Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “life testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,369 records · Page 76

Service-Life Extension of Explosive Escape Devices

Chemical and functional tests yield conservative service-life estimates. Approach to extension of service lives of explosive devices in aircraft escape system developed, supported by testing of representative candidate devices to evaluate quantitatively effects of service, age, and degradation, and to enable responsible, conservative service-life determinations. Five types of explosive components evaluated: rigid and flexible explosive transfer lines; one-way transfers; flexible, linear-shaped charges; and initiation-handles. Extension of service in realistic manner provides both cost savings and increased system reliability.

Bement, L. J.↗

HESTIA Commodities Exchange Pallet and Sounding Rocket Test Stand

During my Spring 2016 internship, my two major contributions were the design of the Commodities Exchange Pallet and the design of a test stand for a 100 pounds-thrust sounding rocket. The Commodities Exchange Pallet is a prototype developed for the Human Exploration Spacecraft Testbed for Integration and Advancement (HESTIA) program. Under the HESTIA initiative the Commodities Exchange Pallet was developed as a method for demonstrating multi-system integration thru the transportation of In-Situ Resource Utilization produced oxygen and water to a human habitat. Ultimately, this prototype's performance will allow for future evaluation of integration, which may lead to the development of a flight capable pallet for future deep-space exploration missions. For HESTIA, my main task was to design the Commodities Exchange Pallet system to be used for completing an integration demonstration. Under the guidance of my mentor, I designed, both, the structural frame and fluid delivery system for the commodities pallet. The fluid delivery system includes a liquid-oxygen to gaseous-oxygen system, a water delivery system, and a carbon-dioxide compressors system. The structural frame is designed to meet safety and transportation requirements, as well as the ability to interface with the ER division's Portable Utility Pallet. The commodities pallet structure also includes independent instrumentation oxygen/water panels for operation and system monitoring. My major accomplishments for the commodities exchange pallet were the completion of the fluid delivery systems and the structural frame designs. In addition, parts selection was completed in order to expedite construction of the prototype, scheduled to begin in May of 2016. Once the commodities pallet is assembled and tested it is expected to complete a fully integrated transfer demonstration with the ISRU unit and the Environmental Control and Life Support System test chamber in September of 2016. In addition to the development of the Commodities Exchange Pallet, I also assisted in preparation for testing the upper stage of a sounding rocket developed as a Center Innovation Fund project. The main objective of this project is to demonstrate the integration between a propulsion system and a solid oxide fuel cell (SOFC). The upper stage and SOFC are scheduled to complete an integrated test in August of 2016. As part of preparation for scheduled testing, I was responsible for designing the upper stage's test stand/support structure and main engine plume deflector to be used during hot-fire testing (fig. 3). The structural components of the test stand need to meet safety requirements for operation of the propulsion system, which consist of a 100 pounds-thrust main engine and two 15 pounds-thrust reaction control thrusters. My main accomplishment for this project was the completion of the design and the parts selection for construction of the structure, scheduled to begin late April of 2016.

Chaparro, Javier↗

Special Issue: Environmental Barrier Coatings

The global increase in air travel will require commercial vehicles to be more efficient than ever before. Advanced turbine hot section materials are a key technology required to keep fuel consumption and emission to a minimum. Ceramic matrix composites (CMCs) are the most promising material to revolutionize turbine hot section materials because of their excellent high‐temperature properties. Rapid surface recession due to volatilization by water vapor is the Achilles heel of CMCs. Environmental barrier coatings (EBCs), which protect CMCs from water vapor, is an enabling technology for CMCs. The first CMC component entered into service in 2016 in a commercial engine, and more CMC components are scheduled to follow within the next few years. One of the most difficult challenges to CMC components is EBC durability because failure of EBC leads to a rapid reduction in CMC component life. Novel EBC chemistries, creative EBC designs, and robust processes are required to meet EBC durability challenges. Engine-relevant testing, characterization, and lifing methods need to be developed to improve EBC reliability. The aim of this Special Issue is to present recent advances in EBC technology to address current EBC challenges.

