Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Unit Testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,369 records · Page 76

Performance Testing of Lithium Li-ion Cells and Batteries in Support of JPL's 2003 Mars Exploration Rover Mission

In early 2004, JPL successfully landed two Rovers, named Spirit and Opportunity, on the surface of Mars after traveling > 300 million miles over a 6-7 month period. In order to operate for extended duration on the surface of Mars, both Rovers are equipped with rechargeable Lithium-ion batteries, which were designed to aid in the launch, correct anomalies during cruise, and support surface operations in conjunction with a triple-junction deployable solar arrays. The requirements of the Lithium-ion battery include the ability to provide power at least 90 sols on the surface of Mars, operate over a wide temperature range (-20(super 0)C to +40(super 0)C), withstand long storage periods (e.g., including pre-launch and cruise period), operate in an inverted position, and support high currents (e.g., firing pyro events). In order to determine the inability of meeting these requirements, ground testing was performed on a Rover Battery Assembly Unit RBAU), consisting of two 8-cell 8 Ah lithium-ion batteries connected in parallel. The RBAU upon which the performance testing was performed is nearly identical to the batteries incorporated into the two Rovers currently on Mars. The primary focus of this paper is to communicate the latest results regarding Mars surface operation mission simulation testing, as well as, the corresponding performance capacity loss and impedance characteristics as a function of temperature and life. As will be discussed, the lithium-ion batteries (fabricated by Yardney Technical Products, Inc.) have been demonstrated to far exceed the requirements defined by the mission, being able to support the operation of the rovers for over three years, and are projected to support an even further extended mission.

low temperature electrolytes↗

Challenges and Considerations When Using Hydraulic Modal Shaking in Large-Scale Modal Testing

As test articles become dimensionally larger, more complex, and massive in weight, combined with the need to excite them to higher than traditional levels in order to identify their nonlinear characteristics, modal shakers that can generate significantly higher force levels, have longer stroke lengths, and possess higher velocity limits are required. While large scale modal tests may be performed with electrodynamic modal shakers, hydraulic modal shakers become attractive since they can generate higher force levels at lower unit cost with a smaller spatial footprint. While test engineers familiar with electrodynamic modal shakers are familiar with the challenges of displacement and velocity limits and the relatively mild shaker nonlinear distortion due to amplifier gains and shaker flexure structural geometric nonlinearities, they probably are not as familiar with the unique set of challenges hydraulic modal shakers present. These unique challenges include significant nonlinear distortion in the shaker force, issues with the setup of the hydraulic power supply and the associated hydraulic hosing, velocity limits as they relate to potentially damaging the hydraulic actuator piston, and safety issues with operating high-pressure hydraulic systems. This paper addresses these unique challenges to help the test engineer to better utilize hydraulic modal shakers on large-scale modal tests.

Distortion↗

Challenges and Considerations When Using Hydraulic Modal Shaking in Large-Scale Modal Testing IMAC-XL

As test articles become dimensionally larger, more complex, and massive in weight, combined with the need to excite them to higher than traditional levels in order to identify their nonlinear characteristics, modal shakers that can generate significantly higher force levels, have longer stroke lengths, and possess higher velocity limits are required. While large scale modal tests may be performed with electrodynamic modal shakers, hydraulic modal shakers become attractive since they can generate higher force levels at lower unit cost with a smaller spatial footprint. While test engineers familiar with electrodynamic modal shakers are familiar with the challenges of displacement and velocity limits and the relatively mild shaker nonlinear distortion due to amplifier gains and shaker flexure structural geometric nonlinearities, they probably are not as familiar with the unique set of challenges hydraulic modal shakers present. These unique challenges include significant nonlinear distortion in the shaker force, issues with the setup of the hydraulic power supply and the associated hydraulic hosing, velocity limits as they relate to potentially damaging the hydraulic actuator piston, and safety issues with operating high-pressure hydraulic systems. This paper addresses these unique challenges to help the test engineer to better utilize hydraulic modal shakers on large-scale modal tests.

Distortion↗

Performance testing of a solid propellant pulsed plasma microthruster.

Extensive performance testing has been carried out on a solid propellant, pulsed plasma microthruster essentially identical to the four units aboard the DOD, Lincoln Experimental Satellite (LES)-6. Tests include measurements of thrust, specific impulse, thrust vector, impulse bit repeatability, intermittency and endurance. The results show good impulse bit repeatability and a well defined thrust vector. The impulse bit, with a 1.85-joule input, was found to be approximately 26 micronewton-seconds at 190 seconds specific impulse. Based upon the results of the intermittency tests, a better understanding of the intermittency mechanism has been achieved.

