Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “dispatch”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,369 records · Page 76

Control Parameter Sensitivity Study for Inverter-Based-Resource Dominated Grids: A Small Signal Stability Approach and Framework

The growing adoption of renewable energy is driving the prevalence of inverter-based resources (IBRs) within power grids. Future power grids will integrate both grid-following IBRs (GFM-IBRs) and grid-forming IBRs (GFL-IBRs) alongside synchronous generators. Therefore, it is crucial to perform stability studies that account for all components and especially control interactions related to IBRs. Extensive research has performed to study the IBR-related stability, however, the sensitivity study of IBRs' control parameters on system stability has not been adequately studied yet, especially from a systematic way. Therefore, this paper conducts a small signal stability analysis for a generic grid with multiple types of resources and develops an analytical framework for assessing the sensitivity of control parameters affecting stability margins. To achieve that, the non-autonomous reduced-order non-linear dynamic model is developed for a generic power system with multiple synchronous generator-based resources (SGBRs), GFM-IBRs, and GFL-IBRs. Based on the analytic model, a systematic framework for parametric sensitivity on systems' asymptotic stability is developed. A parameter sensitivity analysis based on eigenvalue methods is proposed. The impact of the droop controllers of GFM-IBRs, PQ-dispatch and the PLL controller of GFL-IBR on the system asymptotic stability is discussed. This sensitivity study is aiming to provide deep insights on control parameters' impact on system stability, and gives direction for parameter tuning in case of instability.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Agent-Based, Bottom-Up Medium- and Heavy-duty Electric Vehicle Economics, Operation, Charging and Adoption (Research Performance Final Report)

This is the research performance final report for the project entitled: Agent-Based, Bottom-Up Medium- and Heavy-duty Electric Vehicle Economics, Operation, Charging and Adoption This project was able to achieve the DOE’s goals of developing new modeling tools to understand MDHD vehicle operation and adoption. The first modeling tool is a fleet-level techno-economic analysis model capable of estimating energy use and associated environmental and cost impacts for electrified and conventional vehicles of any MDHD vocation, using real-world cost and operations data, including approaches to optimizing schedules for charging and/or vehicle dispatch. The second modeling tool is a system-level, bottom-up, agent-based adoption model capable of generating geographically-resolved estimates of market projections for MDHD vehicles and charging infrastructure. These tools will be developed and published to serve dual purposes as analysis tools for researchers, and decision-support tools for decision makers within the MDHD system.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

California Price Response Potential Study

California's energy landscape is undergoing a significant transformation, driven by the increasing integration of renewable energy sources, the increased adoption of distributed energy resources, the electrification of end-use loads, and the growing need for grid efficiency. To address these challenges, recent revisions to the State’s Load Management Standards (LMS) require all of California’s large utilities and community choice aggregators (CCAs) to offer dynamic electricity pricing options to customers by 2027. Dynamic pricing, which involves varying electricity rates based on real-time supply and demand conditions, offers a promising solution for optimizing grid operations, reducing costs, and incentivizing efficient use of grid capacity. Effective implementation of dynamic pricing requires understanding the potential impacts on customer bills, system load, and the cost-effectiveness of automation technologies. This study aims to evaluate the load response of various end-use devices to hourly dynamic prices. The end-uses studied here are space cooling, space heating, water heating, crop irrigation, pool and spa pumps, and electric vehicle (EV) charging, all for both residential and commercial applications, except for crop irrigation. In 2030, these end uses are forecasted to account for 18% of annual electricity demand in the state, but 40% of demand in the peak net load hour. By modeling possible price-responsive load dispatch algorithms and assessing the resulting impacts on both individual bills and the overall grid, we seek to inform policymakers and utilities about the potential benefits and challenges associated with dynamic pricing, and considerations for the design of dynamic pricing tariffs. Additionally, we will explore the cost effectiveness of adopting automation technologies to enable devices to respond more effectively to real-time price signals. This study considers a range of price profiles, accounting for differences across utilities and customer classes, and presents scenarios for dynamic price design via variation in the percentage of total customer electric costs that are allocated dynamically (versus constituting a fixed portion of the hourly volumetric price). We present results focused primarily on 2030, forecasting electricity prices under both low and high-cost scenarios, to inform longer-term tariff design considerations. We design tariffs by starting with 2019 prices that were calculated according to CalFUSE guidance (CPUC, 2022) and that have been used in recent studies; these prices are all-in volumetric rates that vary by utility and are revenue-neutral to each customer class. They are developed by considering six electricity cost components that are allocated hourly based on system load indicators (gross and net load, and wholesale prices). These prices are forecasted to 2030 for low and high cost scenarios, considering recent trends in total electricity costs with and without years of substantial wildfire mitigation investments. These tariffs, which allocate all costs on an hourly basis, are considered our “Full” dynamic tariff design scenario, while two additional scenarios explore allocating a portion of costs as a flat volumetric charge: the “Medium” scenario allocates 50% of revenue dynamically (and keeps 50% flat), while the “Mild” scenario allocates 20% of revenue dynamically. The 20% dynamic allocation on the Mild scenario aims to represent a case where only the marginal operating costs of the grid are included in the dynamic price.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Identifying Barriers to Solar and Storage Hybrids: Modeled vs. empirical wholesale market value and net-value for co-located solar + storage projects [Slides]

