Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Probabilistic Uncertainty”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 1,369 records · Page 76

HackAttack: Game-Theoretic Analysis of Realistic Cyber Conflicts

Game theory is appropriate for studying cyber conflict because it allows for an intelligent and goal-driven adversary. Applications of game theory have led to a number of results regarding optimal attack and defense strategies. However, the overwhelming majority of applications explore overly simplistic games, often ones in which each participant s actions are visible to every other participant. These simplifications strip away the fundamental properties of real cyber conflicts: probabilistic alerting, hidden actions, unknown opponent capabilities. In this paper, we demonstrate that it is possible to analyze a more realistic game, one in which different resources have different weaknesses, players have different exploits, and moves occur in secrecy, but they can be detected. Certainly, more advanced and complex games are possible, but the game presented here is more realistic than any other game we know of in the scientific literature. While optimal strategies can be found for simpler games using calculus, case-by-case analysis, or, for stochastic games, Q-learning, our more complex game is more naturally analyzed using the same methods used to study other complex games, such as checkers and chess. We define a simple evaluation function and employ multi-step searches to create strategies. We show that such scenarios can be analyzed, and find that in cases of extreme uncertainty, it is often better to ignore one s opponent s possible moves. Furthermore, we show that a simple evaluation function in a complex game can lead to interesting and nuanced strategies.

botnets↗

Evaluation of containment failure and cleanup time for Pu shots on the Z machine.

Between November 30 and December 11, 2009 an evaluation was performed of the probability of containment failure and the time for cleanup of contamination of the Z machine given failure, for plutonium (Pu) experiments on the Z machine at Sandia National Laboratories (SNL). Due to the unique nature of the problem, there is little quantitative information available for the likelihood of failure of containment components or for the time to cleanup. Information for the evaluation was obtained from Subject Matter Experts (SMEs) at the Z machine facility. The SMEs provided the State of Knowledge (SOK) for the evaluation. There is significant epistemic- or state of knowledge- uncertainty associated with the events that comprise both failure of containment and cleanup. To capture epistemic uncertainty and to allow the SMEs to reason at the fidelity of the SOK, we used the belief/plausibility measure of uncertainty for this evaluation. We quantified two variables: the probability that the Pu containment system fails given a shot on the Z machine, and the time to cleanup Pu contamination in the Z machine given failure of containment. We identified dominant contributors for both the time to cleanup and the probability of containment failure. These results will be used by SNL management to decide the course of action for conducting the Pu experiments on the Z machine.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Propulsion System Modeling and Simulation

The Aerospace Systems Design Laboratory at the School of Aerospace Engineering in Georgia Institute of Technology has developed a core competency that enables propulsion technology managers to make technology investment decisions substantiated by propulsion and airframe technology system studies. This method assists the designer/manager in selecting appropriate technology concepts while accounting for the presence of risk and uncertainty as well as interactions between disciplines. This capability is incorporated into a single design simulation system that is described in this paper. This propulsion system design environment is created with a commercially available software called iSIGHT, which is a generic computational framework, and with analysis programs for engine cycle, engine flowpath, mission, and economic analyses. iSIGHT is used to integrate these analysis tools within a single computer platform and facilitate information transfer amongst the various codes. The resulting modeling and simulation (M&S) environment in conjunction with the response surface method provides the designer/decision-maker an analytical means to examine the entire design space from either a subsystem and/or system perspective. The results of this paper will enable managers to analytically play what-if games to gain insight in to the benefits (and/or degradation) of changing engine cycle design parameters. Furthermore, the propulsion design space will be explored probabilistically to show the feasibility and viability of the propulsion system integrated with a vehicle.

Tai, Jimmy C. M.↗

Human reliability analysis studies from simulator experiments using Bayesian inference

Probabilistic Safety Assessment (PSA) of complex facilities is performed to arrive at the risk posed by them. PSA also accounts for the contribution of the human errors towards the overall risk through Human Reliability Analysis (HRA) in terms of Human Error Probability (HEP). Human operators are part of the system and do not work in isolation. Their performance is influenced by the context in which the actions are performed. As a result, quantification of HEP requires operator performance data under the given context. Some good sources of operator performance data are plant‘s operation data, simulator data and expert judgement. The plant operation data pertaining to HRA is generally sparse. In this situation, a full scope plant simulator provides a good alternative for operator performance data generation. Many of the currently practiced HRA methods have been developed by combining the empirical evidence with expert judgement and contain a lot of uncertainty in their estimates. Bayesian inference is suitable for updating the prior HRA estimates with the simulator evidence to obtain the posterior HEP. Here, posterior HEP has been calculated for postulated accident scenarios in advanced reactor (first of its kind) at design stage, using plant simulator.

