Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,369 records · Page 76

GRAFEC: A New Spanish Program to Investigate Waste Management Options for Radioactive Graphite - 12399

Spain has to manage about 3700 tons of irradiated graphite from the reactor Vandellos I as radioactive waste. 2700 tons are the stack of the reactor and are still in the reactor core waiting for retrieval. The rest of the quantities, 1000 tons, are the graphite sleeves which have been already retrieved from the reactor. During operation the graphite sleeves were stored in a silo and during the dismantling stage a retrieval process was carried out separating the wires from the graphite, which were crushed and introduced into 220 cubic containers of 6 m{sup 3} each and placed in interim storage. The graphite is an intermediate level radioactive waste but it contains long lived radionuclides like {sup 14}C which disqualifies disposal at the low level waste repository of El Cabril. Therefore, a new project has been started in order to investigate two new options for the management of this waste type. The first one is based on a selective decontamination of {sup 14}C by thermal methods. This method is based on results obtained at the Research Centre Juelich (FZJ) in the Frame of the EC programs 'Raphael' and 'Carbowaste'. The process developed at FZJ is based on a preferential oxidation of {sup 14}C in comparison to the bulk {sup 12}C. Explanations for this effect are the inhomogeneous distribution and a weaker bounding of {sup 14}C which is not incorporated in the graphite lattice. However these investigations have only been performed with graphite from the high temperature reactor Arbeitsgemeinschaft Versuchsreaktor Juelich AVR which has been operated in a non-oxidising condition or research reactor graphite operated at room temperature. The reactor Vandellos I has been operated with CO{sub 2} as coolant and significant amounts of graphite have been already oxidised. The aim of the project is to validate whether a {sup 14}C decontamination can also been achieved with graphite from Vandellos I. A second possibility under investigation is the encapsulation of the graphite in a long term stable glass matrix. The principal applicability has been already proved by FNAG. Crushed graphite mixed with a suitable glass powder has been pressed at elevated temperature under vacuum. The vacuum is required to avoid gas enclosures in the obtained product. The obtained products, named IGM for 'Impermeable Graphite Matrix', have densities above 99% of theoretical density. The amount of glass has been chosen with respect to the pore volume of the former graphite parts. The method allows the production of encapsulated graphite without increasing the disposal volume. This paper will give a short overview of characterisation results of different irradiated graphite materials obtained at CIEMAT and in the Carbowaste project as well as the proposed methods and the actual status of the program including first results about leaching of non-radioactive IGM samples and hopefully first tendencies concerning the C-14 separation from graphite of Vandellos I by thermal treatment. Both processes, the thermal treatment as well as the IGM, have the potential to solve problems related to the management of irradiated graphite in Spain. However the methods have only been tested with different types of i-graphite and virgin graphite, respectively. Only investigations with real i-graphite from Spain will reveal whether the described methods are applicable to graphite from Vandellos I. However all partners are convinced that one of these new methods or a combination of them will lead to a feasible option to manage i-graphite in Spain on an industrial scale. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Decommissioning of the NPP A-1 heavy water management system - 15121

