Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “test assembly”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,369 records · Page 76

Fuel Cell Model Validation with Power Module Test Data

The AES Modular Power Systems (AMPS) Fuel Cell team at the NASA Glenn Research Center (GRC) has created a Microsoft Excel model of a regenerative fuel cell (RFC) system for potential lunar and Martian applications. Due to some limitations of this model, including the ability to predict transient effects in the thermal and fluidic performance of the system, a system-level transient thermal/fluids model was desired. GT-SUITE is a transient multi-physics simulation tool that is popular in the automotive industry and has a built-in template for proton exchange membrane (PEM) fuel cells. However, terrestrial fuel cells used in the automotive industry vary significantly from aerospace fuel cells. A validation effort was undertaken to compare GT SUITE model results to actual data collected during the 2015 AMPS (Advanced Exploration Systems (AES) Modular Power Systems) Power Module Demonstration in which the AMPS team used a PEM fuel cell system to power a 478 kilogram rover assembly at the Dunes test site located at GRC. The purpose of the model was to evaluate the efficacy of using GT SUITE to model a non-flow through PEM fuel cell system. The validation effort examined electrochemical performance including fuel cell stack voltage and power supplied, the thermal performance of the stack namely stack temperature and heat rejection rates, and the fluidic performance of the system including pressures, reactant consumption, and water production rates.

Model Validation↗

Preliminary Feasibility Testing of the BRIC Brine Water Recovery Concept

The Brine Residual In-Containment (BRIC) concept is being developed as a new technology to recover water from spacecraft wastewater brines. Such capability is considered critical to closing the water loop and achieving a sustained human presence in space. The intention of the BRIC concept is to increase the robustness and efficiency of the dewatering process by performing drying inside the container used for the final disposal of the residual brine solid. Recent efforts in the development of BRIC have focused on preliminary feasibility testing using a laboratory- assembled pre-prototype unit. Observations of the drying behavior of actual brine solutions processed under BRIC-like conditions has been of particular interest. To date, experiments conducted with three types of analogue spacecraft wastewater brines have confirmed the basic premise behind the proposed application of in-place drying. Specifically, the dried residual mass from these solutions have tended to exhibit characteristics of adhesion and flow that are expected to continue to challenge process stream management designs typically used in spacecraft systems. Yet, these same characteristics may favor the development of capillary- and surface-tension-based approaches currently envisioned as part of an ultimate microgravity-compatible BRIC design. In addition, preliminary feasibility testing of the BRIC pre-prototype confirmed that high rates of water recovery, up to 98% of the available brine water, may be possible while still removing the majority of the brine contaminants from the influent brine stream. These and other early observations from testing are reported.

Callahan, Michael R.↗

Preliminary Feasibility Testing of the BRIC Brine Water Recovery Concept

The Brine Residual In-Containment (BRIC) concept was developed as a new technology to recover water from spacecraft wastewater brines. Such capability is considered critical to closing the water loop and achieving a sustained human presence in space. The intention of the BRIC concept is to increase the robustness and efficiency of the dewatering process by performing drying inside the container used for the final disposal of the residual brine solid. Recent efforts in the development of BRIC have focused on preliminary feasibility testing using a laboratory- assembled pre-prototype unit. Observations of the drying behavior of actual brine solutions processed under BRIC-like conditions has been of particular interest. To date, experiments conducted with three types of analogue spacecraft wastewater brines have confirmed the basic premise behind the proposed application of in-place drying for these solutions. Specifically, the dried residual mass from these solutions have tended to exhibit characteristics of adhesion and flow that are expected to continue to challenge process stream management in spacecraft brine dewatering system designs. Yet, these same characteristics may favor the development of capillary- and surface-tension-based approaches envisioned as part of an ultimate microgravity-compatible BRIC design. In addition, preliminary feasibility testing of the BRIC pre-prototype confirmed that high rates of water recovery, up to 98% of the available brine water, may be possible while still removing the majority of the brine contaminants from the influent brine stream. These and other observations from testing are reported.

