. In this grant period, the AEAD was upgraded with a set of individual amplifiers for each of a set of six antennas in two toroidally opposite locations. These new amplifiers allowed targeted selection of the antennas’ toroidal spectrum for AEs of interest with toroidal mode number | n | ≤ 20. The resonant detection and measurement of the damping rates of AEs was obtained from magnetic probes that could be compared with theory and simulations. This is a key topic of investigation for ITER and all other next-step fusion experiments, where such modes will interact with energetic particles produced by fusion reactions (alpha particles), Neutral Beam Injection (NBI) and Ion Cyclotron Resonance Heating (ICRH). The majority of the observations during this period were of Toroidal Alfvén Eigenmodes (TAEs) as these are most commonly observed on JET; a number of measurements were made during dedicated TAE experiments. However, a new set of lower frequency band filters were procured with the goal of studying Geodesic Acoustic Modes (GAMs), Beta (Acoustic) AEs (BAE/BAAEs), and Reverse Shear AEs (RSAEs), also predicted by theory. Commissioning and optimizations were successfully completed in this period, and the diagnostic has been in operation during the more recent JET campaigns. Initial results have been obtained in dedicated TAE experiments and successfully compared to drift-kinetic theory. A wide range of theoretical studies have been undertaken in support of the upcoming JET campaigns experiments. To supplement the ongoing use of ideal MHD codes, such as MISHKA during the studies of TAEs, gyrokinetic simulations of low frequency AEs were performed in collaboration with UC Irvine. The Gyrokinetic Toroidal Code (GTC) was used to determine the structure, frequencies and stability of AEs in JET plasmas. Thus, a solid scientific foundation has been laid for future DT campaigns in JET in the 2021 operation period when the damping rates of relevant modes in the presence of alpha particles could be assessed.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Determination of Phenolic Groups in Bio-Oils Using Revised Folin-Ciocalteu Methods: Single Cuvette and Plate Reader. Laboratory Analytical Procedure (LAP), Issue Date: May 12, 2022

Phenol components are ubiquitous in wood-derived bio-oils and biocrudes. Their reaction with other functional groups (e.g., aldehydes) may contribute to the formation of carbonaceous species and the expected thermal instability of pyrolysis oils. During hydrotreating, phenols can be recalcitrant species, requiring higher reaction temperatures than other oxygen-containing functional groups. Phenols are also present in upgraded products and have been shown to lead to catalyst deactivation during hydrotreating. They also are the first oxygenated functional group to re-appear in the upgraded product, signaling catalyst deactivation. This procedure covers the determination of phenolic compounds in fast pyrolysis oils. This Laboratory Analytical Procedure (LAP) includes two methods, the first allowing for shorter analysis time at increased reaction temperature, while the second employs a longer analysis time but at room temperature. Additionally, the use of both a single cuvette and of a plate reader are also presented.

09 BIOMASS FUELS↗

Snowmass Neutrino Frontier: DUNE Physics Summary

The Deep Underground Neutrino Experiment (DUNE) is a next-generation long-baseline neutrino oscillation experiment with a primary physics goal of observing neutrino and antineutrino oscillation patterns to precisely measure the parameters governing long-baseline neutrino oscillation in a single experiment, and to test the three-flavor paradigm. DUNE's design has been developed by a large, international collaboration of scientists and engineers to have unique capability to measure neutrino oscillation as a function of energy in a broadband beam, to resolve degeneracy among oscillation parameters, and to control systematic uncertainty using the exquisite imaging capability of massive LArTPC far detector modules and an argon-based near detector. DUNE's neutrino oscillation measurements will unambiguously resolve the neutrino mass ordering and provide the sensitivity to discover CP violation in neutrinos for a wide range of possible values of $\delta_{CP}$. DUNE is also uniquely sensitive to electron neutrinos from a galactic supernova burst, and to a broad range of physics beyond the Standard Model (BSM), including nucleon decays. DUNE is anticipated to begin collecting physics data with Phase I, an initial experiment configuration consisting of two far detector modules and a minimal suite of near detector components, with a 1.2 MW proton beam. To realize its extensive, world-leading physics potential requires the full scope of DUNE be completed in Phase II. The three Phase II upgrades are all necessary to achieve DUNE's physics goals: (1) addition of far detector modules three and four for a total FD fiducial mass of at least 40 kt, (2) upgrade of the proton beam power from 1.2 MW to 2.4 MW, and (3) replacement of the near detector's temporary muon spectrometer with a magnetized, high-pressure gaseous argon TPC and calorimeter.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Advanced Hydropower and PSH Capacity Expansion Modeling (Final Report on HydroWIRES D1 Improvements to Capacity Expansion Modeling)

