Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “launch control system”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,369 records · Page 76

Overview of the Planetary Observer Program

An overview of the Planetary Observer Program formulated by the Solar System Exploration Committee, including the key assumptions intended to constrain the cost of each program mission, is presented. Several candidate missions for the program and their scientific objectives and launch opportunities are described. A missions operations concept for controlling the operations costs of these projects is presented.

Blume, W. H.↗

Mass property control of a spin stabilized spacecraft with restrictive mission and weight constraints

In the primary experiment of the spin stabilized San Marco D/L spacecraft, the drag effects on a light spherical shell coupled to a relatively massive center body will be measured. To achieve the precise mass property control, the centroids of both the shell and the center body must coincide with each other and with the center of pressure of the shell. Precise spin balancing is needed for launch and orbital stability, and the deployable antennas need accurate alignment. Corrective measures, developed after the preliminary mass measurements showed flaws in the mass property control, are described in detail. Inertia booms and a yo-yo despin system were developed as add-on units, spin balance measurements about all three geometric axes were used to define weight minimized correction within the outer shell envelope, and boom tip mass differentials were optimized for the most favorable inertia ratio margin achievable within the mission weight constraints. The weight versus orbital lifetime trade-offs were also considered.

Lang, W. E.↗

Assessment Of The Stirling Power Option for Space Science Applications

Free-piston Stirling technology efforts in the past typically were intended to address power needs in the multi-kilowatt range. The Stirling power option was attractive primarily because of the high conversion efficiency and potential for long life. In recent years, several technology efforts have focused on the free-piston Stirling power d convertor for space power applications, however the more recent efforts are intended to provide power at levels far below one kilowatt. Through a variety of projects funded by both NASA and DOE, the free-piston Stirling convertor technology has successfully demonstrated high efficiency and long life. Other areas of concern, such as control of multi-convertor systems, and vibration reduction have also been addressed. Efforts are being initiated to address issues such as electro-magnetic interference (EMI), radiation tolerance of organic materials, and the ability to operate through launch loads and survive with integrity. The status of the technology in these areas will be briefly discussed in this paper.

Schreiber, Jeffrey G.↗

Programs Automate Complex Operations Monitoring

Kennedy Space Center, just off the east coast of Florida on Merritt Island, has been the starting place of every human space flight in NASA s history. It is where the first Americans left Earth during Project Mercury, the terrestrial departure point of the lunar-bound Apollo astronauts, as well as the last solid ground many astronauts step foot on before beginning their long stays aboard the International Space Station. It will also be the starting point for future NASA missions to the Moon and Mars and temporary host of the new Ares series rockets designed to take us there. Since the first days of the early NASA missions, in order to keep up with the demands of the intricate and critical Space Program, the launch complex - host to the large Vehicle Assembly Building, two launch pads, and myriad support facilities - has grown increasingly complex to accommodate the sophisticated technologies needed to manage today s space missions. To handle the complicated launch coordination safely, NASA found ways to automate mission-critical applications, resulting in streamlined decision-making. One of these methods, management software called the Control Monitor Unit (CMU), created in conjunction with McDonnell Douglas Space & Defense Systems, has since left NASA, and is finding its way into additional applications.

Source record↗

Experimental Results of Integrated Refrigeration and Storage System Testing

Launch operations engineers at the Kennedy Space Center have identified an Integrated Refrigeration and Storage system as a promising technology to reduce launch costs and enable advanced cryogenic operations. This system uses a close cycle Brayton refrigerator to remove energy from the stored cryogenic propellant. This allows for the potential of a zero loss storage and transfer system, as well and control of the state of the propellant through densification or re-liquefaction. However, the behavior of the fluid in this type of system is different than typical cryogenic behavior, and there will be a learning curve associated with its use. A 400 liter research cryostat has been designed, fabricated and delivered to KSC to test the thermo fluid behavior of liquid oxygen as energy is removed from the cryogen by a simulated DC cycle cryocooler. Results of the initial testing phase focusing on heat exchanger characterization and zero loss storage operations using liquid oxygen are presented in this paper. Future plans for testing of oxygen densification tests and oxygen liquefaction tests will also be discussed. KEYWORDS: Liquid Oxygen, Refrigeration, Storage

Notardonato, W. U.↗

Synthesizing a New Launch Vehicle Failure Probability Based on Historical Flight Data