Large-scale (1MW+) co-located solar and battery storage projects are expanding rapidly in the United States, but their realized contribution to the bulk power system remains poorly understood because public project-level operating data are limited. The Lawrence Berkeley National Laboratory estimates the wholesale market value of 280 operational photovoltaic-plus-storage (PV+S) projects across the seven ISOs/RTOs and 19 additional balancing authorities, representing roughly 95% of the U.S. PV+S fleet in 2024. We model optimized hourly dispatch under energy, capacity, and ancillary-service market opportunities and compare the resulting value with standalone PV value, project-specific levelized cost estimates, and empirical operating or revenue data where available.

14 SOLAR ENERGY↗

Data for Autonomous Transportation Awareness: Data Exchange Use Cases, Standards, and Barriers

This report examines the critical data exchanges between automated vehicle (AV) service providers and the cities and municipalities they serve. It assists municipal authorities in navigating the often complex and real-time digital data exchanges needed to support AV mobility services, with emphasis in three areas: (1) critical safety data for broad-area situational awareness of hazards typically associated emergency dispatch or roadway work zones; (2) performance metrics of AV services that inform the quantity, quality, spatial extents, and impact on the roadway network; and (3) regulatory and policy information, particularly dynamic information that governs how AV services interact with the roadway network, with emphasis on curb space. The report reviews existing practices and emerging protocols and standards and identifies key gaps to address moving forward.

33 ADVANCED PROPULSION SYSTEMS↗

Congestion Management Solutions for Enhanced Distribution System Operations with Aggregated Distribution Grid Resources Providing Grid Services and Market Participation

Microgrids and other aggregations of distribution grid resources (DGRs) are poised to actively participate in electricity markets and provide essential grid services in the coming years. In fact, DGRs already play such a role through behind-the-meter (BTM) demand response programs and small-scale BTM dispatchable generation initiatives. At the same time, the rapid growth of artificial intelligence (AI) and cryptocurrency datacenters imposes significant, often unpredictable, demands on the power distribution system. Aggregated DGRs can serve as flexible resources that help mitigate these pressures by using available transmission and distribution capacity more efficiently, supporting resource adequacy and other reliability services, and providing bridge strategies while long-term transmission infrastructure is being developed. The impacts this activity will have on distribution networks are not fully understood and could present significant challenges for distribution utilities due to capacity constraints and the need for congestion management. Technical issues include reverse power flow, variability and possible degradation of equipment integrity, voltage violations, and customer power quality concerns. These issues will likely intensify as electricity market operators across the United States implement Federal Energy Regulatory Commission Order 2222 over the next few years.

