Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “hardware reliability”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,369 records · Page 76

Modeling the data management system of Space Station Freedom with DEPEND

Some of the features and capabilities of the DEPEND simulation-based modeling tool are described. A study of a 1553B local bus subsystem of the Space Station Freedom Data Management System (SSF DMS) is used to illustrate some types of system behavior that can be important to reliability and performance evaluations of this type of spacecraft. A DEPEND model of the subsystem is used to illustrate how these types of system behavior can be modeled, and shows what kinds of engineering and design questions can be answered through the use of these modeling techniques. DEPEND's process-based simulation environment is shown to provide a flexible method for modeling complex interactions between hardware and software elements of a fault-tolerant computing system.

Olson, Daniel P.↗

A Comparison of Tropical Storm (TS) and Non-TS Gust Factors for Assessing Peak Wind Probabilities at the Eastern Range

Peak wind speed is an important forecast element to ensure the safety of personnel and flight hardware at Kennedy Space Center (KSC) and the Cape Canaveral Air Force Station (CCAFS) in East-Central Florida. The 45th Weather Squadron (45 WS), the organization that issues forecasts for the KSC/CCAFS area, finds that peak winds are more difficult to forecast than mean winds. This difficulty motivated the 45 WS to request two independent studies. The first (Merceret 2009) was the development of a reliable model for gust factors (GF) relating the peak to the mean wind speed in tropical storms (TS). The second (Lambert et al. 2008) was a climatological study of non-TS cool season (October-April) mean and peak wind speeds by the Applied Meteorology Unit (AMU; Bauman et al. 2004) without the use of GF. Both studies presented their statistics as functions of mean wind speed and height. Most of the few comparisons of TS and non-TS GF in the literature suggest that non-TS GF at a given height and mean wind speed are smaller than the corresponding TS GF. The investigation reported here converted the non-TS peak wind statistics calculated by the AMU to the equivalent GF statistics and compared them with the previous TS GF results. The advantage of this effort over all previously reported studies of its kind is that the TS and non-TS data were taken from the same towers in the same locations. This eliminates differing surface attributes, including roughness length and thermal properties, as a major source of variance in the comparison. The goal of this study is two-fold: to determine the relationship between the non-TS and TS GF and their standard deviations (GFSD) and to determine if models similar to those developed for TS data in Merceret (2009) could be developed for the non-TS environment. The results are consistent with the literature, but include much more detailed, quantitative information on the nature of the relationship between TS and non-TS GF and GFSD as a function of height and mean wind speed.

Merceret, Francis J.↗

Standardized Modular Power Interfaces for Future Space Explorations Missions

Earlier studies show that future human explorations missions are composed of multi-vehicle assemblies with interconnected electric power systems. Some vehicles are often intended to serve as flexible multi-purpose or multi-mission platforms. This drives the need for power architectures that can be reconfigured to support this level of flexibility. Power system developmental costs can be reduced, program wide, by utilizing a common set of modular building blocks. Further, there are mission operational and logistics cost benefits of using a common set of modular spares. These benefits are the goals of the Advanced Exploration Systems (AES) Modular Power System (AMPS) project. A common set of modular blocks requires a substantial level of standardization in terms of the Electrical, Data System, and Mechanical interfaces. The AMPS project is developing a set of proposed interface standards that will provide useful guidance for modular hardware developers but not needlessly constrain technology options, or limit future growth in capability. In 2015 the AMPS project focused on standardizing the interfaces between the elements of spacecraft power distribution and energy storage. The development of the modular power standard starts with establishing mission assumptions and ground rules to define design application space. The standards are defined in terms of AMPS objectives including Commonality, Reliability-Availability, Flexibility-Configurability and Supportability-Reusability. The proposed standards are aimed at assembly and sub-assembly level building blocks. AMPS plans to adopt existing standards for spacecraft command and data, software, network interfaces, and electrical power interfaces where applicable. Other standards including structural encapsulation, heat transfer, and fluid transfer, are governed by launch and spacecraft environments and bound by practical limitations of weight and volume. Developing these mechanical interface standards is more difficult but an essential part of defining physical building blocks of modular power. This presentation describes the AMPS projects progress towards standardized modular power interfaces.