Williams, T. E.↗

USNO GPS program

Initial test results indicated that the Global Positioning System/Time Transfer Unit (GPS/TTU) performed well within the + or - 100 nanosecond range required by the original system specification. Subsequent testing involved the verification of GPS time at the master control site via portable clocks and the acquisition and tracking of as many passes of the space vehicles currently in operation as possible. A description and discussion of the testing, system modifications, test results obtained, and an evaluation of both GPS and the GPS/TTU are presented.

Putkovich, K.↗

Auxiliary propulsion system flight package

Hughes Aircraft Company developed qualified and integrated flight, a flight test Ion Auxiliary Propulsion System (IAPS), on an Air Force technology satellite. The IAPS Flight Package consists of two identical Thruster Subsystems and a Diagnostic Subsystem. Each thruster subsystem (TSS) is comprised of an 8-cm ion Thruster-Gimbal-Beam Shield Unit (TGBSU); Power Electronics Unit; Digital Controller and Interface Unit (DCIU); and Propellant Tank, Valve and Feed Unit (PTVFU) plus the requisite cables. The Diagnostic Subsystem (DSS) includes four types of sensors for measuring the effect of the ion thrusters on the spacecraft and the surrounding plasma. Flight qualifications of IAPS, prior to installation on the spacecraft, consisted of performance, vibration and thermal-vacuum testing at the unit level, and thermal-vacuum testing at the subsystem level. Mutual compatibility between IAPS and the host spacecraft was demonstrated during a series of performance and environmental tests after the IAPS Flight Package was installed on the spacecraft. After a spacecraft acoustic test, performance of the ion thrusters was reverified by removing the TGBSUs for a thorough performance test at Hughes Research Laboratories (HRL). The TGBSUs were then reinstalled on the spacecraft. The IAPS Flight Package is ready for flight testing when Shuttle flights are resumed.

Collett, C. R.↗

Nevada Test Site craters used for astronaut training

Craters produced by chemical and nuclear explosives at the Nevada Test Site were used to train astronauts before their lunar missions. The craters have characteristics suitable for reconnaissance-type field investigations. The Schooner test produced a crater about 300 m across and excavated more than 72 m of stratigraphic section deposited in a fairly regular fashion so that systematic observations yield systematic results. Other features common on the moon, such as secondary craters and glass-coated rocks, are present at Schooner crater. Smaller explosive tests on Buckboard Mesa excavated rocks from three horizontal alteration zones within basalt flows so that the original sequence of the zones could be determined. One crater illustrated the characteristics of craters formed across vertical boundaries between rock units. Although the exercises at the Nevada Test Site were only a small part of the training of the astronauts, voice transcripts of Apollo missions 14, 16, and 17 show that the exercises contributed to astronaut performance on the moon.

Moore, H. J.↗

Stability criteria for two-variable polynomials

Recursive algebraic algorithms are developed for testing various stability properties of two-variable polynomials in a finite number of steps. Stability is tested with respect to either the half-plane or the unit circle applying only two times the equivalent of the Routh or Marden test, regardless of the degree of the polynomial.

Siljak, D. D.↗

Extended testing of compression distillation.

During the past eight years, the NASA Manned Spacecraft Center has supported the development of an integrated water and waste management system which includes the compression distillation process for recovering useable water from urine, urinal flush water, humidity condensate, commode flush water, and concentrated wash water. This paper describes the design of the compression distillation unit, developed for this system, and the testing performed to demonstrate its reliability and performance. In addition, this paper summarizes the work performed on pretreatment and post-treatment processes, to assure the recovery of sterile potable water from urine and treated urinal flush water.

Bambenek, R. A.↗

Portable Virtual Training Units

The Mission Operations Lab initiated a project to design, develop, deliver, test, and validate a unique training system for astronaut and ground support personnel. In an effort to keep training costs low, virtual training units (VTUs) have been designed based on images of actual hardware and manipulated by a touch screen style interface for ground support personnel training. This project helped modernized the training system and materials by integrating them with mobile devices for training when operators or crew are unavailable to physically train in the facility. This project also tested the concept of a handheld remote device to control integrated trainers using International Space Station (ISS) training simulators as a platform. The portable VTU can interface with the full-sized VTU, allowing a trainer co-located with a trainee to remotely manipulate a VTU and evaluate a trainee's response. This project helped determine if it is useful, cost effective, and beneficial for the instructor to have a portable handheld device to control the behavior of the models during training. This project has advanced NASA Marshall Space Flight Center's (MSFC's) VTU capabilities with modern and relevant technology to support space flight training needs of today and tomorrow.

