Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “prepare”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,369 records · Page 76

Science in a Team Environment (AKA, How to Play Nicely with Others)

So you want to do NASA funded research in a spaceflight analog? There are several things about participating in an HRP managed analog that may be different from the way you normally do work in your laboratory. The purpose of this presentation is to highlight those differences and explain some of the unique aspects of doing this research. Participation in an HRP funded analog study complement, even if initially selected for funding, is not automatic and involves numerous actions from ISSMP, HRP, and the PI. There are steps that have to be taken and processes to follow before approval and ISSMP-FA integration. After the proposal and acceptance process the Investigator works closely with the Flight Analog team to ensure full integration of their study requirements into a compliment. A complement is comprised of a group of studies requiring a common platform and/or scenario that are able to be integrated on a non-interference basis for implementation. Full integration into the analog platform can be broken down into three phases: integration, preparation, and implementation. These phases occur in order with some overlap in the integration and preparation phase. The ISSMP-FA team integrates, plans and implements analog study complements. Properly defining your research requirements and getting them documented is one of the most critical components to ensure successful integration and implementation of your study, but is also one of the most likely to be neglected by PIs. Requirements that are not documented, or that are documented poorly are unlikely to get done, no matter how much you push. The process to document requirements is two-fold, consisting of an initial individual requirements integration and then a compliment requirements integration. Understanding the requirements in detail and early ensures that the science is not compromised by outside influences. This step is vital to the integration, preparation, and implementation phases. The individual requirements integration is the first step in ensuring that the research fits into an available analog platform or allows for the Flight Analog team to provide information on structural study changes for participation in the analog. At this early point investigators need to understand exactly what their requirements are to produce relevant data and convey their must have needs to the Flight Analog team. The fluid nature of analog platforms allow for minor alterations to the operational structure. Participation in analog research requires flexibility from the investigator to ensure implementation of their research into a flight like analog platform. The compliment integration requires plasticity; investigators are asked to work closely with one another and the Flight Analog team to combine research studies into a single study plan. This study plan's ultimate goal is to facilitate multiple study participation with minimal scientific impact to each individual study. The Flight Analogs team works to find the best compromise for all parties while protecting the flight like atmosphere of a particular analog. Additional restrictions, limitations and constraints may be required by the analog in order to make all of the science work. Many studies need to be combined into each complement and there are a limited number of hours available for data collection. Through data/sample sharing, we can reduce the burden on the test subject, while usually avoiding significant science impacts. Restrictions on food, exercise, medications and sleep cycle are important to consider for your research.

Platts, S. H.↗

Sample Curation in Support of the OSIRIS-REx Asteroid Sample Return Mission

The OSIRIS-REx asteroid sample return mission launched to asteroid Bennu Sept. 8, 2016. The spacecraft will arrive at Bennu in late 2019, orbit and map the asteroid, and perform a touch and go (TAG) sampling maneuver in July 2020. After sample is stowed and confirmed the spacecraft will return to Earth, and the sample return capsule (SRC) will land in Utah in September 2023. Samples will be recovered from Utah [2] and then transported and stored in a new sample cleanroom at NASA Johnson Space Center in Houston [3]. The materials curated for the mission are described here. a) Materials Archive and Witness Plate Collection: The SRC and TAGSAM were built between March 2014 and Summer of 2015, and instruments (OTES,OVIRS, OLA, OCAMS, REXIS) were integrated from Summer 2015 until May 2016. A total of 395 items were received for the materials archive at NASA-JSC, with archiving finishing ~30 days after launch (with the final archived items being related to launch operations)[4]. The materials fall into several general categories including metals (stainless steel, aluminum, titanium alloys, brass and BeCu alloy), epoxies, paints, polymers, lubricants, non-volatile-residue samples (NVR), sapphire, and various miscellaneous materials. All through the ATLO process (from March 2015 until late August 2016) contamination knowledge witness plates (Si wafer and Al foil) were deployed in the various cleanrooms in Denver and KSC to provide an additional record of particle counts and volatiles that is archived for current and future scientific studies. These plates were deployed in roughly monthly increments with each unit containing 4 Si wafers and 4 Al foils. We archived 128 individual witness plates (64 Si wafers and 64 Al foils); one of each witness plate (Si and Al) was analyzed immediately by the science team after archiving, while the remaining 3 of each are archived indefinitely. Information about each material archived is stored in an extensive database at NASA-JSC, and key summary information for each will be presented in an online catalog. b) Bulk Asteroid sample: The Touch and Go Sampling Mechanism (TAGSAM) head will contain up to 1.5 kg of asteroid material. Upon return to Earth, the TAGSAM head with the sample canister will be subjected to a nitrogen purge and then opened in a nitrogen cabinet in Houston. Once the TAGSAM head is removed from the canister, it will be dis-assembled slowly and carefully under nitrogen until the sample can be removed for processing in a dedicated nitrogen glovebox. Bennu surface samples are expected to be sub-cm sized, based on thermal infrared and radar polarization ratio measurements [1]. The upper limit on material collected by the TAGSAM head is ~2 cm. Therefore, we will be prepared to handle, subdivide, and characterize materials of a wide grain size (from ~10 m to 2 cm), and for both organic (UV fluorescence) and inorganic (SEM, FTIR, optical) properties. Representative portions of the bulk sample will be prepared for JAXA (0.5 %; see also [5]) and Canadian Space Agency (4%), with the remaining divided between the science team (<25%) and archived for future studies (NASA) (>75%). c) Contact Pad samples: The base of the TAGSAM head contains 24 contact pads that are designed to trap the upper surface layer of material and thus offer an opportunity to study asteroid samples that have resided at the very top surface of the regolith. Asteroid material is trapped on the pads in spring steel Velcro hooks, and material will have to be removed from these pads by curation specialists in the lab. d) Hardware: Some canister and SRC hardware items will contain information that will be important to understanding the collected samples, including the canister gas filter, temperature strips, flight witness plates, and the TAGSAM and canister parts that might have adhering dust grains. Some challenges remaining for both bulk sample and contact pad samples include: i) working with intermediate size range (200 to 500 micron) samples - a size range NASA has not previously worked in such detail; ii) techniques for removal of contact pad material from the spring steel hooks, iii) static electrical effects of dust sized particles during sample handling and curation is likely to be significant, and iv) the TAGSAM head and associated canister hardware will undoubtedly be coated with fine adhering dust grains from Bennu. In the case of collection of a large bulk sample mass, the adhering dust grains may be of lower priority. If a small sample mass is returned, the adhering dust may attain a higher priority, so recovery of adhering dust grains is an additional challenge to consider. In the year leading up to sample return we plan a variety of sample handling rehearsals that will enables the curation team to be prepared for many new aspects posed by this sample suite.