24 POWER TRANSMISSION AND DISTRIBUTION↗

POWER ELECTRONICS GRID TIED SYSTEM FINAL REPORT

Across the country, electric utilities are grappling with the persistent hurdles of integrating Distributed Energy Resources (DERs). Managing these assets safely and effectively is a complex endeavor, complicated by varying ownership structures, management philosophies, and the diversity of the technologies themselves. Consequently, the industry has seen a proliferation of bespoke system designs, control strategies, and communication frameworks—forcing utilities to spend significant time and resources developing one-off integration solutions. This project addressed these integration hurdles through a scalable demonstration of intelligent devices designed to coordinate and control diverse resources in low-voltage applications. This concept minimized the need for complex integration by transforming the separate DERs into a dispatchable virtual power plant (VPP) with integrated resiliency functions (called a Node). By collaborating with a utility partner, the project focused on developing rapidly implementable use cases that bridged the gap between theoretical control and real-world deployment

99 GENERAL AND MISCELLANEOUS↗

Spinning Reserve From Hotel Load Response: Initial Progress

This project was motivated by the fundamental match between hotel space conditioning load response capability and power system contingency response needs. As power system costs rise and capacity is strained demand response can provide a significant system reliability benefit at a potentially attractive cost. At ORNL s suggestion, Digital Solutions Inc. adapted its hotel air conditioning control technology to supply power system spinning reserve. This energy saving technology is primarily designed to provide the hotel operator with the ability to control individual room temperature set-points based upon occupancy (25% to 50% energy savings based on an earlier study [Kirby and Ally, 2002]). DSI added instantaneous local load shedding capability in response to power system frequency and centrally dispatched load shedding capability in response to power system operator command. The 162 room Music Road Hotel in Pigeon Forge Tennessee agreed to host the spinning reserve test. The Tennessee Valley Authority supplied real-time metering equipment in the form of an internet connected Dranetz-BMI power quality meter and monitoring expertise to record total hotel load during both normal operations and test results. The Sevier County Electric System installed the metering. Preliminary testing showed that hotel load can be curtailed by 22% to 37% depending on the outdoor temperature and the time of day. These results are prior to implementing control over the common area air conditioning loads. Testing was also not at times of highest system or hotel loading. Full response occurred in 12 to 60 seconds from when the system operator s command to shed load was issued. The load drop was very rapid, essentially as fast as the 2 second metering could detect, with all units responding essentially simultaneously. Load restoration was ramped back in over several minutes. The restoration ramp can be adjusted to the power system needs. Frequency response testing was not completed. Initial testing showed that the units respond very quickly. Problems with local power quality generated false low frequency signals which required testing to be stopped. This should not be a problem in actual operation since the frequency trip points will be staggered to generate a droop curve which mimics generator governor response. The actual trip frequencies will also be low enough to avoid power quality problems. The actual trip frequencies are too low to generate test events with sufficient regularity to complete testing in a reasonable amount of time. Frequency response testing will resume once the local power quality problem is fully understood and reasonable test frequency settings can be determined. Overall the preliminary testing was extremely successful. The hotel response capability matches the power system reliability need, being faster than generation response and inherently available when the power system is under the most stress (times of high system and hotel load). Periodic testing is scheduled throughout the winter and spring to characterize hotel response capability under a full range of conditions. More extensive testing will resume when summer outdoor temperatures are again high enough to fully test hotel response.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Comparison of AEO 2009 Natural Gas Price Forecast to NYMEX Futures Prices

On December 17, 2008, the reference-case projections from Annual Energy Outlook 2009 (AEO 2009) were posted on the Energy Information Administration's (EIA) web site. We at LBNL have, in the past, compared the EIA's reference-case long-term natural gas price forecasts from the AEO series to contemporaneous natural gas prices that can be locked in through the forward market, with the goal of better understanding fuel price risk and the role that renewables can play in mitigating such risk. As such, we were curious to see how the latest AEO reference-case gas price forecast compares to the NYMEX natural gas futures strip. This brief memo presents our findings. Note that this memo pertains only to natural gas fuel price risk (i.e., the risk that natural gas prices might differ over the life of a gas-fired generation asset from what was expected when the decision to build the gas-fired unit was made). We do not take into consideration any of the other distinct attributes of gas-fired and renewable generation, such as dispatchability (or lack thereof), differences in capital costs and O&M expenses, or environmental externalities. A comprehensive comparison of different resource types--which is well beyond the scope of this memo--would need to account for differences in all such attributes, including fuel price risk. Furthermore, our analysis focuses solely on natural-gas-fired generation (as opposed to coal-fired or nuclear generation, for example), for several reasons: (1) price volatility has been more of a concern for natural gas than for other fuels used to generate power; (2) for environmental and other reasons, natural gas has, in recent years, been the fuel of choice among power plant developers; and (3) natural gas-fired generators often set the market clearing price in competitive wholesale power markets throughout the United States. That said, a more-complete analysis of how renewables mitigate fuel price risk would also need to consider coal, uranium, and other fuel prices. Finally, we caution readers about drawing inferences or conclusions based solely on this memo in isolation: to place the information contained herein within its proper context, we strongly encourage readers interested in this issue to read through our previous, more-detailed studies, available at http://eetd.lbl.gov/ea/EMS/reports/53587.pdf or http://eetd.lbl.gov/ea/ems/reports/54751.pdf.