The paper deals with experience and techniques in the application of decontamination technology and remotely controlled robotic devices for the decontamination and dismantling of the heavy water management system during undergoing decommissioning process of the A-1 NPP as well as treatment of arising liquid waste All of these activities are characterized by high level of radioactivity and contamination. During operation of the A-1 NPP the heavy water management system fulfilled several functions: (1) cooling of the moderator, (2) topping up of the moderator in the active zone, (3) drainage, feed and storage of heavy water, (4) capture of leaked heavy water. Closely associated with heavy water management were systems for separation and isotopic purification of heavy water (distilling station, removing organic impurities station, isotopic purification station). The NPP heavy water system is located inside the power block building in several rooms where the inner surface contamination is up to the level of 10 E4 Bq.cm{sup -2}, dose rate up to 15,0 mGy.h{sup -1} and the feeding pipeline contained liquid RAW with high tritium content. Pre-dismantling decontamination of the heavy water management system and associated systems had to be performed with the intention of improving the radiation situation, i.e. reducing contamination of internal surface and dose rates in the vicinity of the equipment. Various sophisticated procedures such as retrieval of sludge using remotely operated devices and loop chemical decontamination of internal surfaces were applied. The generated radioactive waste such as spent decontamination solutions and sludge were immediately solidified on-site into a geo-polymer matrix using a mobile conditioning facility. For dismantling and fragmentation of some devices, mobile robotic systems MT80 and MT15 were applied which had been developed, designed and constructed as general-purpose decommissioning equipment. Special tooling was developed for application with the robots, such as hydraulic shears, circular saw, reciprocating saw, circular pipe cutter and a system for quick tool-change without direct intervention of the operators. Most of the operations are remotely controlled on basis of visual information from four cameras, with consistent radiation protection of the operators. The implementation of partial decommissioning tasks in such hard and unfavorable radiation conditions (moreover accompanied by generation of specific high-content alpha radwaste) has introduced in practice several new unique decontamination and dismantling techniques and new procedures for the effective on-site processing of generated secondary radioactive waste, including sludge and sorbents. These advantageous techniques, equipment and experience will be exploited in the continuation of the A-1 NPP decommissioning process which has been organized according to distinctively licensed phases and are also being applied in the decommissioning of other NPP in Slovakia as well as abroad. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Feasibility studies for the design of disposal vaults for multi-purpose containers (MPCs): construction, operation, ventilation and management of heat - 15175

The Nuclear Decommissioning Authority (NDA) subsidiary, Radioactive Waste Management Ltd (RWM) is responsible for the safe implementation of a Geological Disposal Facility (GDF) for radioactive waste in the UK. As part of their generic programme to underpin the planned designs for a GDF, work is ongoing to explore a range of possible geological disposal concepts. This work developed GDF concept designs for Multi-Purpose Containers (MPC) disposal in the generic host rock types considered: higher strength (crystalline), lower strength sedimentary (sedimentary / clay formations) and evaporite rocks. This paper is specific to concepts for the disposal of MPC for Pressurised Water Reactor (PWR) spent nuclear fuel (SF). The key outcomes of the feasibility studies to improve the understanding of the MPC disposal concept and the specific challenges to construct, operate, ventilate, manage heat and backfill associated with this concept are summarised in this paper. The management of the high loading of radiogenic heat (from 12 PWR SF assemblies in MPCs compared to 4 in 'standard' disposal containers) during an extended open phase (delayed backfilling of the disposal area) of up to 300 years was investigated. The concept designs developed demonstrate it is feasible to construct, operate and ventilate disposal vaults to accommodate open 'storage' periods required for transitional thermal decay of high heat generating waste in higher strength and lower strength sedimentary host rock types considered by RWM. This work focused on developing two contrasting disposal concepts which are applicable to both higher strength and lower strength rock environments; both of which illustrate how vault temperature, stability and groundwater inflows can be controlled to delay backfilling and allow MPC package thermal output to decrease. MPC disposal in evaporite rock does not require a cooling period due to its high thermal conductivity and favourable performance at higher temperatures; therefore the concept developed for this rock includes immediate backfilling of disposal tunnels. A clear understanding of the interactions and limitations associated with heat management during the open period was developed by investigation of a 'Heating Ventilation and Air-Conditioning System' (HVAC). It was concluded that removal of heat from the disposal tunnels / vaults is feasible, but introduces significant operational complexity. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Advanced simulation capability for environmental management, integrated tool-sets and simulator to enhance public communication - 15186