New launch vehicles have historically had significantly higher failure rates in early flights than what has been predicted using Probabilistic Risk Assessment - PRA. This is because PRAs typically model a mature vehicle where a significant portion of the early failure probability contributors have been eliminated due to testing and improvements after actual field operation. To capture a more accurate early flight failure probability estimate, this paper develops a method that estimates ascent failure probability starting with the first flight based on historical launch vehicle records. With new launch vehicles being developed, such as the Space Launch System - SLS, a PRA model must be extended to cover early flight failure probability contributions that are either not covered in the mature-vehicle PRA or are underestimated. These failure probability contributions include design errors, quality control deficiencies, installation errors, and environmental impacts. There are also failure dependencies due to systemic errors that still exist due to limited entire-system testing.

Cross, Robert B.↗

Launch booster gust alleviation.

Design of gust alleviation controls for boost phase flight of missiles incorporating random winds, time-varying missile dynamics, control problem, etc

WIND EFFECT↗

A Custom Robotic System for Inspecting HEPA Filters in the Payload Changeout Room at the NASA Kennedy Space Center

In this paper, the prime objective is to describe a custom 4-dof (degree-of-freedom) robotic arm capable of autonomously or telerobotically performing systematic HEPA filter inspection and certification in the Shuttle Launch Pad Payload Changeout Rooms (PCR's) on pads A and B at the Kennedy Space Center, Florida. This HEPA filter inspection robot (HFIR) has been designed to be easily deployable and is equipped with the necessary sensory devices, control hardware, software and man-machine interfaces needed to implement HEPA filter inspection reliably and efficiently without damaging the filters or colliding with existing PCR structures or filters. The main purpose of the HFIR is to implement an automated positioning system to move special inspection sensors in pre-defined or manual patterns for the purpose of verifying filter integrity and efficiency. This will ultimately relieve NASA Payload Operations from significant problems associated with time, cost and personnel safety, impacts realized during non-automated PCR HFIR filter certification.

Spencer, James E., Jr.↗

Estimating Software Reliability for Space Launch Vehicles in Probabilistic Risk Assessment (PRA)

It is acutely recognized in the Probabilistic Risk assessment (PRA) field that software plays a defining role in overall system reliability for all modern systems across a wide variety of industries. Regardless if the software is embedded firmware for working components or elements, part of a Human-Machine-Interface, or automated command and control logic, the success of the software to fulfill its function under nominal and off-nominal environments will be a dominant contributor to system reliability. It is also recognized that software reliability prediction and estimation is one of the more challenging and questionable aspects of any PRA or system analyses due to the nature of software and its integration with physics based systems. Irrespective of this dichotomy, any incorporation of software reliability methods requires that the contributions are accountable, quantitative, and tractable. This paper provides a brief overview of software reliability methods, establishes some minimum requirements that the methods should incorporate for completeness, and provides a logic structure for applying software reliability. Model resolution will be discussed that supports current testing plans and trade studies. We will provide initial recommendations for use in the NASA PRA and present a future dynamic option for software and PRA. Space Launch Vehicle Software is recognized to be reliable in static conditions, yet relatively vulnerable to a set of failure modes in changing environments/flight phases. Two quantitative methods were chosen to incorporate software reliability into a Space Launch Vehicle PRA accounting for phase adjustments. One method predicts latent software failure using statistical methods, and the second provides estimates of coding errors and software operating system failures based on test and historical data, respectively. Software uncertainty will also be discussed. We determined that recommendations for PRA software reliability should be modeled at the software module level where multiple software components compose a module and combinations of the software architecture can lead to a functional failure.