Spacecraft Power↗

Composite Technology for Exploration (CTE)

Technology Product Capability: The CTE (Composite Technology for Exploration) project will develop and demonstrate critical composites technologies with a focus on weight-saving, performance-enhancing bonded joint technology for Space Launch System (SLS)-scale composite hardware to support future NASA exploration missions - Improve the analytical capabilities required to predict failure modes in composite structures; - and, Support SLS payload adapters and fittings by maturing composite bonded joint technology and analytical tools to enable risk reduction. Exploration & Science Impact: Lighter weight structures; Improved material predictive capabilities; Improved bonded joint failure load and mode predictions to help reduce knockdown factors; and improve predictability and reliability; Increase confidence of all bonded joint composite structures; Reduce reliance on expensive testing.

CTE↗

Device Feasibility Analysis of Multi-level FeFETs for Neuromorphic Computing

As an emerging non-volatile memory device technology, Ferroelectric Field-Effect Transistors (FeFETs) can enable low-power, adaptive intelligent system design. However, device dimension and operating voltage dependent reliability issues of scaled FeFETs can ultimately lead to degraded performance in solving machine learning tasks. In this article, detailed experimental characterization of FeFET devices of different dimensions have been carried out to explicitly evaluate the non-ideal behavior in device conductance programming properties like number of programming states, cycle-to-cycle (C2C) variations, device-to-device (D2D) variations, and state retention. A hardware-aware software simulation approach has been adopted to capture the adversarial effects of the non-idealities on recognition accuracy through algorithm-level performance assessment by including them in NeuroSim, a popular neural network hardware simulator, to execute a neural network model considering all other hardware constraints. With the added non-idealities, significant accuracy degradation has been observed compared to the ideal scenarios where D2D variations play the most critical role. Thereafter, feasibility of a variation-aware training method has been evaluated to tackle the accuracy drop.

42 ENGINEERING↗

Validating the simulation of large-scale parallel applications using statistical characteristics

Simulation is a widely adopted method to analyze and predict the performance of large-scale parallel applications. Validating the hardware model is highly important for complex simulations with a large number of parameters. Common practice involves calculating the percent error between the projected and the real execution time of a benchmark program. However, in a high-dimensional parameter space, this coarse-grained approach often suffers from parameter insensitivity, which may not be known a priori. Moreover, the traditional approach cannot be applied to the validation of software models, such as application skeletons used in online simulations. In this work, we present a methodology and a toolset for validating both hardware and software models by quantitatively comparing fine-grained statistical characteristics obtained from execution traces. Although statistical information has been used in tasks like performance optimization, this is the first attempt to apply it to simulation validation. Lastly, our experimental results show that the proposed evaluation approach offers significant improvement in fidelity when compared to evaluation using total execution time, and the proposed metrics serve as reliable criteria that progress toward automating the simulation tuning process.

97 MATHEMATICS AND COMPUTING↗

Evaluation of the HARDMAN comparability methodology for manpower, personnel and training

The methodology evaluation and recommendation are part of an effort to improve Hardware versus Manpower (HARDMAN) methodology for projecting manpower, personnel, and training (MPT) to support new acquisition. Several different validity tests are employed to evaluate the methodology. The methodology conforms fairly well with both the MPT user needs and other accepted manpower modeling techniques. Audits of three completed HARDMAN applications reveal only a small number of potential problem areas compared to the total number of issues investigated. The reliability study results conform well with the problem areas uncovered through the audits. The results of the accuracy studies suggest that the manpower life-cycle cost component is only marginally sensitive to changes in other related cost variables. Even with some minor problems, the methodology seem sound and has good near term utility to the Army. Recommendations are provided to firm up the problem areas revealed through the evaluation.

Zimmerman, W.↗

Definition of an auxiliary processor dedicated to real-time operating system kernels

In order to increase the efficiency of process control data processing, it is necessary to enhance the productivity of real time high level languages and to automate the task administration, because presently 60 percent or more of the applications are still programmed in assembly languages. This may be achieved by migrating apt functions for the support of process control oriented languages into the hardware, i.e., by new architectures. Whereas numerous high level languages have already been defined or realized, there are no investigations yet on hardware assisted implementation of real time features. The requirements to be fulfilled by languages and operating systems in hard real time environment are summarized. A comparison of the most prominent languages, viz. Ada, HAL/S, LTR, Pearl, as well as the real time extensions of FORTRAN and PL/1, reveals how existing languages meet these demands and which features still need to be incorporated to enable the development of reliable software with predictable program behavior, thus making it possible to carry out a technical safety approval. Accordingly, Pearl proved to be the closest match to the mentioned requirements.