97 MATHEMATICS AND COMPUTING↗

Underestimating Internal Variability Leads to Narrow Estimates of Climate System Properties

Probabilistic estimates of climate system properties often rely on the comparison of model simulations to observed temperature records and an estimate of the internal climate variability. In this study, we investigate the sensitivity of probability distributions for climate system properties in the Massachusetts Institute of Technology Earth System Model to the internal variability estimate. In particular, we derive probability distributions using the internal variability extracted from 25 different Coupled Model Intercomparison Project Phase 5 models. We further test the sensitivity by pooling variability estimates from models with similar characteristics. We find the distributions to be highly sensitive when estimating the internal variability from a single model. When merging the variability estimates across multiple models, the distributions tend to converge to a wider distribution for all properties. This suggests that using a single model to approximate the internal climate variability produces distributions that are too narrow and do not fully represent the uncertainty in the climate system property estimates.

58 GEOSCIENCES↗

When the Details Matter – Sensitivities in PRA Calculations That Could Affect Risk-Informed Decision-Making

As the U.S. Nuclear Regulatory Commission (NRC) continues its efforts to increase its use of risk information in decision making, the detailed, quantitative results of probabilistic risk assessment (PRA) calculations are coming under increased scrutiny. Where once analysts and users were not overly concerned with figure of merit variations that were less than an order of magnitude, now factors of two or even less can spark heated debate regarding modeling approaches and assumptions. The philosophical and policy-related aspects of this situation are well-recognized by the PRA community. On the other hand, the technical implications for PRA methods and modeling have not been as widely discussed. This paper illustrates the potential numerical effects of choices as to the details of models and methods for parameter estimation with three examples: 1) the selection of the time period data for parameter estimation, and issues related to component boundary and failure mode definitions; 2) the selection of alternative diffuse prior distributions, including the constrained noninformative prior distribution, in Bayesian parameter estimation; and 3) the impact of uncertainty in calculations for recovery of offsite power.

99 GENERAL AND MISCELLANEOUS↗

Reassessing Double-Ended Guillotine Break Requirements: Evidence-Based Analysis of Regulatory Assumptions After Five Decades of Nuclear Operation

After five decades of nuclear power operation encompassing more than 20,000 reactor-years across 35 countries and 647 reactors, zero double-ended guillotine breaks (DEGBs) have been documented in commercial reactor coolant systems—despite DEGB being the fundamental design-basis assumption driving Emergency Core Cooling System (ECCS) sizing, structural protection requirements, and containment design specifications. This report examines the basis for DEGB requirements in nuclear power plant design. The DEGB postulate assumes the instantaneous, complete circumferential severance of the largest diameter pipes in reactor coolant systems, driving major design requirements under 10 Code of Federal Regulations 50.46, General Design Criterion 4 and containment design specifications. The United States (4,880 reactor-years) and France (2,505 reactor-years) contribute the largest operational datasets. Probabilistic assessments estimate direct DEGB occurrence probabilities with extremely low event frequencies, far below the 10-5/reactor-year thresholds typically used to define non-credible events in nuclear-safety analyses; i.e., events with probability this low fall into beyond-design-basis events. Current material-science knowledge demonstrates that the ductile steel materials used in nuclear piping systems exhibit stable crack-growth behavior fundamentally incompatible with instantaneous severance. International regulatory experience, particularly Germany’s comprehensive break-preclusion implementation, and successful leak-before-break (LBB) applications in almost all of U.S. pressurized water reactor units validate that alternatives can maintain safety performance while reducing economic burden. Current DEGB protection systems impose estimated lifetime costs of hundreds of millions of dollars per unit, over the life of a plant across the nuclear industry (including ongoing costs), representing substantial resource allocation toward scenarios with extremely low probability. Although this report acknowledges uncertainties regarding long-term aging effects, potential synergistic degradation mechanisms, and site-specific seismic considerations that warrant continued evaluation as regulatory policy evolves, there remains no documented evidence that a DEGB has occurred as a consequence of the conditions or mechanisms described in this report. This report acknowledges the Nuclear Regulatory Commission’s (NRC’s) recent efforts—outlined in the draft Interim Staff Guidance (ISG) NRC-DSS-ISG-2025-XX (“Treatment of Certain Loss-of-Coolant Accident Locations as Beyond-Design-Basis Accidents Draft Interim Staff Guidance”)—to reduce overly conservative requirements for large-break loss of coolant accidents through technical justifications and exemptions. However, extensive operating experience and validated methodologies—such as LBB and in-service inspection programs—demonstrate that the probability of a DEGB in reactor coolant-loop piping is extremely low, even under seismic conditions. The authors and reviewers of this report recommend that DEGB be removed as a design-basis event through formal rulemaking, rather than case-by-case exemptions, to better reflect credible failure modes, align with current data, and align with modern, risk-informed safety analysis.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Thoughts Without Content are Empty, Intuitions Without Concepts are Blind - Determinism and Contingency Revisited