Novack, Steven↗

NextSTEP Appendix A Modular ECLSS Effort Lessons Learned

NASA’s Artemis program provides the first steps for earth-independent exploration starting with crewed habitats in cislunar space and progressing toward crewed landings on the lunar surface that will prepare systems and crews for the exploration of Mars. The Next Space Technology for Exploration Partnerships (NextSTEP) is a public-private partnership model that facilitates commercial development of deep space exploration capabilities in support of more extensive human spaceflight missions in and beyond cislunar space. NASA issued the original NextSTEP Broad Agency Announcement (BAA) to U.S. industry in late 2014 and issued the second BAA (NextSTEP-2) in April 2016. The first appendix under NextSTEP-2, Appendix A, focused on developing deep space habitation concepts, engineering design and development, and risk reduction efforts leading to a habitation capability in cislunar space. NASA solicited concepts to develop and refine the evolvable, modular architecture, functional allocation options, standards, and common interfaces required to enable interoperability of the aggregate system to provide long duration deep space transit habitation, specifically enhancements and testing of deep space Environmental Control and Life Support Systems (ECLSS). Collins Aerospace, formerly UTC Aerospace Systems (UTAS), was awarded a Phase 1 and subsequent Phase 2 contract to “develop concepts that group ECLS systems into logical modules maximizing the use of common components and the development of unique methods and design concepts that support in-flight maintenance and repair for future exploration systems.” This paper summarizes the work accomplished under this effort, the lessons that can be applied to development of forthcoming habitation elements, and the gaps remaining to achieve a more resilient, maintainable, repairable and adaptable system capable of installation on a wide variety of habitat platforms. A primary accomplishment of this effort is the development and maturation of a modular palletization concept to enable standard rack interfaces, post-launch outfitting, and decoupling of structural supports that withstand launch environments from those needed for lower on-orbit loads in order to reduce installed mass and repurposing of panels within the habitat. In the course of the effort, Collins assessed numerous architecture trades, including the use of condensing and noncondensing heat exchangers, the ability of modular units to accommodate various habitat volumes and thermal loading, and the most appropriate order of and timing of delivery of regenerative ECLSS hardware to orbital habitats. In addition to the modularity of hardware elements, Collins developed software approaches for distributed/modular command, control, and communication systems and innovative Bayesian fault detection and isolation techniques. Finally, the effort explored advanced maintainability and supportability concepts including the definition of maintenance units (MUs) in place of the traditional Orbital Replacement Units (ORUs), increasing parts commonality to reduce the number and type of spare parts, the use of augmented reality to guide crews during maintenance and repair procedures, and how crews would prepare for and recover from long durations of habitat dormancy. Now that the NextSTEP Modular ECLSS effort has come to a close, it’s important to identify the lessons learned and where they can be leveraged to improve NASA’s broader program of ECLSS technology development and demonstration and ultimately how they can increase the performance of future surface and orbital habitats.

NextSTEP↗

NextSTEP Appendix A Modular ECLSS Effort Lessons Learned

NASA’s Artemis program provides the first steps for earth-independent exploration starting with crewed habitats in cislunar space and progressing toward crewed landings on the lunar surface that will prepare systems and crews for the exploration of Mars. The Next Space Technology for Exploration Partnerships (NextSTEP) is a public-private partnership model that facilitates commercial development of deep space exploration capabilities in support of more extensive human spaceflight missions in and beyond cislunar space. NASA issued the original NextSTEP Broad Agency Announcement (BAA) to U.S. industry in late 2014 and issued the second BAA (NextSTEP-2) in April 2016. The first appendix under NextSTEP-2, Appendix A, focused on developing deep space habitation concepts, engineering design and development, and risk reduction efforts leading to a habitation capability in cislunar space. NASA solicited concepts to develop and refine the evolvable, modular architecture, functional allocation options, standards, and common interfaces required to enable interoperability of the aggregate system to provide long duration deep space transit habitation, specifically enhancements and testing of deep space Environmental Control and Life Support Systems (ECLSS). Collins Aerospace, formerly UTC Aerospace Systems (UTAS), was awarded a Phase 1 and subsequent Phase 2 contract to “develop concepts that group ECLS systems into logical modules maximizing the use of common components and the development of unique methods and design concepts that support in-flight maintenance and repair for future exploration systems.” This paper summarizes the work accomplished under this effort, the lessons that can be applied to development of forthcoming habitation elements, and the gaps remaining to achieve a more resilient, maintainable, repairable and adaptable system capable of installation on a wide variety of habitat platforms. A primary accomplishment of this effort is the development and maturation of a modular palletization concept to enable standard rack interfaces, post-launch outfitting, and decoupling of structural supports that withstand launch environments from those needed for lower on-orbit loads in order to reduce installed mass and repurposing of panels within the habitat. In the course of the effort, Collins assessed numerous architecture trades, including the use of condensing and noncondensing heat exchangers, the ability of modular units to accommodate various habitat volumes and thermal loading, and the most appropriate order of and timing of delivery of regenerative ECLSS hardware to orbital habitats. In addition to the modularity of hardware elements, Collins developed software approaches for distributed/modular command, control, and communication systems and innovative Bayesian fault detection and isolation techniques. Finally, the effort explored advanced maintainability and supportability concepts including the definition of maintenance units (MUs) in place of the traditional Orbital Replacement Units (ORUs), increasing parts commonality to reduce the number and type of spare parts, the use of augmented reality to guide crews during maintenance and repair procedures, and how crews would prepare for and recover from long durations of habitat dormancy. Now that the NextSTEP Modular ECLSS effort has come to a close, it’s important to identify the lessons learned and where they can be leveraged to improve NASA’s broader program of ECLSS technology development and demonstration and ultimately how they can increase the performance of future surface and orbital habitats.