Callahan, Michael R.↗

Evaluation of Margins of Safety in Brazed Joints

One of the essential steps in assuring reliable performance of high cost critical brazed structures is the assessment of the Margin of Safety (MS) of the brazed joints. In many cases the experimental determination of the failure loads by destructive testing of the brazed assembly is not practical and cost prohibitive. In such cases the evaluation of the MS is performed analytically by comparing the maximum design loads with the allowable ones and incorporating various safety or knock down factors imposed by the customer. Unfortunately, an industry standard methodology for the design and analysis of brazed joints has not been developed. This paper provides an example of an approach that was used to analyze an AlBeMet 162 (38%Be-62%Al) structure brazed with the AWS BAlSi-4 (Al-12%Si) filler metal. A practical and conservative interaction equation combining shear and tensile allowables was developed and validated to evaluate an acceptable (safe) combination of tensile and shear stresses acting in the brazed joint. These allowables are obtained from testing of standard tensile and lap shear brazed specimens. The proposed equation enables the assessment of the load carrying capability of complex brazed joints subjected to multi-axial loading.

Flom, Yury↗

Benefits Of Automated Construction And Energy Efficiency Measures In Modular Homes

This article builds on and adds to a Buildings XV publication that introduced the Transformative Efficiency and Automation in Modular Homes (TEAMH) project. The TEAMH project sought to develop a scalable solution for producing modular homes with 20-50% energy savings and similar cost relative to site-fabricated single-family home construction. A key aspect of the project was assessing the potential for labor cost reductions through automation-assisted construction using light gauge steel (LGS). To quantify the advantages of this approach, side-by-side comparisons were made between traditional wood-framed construction and automation-assisted LGS construction. This demonstration involved constructing one wood-framed wall and several LGS test walls, accompanied by a time-and-motion study. The results indicated that automation assistance could decrease construction time and associated labor costs by as much as 46%. High-performance envelope technologies for exterior insulation and air sealing were evaluated to compare modular homes with site-built homes that meet the International Energy Conservation Code (IECC). A key technology considered was vacuum insulation panels (VIPs) with fiberglass cores. Guarded hot box testing of multiple full-scale wall assemblies containing different combinations of exterior continuous insulation systems containing phenolic foam and VIPs. Testing on various full-scale wall assemblies revealed that, with LGS construction, cavity insulation had minimal impact on exterior wall performance. Omitting cavity insulation can reduce labor and material costs while streamlining manufacturing, as its installation is labor-intensive and not easily automated due to the need for precise placement around wiring and other internal components. Guarded hot box tests of multiple LGS test walls with foam and VIP-based exterior insulation systems achieved R-values of up to 31 hr-ft2-°F/Btu. Finally, building energy modeling of multiple modular home designs indicated that the upgraded envelope assemblies can yield heating energy savings of up to 50% and cooling energy savings of up to 30% compared to IECC 2018 standards.

Shrestha, Som [ORNL] (ORCID:0000000183993797)↗

PYROLYTIC GRAPHITE ROCKET THRUST CHAMBER INVESTIGATION PROJECT. MONTHLY LETTER

This is the Monthly Letter Progress Report for the eighth month of a twelve month technical study directed toward the following objectives: A. Determining analytically and experimentally the feasibility and attractiveness of using free-standing pyrolytic graphite for a radiation cooled liquid rocket thrust chamber and exit nozzle for space application. B. Establishing through analysis and experimental demonstration, a set of design principles to facilitate the design of a reliable pyrolytic graphite thrust chamber assembly for a specific range of operating conditions. C. Demonstrate by means of test firings of complete thrust chamber assemblies, the validity of the design data and principles developed during the program. Preparations have been completed for test firing the two 100 lb. thrust Boron Pyralloy chambers at Marquardt during the first week in March 1962. These two chambers will first be static pressure checked with water to a pressure of 135 psig. The chambers will then be test fired with N204/N2H4-MMH propellants . Test samples of eleven different pyrolytic carbide and nitride materials have been ordered for high temperature oxidation tests and should be delivered by the end of March for evaluation in the plasma torch facility. The specific materials ordered in free- standing condition in thicknesses from 0.030 inch to 0.065 inch were as follows: (a) Pyrolytic graphite (on hand) (b) Pyrolytic graphite-boron alloy (on hand) (c) Pyrolytic graphite-tungsten alloy (d)Boron nitride (e) Titanium nitride (f) Silicon carbide (g) Titanium carbide (h) Zirconium carbide (i) Hafnium carbide (j) Niobium carbide (k) Tantalum carbide (l) High density (1 1-90) graphite (m) High density graphite (heat treated) These materials were ordered from Raytheon, HTM, and American Meta 1 Products . A summary of the available data on the oxidation rates of pyrolytic materials under slow air and rocket motor conditions is shown in Figure 1. High Temperature Materials, Inc. has been contacted relative to providing Pyrographite thrust chambers with extra-thick walls . They believe they can deliver chambers with substantially thicker walls than were possible a short time ago. Such a configuration, with acceptable residual stresses, would provide a longer firing life since it is ultimately limited by the oxidation rate of the chamber wall material. Stress and structural studies have continued. The analytical stress studies point out some of the problems associated with the experimental determination of the elastic constants of this highly anisotropic material. Further analysis may shed light on improved techniques for making these experimental determinations. The large potential weight saving available with the use of pyrolytic graphite as a thrust chamber wall material in a radiation cooled rocket motor has been calculated and is shown graphically in Figure 2. Figure A presents the program progress schedule and the actual expenditures as of 7 February 1962.