Malone, Reagan↗

Economical printed circuit front panel for computer use

Techniques for preparing printed circuit boards are used to provide an alternate method for producing panel symbology for ground computer test trap. After processing, the panel unit is either solder or gold plated.

Newman, J.↗

Ascent heat transfer rate distribution on the North American Rockwell delta wing orbiter and the General Dynamics/Convair booster at a Mach number of 8 (mated)

A wind tunnel test program to determine aerodynamic interference heating on the North American Rockwell orbiter mated with the General Dynamics Convair booster is discussed. The tests were conducted at the Arnold Engineering Development Center (AEDC) in Tunnel B of the von Karman Gas Dynamics Facility (VKF). The test period was June 1971. Heat-transfer rates were determined by the phase-change paint technique on 0.013-scale Stycast models using Tempilaq as the surface temperature indicator. The nominal test conditions were: Mach 8, free-stream unit length Reynolds numbers of 1.25 x one million and 2.55 x one million angles of attack of -5, 0, +5 deg. Model details, test conditions, phase-change paint photographs and reduced heat-transfer coefficients are presented.

Matthews, R. K.↗

A contaminant monitor for submarine atmospheres.

A requirement for monitoring selected atmospheric constituents on board nuclear powered submarines has been met by the development of the Central Atmosphere Monitoring System, Mark I. This system employs a mass spectrometer to monitor H2, H2O, N2, O2, CO2, Freon 11, Freon 12, and Freon 114, in addition to an infrared sensor for CO. The CAMS MKI development is discussed, including background, operating fundamentals, principal requirements, functional and physical descriptions, and summarized test results. Each of two prototype units has successfully completed over 9000 hr of operational sea trails, providing the necessary ground work for the manufacture of production units. At the same time, these units, which have benefited extensively from NASA hardware experience, may in turn provide useful data for the development of a new class of maintainable atmospheric monitoring instrumentation for manned spacecraft.

Ruecker, M. R.↗

Atmosphere-entry behavior of a modular, disk-shaped, isotope heat source.

The authors have studied the entry and impact behavior of an isotope heat source for space nuclear power that disassembles into a number of modules which would enter the earth's atmosphere separately if a flight aborted. These modules are disk-shaped units, each with its own reentry heat shield and protective impact container. In normal operation, the disk modules are stacked inside the generator, but during a reentry abort they separate and fly as individual units of low ballistic coefficient. Flight tests at hypersonic speeds have confirmed that a stack of disks will separate and assume a flat-forward mode of flight. Free-fall tests of single disks have demonstrated a nominal impact velocity of 30 m/sec at sea level for a practical range of ballistic coefficients.

Vorreiter, J. W.↗

Simulation and flight evaluation of a heads-up display for general aviation

A landing-site indicator (LASI) has been devised as a relatively simple heads-up display to show the pilot the magnitude and direction of the aircraft's velocity vector superimposed on the pilot's view of the landing area. A total of 160 landings were performed in a fixed-base simulation program by four pilots with and without the LASI display. These tests showed the display to be of beneficial use in making the approaches more consistent. Some inferences were also made that the physical workload would also be less with its use. The pilots generally agreed that the LASI, as represented in the simulation was a useful landing aid. Additional pilot comments from preliminary flight tests of a breadboard LASI display unit tend to confirm the simulator results.

Harris, R. L., Sr.↗

Earth Observatory Satellite system definition study. Report no. 6: Space shuttle interfaces/utilization

The impacts of achieving compatibility of the Earth Observatory Satellite (EOS) with the space shuttle and the potential benefits of space shuttle utilization are discussed. Mission requirements and mission suitability, including the effects of multiple spacecraft missions, are addressed for the full spectrum of the missions. Design impact is assessed primarily against Mission B, but unique requirements reflected by Mission A, B, and C are addressed. The preliminary results indicated that the resupply mission had the most pronounced impact on spacecraft design and cost. Program costs are developed for the design changes necessary to achieve EOS-B compatibility with Space Shuttle operations. Non-recurring and recurring unit costs are determined, including development, test, ground support and logistics, and integration efforts. Mission suitability is addressed in terms of performance, volume, and center of gravity compatibility with both space shuttle and conventional launch vehicle capabilities.

Source record↗