The U.S. Department of Energy (US DOE) Office of Environmental Management (EM), Office of Soil and Groundwater Remediation, is supporting multi-laboratory development of the Advanced Simulation Capability for Environmental Management (ASCEM). ASCEM is an open source and modular computing framework that incorporates new advances and tools for predicting contaminant fate and transport in natural and engineered systems. ASCEM facilitates transparent, efficient and integrated approaches to modeling and site characterization, and provides robust and standardized assessments of performance and risk for EM cleanup and closure activities. Site subsurface simulation modeling and performance assessments are complex and involve sensitivity evaluations and uncertainty quantification to better understand the risks at a site. The ASCEM tool-set was designed in close collaboration with the sites and other potential end-users (both the public and regulators) to allow better communication and understanding of these complex modeling efforts. ASCEM's integrated tool-sets provide a user interface and tools for managing work-flows, including conceptual model development, management of data and metadata for model input, sensitivity analysis, model calibration and uncertainty analysis, model execution on diverse computational platforms, and processing of model output, including visualization. The hierarchical and modular design of ASCEM HPC simulator Amanzi easily lends itself to translating this conceptual model of a site into a numerical model that can easily be spatially and temporally discretized to run on the HPC simulator. Together this integrated work-flow allows for a seamless and integrated analysis tracking all provenance information and modeling uncertainties. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Applying lean management to aging infrastructure - 15416

Currently the Savannah River Site liquid waste system consists of 51 waste tanks, two operating evaporators, a salt processing pilot plant, the DWPF vitrification facility, the salt-stone Processing Facility and an Effluent Treatment Plant. Six of the waste tanks have been grouted and closed and the full scale Salt Waste Processing Facility (SWPF) is under construction. Some of the waste tanks and associated infrastructure were placed into operation as early as 1954 and DWPF went into operation in 1996. Due to this long history of operation, the SRS liquid waste system is being challenged by aging infrastructure issues and the stored radioactive liquid waste has been identified by regulators as the highest environmental risk in the state. Much of the DOE complex faces similar infrastructure issues. Remedies that can mitigate the impact of those issues are needed all across the complex. At SRS, Lean Management has been adopted as a business process to help address some of the impacts. Lean Management got its start decades ago in the manufacturing sector and has its roots in the work of W. Edwards Deming and his contemporaries. In more recent years the process has matured in the Toyota Production System and migrated into fields as diverse as services industries, health care, and now the DOE complex. Lean Management has a 'secret sauce' that must be correct to avoid becoming the 'flavor of the month'. The easy part is the talking. The hard part is the doing. The payoff is in the doing. Obviously as facilities and equipment age, more and more funds are needed to maintain, refurbish, and replace them. Funding of course is tight for all our sites. Lean management generates work efficiency so a given set of resources can produce more. It must be noted that this isn't by working harder but rather by focusing scarce resources on the few activities that truly add value. A positive aspect for companies that have been on this journey is employees feel less stress and higher motivation. The work they do matters and they have fewer outside impediments to distract and sap their energy. SRR has used the Lean process to streamline both work planning and control and the supply chain to improve maintenance efficiency and reduce the Corrective Maintenance backlog. This paper explains how this was done, the challenges encountered, and how organizations can use this methodology for their own improvements. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Safeguarding Nuclear Waste - A Study in Risk Management and Overcoming Significant Challenges - 16439

Three years after what is commonly referred to as the 'Y-12 Incident', where three individuals trespassed and defaced a building at the Department of Energy's (DOE) Y-12 National Security Complex early on July 28, 2012, the DOE commissioned study after study to review security practices and internal risk management safeguarding protocols that preserves safety and a secure environment. These studies highlighted systemic organizational dysfunctions, critical leadership shortcomings, and communications failures. Much attention has been focused on risk management and security oversight practices. This analysis presents an update on the Department's Environmental Management (EM)-wide security leadership improvements designed to restore public confidence and explain how a deeper risk analysis has elevated security oversight into a common-core Department of Energy achievement. While EM is not the managing Program Office for Y-12, this event had a DOE-corporate wide impact. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Assessment of Quality Management for Transport Packages Not Requiring Authority Design Approval - 18194