ROCKET ENGINE↗

Thermal Vacuum Test Performance of the Hubble Space Telescope (HST) Wide Field Camera 3 (WFC3) Variable Conductance Heat Pipe Assembly

The Variable Conductance Heat Pipe (VCHP) Assembly of the HST Wide Field Camera 3 was subjected to thermal vacuum (TN) environmental testing. The test program included both maximum and minimum environments as well as simulated on-orbit cycling. Elements of the VCHP assembly included a VCHP, an optical bench cold plate with an imbedded constant conductance heat pipe, and a VCHP reservoir radiator with a proportionally controlled heater. The purpose of the test was to characterize and demonstrate the assembly s ability to control the temperature of the cold plate, which provides a stable thermal environment for the instrument s optical bench. This paper discusses the VCHP Assembly control performance and control authority during the dynamic hot and cold 90-minute orbit cycling test phases.

Cleveland, Paul E.↗

Extreme Environments Solar Power Project For Use Near Jupiter

The Extreme Environment Solar Power (EESP) Project goal was to develop solar cell and solar array design concept technologies for space power applications in high radiation and low solar intensity, low temperature (LILT) environments. NASA missions focused on outer planets, such as Jupiter, are subjected to intense radiation while experiencing less than ten percent of the solar flux relative to a mission in the general vicinity of Earth. Under these conditions, present solar array technology is not as efficient in converting the sun’s energy, and the solar array performance degrades quickly due to the additional radiation exposure. The EESP Project objectives were accomplished through four competitively selected contracts. These contracts were awarded with a Base and two option periods of performance. The Base requirements included System Design and Component Test & Analysis with a duration of nine and one half (9.5) months. The Option I requirements involved the fabrication of test hardware that NASA would evaluate following its delivery, and this period of performance had a duration of thirteen (13) months. The Option II requirements involved the fabrication of a scalable system prototype that can be integrated into a system level application and be demonstrated in a relevant environment. Option II had a duration of fifteen (15) months. The Transformational Array (TA) is an array concept developed by JHU-APL with Deployable Space Systems (DSS), SolAero Technologies and NewForge Technologies that proceeded through all three contract periods. The TA combines the DSS Roll Out Solar Array (ROSA) with Flexible Array Concentrator Technology (FACT) and SolAero’s Inverted Metamorphic Multijunction (IMM) solar cells for operation in the EESP Project environment. To achieve the EESP Project goals, the JHU-APL team conducted several investigations to improve performance of the solar cells and increase their efficiency, reduce outgassing contamination of the concentrators from the solar cell assembly adhesives, and to test the robustness of a sample blanket during deployment and retraction. Additionally, the team performed vibration, thermal cycling, and performance tests at a Standard Power Module (SPM) level. At the end of Option II, the JHU-APL team achieved the following performance metrics: • 39% beginning of life (BOL) cell efficiency at 5 AU and -125 C • 29% end of life (EOL) efficiency at the blanket level at 50 W/m2, -125 C and 4x1015 1 MeV e/cm2 • Increased specific power to 8 W/kg at EOL for the entire array including structure, deployment, and pointing mechanisms • Demonstrated the ability to survive numerous deploy-retract cycles without degradation • Reached a current System-Level Technology Readiness Level, TRL5 This presentation will describe the Transformational Array and component technologies and will discuss future potential uses for the system.