03 NATURAL GAS↗

Retail Demand Response in Southwest Power Pool

In 2007, the Southwest Power Pool (SPP) formed the Customer Response Task Force (CRTF) to identify barriers to deploying demand response (DR) resources in wholesale markets and develop policies to overcome these barriers. One of the initiatives of this Task Force was to develop more detailed information on existing retail DR programs and dynamic pricing tariffs, program rules, and utility operating practices. This report describes the results of a comprehensive survey conducted by LBNL in support of the Customer Response Task Force and discusses policy implications for integrating legacy retail DR programs and dynamic pricing tariffs into wholesale markets in the SPP region. LBNL conducted a detailed survey of existing DR programs and dynamic pricing tariffs administered by SPP's member utilities. Survey respondents were asked to provide information on advance notice requirements to customers, operational triggers used to call events (e.g. system emergencies, market conditions, local emergencies), use of these DR resources to meet planning reserves requirements, DR resource availability (e.g. seasonal, annual), participant incentive structures, and monitoring and verification (M&V) protocols. Nearly all of the 30 load-serving entities in SPP responded to the survey. Of this group, fourteen SPP member utilities administer 36 DR programs, five dynamic pricing tariffs, and six voluntary customer response initiatives. These existing DR programs and dynamic pricing tariffs have a peak demand reduction potential of 1,552 MW. Other major findings of this study are: o About 81percent of available DR is from interruptible rate tariffs offered to large commercial and industrial customers, while direct load control (DLC) programs account for ~;;14percent. o Arkansas accounts for ~;;50percent of the DR resources in the SPP footprint; these DR resources are primarily managed by cooperatives. o Publicly-owned cooperatives accounted for 54percent of the existing DR resources among SPP members. For these entities, investment in DR is often driven by the need to reduce summer peak demand that is used to set demand charges for each distribution cooperative. o About 65-70percent of the interruptible/curtailable tariffs and DLC programs are routinely triggered based on market conditions, not just for system emergencies. Approximately, 53percent of the DR resources are available with less than two hours advance notice and 447 MW can be dispatched with less than thirty minutes notice. o Most legacy DR programs offered a reservation payment ($/kW) for participation; incentive payment levels ranged from $0.40 to $8.30/kW-month for interruptible rate tariffs and $0.30 to $4.60/kW-month for DLC programs. A few interruptible programs offered incentive payments which were explicitly linkedto actual load reductions during events; payments ranged from 2 to 40 cents/kWh for load curtailed.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Wind-To-Hydrogen Energy Pilot Project

