Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Project Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,369 records · Page 76

Electron Cooling Experiment for Proton Beams with Intense Space-Charge in IOTA

Electron cooling as a method of creating intense ion beams has a practical upper limit when it comes to the peak phase space density of ion beams which can be achieved in practice. We describe a new experiment to study electron cooling of 2.5 MeV protons at the intensity limit using the Integrable Optics Test Accelerator (IOTA), which is a storage ring dedicated to beam physics research at Fermilab. This system will enable the study of magnetized electron cooling of a proton beam with transverse incoherent tune shifts approaching -0.5 due to the presence of intense space-charge forces. We present an overview of the hardware design, simulations and specific experiments planned for this project.

43 PARTICLE ACCELERATORS↗

Design Status of the Electron-Ion Collider

The Electron-Ion Collider is gearing up for "Critical Decision 2", theproject baseline with defined scope, cost and schedule.Lattice designs are beingfinalized, and preliminary component design is being carried out. Beam dynamicsstudies such as dynamic aperture optimization, instability and polarizationstudies, and beam-beam simulations are continuing in parallel. We report onthe latest developments and the overall status of the project, and presentthe plans for future activities.

43 PARTICLE ACCELERATORS↗

The EIC accelerator: design highlights and project status

The design of the electron-ion collider (EIC) at Brookhaven National Laboratory is well underway, aiming at a peak electron-proton luminosity of 10e+34 cm^-1·sec^-1. This high luminosity, the wide center-of-mass energy range from 29 to 141 GeV (e-p) and the high level of polarization require innovative solutions to maximize the performance of the machine, which makes the EIC one of the most challenging accelerator projects to date. The complexity of the EIC will be discussed, and the project status and plans will be presented.

43 PARTICLE ACCELERATORS↗

Status of the LCLS-II-HE Project at Jefferson Lab

The Linac Coherent Light Source II High Energy (LCLS-II-HE) upgrade at the SLAC National Accelerator Laboratory is being constructed in partnership with the Thomas Jefferson National Accelerator Facility (JLab) and the Fermi National Accelerator Laboratory (FNAL). The cryomodule production scope consists of the design, procurement, construction, and acceptance testing of 24 eight-cavity, 1.3 GHz cryomodules, as well as R&D activities necessary to develop the required technology. To achieve this, JLab and FNAL are also contributing to SLAC’s effort to develop the cavity recipe and production processes necessary to meet the LCLS-II-HE goal of 20.8 MV/m and average Q₀ of 2.7·10¹⁰. This paper details the JLab scope, focusing on the project initiation phase, in particular technology development and prototyping, project development and planning, and implementation of lessons learned from LCLS-II.

Wilson, K. M.↗

U.S. Nuclear Regulatory Commission Extremely Low Probability of Rupture pilot study : xLPR framework model user's guide.

For the U.S. Nuclear Regulatory Commission (NRC) Extremely Low Probability of Rupture (xLPR) pilot study, Sandia National Laboratories (SNL) was tasked to develop and evaluate a probabilistic framework using a commercial software package for Version 1.0 of the xLPR Code. Version 1.0 of the xLPR code is focused assessing the probability of rupture due to primary water stress corrosion cracking in dissimilar metal welds in pressurizer surge nozzles. Future versions of this framework will expand the capabilities to other cracking mechanisms, and other piping systems for both pressurized water reactors and boiling water reactors. The goal of the pilot study project is to plan the xLPR framework transition from Version 1.0 to Version 2.0; hence the initial Version 1.0 framework and code development will be used to define the requirements for Version 2.0. The software documented in this report has been developed and tested solely for this purpose. This framework and demonstration problem will be used to evaluate the commercial software's capabilities and applicability for use in creating the final version of the xLPR framework. This report details the design, system requirements, and the steps necessary to use the commercial-code based xLPR framework developed by SNL.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Reducing Thermal Losses and Gains With Buried and Encapsulated Ducts in Hot-Humid Climates