NextSTEP↗

Treatment of Launch Vehicle Flight Control Stability Margin Reductions for Crewed Missions with Emphasis on Slosh Dynamics

NESC’s perspective for crewed spaceflight: Acceptance of flight control gain/phase stability margin reductions from industry standards should be accompanied by an adequately extensive technical treatment, including: •Analyzing the fundamental physics involved, with applicable simulation tool verification (particularly if results are dissimilar among rules of thumb, linear tools, nonlinear analysis, and flight data) •Conducting sensitivity studies in time and frequency domains to analyze effects of possible parameter and system variations •Studying the effects of the consequence of instability associated with offending modes by running stressing cases in time domain •Assessing alternative flight control designs to demonstrate that present design appropriately balances overall vehicle risk (i.e., quantitatively delineate chosen tradeoffs between various stability margins and vehicle performance in the context of risk/consequence) Work presented here represents an example summary of expected engineering work to flight-certify crewed missions with unstable slosh modes and reduced stability margins

Launch Vehicle Flight Control↗

Project APEX: Advanced Phobos Exploration. Manned mission to the Martian moon Phobos

The manned exploration of Mars is a massive undertaking which requires careful consideration. A mission to the moon of Mars called Phobos as a prelude to manned landings on the Martian surface offers some advantages. One is that the energy requirements, in terms of delta 5, is only slightly higher than going to the Moon's surface. Another is that Phobos is a potential source of water and carbon which could be extracted and processed for life support and cryogenic propellants for use in future missions; thus, Phobos might serve as a base for extended Mars exploration or for exploration of the outer planets. The design of a vehicle for such a mission is the subject of our Aerospace System Design course this year. The materials and equipment needed for the processing plant would be delivered to Phobos in a prior unmanned mission. This study focuses on what it would take to send a crew to Phobos, set up the processing plant for extraction and storage of water and hydrocarbons, conduct scientific experiments, and return safely to Earth. The size, configuration, and subsystems of the vehicle are described in some detail. The spacecraft carries a crew of five and is launched from low Earth orbit in the year 2010. The outbound trajectory to Mars uses a gravitational assisted swing by of Venus and takes eight months to complete. The stay at Phobos is 60 days at which time the crew will be engaged in setting up the processing facility. The crew will then return to Earth orbit after a total mission duration of 656 days. Both stellar and solar observations will be conducted on both legs of the mission. The design of the spacecraft addresses human factors and life science; mission analysis and control; propulsion; power generation and distribution; thermal control; structural analysis; and planetary, solar, and stellar science. A 0.5 g artificial gravity is generated during transit by spinning about the lateral body axis. Nuclear thermal rockets using hydrogen as fuel are selected to reduce total launch mass and to shorten the duration of the mission. The nuclear systems also provide the primary electrical power via dual mode operation. The overall spacecraft length is 110 meters and the total mass departing from low Earth orbit is 900 metric tons.

Source record↗

Novel Micro ElectroMechanical Systems (MEMS) Packaging for the Skin of the Satellite

This paper includes a discussion of the novel packaging techniques that are needed to place MEMS based thermal control devices on the skin of various satellites, eliminating the concern associated with potential particulates &om integration and test or the launch environment. Protection of this MEMS based thermal device is achieved using a novel polymer that is both IR transmissive and electrically conductive. This polymer was originally developed and qualified for space flight application by NASA at the Langley Research Center. The polymer material, commercially known as CPI, is coated with a thin layer of ITO and sandwiched between two window-like frames. The packaging of the MEMS based radiator assembly offers the benefits of micro-scale devices in a chip on board fashion, with the level of protection generally found in packaged parts.