Halang, Wolfgang A.↗

A Ground Testing Program to Verify Lunar Dust-Tolerant Hardware for the Artemis Mission

In preparation for NASA’s Artemis Mission that will return humans to the surface of moon by 2024, an extensive test campaign will be undertaken to understand the effects of lunar dust contamination on equipment. Historically, early Apollo astronauts were affected by lunar dust that entered the cabin after their extravehicular activities, and subsequent missions had various cleaning protocols to reduce the impact of the contamination. The longest stays on the lunar surface were Apollo 15, 16, and 17 (just over three days), so equipment and suits were required to operate reliably for a relatively short duration. The ultimate goal of Artemis is a sustained human presence on the lunar surface, beginning with Artemis 3 which targets a six-and-a-half day surface deployment. This requires the design and testing of dust-tolerant infrastructure. Ground testing with aerosolized lunar dust simulants in a specialized chamber is an inexpensive way to verify the performance of equipment. Chambers equipped with various powder dispersers and analysis instrumentation can explore a variety of realistic scenarios relevant to lunar surface missions, from the interaction of dust with sensitive surfaces such as solar panels, textiles, radiators, and scientific equipment, to the effects of dust as it intrudes into habitable areas. These experiments require careful consideration of the expected mass concentrations, aerosolization methods, and transport properties of dust. Instruments that use light-scattering techniques to measure mass concentrations require calibration against lunar simulants for improved accuracy, and different simulants may have different calibration factors. Test facilities, laboratory setup and test methods for aerosolizing lunar simulant will be described along with relevant aerosol instruments and calibration efforts.

Benjamin J Sumlin↗

Transient Efficiency, Flexibility, and Reliability Optimization of Coal-Fired Power Plants - Final Report

This program developed an advanced model-based monitoring and model-predictive control algorithms for a coal fired power plant (CFPP), and deployed these algorithms in a real-time platform to demonstrate performance benefits for transient flexibility and plant operation efficiency. More specifically, the objectives were successfully achieved through a combination of (i) developing a high-fidelity transient plant model in Apros, which was used as a high-fidelity plant simulation between $100-50\% TMCR$ where TMCR denotes the turbine maximum continuous rating, i.e., baseload, (ii) developing a very fast physics-based reduced-order model (ROM) of the plant, which ran more than $100\times$ faster than real-time, enabling its use as real-time embedded model for model-based estimation (MBE) and model predictive control (MPC) (iii) implementing a real-time MBE based on ROM using a robust unscented Kalman filter (UKF) to continuously tune the ROM to match the measurements from high-fidelity Apros plant model despite significant plant-model mismatch, and thus, obtain a Digital Twin of the plant (iv) designing and implementing a real-time MPC with dual objectives of transient plant load tracking with high ramp rates and minimizing coal consumption, i.e., improving plant efficiency in the baseload-partload operation range of $100-50\% TMCR$. Each key element above was developed and tested individually, and has been reported in corresponding Topical Reports. Finally, all the individual elements were integrated in an overall closed-loop system, that was successfully tested in desktop Simulink test harness simulations with ROM or high-fidelity model as the plant. Thereafter, the Simulink implementation was used to auto-generate C-code and deploy as real-time Docker microservice containers in Linux, and validate that they can run in real-time in the hardware-in-the loop (HIL) setup and produce the same results as in Simulink. The results of the integrated simulation tests in Simulink as well as the real-time HIL deployment are documented in this final report, showing good load tracking for load ramps at $3-4\%/min$ ramp rates, and achieving up to $5.5\%$ reduction in coal relative to baseline operation at $50\% TMCR$ load. The desktop and HIL simulations show successful performance of the overall model based estimation and control solution and achieve the key objectives of the program for flexible, efficient and reliable operation of subcritical coal fired power plants.