EBC, CMC, Oxidation, Volatility, CMAS, Thermomecha↗

Fatigue Characterization of Alloy 10: a 1300F Disk Alloy for Small Gas Turbine Engines

A detailed fatigue characterization of Alloy 10, a high strength nickel-based disk alloy, was conducted on test coupons machined from a 'pancake' forging. Smooth bar, strain controlled fatigue testing at various R-ratios was run at representative bore, 750 F, and rim, 1300 F, temperatures. This was followed by notch fatigue testing (Kt=2) run under load control. Analysis of the fatigue data using a Smith-Watson-Topper approach and finite element analysis of the notch root was employed to understand material behavior in these tests. Smooth bar fatigue data showed a significant R-ratio dependence at either test temperature which could be accounted for using a Smith-Watson-Topper parameter (SWT). In general, fatigue life was longer at 750 F than 1300 F for a given SWT. For notch fatigue tests, life was longer at 750 F than 1300 F but only at higher stresses. This was attributed to differences in alloy strength. At lower stresses, finite element analysis suggested that convergence of fatigue life at both temperatures resulted from relaxation of stresses at the notch root in the 1300 F tests.

Gayda, John↗

A ground test program to support condition monitoring of a spacecraft attitude control propulsion system

The Comet Rendezvous Asteroid Flyby (CRAF) mission involves seven years of flight from 0.6 to 4.57 Astronomical Units (AU), followed by about 915 days of maneuvering around a comet. Ground testing will characterize the very critical attitude control system thrusters' fuel consumption and performance for all anticipated fuel temperatures over thruster life. The ground test program characterization will support flight condition monitoring. A commercial software application hosted on a commercial microcomputer will control ground test operations and data acquisition using a newly designed thrust stand. The data acquisition and control system uses a graphics-based language and features a visual interface to integrate data acquisition and control.

Clark, Douglas J.↗

Test Population Selection from Weibull-Based, Monte Carlo Simulations of Fatigue Life

Fatigue life is probabilistic and not deterministic. Experimentally establishing the fatigue life of materials, components, and systems is both time consuming and costly. As a result, conclusions regarding fatigue life are often inferred from a statistically insufficient number of physical tests. A proposed methodology for comparing life results as a function of variability due to Weibull parameters, variability between successive trials, and variability due to size of the experimental population is presented. Using Monte Carlo simulation of randomly selected lives from a large Weibull distribution, the variation in the L10 fatigue life of aluminum alloy AL6061 rotating rod fatigue tests was determined as a function of population size. These results were compared to the L10 fatigue lives of small (10 each) populations from AL2024, AL7075 and AL6061. For aluminum alloy AL6061, a simple algebraic relationship was established for the upper and lower L10 fatigue life limits as a function of the number of specimens failed. For most engineering applications where less than 30 percent variability can be tolerated in the maximum and minimum values, at least 30 to 35 test samples are necessary. The variability of test results based on small sample sizes can be greater than actual differences, if any, that exists between materials and can result in erroneous conclusions. The fatigue life of AL2024 is statistically longer than AL6061 and AL7075. However, there is no statistical difference between the fatigue lives of AL6061 and AL7075 even though AL7075 had a fatigue life 30 percent greater than AL6061.

Vlcek, Brian L.↗

Test Population Selection from Weibull-Based, Monte Carlo Simulations of Fatigue Life

Fatigue life is probabilistic and not deterministic. Experimentally establishing the fatigue life of materials, components, and systems is both time consuming and costly. As a result, conclusions regarding fatigue life are often inferred from a statistically insufficient number of physical tests. A proposed methodology for comparing life results as a function of variability due to Weibull parameters, variability between successive trials, and variability due to size of the experimental population is presented. Using Monte Carlo simulation of randomly selected lives from a large Weibull distribution, the variation in the L10 fatigue life of aluminum alloy AL6061 rotating rod fatigue tests was determined as a function of population size. These results were compared to the L10 fatigue lives of small (10 each) populations from AL2024, AL7075 and AL6061. For aluminum alloy AL6061, a simple algebraic relationship was established for the upper and lower L10 fatigue life limits as a function of the number of specimens failed. For most engineering applications where less than 30 percent variability can be tolerated in the maximum and minimum values, at least 30 to 35 test samples are necessary. The variability of test results based on small sample sizes can be greater than actual differences, if any, that exists between materials and can result in erroneous conclusions. The fatigue life of AL2024 is statistically longer than AL6061 and AL7075. However, there is no statistical difference between the fatigue lives of AL6061 and AL7075 even though AL7075 had a fatigue life 30 percent greater than AL6061.