The majority of transports of radioactive materials are carried out in packages which don't need a package design approval of a competent authority. Low active radioactive materials are transported in such kind of packages e.g. in the medical and pharmaceutical industry and in the nuclear industry as well. In Germany the decision to phase out nuclear energy leads to a strong demand for packages to transport low and middle active radioactive waste due to the dismantling and decommissioning of nuclear power plants. According to IAEA regulations the 'non-competent authority approved package types' are the excepted packages and the industrial packages of Type IP-1, IP-2 and IP-3 and of Type A. For the packages of Type IP-2, IP-3 and Type A an assessment by the German competent authority is required for the quality management for the design, manufacture, testing, documentation, use, maintenance and inspection. In general a compliance audit of the manufacturer of the packaging is required during this assessment procedure. Their regulatory level in the IAEA regulations is not comparable with the regulatory density for packages requiring competent authority design approval. The countries apply different approaches within the assessment of the quality assurance measures in the management system as well as in the quality assurance program of a special package design. To use the package or packaging in a safe manner and in compliance with the regulations a management system for each phase of the life of the package or packaging is necessary. In order to help manufactures, which measurements and documents are needed for the assessment procedure, BAM developed a guideline. The guideline BAM-GGR 016 [5] describes the needed quality management for the design, manufacture, testing, documentation, use, maintenance and inspection of a packaging and the package. The poster to be presented will explain the different requirements of the quality assurance measures and give examples. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Management of Metals from Decommissioning of Nuclear Facilities - 18411

The EDF group companies within the Cyclife platform have for decades performed treatment and recycling of metals. With different approaches but all considered international Good Practice, as valuable materials are recovered for safe recycling and volumes in the repositories for radioactive waste are saved. For an efficient decommissioning project, a well-defined waste management process is one of the critical paths, not least when it comes to routes for clearance and recycling of materials. It is easy to underestimate the complexity and bottlenecks caused by shortage of logistic space. In order to mitigate these risks, activities such as strengthening categorization, quantification and adopting different routes based on the material properties should be implemented. By categorization of the of waste and materials considered/classified as contaminated or potentially contaminated it is obvious that the management of the metals is a key parameter in nuclear decommissioning. Analyses performed by the EDF companies shows that a majority of the materials, classified as contaminated, from a BWR/PWR plant are metals. Experience gives that a high percentage of these metals from decommissioning can be subject to recycling either directly upon completion of the clearance process or after certain treatment. Non-technical key parameters like the regulatory requirements on applying the waste hierarchy, the impact on repository programs as well as, not at least, the regulatory and public acceptance of recycling of materials from the nuclear industry are, together with costs essential factors when forming the routing of metals and other waste materials from a decommissioning project. Today the EDF group companies are positioned to provide a wide range of services for management of the contaminated metals from decommissioning projects, spanning from industrial management of metals which directly will be subject general clearance after verification measurements up to decontamination and melting of selected reactor internals for recycling to public domain or within the nuclear industry. In this paper the typical waste material composition for BWR and PWR plants, the different ways to treat/manage the radioactive and potentially radioactive metals including a comparison of the different approach commonly used in a technical, logistical and economical perspectives. A few success stories will be resented as well as lessons learned. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 81: Engaging on Safety at the Work Face - Workers, Front Line Managers, and Subcontractors