WIND-TO-HYDROGEN ENERGY PILOT PROJECT: BASIN ELECTRIC POWER COOPERATIVE In an effort to address the hurdles of wind-generated electricity (specifically wind's intermittency and transmission capacity limitations) and support development of electrolysis technology, Basin Electric Power Cooperative (BEPC) conducted a research project involving a wind-to-hydrogen system. Through this effort, BEPC, with the support of the Energy & Environmental Research Center at the University of North Dakota, evaluated the feasibility of dynamically scheduling wind energy to power an electrolysis-based hydrogen production system. The goal of this project was to research the application of hydrogen production from wind energy, allowing for continued wind energy development in remote wind-rich areas and mitigating the necessity for electrical transmission expansion. Prior to expending significant funding on equipment and site development, a feasibility study was performed. The primary objective of the feasibility study was to provide BEPC and The U.S. Department of Energy (DOE) with sufficient information to make a determination whether or not to proceed with Phase II of the project, which was equipment procurement, installation, and operation. Four modes of operation were considered in the feasibility report to evaluate technical and economic merits. Mode 1 - scaled wind, Mode 2 - scaled wind with off-peak, Mode 3 - full wind, and Mode 4 - full wind with off-peak In summary, the feasibility report, completed on August 11, 2005, found that the proposed hydrogen production system would produce between 8000 and 20,000 kg of hydrogen annually depending on the mode of operation. This estimate was based on actual wind energy production from one of the North Dakota (ND) wind farms of which BEPC is the electrical off-taker. The cost of the hydrogen produced ranged from $20 to $10 per kg (depending on the mode of operation). The economic sensitivity analysis performed as part of the feasibility study showed that several factors can greatly affect, both positively and negatively, the "per kg" cost of hydrogen. After a September 15, 2005, meeting to evaluate the advisability of funding Phase II of the project DOE concurred with BEPC that Phase I results did warrant a "go" recommendation to proceed with Phase II activities. The hydrogen production system was built by Hydrogenics and consisted of several main components: hydrogen production system, gas control panel, hydrogen storage assembly and hydrogen-fueling dispenser The hydrogen production system utilizes a bipolar alkaline electrolyzer nominally capable of producing 30 Nm3/h (2.7 kg/h). The hydrogen is compressed to 6000 psi and delivered to an on-site three-bank cascading storage assembly with 80 kg of storage capacity. Vehicle fueling is made possible through a Hydrogenics-provided gas control panel and dispenser able to fuel vehicles to 5000 psi. A key component of this project was the development of a dynamic scheduling system to control the wind energy's variable output to the electrolyzer cell stacks. The dynamic scheduling system received an output signal from the wind farm, processed this signal based on the operational mode, and dispatched the appropriate signal to the electrolyzer cell stacks. For the study BEPC chose to utilize output from the Wilton wind farm located in central ND. Site design was performed from May 2006 through August 2006. Site construction activities were from August to November 2006 which involved earthwork, infrastructure installation, and concrete slab construction. From April - October 2007, the system components were installed and connected. Beginning in November 2007, the system was operated in a start-up/shakedown mode. Because of numerous issues, the start-up/shakedown period essentially lasted until the end of January 2008, at which time a site acceptance test was performed. Official system operation began on February 14, 2008, and continued through the end of December 2008. Several issues continued to prevent consistent operation, resulting in operation of the system in fits and starts. During the operational period, three ramp tests were performed on the electrolyzer cell stacks to evaluate cell stack degradation, if present. In addition, from December 23 - 30 2008, the hydrogen system was operated using Mode 1 protocol. From February 14, 2008 - December 31, 2008, the system produced a total of just less than 26,000,000 liters (2320 kg), including approximately 3,300,000 liters (295 kg) of hydrogen during Mode 1 operation. Unfortunately, the chronic shutdown issues prevented consistent operation and, therefore, did not allow for any accurate economic analysis as originally intended. With that said, much valuable experience was gained in the form of "lessons learned," and the project served as an extremely valuable platform for educating the public.