Vlcek, Brian L.↗

CMIF ECLS system test findings

During 1987 three Space Station integrated Environmental Control and Life Support System (ECLSS) tests were conducted at the Marshall Space Flight Center (MSFC) Core Module Integration Facility (CMIF) as part of the MSFC ECLSS Phase II test program. The three tests ranged in duration from 50 to 150 hours and were conducted inside of the CMIF module simulator. The Phase II partial integrated system test configuration consisted of four regenerative air revitalization subsystems and one regenerative water reclamation subsystem. This paper contains a discussion of results and lessons learned from the Phase II test program. The design of the Phase II test configuration and improvements made throughout the program are detailed. Future plans for the MSFC CMIF test program are provided, including an overview of planned improvements for the Phase III program.

Schunk, Richard G.↗

Implementation of Research and Development (R and D) Results in the Design of Liner System for the Near Surface Disposal Facility (NSDF) - 19089

Canadian Nuclear Laboratories (CNL) proposes to develop a Near Surface Disposal Facility (NSDF) at the Chalk River Laboratories (CRL) site in Ontario, Canada for disposal of CNL's Low Level Radioactive Waste (LLW) and other suitable wastes meeting the Waste Acceptance Criteria (WAC). The NSDF's Engineered Containment Mound (ECM) includes base liner and final cover systems. These liner systems are designed to perform effectively for a total of 550 years. The specified geomembrane in the NSDF detailed design is 2 mm thick High Density Polyethylene Geomembrane (HDPE GMB) double sided textured and white surface. CNL's approach to collaborate with Subject Matter Expert (SME) consultants and contractors, a Canadian university, and industry has enabled the NSDF to incorporate current best design practices, particularly for the design of the ECM's liner systems. This paper describes the HDPE GMB testing program and how the results of the state-of-the-art research have been utilized in the design of the NSDF's liner system and in selection of the best candidate materials to strengthen the confidence that the required service-life will be met. The testing program includes index properties and long-term performance evaluation tests of the five candidate HDPE GMBs using leachate simulant comparable to expected NSDF leachate and an index simulant used for testing many GMBs. The results of the tests are used as the basis to assess expected HDPE GMBs long-term performance. The expected long-term performance is applied as the key consideration for the final selection of the HDPE GMB in the NSDF project. Preliminary results of the testing program indicate that an expected service-life of 550 years will likely be met by the candidate HDPE GMB. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Continued Benefit to Rectal Separation for Prostate Radiation Therapy: Final Results of a Phase III Trial

Purpose: SpaceOAR, a Food and Drug Administration–approved hydrogel intended to create a rectal–prostate space, was evaluated in a single-blind phase III trial of image guided intensity modulated radiation therapy. A total of 222 men were randomized 2:1 to the spacer or control group and received 79.2 Gy in 1.8-Gy fractions to the prostate with or without the seminal vesicles. The present study reports the final results with a median follow-up period of 3 years. Methods and Materials: Cumulative (Common Terminology Criteria for Adverse Events, version 4.0) toxicity was evaluated using the log-rank test. Quality of life (QOL) was examined using the Expanded Prostate Cancer Index Composite (EPIC), and the mean changes from baseline in the EPIC domains were tested using repeated measures models. The proportions of men with minimally important differences (MIDs) in each domain were tested using repeated measures logistic models with prespecified thresholds. Results: The 3-year incidence of grade ≥1 (9.2% vs 2.0%; P=.028) and grade ≥2 (5.7% vs 0%; P=.012) rectal toxicity favored the spacer arm. Grade ≥1 urinary incontinence was also lower in the spacer arm (15% vs 4%; P=.046), with no difference in grade ≥2 urinary toxicity (7% vs 7%; P=0.7). From 6 months onward, bowel QOL consistently favored the spacer group (P=.002), with the difference at 3 years (5.8 points; P<.05) meeting the threshold for a MID. The control group had a 3.9-point greater decline in urinary QOL compared with the spacer group at 3 years (P<.05), but the difference did not meet the MID threshold. At 3 years, more men in the control group than in the spacer group had experienced a MID decline in bowel QOL (41% vs 14%; P=.002) and urinary QOL (30% vs 17%; P=.04). Furthermore, the control group were also more likely to have experienced large declines (twice the MID) in bowel QOL (21% vs 5%; P=.02) and urinary QOL (23% vs 8%; P=.02). Conclusions: The benefit of a hydrogel spacer in reducing the rectal dose, toxicity, and QOL declines after image guided intensity modulated radiation therapy for prostate cancer was maintained or increased with a longer follow-up period, providing stronger evidence for the benefit of hydrogel spacer use in prostate radiation therapy.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Design and Testing of Suit Regulator Test Rigs

The next generation space suit requires additional capabilities for controlling and adjusting internal pressure compared to that of historical designs. Next generation suit pressures will range from slight pressure, for astronaut prebreathe comfort, to hyperbaric pressure levels for emergency medical treatment of decompression sickness. In order to test these regulators through-out their development life cycle, novel automated test rigs are being developed. This paper addresses the design philosophy, performance requirements, physical implementation, and test results with various units under test.