Righter, Kevin↗

NASA's Space Launch System Gains Momentum Toward Integration and Testing

NASA's Space Launch System (SLS) entered a new phase in 2017, completing major structural manufacturing on the core stage and delivering the first flight hardware to NASA's Kennedy Space Center (KSC). The program is now transitioning to integration, assembly and testing in preparation for launch readiness in late 2019. Core stage prime contractor Boeing concluded welding of the major core stage components for Exploration Mission 1 (EM-1) with the liquid hydrogen flight tank, following completion of the engine section, liquid oxygen tank, and forward skirt. Technicians also completed assembly of the bolted intertank, and all sections are currently in hardware integration. The engine section structural test article was shipped to NASA's Marshall Space Flight Center (MSFC) and began testing in 2017. The core stage pathfinder shipped to NASA's Michoud Assembly Facility (MAF). Booster prime contractor Orbital ATK made significant progress casting motor segments for SLS, with several segments finishing processing and in storage. Forward and aft sections of the boosters are being refurbished at KSC. RS-25 prime contractor Aerojet Rocketdyne completed SLS adaptation testing and qualification of four new EM-1 controllers. The four EM-1 engines are ready and waiting for shipment from NASA's Stennis Space Center (SSC) to Michoud Assembly Facility (MAF) for core stage integration in preparation for green run testing at SSC. The EM-1 Interim Cryogenic Propulsion System (ICPS) became the first major piece of SLS to arrive at KSC. Welding is complete on the EM-1 Launch Vehicle Stage Adapter (LVSA) and the flight Orion Stage Adapter (OSA). SLS is critical to U.S. leadership in future human and robotic space exploration, including a presence on the moon in preparation for missions deeper into space. This paper will elaborate on 2017 SLS progress and progress envisioned for 2018.

Askins, Bruce R.↗

Establishing and Monitoring an Aseptic Workspace

When are aseptic operations necessary? In order to meet certain bioburden requirements, some components must undergo dry heat microbial reduction (DHMR) or other sterilizing procedures. If sensitive surfaces must be re-exposed after DHMR, this could compromise the bioburden levels. Recontaminating sterilized surfaces could be costly both in time by requiring repeated DHMR and risk to the hardware, which may not be compatible with repeated high temperature bakes. In order to prevent recontamination of the sensitive surfaces, an aseptic environment and sterile technique must be employed. Aseptic environments mean working in a space with almost no detectable bioburden in the air or on surfaces. Ideally, DHMR happens as late as possible to avoid requiring aseptic operations, as it can be considered a high-risk operations. Preparing the cleanroom for aseptic operations Establishing an ISO (International Organization for Standardization) class 5 space to minimize airborne particles. Maintain low bioburden in the cleanroom by using biocidal cleaners. Using multiple biocidal techniques decreases the likelihood of selecting for resistant microorganisms. 70% Isopropyl Alcohol (IPA) denatures the proteins in a microorganism (note: 70% IPA is better at killing microorganisms than 100% IPA) 7% hydrogen peroxide: damages DNA and proteins through oxygen radical damage. Ultraviolet-C (UV-C) lamps: causes crosslinking in DNA which prevents replication. Monitor cleanroom regularly for bioburden trending: Standard bioassay: Swab or wipe samples of cleanroom surfaces processed for colony forming unity (viable or spore selected); Rapid bioassay: Adenosine triphosphate (ATP) or Limulus amebocyte lysate (LAL) for a bioburden snapshot. High levels can signal an immediate re-cleaning before standard bioassay samples are taken. Airborne monitoring: Active (pulling air through a filter) or passive (particle fallout) for bioburden. Verify bioburden levels just before aseptic operation. Test hardware and cleanroom surfaces and air 3 days before the planned aseptic operation. Rapid bioburden just before aseptic operation to ensure room was not re-contaminated. Preparing personnel and tools: Personnel training. Everyone in the cleanroom: Standard cleanroom certification Everyone on the team: 1 day Planetary Protection overview. Aseptic operators only: Half-day aseptic operations training. Covers sterile garmenting/gloves, Sterile handling with a focus on contact transfer risk, tool/GSE preparation, and two-operator system for opening sterilized tools/components. Tool sterilization: All tools to be used during an aseptic operation need to be identified. Compatible tools are sterilized by DHMR or Autoclave. Double wrapped so that the exterior bag can be handled by a non-sterile operator, and the sterile. Tools that are not compatible with high heat do not come in contact with sensitive surfaces: either substitutes are found, or tools are isolated by wrapping in sterile foil. During an aseptic operation. Pre-task to make sure everyone understands the operations, who is handling what, and when the most critical surfaces will be exposed. Monitoring during the operation. Bioburden: active and passive airborne bioburden sampling, glove-tip dabs onto a plate after completion of operation (3 days for results). Particles: real time particle counter constantly running, with alarm for exceeding ISO 5 conditions.