20 FOSSIL-FUELED POWER PLANTS↗

Transient Efficiency, Flexibility, and Reliability Optimization of Coal-Fired Power Plants - Final Program Review

This program developed an advanced model-based monitoring and model-predictive control algorithms for a coal fired power plant (CFPP), and deployed these algorithms in a real-time platform to demonstrate performance benefits for transient flexibility and plant operation efficiency. More specifically, the objectives were successfully achieved through a combination of (i) developing a high-fidelity transient plant model in Apros, which was used as a high-fidelity plant simulation between $100-50\% TMCR$ where TMCR denotes the turbine maximum continuous rating, i.e., baseload, (ii) developing a very fast physics-based reduced-order model (ROM) of the plant, which ran more than $100\times$ faster than real-time, enabling its use as real-time embedded model for model-based estimation (MBE) and model predictive control (MPC) (iii) implementing a real-time MBE based on ROM using a robust unscented Kalman filter (UKF) to continuously tune the ROM to match the measurements from high-fidelity Apros plant model despite significant plant-model mismatch, and thus, obtain a Digital Twin of the plant (iv) designing and implementing a real-time MPC with dual objectives of transient plant load tracking with high ramp rates and minimizing coal consumption, i.e., improving plant efficiency in the baseload-partload operation range of $100-50\% TMCR$. Each key element above was developed and tested individually, and has been reported in corresponding Topical Reports. Finally, all the individual elements were integrated in an overall closed-loop system, that was successfully tested in desktop Simulink test harness simulations with ROM or high-fidelity model as the plant. Thereafter, the Simulink implementation was used to auto-generate C-code and deploy as real-time Docker microservice containers in Linux, and validate that they can run in real-time in the hardware-in-the loop (HIL) setup and produce the same results as in Simulink. The results of the integrated simulation tests in Simulink as well as the real-time HIL deployment are documented in this final report, showing good load tracking for load ramps at $3-4\%/min$ ramp rates, and achieving up to $5.5\%$ reduction in coal relative to baseline operation at $50\% TMCR$ load. The desktop and HIL simulations show successful performance of the overall model based estimation and control solution and achieve the key objectives of the program for flexible, efficient and reliable operation of sub-critical coal fired power plants.

20 FOSSIL-FUELED POWER PLANTS↗

Power Hardware-in-the-Loop Testing of a Smart Distribution System

This paper presents the results of the third and final phase of the National Renewable Energy Lab (NREL) INTEGRATE demonstration: Smart Distribution. For this demonstration, high penetrations of solar PV and wind energy systems were simulated in a power hardware-in-the-loop set-up using a smart distribution test feeder. Simulated and real DERs were controlled by a real-time control platform, which manages grid constraints under high clean energy deployment levels. The power HIL testing, conducted at NREL's ESIF smart power lab, demonstrated how dynamically managing DER increases the grid's hosting capacity by leveraging active network management's (ANM) safe and reliable control framework. Results are presented for how ANM's real-time monitoring, automation, and control can be used to manage multiple DERs and multiple constraints associated with high penetrations of DER on a distribution grid. The project also successfully demonstrated the importance of escalating control actions given how ANM enables operation of grid equipment closer to their actual physical limit in the presence of very high levels of intermittent DER.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Real-Time Testbed for Smart Inverter Cyber Security Studies

Distributed energy resources (DER) have become a popular solution to modern-day issues surrounding the efficiency and reliability of power generation, as well as climate change concerns. Energy centers are shifting towards incorporating smart inverters with embedded functionalities such as high voltage ride through (HVRT), low voltage ride through (LVRT), active and reactive power compensation. However, the integration of smart inverters leave DER systems highly vulnerable to cybersecurity threats. The distributed network protocol 3 (DNP3) is a common method of communication between grid-tied hardware. Despite its popularity, the level of security leaves all hardware connected to the grid at risk of severe cyber-attacks. Thus, it is important to study any potential cybersecurity threats towards grid-tied smart inverters to mitigate cybersecurity vulnerabilities and refine existing cyber-security protections. This report describes the proposed testbed design to study cybersecurity threats to smart inverters. The testbed utilizes a real-time simulation case in RSCAD that includes a grid-tied wind turbine (WT) topology featuring two back-to-back two-level voltage source converters (BTB,2L-VSCs) and a permanent magnet synchronous machine (PMSM). The simulated case runs within the NovaCor real time digital simulator (RTDS). This report focuses on the design and implementation of a single module of the GTNETx2 card as a distributed network protocol and the configuration of an IEEE 1518 DNP database file that includes input and output variables mapped to different connection points in the grid that transmit and receive discrete, analog, and binary signals on command. This allows realistic emulation of the communication between the smart inverter and the grid for cybersecurity studies.

