Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,369 records · Page 76

Recent developments in deployment analysis simulation using a multi-body computer code

Deployment is a candidate mode for construction of structural space systems components. By its very nature, deployment is a dynamic event, often involving large angle unfolding of flexible beam members. Validation of proposed designs and conceptual deployment mechanisms is enhanced through analysis. Analysis may be used to determine member loads thus helping to establish deployment rates and deployment control requirements for a given concept. Futhermore, member flexibility, joint free-play, manufacturing tolerances, and imperfections can affect the reliability of deployment. Analyses which include these effects can aid in reducing risks associated with a particular concept. Ground tests which can play a similar role to that of analyses are difficult and expensive to perform. Suspension systems just for vibration ground tests of large space structures in a 1 g environment present many challenges. Suspension of a structure which spatially expands is even more challenging. Analysis validation through experimental confirmation on relatively small simple models would permit analytical extrapolation to larger more complex space structures.

Housner, Jerrold M.↗

Novel high-gain, improved-bandwidth, finned-ladder V-band Traveling-Wave Tube slow-wave circuit design

The V-band frequency range of 59-64 GHz is a region of the millimeter-wave spectrum that has been designated for inter-satellite communications. As a first effort to develop a high-efficiency V-band Traveling-Wave Tube (TWT), variations on a ring-plane slow-wave circuit were computationally investigated to develop an alternative to the more conventional ferruled coupled-cavity circuit. The ring-plane circuit was chosen because of its high interaction impedance, large beam aperture, and excellent thermal dissipation properties. Despite these advantages, however, low bandwidth and high voltage requirements have, until now, prevented its acceptance outside the laboratory. In this paper, the three-dimensional electrodynamic simulation code MAFIA (solution of MAxwell's Equation by the Finite-Integration-Algorithm) is used to investigate methods of increasing the bandwidth and lowering the operating voltage of the ring-plane circuit. Calculations of frequency-phase dispersion, beam on-axis interaction impedance, attenuation and small-signal gain per wavelength were performed for various geometric variations and loading distributions of the ring-plane TWT slow-wave circuit. Based on the results of the variations, a circuit termed the finned-ladder TWT slow-wave circuit was designed and is compared here to the scaled prototype ring-plane and a conventional ferruled coupled-cavity TWT circuit over the V-band frequency range. The simulation results indicate that this circuit has a much higher gain, significantly wider bandwidth, and a much lower voltage requirement than the scaled ring-plane prototype circuit, while retaining its excellent thermal dissipation properties. The finned-ladder circuit has a much larger small-signal gain per wavelength than the ferruled coupled-cavity circuit, but with a moderate sacrifice in bandwidth.

Kory, Carol L.↗

Effect of Elevated Temperature and Loading Rate on Delamination Fracture Toughness

The effects of temperature and loading rate on delamination growth were studied. The delamination fracture toughness of IM7/K3B was measured at 149 C, 177 C, and 204 C. At each temperature the tests were performed with a variety of loading rates so that the delamination initiated over the range of time from 0.5 sec to 24 hrs. The double cantilever beam (DCB) test was used to measure fracture toughness. The results showed that the delamination resistance is a complicated function of both time and temperature with the effect of temperature either increasing or decreasing the fracture toughness depending on the time scale. The results also showed that the fracture toughness changed by as much as a factor of three as the time scale changed over the five orders of magnitude tested.