This panel focuses on engaging on safety at the work face, with the people who are there every day. This panel will discuss management approaches deployed to directly engage internal and subcontracted workers that have delivered measurable improvements in safety performance and culture. The panelists will share what they did that worked and their perspectives on why. About 24 to 30 people were in attendance. All statements below are paraphrased by the panel reporter and should not be considered direct quotes by the panelists. Presentations proposed include: 1 - Engaging on Safety at the Work Face: Workers, Front Line Managers, and Subcontractors (Jan Preston, Fluor Corporation (USA)); 2 - Responsibility for Safety: Workers and Line Management Joining Together to Improve Performance (Cynthia Williams, Canadian Nuclear Laboratories (Canada)); 3 - Worker Involvement: Trust and the Processing of the Remediated Nitrate Salts (David Funk, Los Alamos National Laboratory (USA)); 4 - Safety Culture: How Employee Engagement is Transforming the Paducah Site (Myrna Espinosa Redfield, Four Rivers Nuclear Partnership (USA)); 5 - Hazard Identification and Control: Subcontractor Performance, Oversight, and Continuous Improvement (Clint Wolfley, URS/CH2M Oak Ridge - UCOR (USA)); 6 - Managing Safety Performance Through Change (Alice Doswell, Fluor (USA))

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Improving Effectiveness of Waste Management Processes with Information and Communications Technology (ICT) - 19524

Improving the effectiveness of waste estimation, tracking, management and disposal processes is a key objective for Waste Management. Project Teams face common challenges producing waste estimates that are accurately accounted for in the project plan, tracking and reporting waste record actuals against the estimate, and communicating the status of waste through the organization. These challenges impact the effectiveness of waste management from a cost and schedule perspective, which can have a significant impact on the bottom line and on future business. By leveraging information and communications technology (ICT) waste management project teams can create a mobile workforce that closes the gaps between creating estimates and tracking actuals against estimates by gathering real time data at each step in the process. This results in significant gains on schedule and cost, improved communication and visibility across the project team, and an improvement in the overall effectiveness of waste processing and disposal procedures. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Port Hope Area Initiative: Information Management for A Very Large Radiation Survey - 19567

The Port Hope Area Initiative (PHAI) represents the Government of Canada's commitment to the cleanup and safe, local, long-term management of historic low-level radioactive waste (LLRW) in two Southern Ontario municipalities - Port Hope. The PHAI is based on community-recommended solutions for the cleanup and safe long-term management of approximately 1.7 million cubic meters of LLRW. It is currently one of Canada's largest environmental remediation projects at a cost of over one billion dollars. The PHAI is being implemented by Canadian Nuclear Laboratories (CNL) on behalf of Atomic Energy of Canada Limited, a federal Crown corporation. The waste is the result of radium and uranium processing in Port Hope by the former federal crown corporation Eldorado Nuclear Limited between 1933 and 1988. The waste has been distributed in the Municipality of Port Hope through placement of contaminated materials (e.g. fill), reuse of contaminated objects (e.g. tailings use in concrete, steel posts, structural wood) and air-borne deposition. Signature contaminants of potential concern (COPCs) are Ra-226, Th-230, uranium and arsenic; however, there are an additional 17 COPCs that also need to be considered. A very large amount of information has been collected during the survey and effectively managing and analyzing this information is critical to the success for the property owners, CNL's implementation of the PHAI, and Arcadis. Data collected during the survey includes information pertaining to long-term interior radon gas measurements, interior gamma radiation surveys, contaminated objects and surfaces, exterior gamma radiation and subsurface investigations. exterior gamma radiation surveys. The information management (IM) is structured with SharePoint as a focal point supported by an EQuIS database, mobile data collection and GIS support. The IM process for this project is being advanced using recent software developments to assist with internal activities (e.g. QA) and interactions with CNL including notifications and scheduling and status of property completion. Different applications have been developed to help automate, visualize, actively track, and QA different processes using recent software developments by Microsoft. We have used SharePoint to organize and track our data. Power BI has been used to actively track and visualize our data from Interior gamma surveying to exterior drilling. The creation of dynamic/advanced visualizations in Power BI gathers data daily from our multiple sources and analyzes it for anomalous data and trends. Microsoft Flow syncs with Power BI and has been implemented to automate many processes including the QA of surveys and soil results for identification of LLRW. To tie everything together, our GIS and EQuIS systems are our primary data compilation source that makes our advanced analytics/visualization and automation/tracking our data possible. Specific examples will be discussed, as will challenges encountered during the continuing development of the IM system. The incorporation of software advancements to the existing IM system for Port Hope characterization has improved the quality of the surveys, the tracking of completion, meeting schedule requirements and providing the required data for tracking, report preparation and supporting remediation of contamination on the properties. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 120: Roundtable: Waste Management - Energy Facilities Contractor Operating Group (EFCOG WM)