97 MATHEMATICS AND COMPUTING↗

Advanced detection, isolation, and accommodation of sensor failures in turbofan engines: Real-time microcomputer implementation

The objective of the Advanced Detection, Isolation, and Accommodation Program is to improve the overall demonstrated reliability of digital electronic control systems for turbine engines. For this purpose, an algorithm was developed which detects, isolates, and accommodates sensor failures by using analytical redundancy. The performance of this algorithm was evaluated on a real time engine simulation and was demonstrated on a full scale F100 turbofan engine. The real time implementation of the algorithm is described. The implementation used state-of-the-art microprocessor hardware and software, including parallel processing and high order language programming.

Delaat, John C.↗

Lunar base heat pump

A heat pump is a device which elevates the temperature of a heat flow by a means of an energy input. By doing this, the heat pump can cause heat to transfer faster from a warm region to a cool region, or it can cause heat to flow from a cool region to a warmer region. The second case is the one which finds vast commercial applications such as air conditioning, heating, and refrigeration. Aerospace applications of heat pumps include both cases. The NASA Johnson Space Center is currently developing a Life Support Systems Integration Facility (LSSIF, previously SIRF) to provide system-level integration, operational test experience, and performance data that will enable NASA to develop flight-certified hardware for future planetary missions. A high lift heat pump is a significant part of the TCS hardware development associated with the LSSIF. The high lift heat pump program discussed here is being performed in three phases. In Phase 1, the objective is to develop heat pump concepts for a lunar base, a lunar lander, and for a ground development unit for the SIRF. In Phase 2, the design of the SIRF ground test unit is being performed, including identification and evaluation of safety and reliability issues. In Phase 3, the SIRF unit will be manufactured, tested, and delivered to the NASA Johnson Space Center.

Goldman, Jeffrey H.↗

Hot Structure Control Surface Progress for X-37 Technology Development Program

The NASA Marshall Space Flight Center (MSFC) has been leading the development of technologies that will enable the development, fabrication, and flight of the automated X-37 Orbital Vehicle (OV). With the Administration s recent announcement of the Vision for Space Exploration, NASA placed the X-37 OV design on hold while developing detailed requirements for a Crew Exploration Vehicle, but has continued funding the development of high-risk, critical technologies for potential future space exploration vehicle applications. Hot Structure Control Surfaces (HSCS) technology development is one of the high-priority areas being funded at this time. The goal of HSCS research is to mitigate risk by qualifying the lightest possible components that meet the stringent X-37 OV weight and performance requirements, including Shuttle-type reen- try environments with peak temperatures of 2800 OF. The small size of the X-37 OV (25.7-feet long and 14.9-foot wingspan) drives the need for advanced HSCS because the vehicle's two primary aerodynamic surfaces, the flaperons and ruddervators, have thicknesses ranging from approximately 5 in. down to 1 in. Traditional metallic or polymer-matrix composites covered with tile or blanket thermal protection system (TPS) materials cannot be used as there is insufficient volume to fabricate such multi-component structures. Therefore, carbon-carbon (C-C) and carbodsilicon-carbide (C-SiC) composite HSCS structures are being developed in parallel by two teams supporting the X-37 prime contractor (The Boeing Company). The Science Applications International Coy. (SAIC) and Carbon-Carbon Advanced Technologies, Inc. (C-CAT) team is developing the C-C HSCS, while the General Electric Energy Power Systems Composites (GE-PSC) and Materials Research and Design (MRD) team is developing the C-SiC HSCS. These two teams were selected to reduce the high level of risk associated with developing advanced control surface components. They have continued HSCS development work as part of the X-37 critical technology development contract. The SAIC/C-CAT team is using Advanced Carbon-Carbon (ACC) because its fabrication is very similar to the process used for Space Shuttle Reinforced Carbon-Carbon fabrication, including the Sic-based pack cementation conversion coating systems using with both materials. ACC was selected over RCC because it has much higher tension and compressions strengths, and because T-300 fiber is readily available, whereas RCC rayon fiber is no longer manufactured. The GE-PSC/MRD team is using a T-300 fiber-reinforced Sic matrix composite material densified by chemical vapor infiltration. The C-Sic material has an Sic-based environmental barrier coating. Major accomplishments have been made over the past year by both HSCS teams. C-C and C- SiC flaperon subcomponents, which are truncated full-scale versions of flight hardware, have been fabricated and are undergoing testing at the NASA Dryden Flight Research Center, NASA Langley Research Center, and U.S. Air Force Research Laboratory. By the end of 2004, ruddervator subcomponents also will be delivered and tested. As NASA moves forward in realizing the Vision for Space Exploration, it will continue to invest in advanced research and development aimed at making new generations of spacecraft safer, more reliable, and more affordable. The X-37 HSCS effort ultimately will benefit the Agency's vision and mission.