Thermal losses and gains from ductwork installed in unconditioned spaces—such as attics, crawl spaces, and garages—can contribute significantly to the overall heating and cooling loads of single-family residential buildings, with estimated duct losses ranging from 10%–45 %. The impact is particularly severe in hot climates where air conditioning dominates and extensive duct systems are typically located in hot attics. The duct system inefficiencies are greatest at peak demand conditions when the attic is hottest and run times are the highest. The thermal losses and gains at the three single-story houses in Florida monitored in this study accounted for 15%–35% of the annual pre-retrofit heating and cooling energy use and 6%–25% of the total pre-retrofit annual utility bill. Even though a number of existing methods can effectively move ducts into the conditioned space, they are not currently being widely implemented. Physically locating the ducts within the conditioned space is most often applicable only to new construction projects and requires planning during design. Attics can be insulated at the roof deck with closed-cell polyurethane foam (ccSPF) to reduce duct losses and infiltration rates, but this method has high up-front costs and the potential to increase loads on the building enclosure. In hot-dry climates, attic duct systems can be buried under loose-fill insulation at a significantly lower cost to reduce thermal loads. In hot-humid climates, however, condensation on the duct jacket can occur when the humidity in the attic is high.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A Full-Featured User Friendly CO 2 -EOR and Sequestration Planning Software

A Full-Featured, User Friendly CO 2 -EOR and Sequestration Planning Software This project addressed the development of an integrated software solution that includes a graphical user interface, numerical simulation, visualization tools and optimization processes for reservoir simulation modeling of CO 2 -EOR. The objective was to assist the industry in the development of domestic energy resources by expanding the application of CO 2 -EOR technologies, and ultimately to maximize the CO 2 } sequestration capacity of the U.S. The software resulted in a field-ready application for the industry to address the current CO 2 -EOR technologies. The software has been made available to the public without restrictions and with user friendly operating documentation and tutorials. The software (executable only) can be downloaded from NITEC’s website at www.nitecllc.com. This integrated solution enables the design, optimization and operation of CO 2 -EOR processes for small and mid-sized operators, who currently cannot afford the expensive, time intensive solutions that the major oil companies enjoy. Based on one estimate, small oil fields comprise 30% of the of total economic resource potential for the application of CO 2 -EOR processes in the U.S. This corresponds to 21.7 billion barrels of incremental, technically recoverable oil using the current “best practices”, and 31.9 billion barrels using “next-generation” CO 2 -EOR techniques. The project included a Case Study of a prospective CO 2 -EOR candidate field in Wyoming by a small independent, Linc Energy Petroleum Wyoming, Inc. NITEC LLC has an established track record of developing innovative and user friendly software. The Principle Investigator is an experienced manager and engineer with expertise in software development, numerical techniques, and GUI applications. Unique, presently-proprietary NITEC technologies have been integrated into this application to further its ease of use and technical functionality.

54 ENVIRONMENTAL SCIENCES↗

3D Seismic Experimentation and Advanced Processing/Inversion Development for Investigations of the Shallow Subsurface

The work plan for this project was to develop and apply advanced seismic reflection and wide-angle processing and inversion techniques to high resolution seismic data for the shallow subsurface to seismically characterize the shallow subsurface at hazardous waste sites as an aid to containment and cleanup activities. We proposed to continue work on seismic data that we had already acquired under a previous DoE grant, as well as to acquire additional new datasets for analysis. The project successfully developed and/or implemented the use of 3D reflection seismology algorithms, waveform tomography and finite-frequency tomography using compressional and shear waves for high resolution characterization of the shallow subsurface at two waste sites. These two sites have markedly different near-surface structures, groundwater flow patterns, and hazardous waste problems. This is documented in the list of refereed documents, conference proceedings, and Rice graduate theses, listed below.

54 ENVIRONMENTAL SCIENCES↗

Fusion Materials Research at Oak Ridge National Laboratory in Fiscal Year 2015

The realization of fusion energy is a formidable challenge with significant achievements resulting from close integration of the plasma physics and applied technology disciplines. Presently, the most significant technological challenge for the near-term experiments such as ITER, and next generation fusion power systems, is the inability of current materials and components to withstand the harsh fusion nuclear environment. The overarching goal of the Oak Ridge National Laboratory (ORNL) fusion materials program is to provide the applied materials science support and understanding to underpin the ongoing Department of Energy (DOE) Office of Science fusion energy program while developing materials for fusion power systems. In doing so the program continues to be integrated both with the larger United States (US) and international fusion materials communities, and with the international fusion design and technology communities.This document provides a summary of Fiscal Year (FY) 2015 activities supporting the Office of Science, Office of Fusion Energy Sciences Materials Research for Magnetic Fusion Energy (AT-60-20-10-0) carried out by ORNL. The organization of this report is mainly by material type, with sections on specific technical activities. Four projects selected in the Funding Opportunity Announcement (FOA) solicitation of late 2011 and funded in FY2012-FY2014 are identified by “FOA” in the titles. This report includes the final funded work of these projects, although ORNL plans to continue some of this work within the base program.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