Hydropower and pumped-storage hydropower (PSH) have played a key role in providing flexible, low-carbon electricity to the U.S. electricity system for over a century. As variable generation (VG) deployment increases the demand for flexible, dispatchable generation, it is important to use all available methods for understanding how hydropower and PSH interfaces with VG in a future low-carbon grid. Capacity expansion models (CEMs) of electricity systems are often used to study future electricity scenarios, but these tools often have difficulty representing site- and technology-details of hydropower and PSH due to limited spatial, temporal, or process resolution. This report demonstrates a set of model advancements to improve hydropower and PSH representations in CEMs and other models that consider hydropower and PSH's role in electricity systems. Model advancements include new data integration to define closed-loop PSH resource availability and cost, along with site-level parameterizations of existing PSH capacity and energy storage specifications. Shifting energy across seasons for both hydropower and PSH is explored to demonstrate the potential value of long-duration storage. New representations of hydropower upgrades offer opportunities to increase dispatchability, add pumps, or independently add capacity or energy depending on what is most valuable. New model structures and data are demonstrated individually and in combination to observe their impact on model results and provide initial insights into what is most important for analysts, electricity system planners, and hydropower decision-makers to consider when assessing future roles of hydropower. Improving flexibility of existing hydropower assets has the potential to reduce CO 2 emissions through complementing VG technologies and/or improve electricity system economics by reducing the need to deploy higher-cost systems. Large-scale energy storage is also shown to provide opportunities for balancing seasonal differences in VG, particularly solar photovoltaics (PV). Initial analysis with a new closed-loop PSH resource and cost dataset also demonstrate the potential for new PSH deployment to offer new grid flexibility opportunities. Future analysis and modeling of hydropower's role in the U.S. and other electricity systems could include methodological improvements based on those discussed here along with sensitivity analysis to better represent current and future potential hydropower and PSH flexibility. Improvements to geospatial and site-level data can further improve the understanding of how hydropower and PSH can be upgraded and operated in response to future electricity system needs. This work lays the groundwork to use advanced planning models to explore the range of roles hydropower and PSH can play in the grid of the future.

13 HYDRO ENERGY↗

Evaluating the Grid Impact of Oregon Offshore Wind [Slides]