Was the emergence of life a predictable outcome of chemical evolution on earth? Could evolution produce life very different from ours? These are one of the oldest questions in the field of the origin of life that not only have broad philosophical implications but also impact how we approach the problem from the methodological standpoint. Framing the issue in terms of the dichotomy between contingency and determinism is not a fortunate because these two terms in their conventional meaning are neither mutually exclusive nor jointly exhaustive. Determinism, represented in natural sciences by Newtonian physics, relies on the assumption that every event is causally determined by a chain of previous events. In the context of the origin of life it means that once the initial conditions on the early earth have been specified further evolution follows inevitably. Considering uncertainties about conditions on the prebiotic earth, many plausible sets of initial conditions can be defined, each followed by a separate deterministic trajectory. This conventional understanding of determinism does not admit contingency. Further, it has no implications for evaluating how many sets of initial conditions lead to the emergence of life. It appears that a better framing of the problem is as follows: given plausible sets of initial conditions on the early earth how probable and broadly spread are evolutionary trajectories that lead to life? Instead of undertaking an impossible task of specifying microscopic initial conditions for all components of the system one uses a reduced representation of this system and specify only a small set of essential macroscopic parameters, values (or ranges of values) of which can be identified, inferred or estimated from experiment, theory or historical record. The following evolutionary trajectories are still governed by laws of physics and chemistry but become probabilistic and "contingency" is admitted as variations in other variables in the system. A similar reasoning is common in other fields of science, for example in statistical mechanics. Some trajectories lead to life, perhaps in different forms, whereas others do not. Of our true interest is the ratio of these two outcomes. The issue of determinism does not directly enter the picture. The debate about the likelihood of the emergence of life is quite old. One view holds that the origin of life is an event governed by chance, and the result of so many random events (contingencies) is unpredictable. This view was eloquently expressed by Monod. In his book "Chance or Necessity" he argued that life was a product of "nature's roulette." In an alternative view, expressed in particular by deDuve and Morowitz, the origin of life is considered a highly probable or even inevitable event (although its details need not be determined in every respect). Only in this sense the origin of life can be considered a "deterministic event".

Pohorille, Andrew↗

Estimating Controller Intervention Probabilities for Optimized Profile Descent Arrivals

Simulations of arrival traffic at Dallas/Fort-Worth and Denver airports were conducted to evaluate incorporating scheduling and separation constraints into advisories that define continuous descent approaches. The goal was to reduce the number of controller interventions required to ensure flights maintain minimum separation distances of 5 nmi horizontally and 1000 ft vertically. It was shown that simply incorporating arrival meter fix crossing-time constraints into the advisory generation could eliminate over half of the all predicted separation violations and more than 80% of the predicted violations between two arrival flights. Predicted separation violations between arrivals and non-arrivals were 32% of all predicted separation violations at Denver and 41% at Dallas/Fort-Worth. A probabilistic analysis of meter fix crossing-time errors is included which shows that some controller interventions will still be required even when the predicted crossing-times of the advisories are set to add a 1 or 2 nmi buffer above the minimum in-trail separation of 5 nmi. The 2 nmi buffer was shown to increase average flight delays by up to 30 sec when compared to the 1 nmi buffer, but it only resulted in a maximum decrease in average arrival throughput of one flight per hour.

