DOE OSTI2018
This paper provides the status and experiences of Low and Intermediate-level radioactive Waste (LILW) disposal facility in Korea. The LILW disposal facility is being constructed in Gyeongju-si, Korea. It can dispose of 800,000 drums (hereafter, 'drums' means '200 liter drum equivalents' unless specified otherwise) of radioactive waste in a site of 2,060,000 m{sup 2}. The first stage of the LILW facility construction was completed in June 2014, and approved for use by Nuclear Safety and Security Commission (NSSC) in December 2014. The first stage of the LILW facility, which is a type of underground silo with disposal capacity of 35,200 m{sup 3} (100,000 drums), consists of a construction tunnel, an operation tunnel, an access shaft, and six silos, etc. Silo for final disposal is located 80∼130 m below sea level, 25 m in diameter and 50 m in height. The capacity of each silo is approximately 16,700 drums. The second stage of the LILW facility is under construction and will be completed by December 2020. The second stage of the LILW facility, which is a type of near-surface disposal with disposal capacity of 32,875 m{sup 3} (125,000 drums), consists of an underground gallery, three movable cranes and twenty vaults, etc. Vault for final disposal is located about 100 m above sea level, 20 m in width, 20 m length and 10.9 m in height. The capacity of each vault is approximately 6,250 drums. A second receipt and storage facility is to be completed by June 2021. This facility is under designing to prepare for further increasing radioactive waste receipt quantities. It has storage capacity of 10,000 drums (existing receipt and storage facility have storage capacity of 7,000 drums)and will be divided into several sections for pre-disposal work, storage, a passage to link the existing facility to the second receipt and storage facility and truck bay, etc. These components of the LILW disposal facilities are together called LILW complex disposal facility. It is the world's first LILW disposal facility with two different types of disposal facilities in one site. For efficient operation, these disposal facilities share a receipt and storage building, a waste water treatment system, a measurement and monitoring system, etc. Once the construction of the first two stages is completed, LILW disposal facilities will be incrementally expanded, and as the whole LILW disposal facilities are completed, all LILW in Korea will be disposed of these disposal facilities efficiently according to its radioactivity level and managed safely by KORAD. (authors)
12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