This analysis used high-resolution offshore wind data and a detailed production cost model (PCM) of the Western Interconnection to explore the value and operational impact of integrating offshore wind along Oregon's coastline. Leveraging local technical stakeholder expertise and input, we determined a set of scenarios to explore. These scenarios vary both offshore wind capacities and the Western Interconnection generation and transmission infrastructure. From the scenario modeling and analysis, we identified the following key findings. In addition, we simulated a subset of the scenarios for a range of historical weather years (2007-2013), to understand the robustness of our findings to different weather conditions. Trans-coastal transmission constraints and congestion are the key drivers to the curtailment of Oregon offshore wind. Once power can be delivered into the Willamette Valley, there are few system constraints that lead to a significant curtailment of offshore wind off the coast of Oregon. Approximately 2.6 GW of installed offshore wind capacity can be integrated into Oregon's power system without major upgrades to trans-coastal transmission while avoiding significant curtailment. The system value provided by offshore wind ranges between $\$65$ /MWh and $\$85$ /MWh across the various scenarios considered. Offshore wind heavily influences the flow of the cross Cascade transmission. Across all scenarios, we found a robust relationship of approximately 500-550 MW decrease in the hourly flow of the cross Cascade transmission for every 1,000 MW of hourly offshore wind generation. However, we also found there was not a strong relationship between the highest cross-Cascade transmission flow hours and high offshore wind generation, limiting the extent to which offshore wind can be considered a non-wires alternative to cross cascade transmission. Depending on the meteorological year, 880-1,580 MW and 1,650-3,100 MW can be counted on to serve coastal loads with 2.6 GW and 5 GW of offshore wind capacity, respectively. Offshore wind allows for more optimal daily and hourly scheduling of hydropower, while still complying with various technical and regulatory constraints on the water resource. Oregon offshore wind has the potential to contribute to the evening net load peak in California (i.e., mitigate duck curve challenges), however transmission congestion between California and Oregon limits this contribution. Co-located storage at the point of interconnection for offshore wind reduces curtailment when trans-coastal transmission is not upgraded, providing a non-wires alternative to increase offshore wind capacity beyond 2.6 GW.

17 WIND ENERGY↗

Hot Cell Manipulator Inventory and Recommendations

During the spring of 2021 repeated manipulator failures in the hot cells of Building 7920 contributed to significant delays in Californium-252 ( 252 Cf) mission execution and loss of rapidly decaying 252Cf product. At the same time, funds became available in the 252 Cf program budget for equipment purchases and upgrades. Accordingly, the 252 Cf program manager requested (1) an inventory of the manipulators used in six Oak Ridge National Laboratory (ORNL) buildings (7920, 7930, 4501, 3047, 3025E, and 3525), (2) an inventory of spare manipulators, and (3) a recommendation on whether to invest 252 Cf funds to purchase additional or upgraded manipulators.

07 ISOTOPE AND RADIATION SOURCES↗

RF Accelerator Technology R&D: Report of AF7-rf Topical Group to Snowmass 2021

Accelerator radio frequency (RF) technology has been and remains critical for modern high energy physics (HEP) experiments based on particle accelerators. Tremendous progress in advancing this technology has been achieved over the past decade in several areas highlighted in this report. These achievements and new results expected from continued R&D efforts could pave the way for upgrades of existing facilities, improvements to accelerators already under construction (e.g., PIP-II), well-developed proposals (e.g., ILC, CLIC), and/or enable concepts under development, such as FCC-ee, CEPC, C 3 , HELEN, multi-MW Fermilab Proton Intensity Upgrade, future Muon Colloder, etc. Advances in RF technology have impact beyond HEP on accelerators built for nuclear physics, basic energy sciences, and other areas. Recent examples of such accelerators are European XFEL, LCLS-II and LCLS-II-HE, SHINE, SNS, ESS, FRIB, and EIC. To support and enable new accelerator-based applications and even make some of them feasible, we must continue addressing their challenges via a comprehensive RF R&D program that would advance the existing RF technologies and explore the nascent ones.

43 PARTICLE ACCELERATORS↗

An Architectural Survey of the REECo Maintenance Compound, Area 6, Nevada National Security Site, Nye County, Nevada