Campbell, Colin↗

Post-Test Inspection of NASA's Evolutionary Xenon Thruster Long-Duration Test Hardware: Discharge Chamber

The NEXT Long-Duration Test is part of a comprehensive thruster service life assessment intended to demonstrate overall throughput capability, validate service life models, quantify wear rates as a function of time and operating condition, and identify any unknown life-limiting mechanisms. The test was voluntarily terminated in February 2014 after demonstrating 51,184 hours of high-voltage operation, 918 kg of propellant throughput, and 35.5 MN-s of total impulse. The post-test inspection of the thruster hardware began shortly afterwards with a combination of non-destructive and destructive analysis techniques, and is presently nearing completion. This paper presents relevant results of the post-test inspection for the discharge chamber as well as other miscellaneous components such as the high-voltage propellant isolators and electrical cabling. Comparison of magnetic field measurements taken during pretest and post-test inspections indicate that the field strength did not degrade, consistent with performance data obtained during the test. Inspection of discharge chamber mesh samples show a deposition coating primarily composed of grid material that is approximately 15 micrometers in thickness. This thickness is well within the retention capability of the mesh and is therefore not expected to present any issues. Approximately 3.1 grams of deposition flakes were found at the bottom of the discharge chamber, composed primarily of grid material and carbon. Calculated size histograms of these flakes indicate that 99% have a maximum dimension of 200 micrometers or smaller, which is significantly less than the ion optics grid gap. Larger flakes that are capable of causing a grid-to-grid short will be analyzed to determine if their formation will occur in flight or is a facility effect. The high-voltage propellant isolators as well as numerous other electrical insulators were inspected and no evidence of arcing or any other issues were found.

Electric Propulsion↗

Post-Test Inspection of NASA's Evolutionary Xenon Thruster Long-Duration Test Hardware: Discharge and Neutralizer Cathodes

The NEXT Long-Duration Test is part of a comprehensive thruster service life assessment intended to demonstrate overall throughput capability, validate service life models, quantify wear rates as a function of time and operating condition, and identify any unknown life-limiting mechanisms. The test was voluntarily terminated in April 2014 after demonstrating 51,184 hours of high-voltage operation, 918 kg of propellant throughput, and 35.5 MN-s of total impulse. The post-test inspection of the thruster hardware began shortly afterwards with a combination of non-destructive and destructive analysis techniques, and is presently nearing completion. This presentation presents relevant results of the post-test inspection for both discharge and neutralizer cathodes.

Lifetime↗

Post-test Inspection of NASA’s Evolutionary Xenon Thruster Long-Duration Test Hardware: Discharge Chamber

The NEXT Long-Duration Test is part of a comprehensive thruster service life assessment intended to demonstrate overall throughput capability, validate service life models, quantify wear rates as a function of time and operating condition, and identify any unknown life-limiting mechanisms. The test was voluntarily terminated in February 2014after demonstrating 51,184 hours of high-voltage operation, 918 kg of propellant throughput, and 35.5 MN-s of total impulse. The post-test inspection of the thruster hardware began shortly afterwards with a combination of non-destructive and destructive analysis techniques, and is presently nearing completion. This paper presents relevant results of the post-test inspection for the discharge chamber as well as other miscellaneous components such as the high-voltage propellant isolators and electrical cabling. Comparison of magnetic field measurements taken during pretest and post-test inspections indicate that the field strength did not degrade, consistent with performance data obtained during the test. Inspection of discharge chamber mesh samples show a deposition coating primarily composed of grid material that is approximately 15 μm in thickness. This thickness is well within the retention capability of the mesh and is therefore not expected to present any issues. Approximately 3.1 grams of deposition flakes were found at the bottom of the discharge chamber, composed primarily of grid material and carbon. Calculated size histograms of these flakes indicate that 99% have a maximum dimension of 200 μm or smaller, which is significantly less than the ion optics grid gap. Larger flakes that are capable of causing a grid-to-grid short will be analyzed to determine if their formation will occur in flight or is a facility effect. The high-voltage propellant isolators as well as numerous other electrical insulators were inspected and no evidence of arcing or any other issues were found.