aseptic processing↗

Beyond Nanopore Sequencing in Space: Identifying the Unknown

Astronaut Kate Rubins sequenced DNA on the International Space Station (ISS) for the first time in August 2016 (Figure 1A). A 2D sequencing library containing an equal mixture of lambda bacteriophage, Escherichia coli, and Mus musculus was prepared on the ground with a SQK_MAP006 kit and sent to the ISS frozen and loaded into R7.3 flow cells. After a total of 9 on-orbit sequencing runs over 6 months, it was determined that there was no decrease in sequencing performance on-orbit compared to ground controls (1). A total of ~280,000 and ~130,000 reads generated on-orbit and on the ground, respectively, identified 90% of reads that were attributed to 30% lambda bacteriophage, 30% Escherichia coli, and 30% M. musculus (Figure 1B). Extensive bioinformatics analysis determined comparable 2D and 1D read accuracies between flight and ground runs (Figure 1C), and data collected from the ISS were able to construct directed assemblies of E.coli and lambda genomes at 100% and M. musculus mitochondrial genome at 96.7%. These findings validate sequencing as a viable option for potential on-orbit applications such as environmental microbial monitoring and disease diagnosis. Current microbial monitoring of the ISS applies culture-based techniques that provide colony forming unit (CFU) data for air, water, and surface samples. The identity of the cultured microorganisms in unknown until sample return and ground-based analysis, a process that can take up to 60 days. For sequencing to benefit ISS applications, spaceflight-compatible sample preparation techniques are required. Subsequent to the testing of the MinION on-orbit, a sample-to-sequence method was developed using miniPCR™ and basic pipetting, which was only recently proven to be effective in microgravity. The work presented here details the in- flight sample preparation process and the first application of DNA sequencing on the ISS to identify unknown ISS-derived microorganisms.

Stahl, Sarah E.↗

Training Artemis Astronauts to Explore the Moon

To prepare for human exploration of the Moon in the mid-2020s, NASA is developing a program to provide geoscience and planetary science classroom training and geologic eld training to astronauts and other mission personnel. The Artemis geoscience training plan builds on a long legacy: NASA has trained astronauts in geology, planetary science, and geological eld work for more than 50 years. From ~1965-1972, the geology focus for astronauts included orbital Earth observations during the early NASA missions, but the endgame was preparation for the Apollo missions to the Lunar surface [see Phinney (2015), NASA-SP-2015-626; Lofgren et al.(2011);Schmitt, et al. (2011); and El Baz (2011), all from GSA SP483]. From the mid 1970s through2017, the primary purpose for geoscience training was to prepare astronauts to observe theEarth and document a wide variety of Earth processes from orbital platforms (Skylab, SpaceShuttle and International Space Station). Astronaut observations of Earth from the InternationalSpace Station remain an important activity today, but the prospect of exploration of the lunar surface through the Artemis Program lends additional purpose to the geoscience content and eld experiences that we provide the astronauts. We recently completed the geology and eld training with Astronaut Class 22 and are now planning both focused eld exercises and simulations for future Artemis crews, as well as the accompanying classroom lessons on lunar and planetary sciences. The training we offer extends beyond the astronaut office – we partner across operational and engineering organizations at NASA and provide eld work exercises and opportunities to personnel in the Flight Operations Directorate (responsible for the overall training and certification), as well as the exploration Extravehicular Activity Oce (developing spacewalk suits and tools). These partnerships contribute to building a common language and sense of purpose, and also help to ensure that NASA’s geoscience training and science operations are fully integrated with the teams and systems responsible for getting the next generation of astronauts to the surface of the Moon.