The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO) plans to install a 26.45-mile-long 138-kilovolt (kV) transmission line on the Nevada National Security Site (NNSS) in Nye County, Nevada. This new transmission line will upgrade the electrical transmission system and provide reliable power between Mercury Switching Station in Area 23 and the U1a Facility in Area 1. The proposed upgrade to the power transmission system constitutes an undertaking subject to review under Section 106 of the National Historic Preservation Act (NHPA) (54 United States Code [USC] § 306101) and its implementing regulations, 36 Code of Federal Regulations (CFR) Part 800. A portion of this new transmission line will cross the western perimeter of the Reynolds Electrical and Engineering Company (REECo) Maintenance Compound located in Area 6 of the NNSS. This compound with its trade shops, storage sheds, and yards served as a general construction facility that supported nuclear testing activities on the NNSS from 1967 to 1992. Although three architectural resources in the compound have previously been recorded and evaluated for the National Register of Historic Places (NRHP), other resources within it have not, nor has the compound been recorded and evaluated as a potential district. The State Historic Preservation Officer (SHPO) concurred with NNSA/NFO’s determination that the unevaluated REECo Maintenance Compound will be adversely affected by the proposed undertaking (Reed 2021). The NNSA/NFO, in consultation with the SHPO, then developed the Memorandum of Agreement DE-GM58-22NA25553 between the U.S. Department of Energy and the Nevada State Historic Preservation Officer Regarding Installation of a 138-kilovolt Transmission Line from the Mercury Switching Station to the U1a Facility and the Removal of the Historic 138-kilovolt Transmission Line from the Mercury Switching Station to the U1a Facility in Areas 1, 3, 5, 6, and 23 of the Nevada National Security Site, Nye County, hereafter referred to as the MOA. This architectural survey report was prepared in accordance with MOA Stipulation III.B. It describes the origins, history, layout, and functions of the REECo Maintenance Compound during the Cold War and identifies contributing and noncontributing resources. The report defines a district boundary based on archival research and the field survey and concludes with an appendix that presents digital color images of the compound with descriptions and a map key showing image viewpoints and directions. Although none of the architectural resources are recommended individually eligible, the district evaluation concludes the REECo Maintenance Compound is eligible as a historic district for listing in the NRHP under the Secretary of the Interior’s Significance Criteria A and C at the local level. The historic district retains all seven aspects of integrity and conveys its significance under the abovementioned criteria.

138 kV↗

Generator Interconnection Cost Analysis in the Midcontinent Independent System Operator (MISO) territory

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data from interconnection studies for the Midcontinent Independent System Operator (MISO), representing nearly 50% of all projects requesting interconnection from 2010 to 2020. Project-level cost summary data are available for download on this page. We find: -Average interconnection costs have grown as the number of interconnection requests have escalated -Projects that have completed all required interconnection studies have the lowest cost compared to applicants still actively working through the interconnection process or those that have withdrawn. -Broader network upgrade costs are the primary driver of recent cost increase. -Potential interconnection costs for wind, storage, and solar are larger than for natural gas -Larger generators have greater interconnection costs in absolute terms, but economies of scale exist on a per kW basis. -Interconnection costs vary by location Berkeley Lab will publish a series of short analytical papers of generator interconnection costs to the transmission system for MISO, PJM, SPP, ISO-NE and NYISO, which you can find at https://emp.lbl.gov/interconnection_costs.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Large-scale Hydrogen Storage – Risk Assessment Seattle City Light and Port of Seattle [Abstract]