continous descent arrivals↗

Distributed Smart Grid Asset Control Strategies for Providing Ancillary Services

With large-scale plans to integrate renewable generation driven mainly by state-level renewable portfolio requirements, more resources will be needed to compensate for the uncertainty and variability associated with intermittent generation resources. Distributed assets can be used to mitigate the concerns associated with renewable energy resources and to keep costs down. Under such conditions, performing primary frequency control using only supply-side resources becomes not only prohibitively expensive but also technically difficult. It is therefore important to explore how a sufficient proportion of the loads could assume a routine role in primary frequency control to maintain the stability of the system at an acceptable cost. The main objective of this project is to develop a novel hierarchical distributed framework for frequency based load control. The framework involves two decision layers. The top decision layer determines the optimal gain for aggregated loads for each load bus. The gains are computed using decentralized robust control methods, and will be broadcast to the corresponding participating loads every control period. The second layer consists of a large number of heterogeneous devices, which switch probabilistically during contingencies so that aggregated power change matches the desired amount according to the most recently received gains. The simulation results show great potential to enable systematic design of demand-side primary frequency control with stability guarantees on the overall power system. The proposed design systematically accounts for the interactions between the total load response and bulk power system frequency dynamics. It also guarantees frequency stability under a wide range of time varying operating conditions. The local device-level load response rules fully respect the device constraints (such as temperature setpoint, compressor time delays of HVACs, or arrival and departure of the deferrable loads), which are crucial for implementing real load control programs. The promise of autonomous, Grid Friendly™ response by smart appliances in the form of under-frequency load shedding was demonstrated in the GridWise Olympic Peninsula Demonstration in 2006. Each controller monitored the power grid voltage signal and requested that electrical load be shed by its appliance whenever electric power-grid frequency fell below 59.95 Hz. The controllers and their appliances responded reliably to each shallow under-frequency event, which was an average of one event per day and shed their loads for the durations of these events. Another objective of this project was to perform extensive simulation studies to investigate the impact of a population of Grid Friendly™ Appliances (GFAs) on the bulk power system frequency stability. The GFAs considered in this report are represented as demonstration units with water heaters individually modeled.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Long-Term Performance of Transuranic Waste Inadvertently Disposed in a Shallow Land Burial Trench at the Nevada Test Site

In 1986, 21 m3 of transuranic (TRU) waste was inadvertently disposed in a shallow land burial trench at the Area 5 Radioactive Waste Management Site on the Nevada Test Site. U.S. Department of Energy (DOE) TRU waste must be disposed in accordance with Title 40, Code of Federal Regulations (CFR), Part 191, Environmental Radiation Protection Standard for Management and Disposal of Spent Nuclear Fuel, High-Level, and Transuranic Radioactive Wastes. The Waste Isolation Pilot Plant is the only facility meeting these requirements. The National Research Council, however, has found that exhumation of buried TRU waste for disposal in a deep geologic repository may not be warranted when the effort, exposures, and expense of retrieval are not commensurate with the risk reduction achieved. The long-term risks of leaving the TRU waste in-place are evaluated in two probabilistic performance assessments. A composite analysis, assessing the dose from all disposed waste and interacting sources of residual contamination, estimates an annual total effective dose equivalent (TEDE) of 0.01 mSv, or 3 percent of the dose constraint. A 40 CFR 191 performance assessment also indicates there is reasonable assurance of meeting all requirements. The 40 CFR 191.15 annual mean TEDE for a member of the public is estimated to reach a maximum of 0.055 mSv at 10,000 years, or approximately 37 percent of the 0.15 mSv individual protection requirement. In both assessments greater than 99 percent of the dose is from co-disposed low-level waste. The simulated probability of the 40 CFR 191.13 cumulative release exceeding 1 and 10 times the release limit is estimated to be 0.0093 and less than 0.0001, respectively. Site characterization data and hydrologic process modeling support a conclusion of no groundwater pathway within 10,000 years. Monte Carlo uncertainty analysis indicates that there is reasonable assurance of meeting all regulatory requirements. Sensitivity analysis indicates that the results are insensitive to TRU waste-related parameters. Limited quantities of TRU waste in a shallow land burial trench can meet DOE performance objectives for disposal of TRU waste and contribute negligibly to disposal site risk. Leaving limited quantities of buried TRU waste in-place may be preferred over retrieval for disposal in a deep geologic repository.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Optimal Power Flow for Distribution Systems under Uncertain Forecasts