Rohit Shastry↗

Commercialization of Medium Voltage HTS Triax™ Cable Systems

The original project scope that was established in 2007 aimed to install a 1,700 meter (1.1 mile) medium voltage HTS Triax™ cable system into the utility grid in New Orleans, LA. In 2010, however, the utility partner withdrew from the project, so the 1,700 meter cable installation was cancelled and the scope of work was reduced. The work then concentrated on the specific barriers to commercialization of HTS cable technology. The modified scope included long-length HTS cable design and testing, high voltage factory test development, optimized cooling system development, and HTS cable life-cycle analysis. In 2012, Southwire again analyzed the market for HTS cables and deemed the near term market acceptance to be low. The scope of work was further reduced to the completion of tasks already started and to testing of the existing HTS cable system in Columbus, OH. The work completed under the project included: • Long-length cable modeling and analysis • HTS wire evaluation and testing • Cable testing for AC losses • Optimized cooling system design • Life cycle testing of the HTS cable in Columbus, OH • Project management. The 200 meter long HTS Triax™ cable in Columbus, OH was incorporated into the project under the initial scope changes as a test bed for life cycle testing as well as the site for an optimized HTS cable cooling system. The Columbus cable utilizes the HTS Triax™ design, so it provided an economical tool for these of the project tasks.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Advanced Materials Testing Plan for the Space Suit Portable Life Support System

The Space Suit Portable Life Support System (PLSS) has a tight mass requirement to meet while also meeting other requirements for supporting a crewmember in space, on the Moon, or on Mars. To meet these requirements, atypical materials must be considered to close the mass budget allocations. However, many of these materials and processes are relatively new and untested. Therefore, initial analysis and testing of some new and advanced processes have been conducted following a roadmap presented last year. This material testing has focused primarily on thermoplastics, both additively manufactured and machined, to assess plating and fastening operations that will be required. These processes will provide additional strength and shielding capability typically only achieved with metallics. This testing has also helped to define a forward plan to certify these materials and processes for critical spaceflight applications. This report will review testing plated thermoplastics both for strength and thermal properties. It will also review fastener and fastening options and look at insert and fastener testing. It will also review state-of-the-art methods being considered elsewhere and some additional testing being conducted. Using the testing results researched here, there will be recommendations on applications for each of these types of methods going forward.

Ryan Ogilvie↗

Advanced Materials Testing Plan for the Space Suit Portable Life Support System

The Space Suit Portable Life Support System (PLSS) has a tight mass requirement to meet while also meeting other requirements for supporting a crewmember in space, on the Moon, or on Mars. To meet these requirements, atypical materials must be considered to close the mass budget allocations. However, many of these materials and processes are relatively new and untested. Therefore, initial analysis and testing of some new and advanced processes have been conducted following a roadmap presented last year. This material testing has focused primarily on thermoplastics, both additively manufactured and machined, to assess plating and fastening operations that will be required. These processes will provide additional strength and shielding capability typically only achieved with metallics. This testing has also helped to define a forward plan to certify these materials and processes for critical spaceflight applications. This report will review testing plated thermoplastics both for strength and thermal properties. It will also review fastener and fastening options and look at insert and fastener testing. It will also review state-of-the-art methods being considered elsewhere and some additional testing being conducted. Using the testing results researched here, there will be recommendations on applications for each of these types of methods going forward.

Ryan Ogilvie↗

Qualification tests and electrical measurements: Practice and problems

As part of the Flat-Plate Solar Array Project, 138 different module designs were subjected to qualification tests. Electrical measurements were subjected on well over a thousand modules representing more than 150 designs. From this experience, conclusions are drawn regarding results and problems, with discussion of the need for change or improvement. The qualification test sequence incuded application of environmental and electrical stresses to the module. With few exceptions, the tests have revealed defects necessitation of environmental and electrical stresses to the module. With few exceptions, the tests have revealed defects necessitating module design or process changes. However, the continued need for these tests may be questioned on the basis of technical and logistical factors. Technically, the current test sequence does not cover all design characteristics, does not include all field conditions and is not known to represent the desired 30-year module life. Logistically, the tests are time-consuming and costly, and there is a lack of, fully qualified independent test organizations. Alternatives to the current test program include simplification based on design specification and site environment, and/or the use of warranties or other commercial practices.

Smokler, M. I.↗