17 WIND ENERGY↗

Effects of Village Power Quality on Fuel Consumption and Operating Expenses

Alaska's rural village electric utilities are isolated from the Alaska railbelt electrical grid intertie and from each other. Different strategies have been developed for providing power to meet demand in each of these rural communities. Many of these communities rely on diesel electric generators (DEGs) for power. Some villages have also installed renewable power sources and automated generation systems for controlling the DEGs and other sources of power. For example, Lime Village has installed a diesel battery photovoltaic hybrid system, Kotzebue and Wales have wind-diesel hybrid systems, and McGrath has installed a highly automated system for controlling diesel generators. Poor power quality and diesel engine efficiency in village power systems increases the cost of meeting the load. Power quality problems may consist of poor power factor (PF) or waveform disturbances, while diesel engine efficiency depends primarily on loading, the fuel type, the engine temperature, and the use of waste heat for nearby buildings. These costs take the form of increased fuel use, increased generator maintenance, and decreased reliability. With the cost of bulk fuel in some villages approaching $1.32/liter ($5.00/gallon) a modest 5% decrease in fuel use can result in substantial savings with short payback periods depending on the village's load profile and the cost of corrective measures. This project over its five year history has investigated approaches to improving power quality and implementing fuel savings measures through the use of performance assessment software tools developed in MATLAB{reg_sign} Simulink{reg_sign} and the implementation of remote monitoring, automated generation control, and the addition of renewable energy sources in select villages. The results have shown how many of these communities would benefit from the use of automated generation control by implementing a simple economic dispatch scheme and the integration of renewable energy sources such as wind generation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Role of Energy Storage with Renewable Electricity Generation

Renewable energy sources, such as wind and solar, have vast potential to reduce dependence on fossil fuels and greenhouse gas emissions in the electric sector. Climate change concerns, state initiatives including renewable portfolio standards, and consumer efforts are resulting in increased deployments of both technologies. Both solar photovoltaics (PV) and wind energy have variable and uncertain (sometimes referred to as intermittent) output, which are unlike the dispatchable sources used for the majority of electricity generation in the United States. The variability of these sources has led to concerns regarding the reliability of an electric grid that derives a large fraction of its energy from these sources as well as the cost of reliably integrating large amounts of variable generation into the electric grid. In this report, we explore the role of energy storage in the electricity grid, focusing on the effects of large-scale deployment of variable renewable sources (primarily wind and solar energy).

14 SOLAR ENERGY↗

Power systems simulations of the western United States region.

This report documents a part of a broad assessment of energy-water-related issues in the western United States. The full analysis involved three Department of Energy national laboratories: Argonne National Laboratory, Los Alamos National Laboratory, and Sandia National Laboratories. Argonne's objective in the overall project was to develop a regional power sector expansion forecast and a detailed unit-level operational (dispatch) analysis. With these two major analysis components, Argonne estimated current and future freshwater withdrawals and consumption related to the operation of U.S. thermal-electric power plants in the Western Electricity Coordinating Council (WECC) region for the period 2005-2025. Water is withdrawn and used primarily for cooling but also for environmental control, such as sulfur scrubbers. The current scope of the analysis included three scenarios: (1) Baseline scenario as a benchmark for assessing the adequacy and cost-effectiveness of water conservation options and strategies, (2) High nuclear scenario, and (3) High renewables scenario. Baseline projections are consistent with forecasts made by the WECC and the Energy Information Administration (EIA) in its Annual Energy Outlook (AEO) (EIA 2006a). Water conservation scenarios are currently limited to two development alternatives that focus heavily on constructing new generating facilities with zero water consumption. These technologies include wind farms and nuclear power plants with dry cooling. Additional water conservation scenarios and estimates of water use associated with fuel or resource extraction and processing will be developed in follow-on analyses.

17 WIND ENERGY↗

Lawrence Livermore National Laboratory Emergency Response Capability 2009 Baseline Needs Assessment Performance Assessment

This document was prepared by John A. Sharry, LLNL Fire Marshal and Division Leader for Fire Protection and was reviewed by Sandia/CA Fire Marshal, Martin Gresho. This document is the second of a two-part analysis of Emergency Response Capabilities of Lawrence Livermore National Laboratory. The first part, 2009 Baseline Needs Assessment Requirements Document established the minimum performance criteria necessary to meet mandatory requirements. This second part analyses the performance of Lawrence Livermore Laboratory Emergency Management Department to the contents of the Requirements Document. The document was prepared based on an extensive review of information contained in the 2004 BNA, a review of Emergency Planning Hazards Assessments, a review of building construction, occupancy, fire protection features, dispatch records, LLNL alarm system records, fire department training records, and fire department policies and procedures. On October 1, 2007, LLNL contracted with the Alameda County Fire Department to provide emergency response services. The level of service called for in that contract is the same level of service as was provided by the LLNL Fire Department prior to that date. This Compliance Assessment will evaluate fire department services beginning October 1, 2008 as provided by the Alameda County Fire Department.