This Roundtable focused on the WM EFCOG working group as they met to discuss a variety of issues of importance to US DOE waste management operations. The purpose of the WM EFCOG is to seek out and promote the best management and operating practices, cost effective technologies and disposal options for all waste streams generated at US DOE facilities whether destined for US DOE or commercial facilities. Each site representative provided a radioactive waste management lessons learned briefing. Panelists with presentations: Savannah River Site (SRS) Solid Waste Program Update (Kerri Crawford); Idaho Clean-up Project Status (Frederick Hughes); West Valley Demonstration Project Update - EFCOG Waste Management Working Group (John Rendall); Key Project Challenges and Successes (Kalli Shupe); EFCOG WMWG Challenging Waste Subgroup Update (Tammy Monday); CH TRU Difficult Waste Stream Processing Challenges (Daniel Pancake); Argonne Building 350 Clean-up Success Using Effective Work Control (Daniel Dilday); Problematic Waste Streams on the Oak Ridge Reservation (John Wrapp)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 36: Hot Topics in US Commercial Low-Level Waste Management

This panel focused on emerging issues in commercial LLW management in the US from the perspective of active members of the Low-Level Radioactive Waste Forum, Inc. State, compact, federal and industry officials shared their views on a variety of timely and significant topics related to low-level radioactive waste management, disposal and related issues. Session no. 36 Co-Chairs, Patricia Holahan and Daniel Shrum, introduced the panelists and provided a summary of the purpose of the session. This Panel Session focused on several current and emerging issues impacting the commercial Low-Level Radioactive Waste (LLRW) management in the US from the perspective of active members of the Low-Level Waste Forum, Inc., States, Compact, as well as Federal and nuclear industries. The panelists provided different perspectives on number of key issues such as: LLW disposal facility status and updates (e.g.; in terms of disposal capacity, plans, and waste acceptance conditions). The panelists also addressed waste disposal rates and potential impacts of ongoing regulatory developments by the NRC and the concerned States. Other timely topics pertaining to the revision of 10CFR Part 61, the Greater-than-Class C (GTCC) and Transuranic (TRU) waste, and Very Low-Level Waste (VLLW) disposal issues were also addressed at this Session. Panelists with presentations: Hot Topics in US Commercial LLW Management (Joe Weismann); Texas LLRW Compact (David Carlson); Texas Low-Level Radioactive Waste Disposal Compact Commission (John Salsman); Barnwell LLRW Disposal Facility (Benjamin Smith, Bill Carver)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Experiences with Mobile Units for Liquid RAW Management in Slovak and Czech Nuclear Power Plants - 20089