Reeder, J. R.↗

Decommissioning the physics laboratory, building 777-10A, at the Savannah River Site (SRS)

SRS recently completed a four year mission to decommission {approx}250 excess facilities. As part of that effort, SRS decommissioned a 48,000 ft{sup 2} laboratory that housed four low-power test reactors, formerly used by SRS to determine reactor physics. This paper describes and reviews the decommissioning, with a focus on component segmentation and handling (i.e. hazardous material removal, demolition, and waste handling). The paper is intended to be a resource for engineers, planners, and project managers, who face similar decommissioning challenges. Building 777-10A, located at the south end of SRS's A/M-Area, was built in 1953 and had a gross area of {approx}48,000 ft{sup 2}. Building 777-10A had two main areas: a west wing, which housed four experimental reactors and associated equipment; and an east wing, which housed laboratories, and shops, offices. The reactors were located in two separate areas: one area housed the Process Development Pile (PDP) reactor and the Lattice Test Reactor (LTR), while the second area housed the Standard Pile (SP) and the Sub-critical Experiment (SE) reactors. The west wing had five levels: three below and three above grade (floor elevations of -37', -28', -15', 0', +13'/+16' and +27' (roof elevation of +62')), while the east wing had two levels: one below and one above grade (floor elevations of -15' and 0' (roof elevation of +16')). Below-grade exterior walls were constructed of reinforced concrete, {approx}1' thick. In general, above-grade exterior walls were steel frames covered by insulation and corrugated, asbestos-cement board. The two interior walls around the PDP/LTR were reinforced concrete {approx}5' thick and {approx}30' high, while the SP/SE reactors resided in a reinforced, concrete cell with 3.5'-6' thick walls/roof. All other interior walls were constructed of metal studs covered with either asbestos-cement or gypsum board. In general, the floors were constructed of reinforced concrete on cast-in-place concrete beams below-grade and concrete on metal beams above-grade. The roofs were flat concrete slabs on metal beams. Building 777-10A was an important SRS research and development location. The reactors helped determine safe operational limits and loading patterns for fuel used in the SRS production reactors, and supported various low power reactor physics studies. All four reactors were shut down and de-inventoried in the 1970's. The building was DD and R 2007, Chattanooga, Tennessee, September 16-19, 2007 169 subsequently used by various SRS organizations for office space, audio/visual studio, and computer network hub. SRS successfully decommissioned Building 777-10A over a thirty month period at a cost of {approx}$14 M ({approx}$290/ft{sup 2}). The decommissioning was a complex and difficult effort due to the building's radiological contamination, height, extensive basement, and thick concrete walls. Extensive planning and extensive hazard analysis (e.g. of structural loads/modifications leading to unplanned collapse) ensured the decommissioning was completed safely and without incident. The decommissioning met contract standards for residual contamination and physical/chemical hazards, and was the last in a series of decommissioning projects that prepared the lower A/M-Area for SRS's environmental restoration program.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Buckling analysis of planar compression micro-springs

Large compression deformation causes micro-springs buckling and loss of load capacity. We analyzed the impact of structural parameters and boundary conditions for planar micro-springs, and obtained the change rules for the two factors that affect buckling. A formula for critical buckling deformation of micro-springs under compressive load was derived based on elastic thin plate theory. Results from this formula were compared with finite element analysis results but these did not always correlate. Therefore, finite element analysis is necessary for micro-spring buckling analysis. We studied the variation of micro-spring critical buckling deformation caused by four structural parameters using ANSYS software under two constraint conditions. The simulation results show that when an x-direction constraint is added, the critical buckling deformation increases by 32.3-297.9%. The critical buckling deformation decreases with increase in micro-spring arc radius or section width and increases with increase in micro-spring thickness or straight beam width. We conducted experiments to confirm the simulation results, and the experimental and simulation trends were found to agree. Buckling analysis of the micro-spring establishes a theoretical foundation for optimizing micro-spring structural parameters and constraint conditions to maximize the critical buckling load.