The paper focuses on distribution systems featuring renewable energy sources and energy storage devices, and develops an optimal power flow (OPF) approach to optimize the system operation in spite of forecasting errors. The proposed method builds on a chance-constrained multi-period AC OPF formulation, where probabilistic constraints are utilized to enforce voltage regulation with a prescribed probability. To enable a computationally affordable solution approach, a convex reformulation of the OPF task is obtained by resorting to i) pertinent linear approximations of the power flow equations, and ii) convex approximations of the chance constraints. Particularly, the approximate chance constraints provide conservative bounds that hold for arbitrary distributions of the forecasting errors. An adaptive optimization strategy is then obtained by embedding the proposed OPF task into a model predictive control framework.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Special Analysis for the Disposal of the Consolidated Edison Uranium Solidification Project Waste Stream at the Area 5 Radioactive Waste Management Site, Nevada National Security Site, Nye County, Nevada

The purpose of this Special Analysis (SA) is to determine if the Oak Ridge (OR) Consolidated Edison Uranium Solidification Project (CEUSP) uranium-233( 233 U) waste stream (DRTK000000050, Revision 0) is acceptable for shallow land burial (SLB) at the Area 5 Radioactive Waste Management Site (RWMS) on the Nevada National Security Site (NNSS). The CEUSP 233 U waste stream requires a special analysis because the concentrations of thorium- 229 ( 229 Th), 230 Th, 232 U, 233 U, and 234 U exceeded their NNSS Waste Acceptance Criteria action levels. The acceptability of the waste stream is evaluated by determining if performance assessment (PA) modeling provides a reasonable expectation that SLB disposal is protective of human health and the environment. The CEUSP 233 U waste stream is a long-lived waste with unique radiological hazards. The SA evaluates the long-term acceptability of the CEUSP 233 U waste stream for near-surface disposal as a two tier process. The first tier, which is the usual SA process, uses the approved probabilistic PA model to determine if there is a reasonable expectation that disposal of the CEUSP 233 U waste stream can meet the performance objectives of U.S. Department of Energy Manual DOE M 435.1-1, “Radioactive Waste Management,” for a period of 1,000 years (y) after closure. The second tier addresses the acceptability of the OR CEUSP 233 U waste stream for near-surface disposal by evaluating long-term site stability and security, by performing extended (i.e., 10,000 and 60,000 y) modeling analyses, and by evaluating the effect of containers and the depth of burial on performance. Tier I results indicate that there is a reasonable expectation of compliance with all performance objectives if the OR CEUSP 233 U waste stream is disposed in the Area 5 RWMS SLB disposal units. The maximum mean and 95 th percentile PA results are all less than the performance objective for 1,000 y. Monte Carlo uncertainty analysis indicates that there is a high likelihood of compliance with all performance objectives. Tier II results indicate that the long-term performance of the OR CEUSP 233 U waste stream is protective of human health and the environment. The Area 5 RWMS is located in one of the least populated and most arid regions of the U.S. Site characterization data indicate that infiltration of precipitation below the plant root zone at 2.5 meters (8.2 feet) ceased 10,000 to 15,000 y ago. The site is not expected to have a groundwater pathway as long as the current arid climate persists. The national security mission of the NNSS and the location of the Area 5 RWMS within the Frenchman Flat Corrective Action Unit require that access controls and land use restrictions be maintained indefinitely. PA modeling results for 10,000 to 60,000 y also indicate that the OR CEUSP 233 U waste stream is acceptable for near-surface disposal. The mean resident air pathway annual total effective dose (TED), the resident all-pathways annual TED, and the acute drilling TED are less than their performance objectives for 10,000 y after closure. The mean radon-222 (222Rn) flux density exceeds the performance objective at 4,200 y, but this is due to waste already disposed at the Area 5 RWMS and is only slightly affected by disposal of the CEUSP 233 U. The peak resident all-pathways annual TED from CEUSP key radionuclides occurs at 48,000 y and is less than the 0.25 millisievert performance objective. Disposal of the OR CEUSP 233 U waste stream in a typical SLB trench slightly increases PA results. Increasing the depth was found to eliminate any impacts of the OR CEUSP 233 U waste stream. Containers could not be shown to have any significant impact on performance due to the long half-life of the waste stream and a lack of data for pitting corrosion rates of stainless steel in soil. The results of the SA indicate that all performance objectives can be met with disposal of the OR CEUSP 233 U waste stream in the SLB units at the Area 5 RWMS. The long-term performance of the OR CEUSP 233 U waste stream disposed in the near surface is protective of human health and the environment. The waste stream is recommended for disposal without conditions.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An Application of the SSHAC Level 3 Process to the Probabilistic Seismic Hazard Analysis for Nuclear Facilities at the Hanford Site, Eastern Washington, USA