In Nuclear Power Plants VVER 440, Russian type of reactor there was designed auxiliary building where according to basic design all operational liquid radioactive waste (RAW) should be stored in large capacity tanks during the whole operational period. That's why there are in the auxiliary building several types of large storage tanks with different internal volume from 110 m{sup 3}, 460 m{sup 3} to 550 m{sup 3}. Storage tanks are usually situated in rooms with limited access and minimal handling space. Operational waste was here transported by the system of pipes from the reactor building. There is possibility to handle with the waste and set the pipeline in to the chosen storage tanks. Nobody takes care about the quality of waste in the storage tanks and waste waits for the period of decommissioning when it should be treated. The storage capacity was designed for the whole lifetime of nuclear power plant. Currently the life time of Nuclear Power Plant's (NPP) is extended and there is necessity to retrieve and treat the RAW in advance. Another reason why the stakeholder, who operates the NPPs, decides to treat the operational RAW during the operational period of NPP, is that there are still new requirements from safety point of view which need to have free available space for example because of potential accident. So treating the operational RAW during the life time of NPP is present issue. Because in basic design nobody cares how the RAW will be retrieved and treated in the future, there is usually no technology for that in existing NPP. Some of the NPPs build an additional building with suitable technologies for treatment or hire the company which offer mobile technology for retrieving the waste from the storage tanks. Wood Nuclear Slovakia PLC provides all activities within liquid RAW management projects by its own staff including management, design, construction and deployment of equipment, engineering support, as well as all RAW retrieval and solidification activities. We offer RAW management as a service without any significant changes in existing NPP's buildings and technology. It is always a technical challenge to conduct successful retrieval, pumping and treatment of RAW. The complex RAW retrieval system can be designed as tailored solution for any RAW storage according to known boundary conditions and specific needs. These systems are based on years of experience with RAW manipulation, processing and treatment and the whole RAW management knowledge by Wood Nuclear Slovakia LTD. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Best Practices for Managing Organizational Diversity

Organizations with increasingly diverse workforces and customer populations face challenges in reaping diversity's benefits while managing its potentially disruptive effects. This article defines workplace diversity and identifies best practices supporting planned and positive diversity management. It explores how academic libraries can apply diversity management best practices and provides a reading list for leaders and human resource managers wishing to optimize their organization's approach to diversity.

99 GENERAL AND MISCELLANEOUS↗

Development and Implementation of a Program Management Maturity Model

In 2006, Honeywell Federal Manufacturing & Technologies (FM&T) announced an updatedvision statement for the organization. The vision is “To be the most admired team within the NNSA [National Nuclear Security Administration] for our relentless drive to convert ideas into the highest quality products and services for National Security by applying the right technology, outstanding program management and best commercial practices.” The challenge to provide outstanding program management was taken up by the Program Management division and the Program Integration Office (PIO) of the company. This article describes how Honeywell developed and deployed a program management maturity model to drive toward excellence.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Managing Natural and Reintroduced Rare Plant Populations within a Large Government Reservation

California is home to many large government reservations that have been in existence for decades. Many of these reservations were formed to support various Department of Defense and Department of Energy national defense activities. Often, only a very small percentage of the reservation is actively used for programmatic activities, resulting in large areas of intact habitat. In some cases, this has benefited rare plant populations, as surrounding lands have been developed for residential or industrial use. However, land management activities such as the suppression or active use of fire and other disturbance (such as fire trail grading) can also work to either the detriment or benefit of rare plant populations at these sites. A management regime that is beneficial to the rare plant populations of interest and is at best consistent with existing site programmatic activities, and at a minimum does not impact such activities, has the best potential for a positive outcome. As a result, some species may be 'difficult' while others may be 'easy' to manage in this context, depending on how closely the species biological requirements match the programmatic activities on the reservation. To illustrate, we compare and contrast two rare annual plant species found at Lawrence Livermore National Laboratory's Site 300. Although several populations of Amsinckia grandiflora have been restored on the site, and all populations are intensively managed, this species continues to decline. In contrast, Blepharizonia plumosa appears to take advantage of the annual controlled burns conducted on the site, and is thriving.

60 APPLIED LIFE SCIENCES↗

Failure Prevention For Nuclear Power Plants Through Proactive Management of Materials Degradation (PMMD)

Failure prevention is central to the operation of nuclear power plants. To meet this goal there is growing interest in new and improved philosophies and methodologies for plant life management (PLiM), which include the migration from reliance on periodic inservice inspection to include condition-based maintenance. A further step in the development of plant management is the move from reactive responses based on ISI to become proactive, through the investigation of the potential for implementation of a proactive management of materials degradation (PMMD) program and its potential impact on the management of LWRs.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