99 GENERAL AND MISCELLANEOUS↗

Financial analysis of experimental releases conducted at Glen Canyon Dam during water years 1997 through 2005.

Because of concerns about the impact that Glen Canyon Dam (GCD) operations were having on downstream ecosystems and endangered species, the Bureau of Reclamation (Reclamation) conducted an Environmental Impact Statement (EIS) on dam operations (DOE 1996). New operating rules and management goals for GCD that had been specified in the Record of Decision (ROD) (Reclamation 1996) were adopted in February 1997. In addition to issuing new operating criteria, the ROD mandated experimental releases for the purpose of conducting scientific studies. This paper examines the financial implications of the experimental flows that were conducted at the GCD from 1997 to 2005. An experimental release may have either a positive or negative impact on the financial value of energy production. This study estimates the financial costs of experimental releases, identifies the main factors that contribute to these costs, and compares the interdependencies among these factors. An integrated set of tools was used to compute the financial impacts of the experimental releases by simulating the operation of the GCD under two scenarios, namely, (1) a baseline scenario that assumes operations comply with the ROD operating criteria and experimental releases that actually took place during the study period, and (2) a ''without experiments'' scenario that is identical to the baseline scenario of operations that comply with the GCD ROD, except it assumes that experimental releases did not occur. The Generation and Transmission Maximization (GTMax) model was the main simulation tool used to dispatch GCD and other hydropower plants that comprise the Salt Lake City Area Integrated Projects (SLCA/IP). Extensive data sets and historical information on SLCA/IP power plant characteristics, hydrologic conditions, and Western Area Power Administration's (Western's) power purchase prices were used for the simulation. In addition to estimating the financial impact of experimental releases, the GTMax model was also used to gain insights into the interplay among ROD operating criteria, exceptions that were made to criteria to accommodate the experimental releases, and Western operating practices. Experimental releases in some water years resulted in financial benefits to Western while others resulted in financial costs. During the study period, the total financial costs of all experimental releases were $11.9 million.

13 HYDRO ENERGY↗

Northwest Open Automated Demand Response Technology Demonstration Project

The Lawrence Berkeley National Laboratory (LBNL) Demand Response Research Center (DRRC) demonstrated and evaluated open automated demand response (OpenADR) communication infrastructure to reduce winter morning and summer afternoon peak electricity demand in commercial buildings the Seattle area. LBNL performed this demonstration for the Bonneville Power Administration (BPA) in the Seattle City Light (SCL) service territory at five sites: Seattle Municipal Tower, Seattle University, McKinstry, and two Target stores. This report describes the process and results of the demonstration. OpenADR is an information exchange model that uses a client-server architecture to automate demand-response (DR) programs. These field tests evaluated the feasibility of deploying fully automated DR during both winter and summer peak periods. DR savings were evaluated for several building systems and control strategies. This project studied DR during hot summer afternoons and cold winter mornings, both periods when electricity demand is typically high. This is the DRRC project team's first experience using automation for year-round DR resources and evaluating the flexibility of commercial buildings end-use loads to participate in DR in dual-peaking climates. The lessons learned contribute to understanding end-use loads that are suitable for dispatch at different times of the year. The project was funded by BPA and SCL. BPA is a U.S. Department of Energy agency headquartered in Portland, Oregon and serving the Pacific Northwest. BPA operates an electricity transmission system and markets wholesale electrical power at cost from federal dams, one non-federal nuclear plant, and other non-federal hydroelectric and wind energy generation facilities. Created by the citizens of Seattle in 1902, SCL is the second-largest municipal utility in America. SCL purchases approximately 40% of its electricity and the majority of its transmission from BPA through a preference contract. SCL also provides ancillary services within its own balancing authority. The relationship between BPA and SCL creates a unique opportunity to create DR programs that address both BPA's and SCL's markets simultaneously. Although simultaneously addressing both market could significantly increase the value of DR programs for BPA, SCL, and the end user, establishing program parameters that maximize this value is challenging because of complex contractual arrangements and the absence of a central Independent System Operator or Regional Transmission Organization in the northwest.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