Under the sponsorship of the US Department of Energy (DOE) and the electric utility Energy Northwest, the Pacific Northwest National Laboratory (PNNL) is conducting a probabilistic seismic hazard analysis (PSHA) within the framework of a SSHAC Level 3 procedure (Senior Seismic Hazard Analysis Committee; Budnitz et al., 1997). Specifically, the project is being conducted following the guidelines and requirements specified in NUREG-2117 (USNRC, 2012b) and consistent with approach given in the American Nuclear Standard ANSI/ANS-2.29-2008 Probabilistic Seismic Hazard Analysis. The collaboration between DOE and Energy Northwest is spawned by the needs of both organizations for an accepted PSHA with high levels of regulatory assurance that can be used for the design and safety evaluation of nuclear facilities. DOE committed to this study after performing a ten-year review of the existing PSHA, as required by DOE Order 420.1C. The study will also be used by Energy Northwest as a basis for fulfilling the NRC’s 10CFR50.54(f) requirement that the western US nuclear power plants conduct PSHAs in conformance with SSHAC Level 3 procedures. The study was planned and is being carried out in conjunction with a project Work Plan, which identifies the purpose of the study, the roles and responsibilities of all participants, tasks and their associated schedules, Quality Assurance (QA) requirements, and project deliverables. New data collection and analysis activities are being conducted as a means of reducing the uncertainties in key inputs to the PSHA. It is anticipated that the results of the study will provide inputs to the site response analyses at multiple nuclear facility sites within the Hanford Site and at the Columbia Generating Station.

Nuclear Facilities↗

Probabilistic Seismic Hazards Update for LLNL

Fugro Consultants, Inc. (FCL) completed the Probabilistic Seismic Hazard Analysis (PSHA) performed for Building 332 at the Lawrence Livermore National Laboratory (LLNL), near Livermore, CA. The study performed for the LLNL site includes a comprehensive review of recent information relevant to the LLNL regional tectonic setting and regional seismic sources in the vicinity of the site and development of seismic wave transmission characteristics. The Seismic Source Characterization (SSC), documented in Project Report No. 2259-PR-02 (FCL, 2015b), and Ground Motion Characterization (GMC), documented in Project Report No. 2259-PR-06 (FCL, 2015a) were developed in accordance with ANS/ANSI 2.29- 2008 Level 2 PSHA guidelines. The ANS/ANSI 2.29-2008 Level 2 PSHA framework is documented in Project Report No. 2259-PR-05 (FCL, 2016a). The Hazard Input Document (HID) for input into the PSHA developed from the SSC and GMC is presented in Project Report No. 2259-PR-04 (FCL, 2016b). The site characterization used as input for development of the idealized site profiles including epistemic uncertainty and aleatory variability is presented in Project Report No. 2259-PR-03 (FCL, 2015c). The PSHA results are documented in Project Report No. 2259-PR-07 (FCL, 2016c).