Artemis↗

NASA’s Space Launch System: Progress Toward Launch

The Space Launch System (SLS), NASA’s cornerstone launch capability for a new generation of deep space exploration, has begun assembly at Kennedy Space Center (KSC) in preparation for launch in 2021. SLS will provide an unparalleled launch capability for human and robotic deep space exploration missions. Its proven propulsion system, upgrade path to more powerful vehicles, and high-volume payload fairings make it the foundation for ambitious and demanding as part of the Artemis program. Artemis is NASA’s 21st-century plan to put boots on the Moon and to perform sustainable, long-term science in deep space, with eyes toward sending explorers to Mars. The initial SLS vehicle to fly, Block 1 in the crew configuration – with the new Orion spacecraft – is scheduled to lift off from revitalized launch facilities at KSC in 2021 for an uncrewed test flight known as Artemis I. Manufacturing is complete on the vehicle and all elements have been delivered to the Exploration Ground Systems (EGS) Program, except the core stage. The program’s all-new development, the core stage is currently in the midst of a “Green Run” test campaign at Stennis Space Center (SSC). Eight progressively more challenging tests in the Green Run series will culminate in a hot-fire of four flight-proven liquid hydrogen/liquid oxygen (LH2/LOX) RS25 engines. Following the Green Run hotfiring, the core stage will ship to KSC. Already at KSC, aft sections of the fivesegment solid rocket boosters are being assembled. Previously delivered elements, including the upper stage, are undergoing final checkouts in preparation for stacking. An exciting 2021 will include such milestones as stacking SLS and Orion in KSC’s Vehicle Assembly Building (VAB), modal testing, roll out to Launch Pad 39B, Wet Dress Rehearsal (WDR), and launch. Teams across the country are preparing for launch by finalizing procedures, defining launch constraints and flight rules, training console operators, performing simulations, and more. With the SLS Block 1 vehicle for Artemis I nearing integration and launch, the second Block 1 vehicle in the crew configuration, which will carry astronauts on an Artemis II hybrid lunar flyby mission, has several elements manufactured. In fact, the solid rocket motor segments and RS-25 engines are complete. Those program elements are processing hardware for the third flight and working toward manufacturing the second SLS variant to fly, Block 1B, which will onramp a powerful new upper stage, the Exploration Upper Stage (EUS).

John Honeycutt↗

Interpretation of Zerodur® Strength Data

Recent, detailed fractographic analysis of Zerodur® strength test specimens prepared by linear grinding and etching with a proprietary process indicated low frequency damage to be the strength limiting defects Recent, detailed fractographic analysis of Zerodur® strength test specimens prepared by linear grinding and etching with a proprietary process indicated low frequency damage to be the strength limiting defects [1]. The 2-parameter Weibull distribution is usually assumed when working with ceramic and glasses such as Zerodur®, although 3-parameter behavior is occasionally considered [2]. Detailed statistical modeling of the Zerodur® strength data with the was initial perspective of a 3-parameter Weibull distribution gave unsatisfying results [3]. The subsequent fractographic investigation indicated [1] that the usual assumption of many small, random, noninteracting flaws [4] was not represented, but instead, less frequent, aligned flaws along etching ridges parallel to the grinding direction were present, Figure 1. It was thus concluded that the strength of Zerodur® as prepared was not Weibull distributed. The flaws represent a sparse flaw population relative to typical grinding damage, but an extensive occurrence (high frequency) of handling damage. We examine the type of distribution present and explain the appearance of a 3-parameter distribution.

Glass, ceramic, strength, Weibull, distribution, m↗

ISS Payload Operations Training During the COVID-19 Pandemic: Impacts and Solutions

Introduction: The onset and the protracted duration of the COVID-19 pandemic brought a dramatic and rapid transformation to almost every aspect of humanity in 2020. The world’s space agencies and their missions were not immune to the unpredictable and wide-sweeping changes. One discipline principally affected was mission operations and the various groups supporting that critical function. Mission support teams, especially for complex and crewed missions like the International Space Station (ISS) were forced to rapidly rethink how and where control center staff performed their vital work. Operations training – an essential element to mission ops, had unique hurdles to overcome. Operations training is responsible for preparing astronaut crews for their scientific missions, providing recurring proficiency and currency material to flight controllers, as well as ensuring new team members are ready to join their colleagues on console. Every element of training was impacted by COVID restrictions. From orientation and introductory classes for new controllers, training for scientists and payload developers, to simulations and advanced lessons, critical On the Job Training (OJT) and final evaluations; all aspects faced new challenges. Operations trainers at NASA’s Marshall Space Flight Center (MSFC) in Huntsville, Alabama, were forced to rethink, retool, and become more efficient with trainees and training resources in order to continue supporting payload operations on the ISS. Impacts and Barriers to Operations Training: The pandemic started in the United States in early March 2020. Immediately, NASA mandated that the support for ISS real-time operations was critical. As a result, physical access to the ISS Payload Operations Center was restricted to only those people supporting console operations. Thus, use of on-site NASA facilities and any trainer to trainee face-to-face interaction was not authorized. Trainers and trainees had to quickly shift to 100% remote learning. In the short term, this was not a problem since NASA had already prepared Information Technology (IT) resources that facilitated remote access to mission resources like classes, documents and teleconferences. However, instructors quickly discovered the classes that they were accustomed to delivering in a large classroom environment did not translate well to remote teaching. The lack of non-verbal communication with the class became a major barrier to instruction. Another significant hurdle to operations training was the mandate that all simulations could only be held remotely. The logistics of planning and executing even small simulations proved to be challenging, almost impossible, due to IT technology and public internet limitations. With simulations essentially stopped, as well as the restrictions on most OJT training, trainees were essentially stopped in their advancement towards certification. An additional barrier that had to be overcome was the formal documentation of the curriculum objectives. Even though NASA had been deliberately transitioning to electronic documents for years, some organizations were still relying on “pen and ink” documents to formalize training completion. The logistics of implementing secure and controlled e-signature documents in a standardized, NASA approved format had to be addressed. Lesson Learned and Efficiencies: Once the various limitations were identified, ISS trainers at MSFC discussed, proposed, and prioritized new options and techniques. Transitioning to all electronic learning materials and certifications was a relevantly easy fix. Teaching courses to large and diverse groups took additional shifts in the NASA training paradigm. Likewise, methods and procedures for preparing astronauts for their missions were forced to be revised. Simulation supervisors and their teams were also forced to find more efficient techniques to provide realistic training experience. Communication and approvals from management was essential. In every case, the ISS payload operations instructors found novel and efficient solutions to all functions listed above. This paper will discuss the factors and solutions payloads operations trainers found to keep scientific research on the ISS flying forward to mission success.