High power s-band vacuum load

Through a combination of experimentation and calculation the components of a novel room temperature dry load were successfully fabricated. These components included lossy ceramic cylinders of various lengths, thicknesses, and percent of silicon carbide (SiC). The cylinders were then assembled into stainless steel compression rings by differential heating of the parts and a special fixture. Post machining of this assembly provided a means for a final weld. The ring assemblies were then measured for S-parameters, individually and in pairs using a low-cost TE10 rectangular to TE01 circular waveguide adapter specially designed to be part of the final load assembly. Matched pairs of rings were measured for assembly into the final load, and a sliding short designed and fabricated to assist in determining the desired short location in the final assembly. The plan for the project was for Muons, Inc. to produce prototype loads for long-term testing at SLAC. The STTR funds for SLAC were to upgrade and operate their test station to ensure that the loads would satisfy their requirements. Phase III was to be the sale to SLAC of loads that Muons, Inc. would manufacture. However, an alternate solution that involved a rebuild of the old loads, reduced SLAC budget projections, and a relaxed time for the replacement of all loads meant that in-house labor will be used to do the upgrade without the need for the loads developed in this project. Consequently, the project was terminated before the long term testing was initiated. However, SLAC can use the upgraded test stand to compare the long-term performance of the ones produced in this project with their rebuilt loads when they are available.

42 ENGINEERING↗

Improvement of Representation of the Cloud-Aerosol Interaction in Large-Scale Models

The main achievements reached under the DOE award DE-SC0006788 are described. It is shown that the plan of the Project is completed. Unique results concerning cloud-aerosol interaction are obtained. It is shown that aerosols affect intensity of hurricanes. The effects of small aerosols on formation of ice in anvils of deep convective clouds are discovered, for the first time the mechanisms of drizzle formation are found and described quantitatively. Mechanisms of formation of warm rain are clarified and the dominating role of adiabatic processes and turbulence are stressed. Important results concerning the effects of sea spray on intensity of clouds and tropical cyclones are obtained. A novel methods of calculation of hail formation has been developed and implemented.

54 ENVIRONMENTAL SCIENCES↗

North American Board of Certified Energy Practitioners Final Report

The U.S. DOE’s Office of EERE National Solar Energy Technology Program (SETP) calls for a “National Accreditation and Certification Program for Installation and Acceptance of Photovoltaic Systems.” A near-term goal listed in the U.S. Photovoltaic Industry’s Roadmap, 2000 - 2020 is to work to establish standards, codes, and certifications which are essential for consumer protection and acceptance as part of the goal of building toward a viable future PV industry. This program paves the way for a voluntary national certification program for PV system practitioners and installers, initiation of the first steps toward certification of hardware, and reinforcement of all five of the technical objectives in the Systems category of SETPs Multi-Year technical Plan. Through this project, NABCEP will direct the continued initiation of and sustained implementation and administration of the NABCEP Solar PV Installer Certification Program (hereafter the “Program”). The NABCEP Program is a national, voluntary program designed to provide certification for those PV installers who demonstrate the requisite skills, abilities and knowledge typically required to install and maintain PV systems. The core document upon which the Program was developed and upon which the national exam is based, is referred to as the (Program) Task Analysis. It is a thorough descriptive document containing specific psychomotor and cognitive tasks for the purposes of identifying the types of training/assessment methods that apply. Psychomotor skills require measuring, assembling, fastening and related activities. Cognitive skills require knowledge processing, decision-making and computations. NABCEP effectively evaluates an applicant’s psychomotor skills through review of a candidate’s PV installations and hands-on training received. NABCEP evaluates the candidate’s cognitive skills through administration of its national Program exam. By first qualifying for and then obtaining the required passing score, NABCEP certificants receive an accreditation that upholds NABCEP’s standards of quality, compliance to applicable codes and safety in PV installation. The objectives of DOE’s National Solar Energy Technology Program (SETP) are intrinsic to NABCEP. As detailed in the PV Roadmap, the lifespan of a PV system is a function of reliability and value. PV system reliability is directly dependent upon the quality of components and, design, installation and maintenance of a system. The latter three are all core components of the NABCEP Task Analysis - accordingly NABCEP certified installers will be instrumental in improving reliability of systems through safe, code and manufacturer-compliant installation and necessary post-installation maintenance of PV systems. This will have the effect of ensuring and increasing the performance of installed systems and, as consumers realize the benefits of well-installed and maintained systems, increased demand will follow and manufacturers will respond - supporting further growth in the PV industry. Furthermore, as more NABCEP certified installers perform these installations and maintenance competently, additional installations (whole system re-installations) and unnecessary repairs can be avoided. This will drive down system costs. This combined with creation/enhancement of the DE-FG36-04GO14348/005 NABCEP Central Data Base of Installers – providing consumers with installation/maintenance service options will further reduce system costs and help meet the overall goal of reducing life cycle costs. As consumers receive more value from PV systems which are providing longer, trouble free, renewable energy, they will join the ranks of professionals and enthusiasts calling for reduced technological barriers to installation (particularly for grid-tied systems). States and utilities will react to pressure and begin easing onerous net-metering and other technological restrictions. The benefits of NABCEP’s Program will be evident to consumers, manufacturers, distributors, state energy officials and solar academic institutions. Consumers benefit through increased system performance and reduced costs. Manufacturers of PV and balance of system components as well as distributors support and benefit from NABCEP because of assurances that systems are installed in accordance to code (i.e., NEC) and their specifications, resulting in longer life. Collaborators including state energy officials (i.e., New York State Energy Research and Development Authority) benefit by knowing that rebate funds are spent on systems whose benefits will far exceed system costs. Program Objectives The improvements and advantages offered by a national voluntary certification program can only expand the horizons for photovoltaic applications.