58 GEOSCIENCES↗

NMME Monthly / Seasonal Forecasts for NASA SERVIR Applications Science

This work details use of the North American Multi-Model Ensemble (NMME) experimental forecasts as drivers for Decision Support Systems (DSSs) in the NASA / USAID initiative, SERVIR (a Spanish acronym meaning "to serve"). SERVIR integrates satellite observations, ground-based data and forecast models to monitor and forecast environmental changes and to improve response to natural disasters. Through the use of DSSs whose "front ends" are physically based models, the SERVIR activity provides a natural testbed to determine the extent to which NMME monthly to seasonal projections enable scientists, educators, project managers and policy implementers in developing countries to better use probabilistic outlooks of seasonal hydrologic anomalies in assessing agricultural / food security impacts, water availability, and risk to societal infrastructure. The multi-model NMME framework provides a "best practices" approach to probabilistic forecasting. The NMME forecasts are generated at resolution more coarse than that required to support DSS models; downscaling in both space and time is necessary. The methodology adopted here applied model output statistics where we use NMME ensemble monthly projections of sea-surface temperature (SST) and precipitation from 30 years of hindcasts with observations of precipitation and temperature for target regions. Since raw model forecasts are well-known to have structural biases, a cross-validated multivariate regression methodology (CCA) is used to link the model projected states as predictors to the predictands of the target region. The target regions include a number of basins in East and South Africa as well as the Ganges / Baramaputra / Meghna basin complex. The MOS approach used address spatial downscaling. Temporal disaggregation of monthly seasonal forecasts is achieved through use of a tercile bootstrapping approach. We interpret the results of these studies, the levels of skill by several metrics, and key uncertainties.

Robertson, Franklin R.↗

Performing a multi-unit level-3 PSA with MACCS

MACCS (MELCOR Accident Consequence Code System), WinMACCS, and MelMACCS now facilitate a multi-unit consequence analysis. MACCS evaluates the consequences of an atmospheric release of radioactive gases and aerosols into the atmosphere and is most commonly used to perform probabilistic safety assessments (PSAs) and related consequence analyses for nuclear power plants (NPPs). WinMACCS is a user-friendly preprocessor for MACCS. MelMACCS extracts source-term information from a MELCOR plot file. The current development can combine an arbitrary number of source terms, representing simultaneous releases from a multi-unit facility, into a single consequence analysis. The development supports different release signatures, fission product inventories, and accident initiation times for each unit. The treatment is completely general except that the model is currently limited to collocated units. A major practical consideration for performing a multi-unit PSA is that a comprehensive treatment for more than two units may involve an intractable number of combinations of source terms. This paper proposes and evaluates an approach for reducing the number of calculations to be tractable, even for sites with eight or ten units. The approximation error introduced by the approach is acceptable and is considerably less than other errors and uncertainties inherent in a Level 3 PSA.

42 ENGINEERING↗

Estimating the Rate of Occurrence of Renal Stones in Astronauts

Changes in urine chemistry, during and post flight, potentially increases the risk of renal stones in astronauts. Although much is known about the effects of space flight on urine chemistry, no inflight incidence of renal stones in US astronauts exists and the question "How much does this risk change with space flight?" remains difficult to accurately quantify. In this discussion, we tackle this question utilizing a combination of deterministic and probabilistic modeling that implements the physics behind free stone growth and agglomeration, speciation of urine chemistry and published observations of population renal stone incidences to estimate changes in the rate of renal stone presentation. The modeling process utilizes a Population Balance Equation based model developed in the companion IWS abstract by Kassemi et al. (2016) to evaluate the maximum growth and agglomeration potential from a specified set of urine chemistry values. Changes in renal stone occurrence rates are obtained from this model in a probabilistic simulation that interrogates the range of possible urine chemistries using Monte Carlo techniques. Subsequently, each randomly sampled urine chemistry undergoes speciation analysis using the well-established Joint Expert Speciation System (JESS) code to calculate critical values, such as ionic strength and relative supersaturation. The Kassemi model utilizes this information to predict the mean and maximum stone size. We close the assessment loop by using a transfer function that estimates the rate of stone formation from combining the relative supersaturation and both the mean and maximum free stone growth sizes. The transfer function is established by a simulation analysis which combines population stone formation rates and Poisson regression. Training this transfer function requires using the output of the aforementioned assessment steps with inputs from known non-stone-former and known stone-former urine chemistries. Established in a Monte Carlo system, the entire renal stone analysis model produces a probability distribution of the stone formation rate and an expected uncertainty in the estimate. The utility of this analysis will be demonstrated by showing the change in renal stone occurrence predicted by this method using urine chemistry distributions published in Whitson et al. 2009. A comparison to the model predictions to previous assessments of renal stone risk will be used to illustrate initial validation of the model.

gravitational physiology↗