ISS Operations↗

Effect of shadowing on survival of bacteria under conditions simulating the Martian atmosphere and UV radiation

Spacecraft-associated spores and four non-spore-forming bacterial isolates were prepared in Atacama Desert soil suspensions and tested both in solution and in a desiccated state to elucidate the shadowing effect of soil particulates on bacterial survival under simulated Martian atmospheric and UV irradiation conditions. All non-spore-forming cells that were prepared in nutrient-depleted, 0.2-μm-filtered desert soil (DSE) microcosms and desiccated for 75 days on aluminum died, whereas cells prepared similarly in 60-μm-filtered desert soil (DS) microcosms survived such conditions. Among the bacterial cells tested, Microbacterium schleiferi and Arthrobacter sp. exhibited elevated resistance to 254-nm UV irradiation (low-pressure Hg lamp), and their survival indices were comparable to those of DS- and DSE-associated Bacillus pumilus spores. Desiccated DSE-associated spores survived exposure to full Martian UV irradiation (200 to 400 nm) for 5 min and were only slightly affected by Martian atmospheric conditions in the absence of UV irradiation. Although prolonged UV irradiation (5 min to 12 h) killed substantial portions of the spores in DSE microcosms (~5- to 6-log reduction with Martian UV irradiation), dramatic survival of spores was apparent in DS-spore microcosms. The survival of soil-associated wild-type spores under Martian conditions could have repercussions for forward contamination of extraterrestrial environments, especially Mars.

Venkateswaran, Kasthuri↗

The Utilization Profiles of the CCSDS Unified Space Link Protocol (USLP)

The purpose of this paper is to identify the utilization profiles for interfacing the Data Protocol Sublayer using the Unified Space Link Protocols (USLP) (reference 1) with the space link coding procedures as specified in the CCSDS Coding & Synchronization Blue Books (references 2 through 5), used in both telecommand and telemetry applications. This paper describes how the USLP Protocol utilizes the coding and synchronization sublayer to support: a. Direct to Earth (DTE) telemetry links for engineering and science data b. Direct to Earth (DTE) telemetry links for very high rate science data c. Direct from Earth (DFE) command, sequencing and flight software loads d. Space to Space Links (Proximity) utilized by orbiters for data exchange to/from surface bound assets. The CCSDS has divided the functions of the Data Link Layer into two sublayers: the Data Link Protocol Sublayer (DLP-SL) and the Coding and Synchronization Sublayer (CS-SL). The Data Link Protocol Sublayer (DLP-SL) interfaces to the users, accepting the data that is to be transported, on the sending side of the link, and delivering that data on the receiving end. The Transfer Frame is the data unit that is transferred across the Data Link Protocol Sublayer and the Coding and Synchronization Sublayer boundary. The Coding and Synchronization Sublayer (CS-SL) provides the encoding, randomization, and frame synchronization functions that prepares the USLP Transfer Frame for transport across the space link. The CS-SL is divided into 2 processes: 1) The Frame Interface Processes (FIP) performs the interface functions required to prepare the data for delivery to the Coding/Decoding Process (CDP). This process includes prepending a Frame Start Marker to the provided frame, when management has designated that the frame is not to be aligned to the codeblock or when there is no block code used. 2) The Coding/Decoding Process (CDP) performs the forward error correction processes that are used to optimize the performance of the link and minimize the error rate. The CDP creates the symbol stream that is delivered to the Physical Layer. The transfer of the USLP transfer frames across different types of space links is the focus of this paper. The Protocol Data Unit (PDU) that is passed in both directions between the Data Link Protocol Sublayer (DLP-SL) and Coding and Synchronization Sublayer (CS-SL) is the transfer frame. The USLP frame structure provides flexibility that can be constrained by the functions utilized within the CS-SL that prepare the transfer frame for transit. For example, the USLP transfer frame contains a length field that enables the frame to be of variable length but CS-SL under certain conditions may constrain the frame to be fixed in length. This paper describes 5 operational modes available for use by the Data Link Layer to provide data exchange across the USLP space link. These modes are different because different operational requirements apply to vastly different types of space links and thus the communications implementation requirements differ. The environmental issues include the power or energy available, the distance between the end points of the link, the complexity of the equipment available at those end points, the atmospheric conditions and radiometric frequency selection. The CS-SL utilizes different forward error correcting codes supported by specific operational modes to configure the data for transit. This paper describes all of the operational modes in a series of data models which decompose the functionality between the Data Link Protocol Sublayer and the Coding and Synchronization sublayer. The operational modes described are: 1. Uncoded Mode: has been used for short links that contain significant available power to provide an acceptable frame error rate. The frames in this mode can be variable in length and typically use an error detection algorithm (i.e., CRC) to determine if there are errors in the received frame. 2. Convolutional Only Mode: is currently the prime forward error correction coding used for the proximity links. The frames in this mode can be variable in length and typically use an error detection algorithm (i.e., CRC) to determine if there are errors in the received frame. 3. Variable Length Frame Aligned to Variable Length Codeblock (TC): is used for Direct from Earth links were power levels are high and the simple, least complex code i.e., the BCH code is used. This mode has been in use since the early 1970s. The BCH code is a short code and the decoder is easy to implement. 4. Fixed Length Frame Aligned to Fixed Length Codeblock (AOS/TM): was introduced when the concatenated Convolutional and Reed-Solomon Code was formulated to provide significant reduction in link data error rate and the ability to determine if there was an error in the decoded codeblock. The frame is aligned to the codeblock so that there is a one to one relationship of frame errors to codeblock errors without additional error detection coding being added. This mode requires the protocol frames to be the exact size of the message portion of the codeblock. 5. Frames Unaligned to Fixed Length Codeblocks (Currently used for very high rates and space to space links): This mode is currently used for missions that have a very high data rate that can be controlled adaptively as the environment changes and as the next generation operating mode for the proximity link. This mode from a coded data stream point of view is exactly like that described in 4. above, except that the frame need not be aligned to the codeblock. There is no requirement on frame length when using this mode. Thus when using USLP it can be used to support links that require short or long frames. There is also no mandatory requirement that frames cannot be separated by idle data reducing the tight data rate connection requirements between the data link protocol sublayer and the coding & synchronization sublayer. In conclusion, how these operational modes can be put to use in mission operational scenarios is described for Direct from Earth links (DFE), Direct to Earth links (DTE), and Proximity links.