Anna Maria Pal↗

Metallographic Preparation of Space Shuttle Reaction Control System Thruster Electron Beam Welds for Electron Backscatter Diffraction

A Space Shuttle Reaction Control System (RCS) thruster failed during a firing test at the NASA White Sands Test Facility (WSTF), Las Cruces, New Mexico. The firing test was being conducted to investigate a previous electrical malfunction. A number of cracks were found associated with the fuel closure plate/injector assembly (Fig 1). The firing test failure generated a flight constraint to the launch of STS-133. A team comprised of several NASA centers and other research institutes was assembled to investigate and determine the root cause of the failure. The JSC Materials Evaluation Laboratory was asked to compare and characterize the outboard circumferential electron beam (EB) weld between the fuel closure plate (Titanium 6Al-4V) and the injector (Niobium C-103 alloy) of four different RCS thrusters, including the failed RCS thruster. Several metallographic challenges in grinding/polishing, and particularly in etching were encountered because of the differences in hardness, ductility, and chemical resistance between the two alloys and the bimetallic weld. Segments from each thruster were sectioned from the outboard weld. The segments were hot-compression mounted using a conductive, carbon-filled epoxy. A grinding/polishing procedure for titanium alloys was used [1]. This procedure worked well on the titanium; but a thin, disturbed layer was visible on the niobium surface by means of polarized light. Once polished, each sample was micrographed using bright field, differential interference contrast optical microscopy, and scanning electron microscopy (SEM) using a backscatter electron (BSE) detector. No typical weld anomalies were observed in any of the cross sections. However, areas of large atomic contrast were clearly visible in the weld nugget, particularly along fusion line interfaces between the titanium and the niobium. This prompted the need to better understand the chemistry and microstructure of the weld (Fig 2). Energy Dispersive X-Ray Spectroscopy (EDS) was used to confirm the chemical composition of the variations in contrast in these areas. Niobium alloys generally require exposure to more aggressive chemical reagents than titanium alloys for etching because of niobium s chemical resistance; therefore, the titanium portion of the sample was etched first. A five second immersion in Kroll s reagent revealed a general microstructure on the titanium portion of the sample; however, the titanium heat affected zone closest to the weld, was over-etched due to higher concentrations of refined grains and an increase in eta-phase. The Kroll s etchant also revealed some microstructure in the weld nugget itself; the niobium portion of the sample remained unetched.

Martinez, James↗

Design, Fabrication and On-Sun Performance Evaluation of SiC Receiver Feature Specimens for CST Applications Using Additively Manufactured SiC Materials

Increasing operating temperatures of solar receivers is paramount to the efficiency of concentrated solar thermal (CST) and solar power (CSP) systems. Successful development of CST systems to generate heat for industrial applications requires significant increase in temperature capability and techno-economically viability of the receiver systems. Supported by an award from the Solar Technology Office (SETO), US Department of Energy (DOE), GE Aerospace Research in collaboration with Heliogen Holdings Inc and Sandia National Lab, is engaged in the development of ultra-High Operating Temperature SiC-matrix Solar Thermal Air Receiver (HOTSSTAR) enabled by additive manufacturing. The program objective is to demonstrate SiC receiver with air exit temperatures up to 1100 oC and high thermal efficiencies. We report design, fabrication and on-sun test results of SiC components of a prototype 50kW (thermal) HOTSSTAR module. The receiver module architecture is based on a radial airflow design and consists of a series of radial SiC receiver sectors organized around a SiC center absorber. The SiC components are fabricated using binder-jet printed SiC followed by melt-infiltration reaction bonding process. To enhance the reliability and to minimize the risk of cracking damage of SiC test articles in thermal gradient and thermal shock environment of the application, the components were laminated with GE’s MI SiC-SiC CMC. Following extensive design and lab test analyses, selected SiC component designs are tested at Heliogen Lancaster Solar field under highly concentrated solar fluxes around 2000 suns to assess the thermal performance characteristics under realistic field conditions. We report on the test results and compare the thermal performances of different HOTSSTAR SiC absorbers. Finally, we discuss fabrication and initial assembly of a 50kW prototype test module in preparation of on-sun field tests to assess the performance of our final design.