Valentine, P. G.↗

An Analysis of Rocket Propulsion Testing Costs

The primary mission at NASA Stennis Space Center (SSC) is rocket propulsion testing. Such testing is generally performed within two arenas: (1) Production testing for certification and acceptance, and (2) Developmental testing for prototype or experimental purposes. The customer base consists of NASA programs, DOD programs, and commercial programs. Resources in place to perform on-site testing include both civil servants and contractor personnel, hardware and software including data acquisition and control, and 6 test stands with a total of 14 test positions/cells. For several business reasons there is the need to augment understanding of the test costs for all the various types of test campaigns. Historical propulsion test data was evaluated and analyzed in many different ways with the intent to find any correlation or statistics that could help produce more reliable and accurate cost estimates and projections. The analytical efforts included timeline trends, statistical curve fitting, average cost per test, cost per test second, test cost timeline, and test cost envelopes. Further, the analytical effort includes examining the test cost from the perspective of thrust level and test article characteristics. Some of the analytical approaches did not produce evidence strong enough for further analysis. Some other analytical approaches yield promising results and are candidates for further development and focused study. Information was organized for into its elements: a Project Profile, Test Cost Timeline, and Cost Envelope. The Project Profile is a snap shot of the project life cycle on a timeline fashion, which includes various statistical analyses. The Test Cost Timeline shows the cumulative average test cost, for each project, at each month where there was test activity. The Test Cost Envelope shows a range of cost for a given number of test(s). The supporting information upon which this study was performed came from diverse sources and thus it was necessary to build several intermediate databases in order to understand, validate, and manipulate data. These intermediate databases (validated historical account of schedule, test activity, and cost) by themselves are of great value and utility. For example, for the Project Profile, we were able to merged schedule, cost, and test activity. This kind of historical account conveys important information about sequence of events, lead time, and opportunities for improvement in future propulsion test projects. The Product Requirement Document (PRD) file is a collection of data extracted from each project PRD (technical characteristics, test requirements, and projection of cost, schedule, and test activity). This information could help expedite the development of future PRD (or equivalent document) on similar projects, and could also, when compared to the actual results, help improve projections around cost and schedule. Also, this file can be sorted by the parameter of interest to perform a visual review of potential common themes or trends. The process of searching, collecting, and validating propulsion test data encountered a lot of difficulties which then led to a set of recommendations for improvement in order to facilitate future data gathering and analysis.

Ramirez-Pagan, Carmen P.↗

Continuous Monitoring and On-line Analysis of Operational Dose Rates: Tools to Further Mitigate Radiation Risks

Along with passive and active engineering and administrative controls usually implemented in radiation protection programs at different facilities, continuous monitoring and on-line analysis of data measured by the radiation detectors at the workplace and in the environment can be considered as an additional tool used to further mitigate radiation risks. Many monitoring systems on the market today allow connecting radiation area monitors into a network, and reading and accumulating data continuously in a database. The point of this presentation is to bring attention to the fact that such accumulated information can be analyzed and used in many respects to improve reliability and functionality of the monitoring and control systems. A simple time history of background readings from a radiation detector can be used to evaluate the stability of the detector performance. Data recorded during normal facility operations may serve to establish a pattern of acceptable dose rates in such detector and allow to better detect off-normal and unstable modes of the facility operation before they reach hardware trip levels. Facility operators and users may utilize such monitoring systems to optimize operations and minimize their radiological impact. Implementation and examples of use of the RADMON radiation monitoring and data analysis system at Jefferson Lab is presented.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