Greenberg, E.↗

In-situ Lunar Launch and Landing Pad Construction with Regolith-Thermoset Polymer Composite Materials

Lunar launch and landing pads are necessary to mitigate risks to lander/ascent vehicles and surrounding surface assets from rocket plume ejected regolith. The current state of the art of landing and launching from the lunar surface is to land/launch on unprepared regolith surfaces. Though this has been a relatively successful approach, significant risks exist for the Artemis Program due to higher thrust levels leading to increased ejecta and cratering, presence of co-located assets in the ejecta path, and potential strict surface levelness requirements. Regolith-thermoset polymer composite materials were developed and evaluated for off Earth launch and landing pad applications. Performance under hot fire conditions was assessed for two simulated Starship lunar launch/landing environments, one targeting thermal conditions and the second targeting pressure conditions. Paver test articles were prepared at 20% and 11% polymer mass fractions. Sintered paver test articles were prepared with 20% polymer grouting filling the seams between pavers. Though significant erosion was experienced during the more extreme thermal testing conditions, all test articles successfully mitigated regolith ejecta from plume effects. A concept for preparing and emplacing the materials was developed and tested in laboratory conditions. The testing evaluated the feasibility of using twin and single screw extruder technology to mix, convey and deposit materials. Both the twin and single screw extruders were capable of processing and extruding the composite with a maximum of 90% mass fraction of regolith achieved by the twin screw extruder.A primary risk for application of regolith-thermoset polymer composites as lunar launch/landingpad is the mass of polymer required to be landed on the moon. Calculations were performed that show that a 100 m diameter, 0.025 m thick pad with polymer mass fraction of 15% will require a payload mass of 72 mt to the Lunar surface. This is below the planned Starship payload capacity to the lunar surface of 100 mt. The regolith-thermoset polymer composite based construction approach proved feasibility in three critical areas: performance under launch/landing conditions, demonstration of a mixing and depositing strategy, and fitting within the planned lunar payload capacity. It is recommended that materials and systems be developed to TRL 6 for a small-scale lunar demonstration of emplacement of a launch/landing pad via a CLPS mission to support Artemis Program roadmap gap closure activities.