CST, CSP, high temperature, air receiver, SiC, add↗

NEXT Propellant Management System Integration With Multiple Ion Thrusters

As a critical part of the NEXT test validation process, a multiple-string integration test was performed on the NEXT propellant management system and ion thrusters. The objectives of this test were to verify that the PMS is capable of providing stable flow control to multiple thrusters operating over the NEXT system throttling range and to demonstrate to potential users that the NEXT PMS is ready for transition to flight. A test plan was developed for the sub-system integration test for verification of PMS and thruster system performance and functionality requirements. Propellant management system calibrations were checked during the single and multi-thruster testing. The low pressure assembly total flow rates to the thruster(s) were within 1.4 percent of the calibrated support equipment flow rates. The inlet pressures to the main, cathode, and neutralizer ports of Thruster PM1R were measured as the PMS operated in 1-thruster, 2-thruster, and 3-thruster configurations. It was found that the inlet pressures to Thruster PM1R for 2-thruster and 3-thruster operation as well as single thruster operation with the PMS compare very favorably indicating that flow rates to Thruster PM1R were similar in all cases. Characterizations of discharge losses, accelerator grid current, and neutralizer performance were performed as more operating thrusters were added to the PMS. There were no variations in these parameters as thrusters were throttled and single and multiple thruster operations were conducted. The propellant management system power consumption was at a fixed voltage to the DCIU and a fixed thermal throttle temperature of 75 C. The total power consumed by the PMS was 10.0, 17.9, and 25.2 W, respectively, for single, 2-thruster, and 3-thruster operation with the PMS. These sub-system integration tests of the PMS, the DCIU Simulator, and multiple thrusters addressed, in part, the NEXT PMS and propulsion system performance and functionality requirements.

Sovey, James S.↗

Roman Space Telescope Optical System: Status and Test

A conference presentation providing an overview of the Roman Space Telescope optical system. Details on the optical system verification plan and Spacecraft Bus + Integrated Payload Assembly (SCIPA) thermal vacuum optical test program are provided.

space telescope↗

Pectin methylesterase selectively softens the onion epidermal wall yet reduces acid-induced creep

De-esterification of homogalacturonan (HG) is thought to stiffen pectin gels and primary cell walls by increasing calcium cross-linking between HG chains. Contrary to this idea, recent studies found that HG de-esterification correlated with reduced stiffness of living tissues, measured by surface indentation. The physical basis of such apparent wall softening is unclear, but possibly involves complex biological responses to HG modification. To assess the direct physical consequences of HG de-esterification on wall mechanics without such complications, we treated isolated onion (Allium cepa) epidermal walls with pectin methylesterase (PME) and assessed wall biomechanics with indentation and tensile tests. In nanoindentation assays, PME action softened the wall (reduced the indentation modulus). In tensile force/extension assays, PME increased plasticity, but not elasticity. These softening effects are attributed, at least in part, to increased electrostatic repulsion and swelling of the wall after PME treatment. Despite softening and swelling upon HG de-esterification, PME treatment alone failed to induce cell wall creep. Instead, acid-induced creep, mediated by endogenous α-expansin, was reduced. We conclude that HG de-esterification physically softens the onion wall, yet reduces expansin-mediated wall extensibility.

59 BASIC BIOLOGICAL SCIENCES↗

Fuel Performance Analysis of Fast Flux Test Facility MFF-3 and -5 Fuel Pins Using BISON with Post Irradiation Examination Data

Using the BISON fuel-performance code, simulations were conducted of an automated process to read initial and operating conditions from the Pacific Northwest National Laboratory (PNNL) database and reports, which contain metallic-fuel data from the Fast Flux Test Facility (FFTF) MFF Experiments. This work builds on previous modeling efforts involving 1977 EBR-II metallic fuel pins from experiments. Coupling the FFTF PNNL reports to BISON allowed for all 338 pins from MFF-3 and MFF-5 campaigns to be simulated. Each BISON simulation contains unique power and flux histories, axial power and flux profiles, and coolant-channel flow rates. Fission-gas release (FGR), fuel axial swelling, cladding profilometry, and burnup were all simulated in BISON and compared to available post-irradiation examination (PIE) data. Cladding profilometry, FGR, and fuel axial swelling simulation results for full-length MFF metallic pins were found to be in agreement with PIE measurements using FFTF physics and models used previously for EBR-II simulations. The main two peaks observed within the cladding profilometry were able to be simulated, with fuel-cladding mechanical interaction (FCMI), fuel-cladding chemical interaction (FCCI), and thermal and irradiation-induced creep being the cause. A U-Pu-Zr hot-pressing model was included in this work to allow pore collapse within the fuel matrix. This allowed better agreement between BISON-simulated cladding profilometry and PIE measurements for the peak caused by FCMI. This work shows that metallic fuel models used to accurately represent fuel performance for smaller EBR-II pins may be used for full-length metallic fuel, such as FFTF MFF assemblies and the Versatile Test Reactor (VTR). As new material models and PIE measurements become available, FFTF MFF assessment cases will be reassessed to further BISON model development.