36 MATERIALS SCIENCE↗

Optimized coupling of cold atoms into a fiber using a blue-detuned hollow-beam funnel

We theoretically investigate the process of coupling cold atoms into the core of a hollow-core photonic-crystal optical fiber using a blue-detuned Laguerre-Gaussian beam. In contrast to the use of a red-detuned Gaussian beam to couple the atoms, the blue-detuned hollow beam can confine cold atoms to the darkest regions of the beam, thereby minimizing shifts in the internal states and making the guide highly robust to heating effects. This single optical beam is used as both a funnel and a guide to maximize the number of atoms into the fiber. In the proposed experiment, Rb atoms are loaded into a magneto-optical trap (MOT) above a vertically oriented optical fiber. We observe a gravito-optical trapping effect for atoms with high orbital momentum around the trap axis, which prevents atoms from coupling to the fiber: these atoms lack the kinetic energy to escape the potential and are thus trapped in the laser funnel indefinitely. We find that by reducing the dipolar force to the point at which the trapping effect just vanishes, it is possible to optimize the coupling of atoms into the fiber. Our simulations predict that by using a low-power (2.5 mW) and far-detuned (300 GHz) Laguerre-Gaussian beam with a 20-{mu}m-radius core hollow fiber, it is possible to couple 11% of the atoms from a MOT 9 mm away from the fiber. When the MOT is positioned farther away, coupling efficiencies over 50% can be achieved with larger core fibers.

74 ATOMIC AND MOLECULAR PHYSICS↗

Recent performance of the SNS H{sup −} ion source and low-energy beam transport system

Recent measurements of the H{sup −} beam current show that SNS is injecting about 55 mA into the RFQ compared to ∼45 mA in 2010. Since 2010, the H{sup −} beam exiting the RFQ dropped from ∼40 mA to ∼34 mA, which is sufficient for 1 MW of beam power. To minimize the impact of the RFQ degradation, the service cycle of the best performing source was extended to 6 weeks. The only degradation is fluctuations in the electron dump voltage towards the end of some service cycles, a problem that is being investigated. Very recently, the RFQ was retuned, which partly restored its transmission. In addition, the electrostatic low-energy beam transport system was reengineered to double its heat sinking and equipped with a thermocouple that monitors the temperature of the ground electrode between the two Einzel lenses. The recorded data show that emissions from the source at high voltage dominate the heat load. Emissions from the partly Cs-covered first lens cause the temperature to peak several hours after starting up. On rare occasions, the temperature can also peak due to corona discharges between the center ground electrode and one of the lenses.

43 PARTICLE ACCELERATORS↗

Comparing Free-Free and Shaker Table Model Correlation Methods Using Jim Beam

Finite element model correlation as part of a spacecraft program has always been a challenge. For any NASA mission, the coupled system response of the spacecraft and launch vehicle can be determined analytically through a Coupled Loads Analysis (CLA), as it is not possible to test the spacecraft and launch vehicle coupled system before launch. The value of the CLA is highly dependent on the accuracy of the frequencies and mode shapes extracted from the spacecraft model. NASA standards require the spacecraft model used in the final Verification Loads Cycle to be correlated by either a modal test or by comparison of the model with Frequency Response Functions (FRFs) obtained during the environmental qualification test. Due to budgetary and time constraints, most programs opt to correlate the spacecraft dynamic model during the environmental qualification test, conducted on a large shaker table. For any model correlation effort, the key has always been finding a proper definition of the boundary conditions. This paper is a correlation case study to investigate the difference in responses of a simple structure using a free-free boundary, a fixed boundary on the shaker table, and a base-drive vibration test, all using identical instrumentation. The NAVCON Jim Beam test structure, featured in the IMAC round robin modal test of 2009, was selected as a simple, well recognized and well characterized structure to conduct this investigation. First, a free-free impact modal test of the Jim Beam was done as an experimental control. Second, the Jim Beam was mounted to a large 20,000 lbf shaker, and an impact modal test in this fixed configuration was conducted. Lastly, a vibration test of the Jim Beam was conducted on the shaker table. The free-free impact test, the fixed impact test, and the base-drive test were used to assess the effect of the shaker modes, evaluate the validity of fixed-base modeling assumptions, and compare final model correlation results between these boundary conditions.