ISRU↗

New Hayabusa2 and OSIRIS REx Curation Facilities at Nasa Johnson Space Center

Asteroids are made up of rocky material that is left over from the formation of our solar system [1]. This material holds the key to unlocking information about the history of the planets and our sun. Hayabusa2 and OSIRIS-REx are two sample return missions that have collected rocky material from carbonaceous asteroids which are rich in water, carbon, and organic compounds [1]. Hayabusa2 is a spacecraft that collected samples from asteroid Ryugu launched by the Japan Aerospace Exploration Agency (JAXA). Samples were returned to Earth in December 2020 and 10 percent of the collected material is currently housed in a state-of-the-art laboratory at NASA Johnson Space Center (JSC) dedicated to Ryugu material [1]. OSIRIS-REx is a spacecraft launched by NASA that collected samples from asteroid Bennu. The samples are on their journey to Earth and will arrive in September 2023. They will be stored in a separate cleanroom dedicated to Bennu material. From these two missions, scientists will examine dust particles and rocky material to research clues on how the early solar system formed and how life began [2]. Because these samples are so precious and rare, it is important to keep them free from Earth contamination. In September of 2020, a massive construction project began to provide curation facilities to meet the needs of two incoming asteroid collections, Hayabusa2 and OSIRIS-REx. Despite numerous setbacks caused by the coronavirus pandemic, these facilities have been completed in the fall of 2021. Some of these setbacks included strict PPE requirements, keeping safe working distances as well as access to the facilities as NASA was operating under a Stage 3 condition in response to the pandemic. These facilities will provide curation laboratories to safely house the precious asteroid samples as well as facilities to manipulate samples, do sample preparation and process samples into and out of the labs for future studies by the scientific community. The lab suite consists of several different rooms including an initial anteroom (ISO 7), a staging area (ISO 7), two gowning areas (one for OSIRIS-REx and one for Hayabusa2; both ISO 6)), the Haybusa2 Curation Laboratory (ISO 5), the OSIRIS-REx Curation Laboratory (ISO 5), an ultramicrotomy laboratory (ISO 7) and a thin section laboratory (not a cleanroom). To maintain cleanliness levels necessary for these lab spaces quarterly to monthly Balazs organic and inorganic sampling has been conducted on a regular basis before, during and after the construction project to monitor the cleanliness levels in the new labs that will house the asteroid samples. These new facilities feature a Ruuvi (Grafana) monitoring system that measures temperature, humidity, and pressure of the lab suite. This is a small puck shaped sensor that sends signals to the Grafana cloud where the data can be plotted and set up on dashboards within the lab suite. These sensors are easy to set up and install and they run off a cell battery that is good for 3-5 years before needing replacement. This system can deliver text messages and emails to the appropriate personnel when values fall outside of set limits. In addition to the monitoring system, this new lab suite features viewing windows from several different locations and sliding motion censored doors. We have obtained some state-of-the-art equipment to outfit the lab spaces (desiccators, microscopes, ultramicrotome) and are in the process of outfitting the suite with additional items such as: nitrogen gloveboxes, additional desiccators, micromanipulators, etc. The Hayabusa2 samples provided to NASA by JAXA included 23 millimeter sized grains and 4 containers with finer material. OSIRIS-REx is expected to return as much as 400 grams of asteroid Bennu. Samples will be stored in a nitrogen glove box and separated into nitrogen sealed transfer containers. Small Bennu and Ryugu particles will be handled and prepared (e.g., ultra-thin sections for scanning electron microscopy (SEM) or transmission electron microscopy (TEM)) using an Axis Pro micromanipulator and Leica EM UC7 ultramicrotome. Analyzing samples at the atomic scale will provide greater insight to the origins of the solar system and life formation on Earth. All the curation preparation for these sample collections is essential to ongoing research and efforts to understand our solar system, both nowand for future generations.

Curation↗

Clean Air Shower Curtain for Protection of Contamination Sensitive Telescopes on the Ariane 5 Launcher

The launch of the James Webb Space Telescope (JWST) was successfully performed by Ariane 5 from French Guiana on December 25th 2021. The unique nature of the JWST mission led to various adaptations of the Ariane 5 launch system to fulfill stringent cleanliness and hygrometry requirements all along the launch preparation. JWST integration and test activities in the Final Assembly Building (BAF) had to be performed in ISO Class 7 equivalent conditions under Volatile Organic Compounds (VOC) protection and monitoring. For this purpose, a dedicated air supply system equipped with Airborne Molecular Contamination (AMC) filters was installed in the umbilical mast. The fairing itself was specially sealed to protect the inner environment, and to, guarantee ISO Class 7, the BAF Composite Hall (BAF-HC) facilities were upgraded with a removable “Air Shower Curtain” (AShC) containment enclosure between the mobile platforms around JWST. The preparation of these Ariane 5 launch system adaptations started several years before the launch campaign with close cooperation and coordination between Arianespace, ArianeGroup, the European Space Agency (ESA) and the National Aeronautics and Space Administration (NASA). This paper describes their specificities and addresses the challenges experienced to achieve the successful mission preparation.

Contamination Control, James Webb Space Telescope,↗

Clean Air Shower Curtain for Protection of Contamination Sensitive Telescopes on the Ariane 5 Launcher

The launch of the James Webb Space Telescope (JWST) was successfully performed by Ariane 5 from French Guiana on December 25th 2021. The unique nature of the JWST mission led to various adaptations of the Ariane 5 launch system to fulfill stringent cleanliness and hygrometry requirements all along the launch preparation. JWST integration and test activities in the Final Assembly Building (BAF) had to be performed in ISO Class 7 equivalent conditions under Volatile Organic Compounds (VOC) protection and monitoring. For this purpose, a dedicated air supply system equipped with Airborne Molecular Contamination (AMC) filters was installed in the umbilical mast. The fairing itself was specially sealed to protect the inner environment, and to, guarantee ISO Class 7, the BAF Composite Hall (BAF-HC) facilities were upgraded with a removable “Air Shower Curtain” (AShC) containment enclosure between the mobile platforms around JWST. The preparation of these Ariane 5 launch system adaptations started several years before the launch campaign with close cooperation and coordination between Arianespace, ArianeGroup, the European Space Agency (ESA) and the National Aeronautics and Space Administration (NASA). This paper describes their specificities and addresses the challenges experienced to achieve the successful mission preparation.

Contamination Control, James Webb Space Telescope,↗

From NASA's EOS to ESO: Advancing Applications of the Future Atmosphere Observing (AOS) Mission