36 MATERIALS SCIENCE↗

Manipulator design and development for the Ranger satellite servicing vehicle

The Ranger program is a planned series of low cost telerobotics flight experiments, based on the use of Pegasus launch vehicles. As the first step towards this goal, the Space Systems Lab was developing a neutral buoyancy version of Ranger for use in design verification and operations testing. The design approach and results of the Ranger manipulator development program is related. Ranger is designed to incorporate four appendages: a pair of dexterous, seven degree of freedom manipulators for general manipulation; a six DOF grappling arm for securing the vehicle to the local work site; and a five DOF positioning manipulator for the stereo camera pair that provide feedback to the remote operator. Each of these manipulators incorporate unique approaches to satisfying design requirements. The numerical and operational requirements are given for Ranger manipulators, and the evolution is discussed of the differing design approaches based on similarities and differences in the requirements. Testing results for individual joints and manipulator assemblies are presented, followed by initial results of operational testing on satellite servicing tasks with the integrated Ranger neutral buoyancy vehicle.

Howard, Russell D.↗

Rock Fracturing Using High-Pressure Ethylene/Nitrous Oxide Detonations

The present work investigates high initial pressure detonations of a stoichiometric mixture of ethylene and nitrous oxide (C2H4 + 6N2O) as a method of fracturing rock beneath the ground surface. These tests were conducted at a test site operated by the Energetic Materials Research and Testing Center (EMRTC), Socorro, New Mexico. The volume under the surface used for testing (called the Down Hole Assembly) consists of a 0.438 in. ID x 50 ft. long stainless-steel tube running down from the test site to a well bore which is 3 in. ID x 10 ft. long and the rock in the well bore is exposed to the propagating combustion wave. The testing carried out at Zucrow Laboratories in the smaller, alloy steel combustion vessel provided a scaling of pressures expected in the well bore. The combustion is initiated by energizing an EBW (Exploding Bridge Wire) above the ground surface. The experimental setup accommodates one high pressure (100,000 psia) transducer to measure the pressure peak and is placed approximately 5 ft. above the ground surface and 5 ft. downstream of the EBW. The focus of this series of experiments is to investigate the dependence of fracture to the rock beneath the surface on initial pressures of the mixture of ethylene and nitrous oxide. Experiments were carried out at initial pressures varying between 125 psia and 300 psi. The transducer recorded elevated pressures, which were 2.3 to 2.6 times in excess of the CJ values. The experimental results are discussed and explained in this report.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Aerothermal modeling, phase 1. Volume 1: Model assessment

Phase 1 was conducted as part of the overall NASA Hot Section Technology (HOST) Program. The purpose of this effort was to determine the predictive accuracy of and the deficiencies within the various analytical modules comprising the overall combustor aerothermal model used at General Electric, as well as to formulate recommendations for improvement where needed. This effort involved the assembly of a benchmark quality data base from selected available literature, and from General Electric engine and combustor component test data. This data base was supplemented with additional definitive data obtained from an experimental test program conducted as part of the Phase 1 effort. Using selections from this data base, assessment studies were conducted to evaluate the various modules. Assessment of the internal flow module was conducted using 2-D parabolic and ellipitic, as well as 3-D elliptic internal flow calculations of definitive test data selected from the assembled data base. The 2-D assessment provided methodical examination of the mathematical techniques and the physical submodules, while the 3-D assessment focused on usefulness as a design tool. Calculations of combustor linear metal temperatures, pressure loss performance, and airflow distribution were performed using aerothermal modules which were in general use for many years at General Electric. The results of these assessment provided for the identification of deficiencies within the modules. The deficiencies were addressed in some detail providing a foundation on which to formulate a prioritized list of recommendations for improvement.

Kenworthy, M. J.↗