Darrin, M. Ann↗

The Ares I-1 Flight Test--Paving the Road for the Ares I Crew Launch Vehicle

In accordance with the U.S. Vision for Space Exploration and the nation's desire to again send humans to explore beyond Earth orbit, NASA has been tasked to send human beings to the moon, Mars, and beyond. It has been 30 years since the United States last designed and built a human-rated launch vehicle. NASA is now building the Ares I crew launch vehicle, which will loft the Orion crew exploration vehicle into orbit, and the Ares V cargo launch vehicle, which will launch the Lunar Surface Access Module and Earth departure stage to rendezvous Orion for missions to the moon. NASA has marshaled unique resources from the government and private sectors to perform the technically and programmatically complex work of delivering astronauts to orbit early next decade, followed by heavy cargo late next decade. Our experiences with Saturn and the Shuttle have taught us the value of adhering to sound systems engineering, such as the "test as you fly" principle, while applying aerospace best practices and lessons learned. If we are to fly humans safely aboard a launch vehicle, we must employ a variety of methodologies to reduce the technical, schedule, and cost risks inherent in the complex business of space transportation. During the Saturn development effort, NASA conducted multiple demonstration and verification flight tests to prove technology in its operating environment before relying upon it for human spaceflight. Less testing on the integrated Shuttle system did not reduce cost or schedule. NASA plans a progressive series of demonstration (ascent), verification (orbital), and mission flight tests to supplement ground research and high-altitude subsystem testing with real-world data, factoring the results of each test into the next one. In this way, sophisticated analytical models and tools, many of which were not available during Saturn and Shuttle, will be calibrated and we will gain confidence in their predictions, as we gain hands-on experience in operating the first of two new launch vehicle systems. The Ares I-1 flight test vehicle (FTV) will incorporate a mix of flight and mockup hardware, reflecting a configuration similar in mass, weight, and shape (outer mold line or OML) to the operational vehicle. It will be powered by a four-segment reusable solid rocket booster (RSRB), which is currently in Shuttle inventory, and will be modified to include a fifth, inert segment that makes it approximately the same size and weight as the five segment RSRB, which will be available for the second flight test in 2012. The Ares I-1 vehicle configuration is shown. Each test flight has specific objectives appropriate to the design analysis cycle in progress. The Ares I-1 demonstration test, slated for April 2009, gives NASA its first opportunity to gather critical data about the flight dynamics of the integrated launch vehicle stack, understand how to control its roll during flight, and other characterize the severe stage separation environment that the upper stage will experience during future operational flights. NASA also will begin the process of modifying the launch infrastructure and fine-tuning ground and mission operational scenarios, as NASA transitions from the Shuttle to the Ares/Orion system.

Davis, Stephan R.↗

SLS Flight Software Testing: Using a Modified Agile Software Testing Approach

NASA's Space Launch System (SLS) is an advanced launch vehicle for a new era of exploration beyond earth's orbit (BEO). The world's most powerful rocket, SLS, will launch crews of up to four astronauts in the agency's Orion spacecraft on missions to explore multiple deep-space destinations. Boeing is developing the SLS core stage, including the avionics that will control vehicle during flight. The core stage will be built at NASA's Michoud Assembly Facility (MAF) in New Orleans, LA using state-of-the-art manufacturing equipment. At the same time, the rocket's avionics computer software is being developed here at Marshall Space Flight Center in Huntsville, AL. At Marshall, the Flight and Ground Software division provides comprehensive engineering expertise for development of flight and ground software. Within that division, the Software Systems Engineering Branch's test and verification (T&V) team uses an agile test approach in testing and verification of software. The agile software test method opens the door for regular short sprint release cycles. The idea or basic premise behind the concept of agile software development and testing is that it is iterative and developed incrementally. Agile testing has an iterative development methodology where requirements and solutions evolve through collaboration between cross-functional teams. With testing and development done incrementally, this allows for increased features and enhanced value for releases. This value can be seen throughout the T&V team processes that are documented in various work instructions within the branch. The T&V team produces procedural test results at a higher rate, resolves issues found in software with designers at an earlier stage versus at a later release, and team members gain increased knowledge of the system architecture by interfacing with designers. SLS Flight Software teams want to continue uncovering better ways of developing software in an efficient and project beneficial manner. Through agile testing, there has been increased value through individuals and interactions over processes and tools, improved customer collaboration, and improved responsiveness to changes through controlled planning. The presentation will describe agile testing methodology as taken with the SLS FSW Test and Verification team at Marshall Space Flight Center.