14 SOLAR ENERGY↗

Kokkos User Support Infrastructure WBS STPM12 Milestone 2.

This report documents the completion of milestone STPM12-2 Kokkos User Support Infrastructure. The goal of this milestone was to develop and deploy an initial Kokkos support infrastructure, which facilitates communication and growth of the user community, adds a central place for user documentation and manages access to technical experts. Multiple possible support infrastructure venues were considered and a solution was put into place by Q1 of FY 18 consisting of (1) a Wiki programming guide, (2) github issues and projects for development planning and bug tracking and (3) a “Slack” channel for low latency support communications with the Kokkos user community. Furthermore, the desirability of a cloud based training infrastructure was recognized and put in place in order to support training events.

97 MATHEMATICS AND COMPUTING↗

Determining Unabated Airborne Radionuclide Emissions Monitoring Requirements Using Inventory-Based Methods

Compliance with the airborne radionuclide emission monitoring requirements in the National Emission Standards for Hazardous Air Pollutants (NESHAP; Title 40 of the U.S. Code of Federal Regulations Part 61, Subpart H) and State requirements in Washington Administrative Code 246–247: Radiation Protection – Air Emissions and 173-480: Ambient Air Quality Standards and Emission Limits for Radionuclides were evaluated for Pacific Northwest National Laboratory (PNNL) operations. Additional guidance may be found in the U.S. Department of Energy Handbook, Environmental Radiological Effluent Monitoring and Environmental Surveillance. To meet regulatory requirements, reviews of planned or proposed projects and activities provide the basis for implementing necessary monitoring adjustments or for implementing changes to projects and activities in a timely manner. Potential unabated offsite doses were evaluated for emission locations managed by PNNL and licensed to the Department of Energy. These locations were at facilities in Richland, Washington (i.e., the Hanford Site and PNNL Richland Campus) and in Sequim, Washington, (PNNL Marine Sciences Laboratory). This report describes the inventory-based methods and provides the results for the NESHAP assessment performed in 2017.

61 RADIATION PROTECTION AND DOSIMETRY↗

Targeted Mineral Carbonation to Enhance Wellbore Integrity [Final Report]

This project evaluated the potential to deploy targeted carbonation reactions to the leading edge of leaking CO 2 ganglion as a strategy for mitigating leakage from deep CO 2 injection sites. Tasks that were performed for this objective included (i) Maintaining and revising the project management and planning; (ii) Developing novel stimuli-responsive materials that release mineral silicates only below a target temperature; (iii) Imaging of subsamples from targeted carbonation demonstration experiments in porous media and fractured wellborn-zone environments; and (iv) Building models to best fit the experiment results and confirm the hypothesis driving this work.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