Modal Test↗

Simulation And Design Of A Reflection Magnet For The EAST Neutral Beam System

The simulation and design of a reflection magnet to be installed in the Experimental Advanced Superconducting Tokamak (EAST) neutral beam injection system are reported. A parametric design and simulation for the reflection magnet was carried out. For a deuterium beam with 42 cm as the bending radius, the intensity of reflection magnet field is about 1376 Gs at the energy of 80 keV. In order to determine position of the ion dump and the surface power load, a particle simulation with Monte Carlo was developed to study ion trajectories. In addition, the louver design is introduced.

43 PARTICLE ACCELERATORS↗

Pitfalls of tungsten multileaf collimator in proton beam therapy

Purpose: Particle beam therapy is associated with significant startup and operational cost. Multileaf collimator (MLC) provides an attractive option to improve the efficiency and reduce the treatment cost. A direct transfer of the MLC technology from external beam radiation therapy is intuitively straightforward to proton therapy. However, activation, neutron production, and the associated secondary cancer risk in proton beam should be an important consideration which is evaluated. Methods: Monte Carlo simulation with FLUKA particle transport code was applied in this study for a number of treatment models. The authors have performed a detailed study of the neutron generation, ambient dose equivalent [H*(10)], and activation of a typical tungsten MLC and compared with those obtained from a brass aperture used in a typical proton therapy system. Brass aperture and tungsten MLC were modeled by absorber blocks in this study, representing worst-case scenario of a fully closed collimator. Results: With a tungsten MLC, the secondary neutron dose to the patient is at least 1.5 times higher than that from a brass aperture. The H*(10) from a tungsten MLC at 10 cm downstream is about 22.3 mSv/Gy delivered to water phantom by noncollimated 200 MeV beam of 20 cm diameter compared to 14 mSv/Gy for the brass aperture. For a 30-fraction treatment course, the activity per unit volume in brass aperture reaches 5.3 x 10{sup 4} Bq cm{sup -3} at the end of the last treatment. The activity in brass decreases by a factor of 380 after 24 h, additional 6.2 times after 40 days of cooling, and is reduced to background level after 1 yr. Initial activity in tungsten after 30 days of treating 30 patients per day is about 3.4 times higher than in brass that decreases only by a factor of 2 after 40 days and accumulates to 1.2 x 10{sup 6} Bq cm{sup -3} after a full year of operation. The daily utilization of the MLC leads to buildup of activity with time. The overall activity continues to increase due to {sup 179}Ta with a half-life of 1.82 yr and thus require prolonged storage for activity cooling. The H*(10) near the patient side of the tungsten block is about 100 {mu}Sv/h and is 27 times higher at the upstream side of the block. This would lead to an accumulated dose for therapists in a year that may exceed occupational maximum permissible dose (50 mSv/yr). The value of H*(10) at the upstream surface of the tungsten block is about 220 times higher than that of the brass. Conclusions: MLC is an efficient way for beam shaping and overall cost reduction device in proton therapy. However, based on this study, tungsten seems to be not an optimal material for MLC in proton beam therapy. Usage of tungsten MLC in clinic may create unnecessary risks associated with the secondary neutrons and induced radioactivity for patients and staff depending on the patient load. A careful selection of material for manufacturing of an optimal MLC for proton therapy is thus desired.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Pulsed electron beam generation with fast repetitive double pulse system

Longer duration high voltage pulse (∼ 100 kV, 260 ns) is generated and reported using helical pulse forming line in compact geometry. The transmission line characteristics of the helical pulse forming line are also used to develop fast repetition double pulse system with very short inter pulse interval. It overcomes the limitations caused due to circuit parameters, power supplies and load characteristics for fast repetitive high voltage pulse generation. The high voltage double pulse of 100 kV, 100 ns with an inter pulse repetition interval of 30 ns is applied across the vacuum field emission diode for pulsed electron beam generation. The electron beam is generated from cathode material by application of negative high voltage (> 100 kV) across the diode by explosive electron emission process. The vacuum field emission diode is made of 40 mm diameter graphite cathode and SS mesh anode. The anode cathode gap was 6 mm and the drift tube diameter was 10 cm. The initial experimental results of pulsed electron beam generation with fast repetitive double pulse system are reported and discussed. (author)