Bolton, Albanie T.↗

Advancement of Entry System Modeling to Support Exploration of Giant Planets

This paper describes NASA’s efforts to advance entry system modeling and simulation capabilities to support future exploration of Giant planets. The Giant planets are key destinations of interest to the planetary science community for their potential to provide insight into the formation and evolution of our Solar System, as well as extrasolar planetary systems. To date, the Galileo atmospheric probe is the only purpose-built entry probe to a Giant planet. Post-flight analysis of Galileo’s performance showed that there was significant recession of the thermal protection system (TPS), well beyond what was anticipated on the flank, and this was due in part to insufficiently accurate capability for estimating the flight environment and TPS response. While Galileo ultimately survived its flight, the example serves to highlight the great challenge of designing successful missions for environments that are poorly understood or where models have not yet been validated. An important means to reduce mission risks is the incorporation of physics-based modeling with well-quantified uncertainties. The emphasis on physics-based modeling – in contrast to empirically-driven models – is motivated by the fact that it is impossible to completely replicate entry environments through ground tests and, therefore, extrapolation to the flight environment is required. Basing analysis in fundamental physics removes the bias of ground test limitations, though one must then be careful to properly characterize model inputs, simplifying assumptions, and the limits wherein the model is valid. NASA’s Entry Systems Modeling (ESM) Project is tasked with investigating such considerations for planetary science missions across the Solar System, and in recent years has begun to do so for Giant planets. The most distinctive features of the Giant planets, from an entry system perspective, are the atmospheres composed primarily of hydrogen and helium. The entry velocities of proposed missions are generally very large and can therefore be expected to result in significant convective and radiative heating generated by the vehicle’s shock layer. Yet thermochemical behavior of the hydrogen-helium system is not well understood under such conditions. The ESM project is leading efforts to develop accurate thermochemical databases based on state-of-the-art measurements in the Electric Arc Shock Tube and detailed computational chemistry. The large heat fluxes anticipated by missions has driven interest in new TPS materials, in particular woven materials, which may be enabling but have never been flown before. Consequently, multiscale models are in development to describe properties and performance of the materials from micro- to system-scale. The goal is to not only provide accurate thermal response but also to inform thermostructural reliability predictions for extreme entries. Additionally, new computational models have been developed to evaluate performance of non-destructive evaluation techniques which are vital to establishing acceptance of systems to be free of manufacturing faults like material cracking, voids, and debonding. Finally, in the area of guidance and control, aerocapture has been shown conceptually to provide a number of mission benefits, including reducing transit time and increasing payload fraction. The ESM project is building a launch-to-landing trajectory simulation capability to enable detailed studies of aerocapture maneuvers in the context of Giant planets missions. The final presentation and paper will describe each of these topics in detail, including discussion of specific gaps and the technical approach to solving them. In addition, the final paper will briefly discuss ongoing coordination between ESM project work and an ESA-funded technology development activity comprised of validation testing in the Oxford T6, IRS PWK and IST ESTHER tunnels, as well as state-to-state modeling of the shock layer to better represent non-Boltzmann energy distributions leading to non-equilibrium radiation.

Entry systems↗

Materials and processes for shuttle engine, external tank, and solid rocket booster

The Shuttle flight system is composed of the Orbiter, an External Tank (ET) that contains the ascent propellant to be used by the Space Shuttle Main Engines (SSME), and two Solid Rocket Boosters (SRB). The ET is expended on each launch; the Orbiter and SRB's are reusable. It is the requirement for reuse which poses the exciting new materials and processes challenges in the development of the Space Shuttle. A brief description of the Space Shuttle and the mission profile is given. The Shuttle configuration is then described with emphasis on the SSME, ET, and SRB. The materials selection, tracking, and control system used to assure reliability and to minimize cost are described, and salient features and challenges in materials and processes associated with the SSME, ET, and SRB are subsequently discussed.

Schwinghamer, R. J.↗