The NASA Earth System Observatory (ESO) Atmosphere Observing System (AOS) is being designed to explore the fundamental questions of how interconnections between aerosols, clouds and precipitation impact our weather and climate, addressing real-world challenges to benefit society. A fundamental component of the AOS mission is ensuring that applications for economic and societal benefit are considered to the greatest extent possible in mission design. As a result, the AOS Applications Impact Team (AIT) was formed to address this objective. The overarching goal of the AIT is to help improve capacity for transitioning science to applications to make it possible to more quickly and effectively inform decisions that will directly benefit society. We seek to maximize AOS benefit to impact decisions through early engagement in the mission development phase in order to prepare stakeholders to apply observations as soon as AOS mission data become available. A critical component of preparing future users of AOS mission data is building on the successes of applications of NASA’s existing Earth Observing System (EOS), A-Train, and sub-orbital campaigns with the goal of advancing current mission applications activities and preparing for innovative AOS mission observations. NASA’s GPM mission forms a framework to enhance AOS precipitation applications while AOS health and air quality applications benefit from the heritage of CALIPSO and MODIS. Additionally, AOS will likely benefit from current and future missions such as TROPICS, MAIA, TEMPO, and PACE which launch before AOS. Additionally, current sub-orbital field campaigns, such as NASA IMPACTS and ACTIVATE, provide rich data sources to highlight future AOS capabilities. Engaging with existing missions and sub-orbital field campaigns helps to identify and understand data needs, gaps, and opportunities for current and future stakeholders, determine what data products are of highest value and use, and connect stakeholders with current mission data that can serve as AOS proxy data, among others. In this presentation, we provide an overview of AOS AIT activities, initiatives, and the AOS Applications Seminar Series to highlight how existing EOS, A-Train, and sub-orbital missions can play a critical role in advancing AOS applications prior to launch.

Emily B. Berndt↗

Enterprise Mission Integration for Artemis Lunar Missions

Mission integration is an iterative process by which a specific mission is formulated, refined, planned, and executed within the established vehicle(s), architecture, and ground systems design. Mission integration includes the people, vehicle(s) and ground hardware/software, products, processes, analyses, schedules, facilities, Certification of Flight Readiness, etc. The Artemis Mission Integration Task Team (MITT) developed a series of products and processes to support the complex mission integration across various Programs within the Artemis Mission Campaign (Orion, Space Launch Systems, Exploration Ground Systems, Gateway, Human Landing System, and Extravehicular Activity and Human Surface Mobility). The Moon to Mars (M2M) Program is referred to as ‘the enterprise’ as it includes both the M2M organization and the Programs supporting the Artemis Mission Campaign. Artemis Mission Integration has five phases: mission capability, mission definition, mission preparation, mission execution, and post-mission assessment. This paper focuses on one of the enterprise-level mission checkpoints as a kick-off to the Mission Preparation phase, the Mission Integration Review (MIR), which occurs 18-24 months prior to launch. The MIR helps to confirm the defined mission technical baseline is within the existing analyzed design envelope. Details are provided on the identification of dependencies, issues, or gaps for mission-specific objectives and requirements, as well as the definition of the analysis, training, mission execution products, facilities, and detailed supporting operations requirements. The MIR was held for both Artemis I and II and this paper aims to share with the aerospace community its value as we prepare for upcoming Artemis Missions.

Mary Anne Plaza↗

Private Astronaut Post-Mission Debrief Interviews Study

BACKGROUND The commercialization of space will increasingly include individuals that are not rigorously-selected, highly-trained professional astronauts. Private astronaut missions (PAMs), such as Axiom-1 in 2022, will continue to travel to the International Space Station in the coming years, but the risk of integrating private astronauts with NASA astronauts has not been clearly quantified nor mitigated. An earlier internal NASA operations assessment, which consisted of a comprehensive literature review and interviews of current NASA experts, found that PAMs are likely to increase the risk to NASA astronauts during integrated missions (Landon, Whiting, Russell, Schorn, Passmore, & Roma, 2022). There are ongoing efforts at NASA to mitigate concerns from a medical, psychological, and technical perspective. NASA experts are working closely with PAM providers to offer recommendations and best practices beyond the limits of requirements to ensure crew health and safety. However, efforts are siloed between groups to some extent, and with the rate of PAMs likely to increase, a more comprehensive and integrated process is needed to reduce the burden on NASA resources. AIMS The purpose of this project is to understand private astronauts’ motivations for journeying to space, their pre-mission preparation period, and their experiences in space. Data will be collected via private astronaut post-mission debrief interviews. This data will inform training needs and in-mission support needed for missions that include private astronauts; the preparation NASA astronauts and mission support personnel will need to work with these integrated crews; and gaps in knowledge to guide research and countermeasure development. Our study aims to (1) Characterize risks posed by commercialization and private astronaut crew integration in spaceflight operations, as it relates to Team, Human Systems Integration Architecture (HSIA), and Behavioral Medicine (BMed) Risks, (2) Recommend potential countermeasures and identify gaps in current research. Countermeasures may be related to crew selection and composition, training, crew support systems (e.g., medical/psychological support, support from Mission Control, on-board resources), and habitability and human factors design. METHOD The BHP Lab will conduct 30-minute interviews with up to eight (8) private astronaut mission (PAM) astronauts (e.g., Axiom) and spaceflight participants (e.g., SFPs or “free flyers” on Polaris Dawn) per year from 2024-2030 to discuss knowledge gaps and needs related to selection and assessment, crew composition, training, crew support systems (e.g., medical/psychological support, support from Mission Control, onboard resources), and habitability and human factors design, which may influence the risk to NASA astronauts. Interviews will then be coded using thematic analysis and interpreted with the assistance of lexical analysis software (e.g., LIWC). As of the end of 2024, we have collected data from one PAM crew. At the conclusion of data collection in 2030, a final report will be prepared integrating all data collected by 2031. SUMMARY Post-return interviews of private astronauts are being conducted to understand their experiences and inform training and countermeasures to ensure the safety of all who journey to the ISS.

Private Astronaut Missions↗