This CRADA presents the strategy that Pacific Northwest National Laboratory (PNNL) and Sandia National Laboratories (SNL) will take to support Seattle City Light (SCL), and the Port of Seattle (Port) in performing a risk assessment of large-scale hydrogen storage. Risk assessment is often used to ensure that adequate measures are taken to protect workers and the public, the environment, infrastructure, and assets. A detailed risk assessment can also be used to direct funding and upgrades, to specific components and sub-systems in order to mitigate risks to the larger system. In this way risk assessments are often employed as a part of a larger risk management strategy, with the goal of minimizing the occurrence of hazards and to identify means to limit their consequences. Risk assessment is often used to engage and inform regulators, and to communicate how specific regulations are being met. However, it is important to note that the proposed work is not intended for SCL and the Port to use in order to gain regulatory acceptance for their proposed activities. The work performed as a part of this effort will be a preliminary risk assessment for early-stage component and system designs and should be considered research and development (R&D). As such, the proposed work will be performed to a quality level and design maturity consistent with R&D and is not considered appropriate for final safety analysis and regulatory compliance purposes. Previous and on-going work at SCL and the Port demonstrated the utility of deploying hydrogen systems at the Port. The deployment of hydrogen at the Port is a part of a larger vision of using hydrogen to address a range of issues for SCL and the Port. These include large-scale fueling of MD/HD vehicles, cargo-handling equipment (CHE), and harbor vessels to reduce emissions; support of adjacent LD vehicles; support of critical port operations during extreme events (i.e., resiliency); deferral of more capital- and time-intensive electrical distribution system upgrades while still supporting evolving port operations and decarbonization efforts; facilitating electrification by establishing energy storage as a grid resource, starting at strategic port locations; creation of a flexible market resource that can be used by SCL to generate revenue via arbitrage; support of planned future maritime operations that involve heavy use of hydrogen for ocean-going vessels; and future end-use applications involving natural gas pipeline hydrogen injection. Ultimately, the success of these activities is underpinned by the deployed storage capacity. Large-scale deployment of hydrogen systems will require hydrogen storage at a scale that has not been demonstrated. In addition, the ideal location for such multi-use systems is near the end user which will often necessitate deploying into urban and/or industrial areas. A detailed risk assessment using the Port as a test case is necessary to ensure the deployment of large-scale hydrogen is successful. Many technologies have been proposed for hydrogen storage; however, these technologies need to be analyzed as they apply to an actual site. The physical infrastructure and hydrogen use cases for the Port will be analyzed, and a risk assessment for compressed hydrogen, liquified hydrogen, and Liquid Organic Hydrogen Carrier (LOHC) storage will be performed. These risk assessments will be useful for understanding how each of these technologies would perform in terms of facility and public safety. The operating states of the proposed hydrogen systems at the Port will be analyzed and incorporated into the storage risk assessment. Scalability will also be analyzed to understand how future port uses would affect the overall risk assessment. Finally, using the risk assessment as a tool to inform engagement and to gain stakeholder acceptance will be explored.

08 HYDROGEN↗

Interconnection Cost Analysis in the PJM Territory

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data from interconnection studies for the PJM Territory, representing nearly 86% of all new unique generators requesting interconnection from 2000 to 2022. Project-level cost summary data are available for download on this page. We find: -Average interconnection costs have grown as the number of interconnection requests have escalated -Projects that have completed all required interconnection studies have the lowest cost compared to applicants still actively working through the interconnection process or those that have withdrawn. -Broader network upgrade costs are the primary driver of recent cost increase. -Potential interconnection costs for wind, storage, and solar are larger than for natural gas -Larger generators have greater interconnection costs in absolute terms, but economies of scale exist on a per kW basis. -Interconnection costs vary by location Berkeley Lab will publish a series of short analytical papers of generator interconnection costs to the transmission system for MISO, PJM, SPP, ISO-NE and NYISO, which you can find at https://emp.lbl.gov/interconnection_costs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Final Report on the Phase II Physics Proposal for T-1063: The Accelerator Neutrino Neutron Interaction Experiment (ANNIE)

The goal of ANNIE is to make the first detailed measurement of the number of neutrons produced by neutrinos interacting with nuclei. This measurement is important for understanding the results of previous and planned neutrino experiments, as neutrons carry away energy from the neutrino interactions that must be accounted for in determining the energy and neutrino type. This effort is also focused on using a new photodetector technology and key target material enhancements to enable advanced water-based neutrino detectors. The ANNIE detector has been installed in the Booster Neutrino Beam at Fermilab, which provides a pulsed source of neutrinos in the energy range of 300-1200 MeV, which is relevant for the next generation of neutrino experiments. In 2017-2018 measurements of the neutron background in this beam were made with a partially-instrumented ANNIE detector. These measurements guided our design of the upgraded detector now built. The upgrade has been realized by adding Large Area Picosecond Photodetectors (LAPPDs) for the first time, more conventional photomultiplier tubes (PMTs), as well as adding electronics channels to the existing data acquisition system.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