43 PARTICLE ACCELERATORS↗

Bend Magnet Heat Loads and Out of Orbit Scenarios

This paper presents an analytical calculation of the spatial power spectrum emitted from relativistic electrons passing through a series of bend magnets. Using lattice files from the software Elegant, both the ideal and missteered trajectories taken by the beam are considered in determination of the power profile. Calculations were performed for the Advanced Photon Source Upgrade multi-bend-achromat storage-ring. The power distribution and integrated total power values are in agreement with Synrad, a monte-carlo based program developed at CERN, within one percent error. The analytic solution used in this software gives a both quick and accurate tool for calculating the heat load on a photon absorber. The location and orientation can be optimized in order to reduce the peak intensity and thus the maximum thermal stress. The program can be used with any optimization or FEA software and gives rise to a versatile set of uses. [1]

MAGNET HEAT LOADS↗

Calculation of synchrotron radiation from high intensity electron beam at eRHIC

The Electron-Relativistic Heavy Ion Collider (eRHIC) at Brookhaven National Lab is an upgrade project for the existing RHIC. A 30 GeV energy recovery linac (ERL) will provide a high charge and high quality electron beam to collide with proton and ion beams. This will improve the luminosity by at least 2 orders of magnitude. The synchrotron radiation (SR) from the bending magnets and strong quadrupoles for such an intense beam could be penetrating the vacuum chamber and producing hazards to electronic devices and undesired background for detectors. In this paper, we calculate the SR spectral intensity, power density distributions and heat load on the chamber wall. We suggest the wall thickness required to stop the SR and estimate spectral characteristics of the residual and scattered background radiation outside the chamber.

43 PARTICLE ACCELERATORS↗

Development of a high-temperature oven for the 28 GHz electron cyclotron resonance ion source

We have been developing the 28 GHz ECR ion source in order to accelerate high-intensity uranium beams at the RIKEN RI-beam Factory. Although we have generated U{sup 35+} beams by the sputtering method thus far, we began developing a high-temperature oven with the aim of increasing and stabilizing the beams. Because the oven method uses UO{sub 2}, a crucible must be heated to a temperature higher than 2000 °C to supply an appropriate amount of UO{sub 2} vapor to the ECR plasma. Our high-temperature oven uses a tungsten crucible joule-heated with DC current of approximately 450 A. Its inside dimensions are ϕ11 mm × 13.5 mm. Since the crucible is placed in a magnetic field of approximately 3 T, it is subject to a magnetic force of approximately 40 N. Therefore, we used ANSYS to carefully design the crucible, which was manufactured by machining a tungsten rod. We could raise the oven up to 1900 °C in the first off-line test. Subsequently, UO{sub 2} was loaded into the crucible, and the oven was installed in the 28 GHz ECR ion source and was tested. As a result, a U{sup 35+} beam current of 150 μA was extracted successfully at a RF power of approximately 3 kW.

43 PARTICLE ACCELERATORS↗

Generation of high-voltage pulses with subnanosecond front rise times in open discharge

The investigation results for plasma switching devices of high-voltage pulses with pulse rise times less than 1 ns are presented. The approach is based on using conditions suitable for bringing a gas discharge chamber in a state with high conductivity due to generation of an electron beam owing to photoelectron emission from the device cathode. It is shown that in co-axial geometry pulses, switching time 0.45 ns on an active load R{sub L} = 50 {Omega} at voltage U = 20 kV can be achieved. It is shown with the method of doubled impulses that such a device can regenerate the acceptable electric strength during 10 {mu}s. It is indicated of the principle possibility of working in the pulse-periodical regime to the repetition rate of 100 kHz.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Micro-beam bending of FCC bicrystals: A comparison between defect dynamics simulations and experiments

To understand the role of the grain boundary (GB) in plasticity at small scale, a concurrently coupled mesoscale plasticity model was developed to simulate micro-bending of bicrystalline micron-sized beams. By coupling dislocation dynamics (DD) with a finite element model (FEM), a novel defect dynamics model provides the means to investigate intricate interactions between dislocations and GBs under various loading conditions. Our simulations of micro-bending agree well with corresponding micro-bending experiments, and they show that mechanical response of bicrystals could have not only hardening but also softening depending on the characters of the GB. In addition, changing the location of the GB in the microbeams results in different mechanical responses; GBs located at the neutral plane show softening compared to single crystals, while inclined GBs located halfway along the length of the beam show little effect. In conclusion, simulation results could provide a clear picture on detailed dislocation-GB interactions, and quantitative resolved shear stress analysis supplemented by dislocation density distribution is used to analyze the mechanical response of bicrystalline samples.

36 MATERIALS SCIENCE↗

A Radar/Radiometer Instrument for Mapping Soil Moisture and Ocean Salinity

The RadSTAR instrument combines an L-band, digital beam-forming radar with an L-band synthetic aperture, thinned array (STAR) radiometer. The RadSTAR development will support NASA Earth science goals by developing a novel, L-band scatterometer/ radiometer that measures Earth surface bulk material properties (surface emissions and backscatter) as well as surface characteristics (backscatter). Present, real aperture airborne L-Band active/passive measurement systems such as the JPUPALS (Wilson, et al, 2000) provide excellent sampling characteristics, but have no scanning capabilities, and are extremely large; the huge JPUPALS horn requires a the C-130 airborne platform, operated with the aft loading door open during flight operation. The approach used for the upcoming Aquarius ocean salinity mission or the proposed Hydros soil mission use real apertures with multiple fixed beams or scanning beams. For real aperture instruments, there is no upgrade path to scanning over a broad swath, except rotation of the whole aperture, which is an approach with obvious difficulties as aperture size increases. RadSTAR will provide polarimetric scatterometer and radiometer measurements over a wide swath, in a highly space-efficient configuration. The electronic scanning approaches provided through STAR technology and digital beam forming will enable the large L-band aperture to scan efficiently over a very wide swath. RadSTAR technology development, which merges an interferometric radiometer with a digital beam forming scatterometer, is an important step in the path to space for an L-band scatterometer/radiometer. RadSTAR couples a patch array antenna with a 1.26 GHz digital beam forming radar scatterometer and a 1.4 GHz STAR radiometer to provide Earth surface backscatter and emission measurements in a compact, cross-track scanning instrument with no moving parts. This technology will provide the first L-band, emission and backscatter measurements in a compact aircraft instrument and will be ideally suited to large apertures, possibly at GEO, and could possibly be implemented on a swarm of micro-satellites. This instrument will have wide application for validation studies, and will have application for other microwave frequencies.

Hildebrand, Peter H.↗

Implications of asymmetric beam geometry for convergent acoustic Doppler profilers

The focus of this research is to develop a measurement instrument to characterize complex flows at spatial and temporal resolutions pertinent to understanding hydrodynamic loads in zones of fluid-structure interaction. Foundational work has demonstrated that flow velocities can be measured at a fixed focal point using a convergent array of acoustic Doppler profiling (C-ADP) instruments. As an extension of this concept, the following approach describes an application of the technology to facilitate 3D velocity measurements at a dynamically adjustable focal point location. Furthermore, the ability to dynamically control the focal point location in real-time allows the instrument to survey velocities within a three-dimensional velocity field. The resulting configuration targets a combination of measurement fidelity and control that has not been achieved by existing remote flow measurement instrumentation in the marine environment.

Harding, Samuel F.↗